This file is a Data Item Matrix for the T-ARC(X) Cable Repair Ship Functional Design phase, listing required deliverables and their completion levels for Phase I of the acquisition. The matrix contains approximately 120 required deliverables spanning various technical areas including hull design, machinery systems, electrical systems, piping systems, and ship arrangements.

The matrix indicates many deliverables are expected to be completed at 100% level during the Functional Design phase, while others range from 5% to 90% completion. Key deliverables include 3-D Product Models (30% completion), Design Review documentation (100%), various system reports and drawings for hull, mechanical, and electrical systems, and verification/testing documentation. The deliverables are categorized as either J-2a or J-2b items, with some new items added that weren't in previous versions. This matrix appears to support the Navy's revised acquisition strategy for the T-ARC(X) program to achieve greater design maturity before Detail Design and Construction.

View the file

Other files

File Type Posted
Enclosure 1 Market Research Questionnaire - December 2025.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Functional Design DIs

DRL TitleOriginLevel of CompletionSuggested ChangesRationale
3-D Product ModelJ-2b30%
Regulatory Body Communications and Correspondence with EnclosuresJ-2a100%
Design Maturity Assessment ReportJ-2a100%
Design Summary ReportJ-2a100%
Design Review Agendas, Presentations, and MinutesJ-2a100%
Preliminary Design Review Data Item Status Summary, Agenda, Presentation, and MinutesJ-2b100%
Functional Design Review Data Item Status Summary, Agenda, Presentation, and MinutesNew100%
Working Groups Meeting Agendas, Presentations, and MinutesNew100%
Special Study ReportJ-2bAs Needed
Speed and Power ReportJ-2a100%
Seakeeping Performance ReportJ-2a100%
Maneuvering Performance ReportJ-2a100%
Intact and Damage Stability ReportJ-2a100%
Hull Lines DrawingJ-2a100%
Appendages DrawingJ-2a100%
Compartment Access DrawingJ-2b100%
Trim and Stability CalculationsJ-2a100%
Weight Control PlanJ-2a100%
Preliminary Allocated Baseline Weight EstimateJ-2a100%
Model Test Program PlanJ-2a100%
Resistance, Appendage Alignment, Wake Survey, and Self-Propulsion (Stock Propeller) Model Test ReportJ-2a100%
Maneuvering Model Test ReportJ-2a100%
Model Test Data, Video, and PhotographsJ-2a100%
Airborne Noise Analysis ReportJ-2a50%
Vibration Analysis Report and FEA FilesJ-2b100%
Airborne Noise and Structureborne Vibration Control PlanJ-2b100%
Structural Design Criteria ReportJ-2a100%
Standard Structural DetailsJ-2b100%
Midship and Other Hull Sections DrawingJ-2a100%
Hull Scantling Plans and Profiles DrawingJ-2a100%
Superstructure Scantling DrawingJ-2a100%
Shell Expansion DrawingJ-2b100%
Mast DrawingJ-2b90%
Deck Loading Capacity DrawingJ-2b100%
Foundation Drawings, Analysis Reports, and FEA FilesJ-2b5%
Hull Girder Longitudinal Strength Analysis (LSA) ReportJ-2b100%
DLA and SFA Analysis ApproachNew100%
DLA and SFA Analysis Report(s)J-2b50%
DPS Performance ReportJ-2a100%
Main Machinery System ReportJ-2a100%
Machinery Arrangement DrawingJ-2a100%
Equipment Removal PlanJ-2a100%
Endurance Fuel CalculationsJ-2a100%
Annual Fuel Consumption CalculationsJ-2b100%
Power Management System Description of OperationsJ-2b60%
Propulsion Control System Description of OperationsJ-2b70%
MCCS Description of OperationsJ-2b90%
MCCS Block Wiring and System Architecture DiagramsJ-2b70%
MCCS Input/Output Signal ListJ-2b20%
Dynamic Positioning System Description of OperationsJ-2b100%
Dynamic Positioning System Control System Description of OperationsJ-2b80%
Engine Emissions Control Systems ReportJ-2b100%
Combustion Air Intake and Exhaust System DiagramJ-2b20%
Combustion Air Intake and Exhaust System AnalysisJ-2b50%
Documented Service Record ReportJ-2b100%
ABS Design Assessment LetterJ-2b100%
Engine Low-Load Operation ReportJ-2b100%
Propulsion SSV Configuration Management PlanJ-2b100%
