Enclosure (1) USS ROSS DDG 71 EDSRA.pdf

PDF 145 KB Posted

Attached to
USS ROSS (DDG 71) Extended Docking Selected Restricted Availability (EDSRA)
Solicitation number
N00024-22-R-4422
Issued by

About this file

This sources sought announcement is seeking information from potential offerors for the USS ROSS (DDG 71) Extended Docking Selected Restricted Availability (EDSRA) availability scheduled for July 2022 through November 2023. The Naval Sea Systems Command is conducting market research to determine industry capability and interest in performing maintenance, repair, and modernization work estimated between 70,000 and 15,000 man-days across multiple trades and spaces aboard the ship. Responses are requested by May 27th, 2021 to provide information on company capabilities, certifications, facilities, and past performance relevant to the scope of work outlined in Enclosure 1, which includes tasks such as hull repairs, propulsion system work, electrical distribution equipment maintenance, auxiliary system repairs, and modernization efforts involving weapons, sensors and other C5I systems. The anticipated solicitation release date is September 29th, 2021.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enclosure (1) | Page i

Enclosure (1): Outline of some of the work anticipated to be completed under the expected USS

ROSS (DDG 71) FY22 EDSRA

A. General

a. Competition Area: Coast Wide – East Coast

b. Rough Estimate Man-Days:

i. Maintenance Ship Yard ~ 70,000

ii. Modernization Ship Yard ~ 15,000

c. Ship Particulars:

i. Length: 510 ft, 10.6 inches

ii. Beam: 66 ft 5 inches (breadth, Molded Maximum

iii. Draft: 21 ft 9 inches (Full Load Condition)

iv. Displacement: 9191 tons

v. Mean Navigable Water depth draft: >30 ft 8 inches

vi. Air Draft: 150.5 ft.

d. Facility Particulars:

i. Pier Length: > 509 feet 6 inches

ii. Electrical: 4800 amps, 450 volts, 60 hz, 3 ph (UFC 4-150-02 table C-7)

iii. Potable Water: 9500 GPD (UFC 4-150-02 Table C-4)

iv. Sea Water: 1250 GPM (UFC 4-150-02 Table C-3), 150 PSI measured at the most remote outlet (UFC 4-150-02, Para 3-3.2.1)

v. Sewage: Ability to accommodate and dispose of 10,000 GPD of effluent and 10,000 GPD of waste water

vi. Mean Pier Water depth draft: >33 ft

vii. Dry Dock to support DDG51 Class Ship

B. The Availability’s modernization scope will include a significant amount of work across multiple trades and spaces. The work will largely consist of CANES HW 1.2, AN/32(V)6, AN/SRQ-4, SSEE Mods, DDG HM&E MOD, ADNS and Removal of Unused MCS Cables. The successful contractor must be able to provide an integrated production schedule that incorporates AIT, 3rd Party contractors, and Government workload. Key trades & efforts include: structural welding, cabling pulling, piping, electrical including fiber optic cabling/connectorization, and ventilation work. Both the prime contractor and AIT contractors will execute the structural/industrial work. Further direction will be provided in the work specification package to define the work split.

C. The Availability’s maintenance requirements are expected to include the following types of work:

Hull Structure

Assessments.

Condition-based repair and replacement of structural decks.

Condition-based repair and replacement of superstructure and deckhouse level decks. This will include thicker deck plating.

Condition-based repair and replacement of watertight doors, hatches, and scuttles.

Preservation and condition-based repairs of U/W Hull, Freeboard, FWD/AFT Stacks, Mast and Superstructure

Complete rip out and replace 02 level plating and replace with thicker plate

Condition based repairs of 03 Level plating.

Anode replacement

ICCP refurbishment

Enclosure (1) | Page ii

Propulsion Plant

Condition-based repairs to the MRG and associated components (main thrust bearing assembly).

Condition-based repair and preservation of the propulsion combustion air intakes and louvers.

Condition-based repair and preservation of the propulsion exhaust air uptakes.

Full Shafting Package to include OD Box, MX-9 Seal, Hub replacement, Waterborne Shafting replacement/refurbish, Rudder Structural refurbishment, Control Rod/Prairie Air Tube and Blade repairs Bearing Land Shim Straps for Stern Tube and Struts

GTM/GTG Louver preservation.

HED installation

Electric Plant and Distribution Equipment

Cableway inspection and condition-based repair. Additionally, circuit breaker replacement.

Generator support system repairs.

Electrical Switchboard Dossert Lug replacement

Command and Surveillance

Sonar transducer and stave cable replacement.

SDRW; inspect and repair

SDRW RT; accomplish

Communication Antenna HF/UHF/VHF refurbishment

Auxiliary Systems

Condition-based repair and replacement of insulation and lagging in machinery spaces.

Repair ventilation fans as condition warrants and as identified by the maintenance team.

Also, condition-based repair to ventilation ducting as identified by the maintenance team.

Clean A/C plant, SPY and Sonar Cooling Skid, LO coolers and condensers.

Condition-based repair to FM/Sea Water piping as identified by the maintenance team.

Condition-based repair to VCHT piping, and VCHT valve replacement.

Sea Valve repair/replacement to include waster sleeve replacement

Outfit and Furnishings

Condition-based interior preservation.

Condition-based exterior preservation.

Condition-based repair and preservation of the stacks.

Condition-based replacement of deck covering and exterior deck non-skid.

Condition-based replacement of foc’sle, flight and hangar deck non-skid.

Condition-based replacement of hull insulation.

Armament

Condition-based repair of Ammo Elevator

MK-41 VLS Launcher; resurface and hatch repairs

Ship Assembly and Support Services

Services are directly related to availability, location, duration, and man-day determination.

Man days can differ by region and whether the availability is performed in a public or private ship repair facility. Services are predominately driven by availability duration with the exception of cleaning and pumping (tanks and bilges), crane, rigging, and temporary refrigeration services which are more ship-specific.

Enclosure (1) | Page iii

Key Maintenance Work Items (not all inclusive)

SA 76087 BOLTED BLISS CAPS

SCD 13111 DDG BILGE WELL REDESIGN

SA 85309 BUBBLE SHIELD OPTIMAL CONFIGURATION

SA 76258 DDGM, MAFO-HOLTKAMP DOORS (PARTIAL).

64191 FAS TRANSDUCER GAGE CUT-OUTROO

AER 64201 STUFFING TUBE REPLC W/MATRIX (PARTIAL).

AER 64270 02 LVL AFT PORT WEATHERDECK DR