Propulsion SSV Regulatory Body Communications and Correspondence with EnclosuresJ-2b100%
Electrical System Fault Current AnalysisJ-2b80%
Electrical System One-Line DiagramJ-2a100%
Master Equipment ListJ-2a100%
Critical Equipment ListJ-2b100%
Electrical Power Load AnalysisJ-2a100%
System Harmonic Analysis and ReportJ-2b30%
Subtransient Reactance CalculationsJ-2b80%
Voltage Drop CalculationsJ-2b100%
Electrical Power Quality ReportJ-2b100%
Arc Flash Hazard Analysis ReportJ-2b60%
Power Systems Wiring Deck PlanJ-2b100%
Lighting System One-Line DiagramJ-2b100%
Topside Arrangement DrawingJ-2a100%
Integrated Topside Design PlanJ-2b100%
3-D Integrated Topside Design ModelJ-2b30%
Communications Requirements MatricesJ-2a100%
CCTV Block Wiring and System Architecture DiagramJ-2b20%
Lighting System Design ReportJ-2b80%
Ship Control, Integrated Bridge, and Navigation Systems Block and Elementary Wiring DiagramJ-2b80%
IBS Block Wiring and System Architecture DiagramJ-2b100%
IBS Input/Output Signal ListJ-2b20%
Sea Plow System ReportJ-2a100%
Sea Plow System DrawingJ-2a100%
ROV System ReportJ-2a100%
ROV System DrawingJ-2a100%
Cable Stowage and Handling ReportJ-2a100%
Cable Stowage and Handling DrawingJ-2a100%
Cable Gear Stowage and Handling DrawingJ-2a100%
Sonar Systems Arrangement DrawingJ-2a100%
CHE Description of OperationsJ-2b100%
CHE Block Wiring and System Architecture DiagramJ-2b70%
CHE Control Systems Input/Output Signal ListJ-2b20%
MSN Input/Output Signal ListJ-2b20%
CS SSV Configuration Management PlanJ-2b100%
HVAC System ReportJ-2a100%
Refrigeration System ReportJ-2a100%
Refrigeration Plant Cooling Load CalculationsJ-2b100%
HVAC Load CalculationsJ-2b100%
HVAC System Equipment List and DiagramJ-2b100%
HVAC Design Criteria ManualJ-2b100%
Piping Systems Design ReportsJ-2b90%
Fresh and Potable Water ServiceJ-2b100%
Freshwater Production and Technical Services WaterJ-2b100%
Low Temperature Freshwater CoolingJ-2b100%
Firemain and SprinklingJ-2b100%
AFFF FirefightingJ-2b100%
Fixed Fire Extinguishing (Clean Agent, Galley)J-2b100%
Washdown CountermeasuresJ-2b100%
WatermistJ-2b100%
Ballast/De-ballast and Ballast Water TreatmentJ-2b100%
Main and Auxiliary Seawater Cooling ServicesJ-2b100%
Lube Oil Service, Fill, Transfer, and PurificationJ-2b100%
Fuel Oil Service, Fill, Transfer, and PurificationJ-2b100%
Sanitary DrainJ-2b100%
Air Escapes, Sounding Tubes, and OverflowsJ-2b100%
Bilge and Oily Waste/Waste Oil Collection and TransferJ-2b100%
HVAC and Chilled WaterJ-2b100%
Machinery Combustion ExhaustJ-2b100%
Ship's Service RefrigerationJ-2b100%
EDG AuxiliariesJ-2b100%
Lifting Appliances DrawingJ-2a100%
Deck Systems ReportJ-2a100%
Stores Handling and Stowage Arrangement DrawingJ-2b100%
Anchoring, Mooring and Fendering, and Towing Arrangement DrawingJ-2b50%
Boat Stowage and Handling DrawingJ-2b70%
Pollution Control Systems ReportJ-2b90%
Airflow, Stack Gas Dispersion, and Stack Design ReportJ-2b100%
Area/Volume ReportJ-2a100%
General Arrangement DrawingJ-2a100%
Impressed Current Cathodic Protection System Block Wiring DiagramJ-2b20%
Food Service Space DrawingJ-2b75%
Pilot House, Naval Communications Center, and Navigational Equipment Spaces DrawingJ-2b75%
Berthing and Sanitary Space DrawingJ-2b75%
Leisure and Public Spaces DrawingJ-2b75%
Medical Facility DrawingJ-2b75%
Laundry Space DrawingJ-2b75%
Administrative Space DrawingJ-2b75%
Engineer's Operating Station DrawingJ-2b75%
Workshop and Maintenance Area DrawingJ-2b75%
Ship's Store, Storerooms, Lockers, and Special Stowage DrawingJ-2b75%
Mission Area DrawingJ-2b75%
Magazine and Ready Service Locker Arrangement Drawing and Outfit ListJ-2b75%
Armory and Gun Mount Arrangement Drawing and Outfit ListJ-2b75%
Post-Award Conference Agenda, Presentation, and MinutesJ-2a100%
Cost EstimatesJ-2a100%
Phase I Master ScheduleJ-2a100%
Notional Phase II ScheduleJ-2a100%
Contract Problem Identification ReportsJ-2bAs Needed
Requirements Verification MatrixJ-2a100%
Integrated Ship Verification Program PlanJ-2b50%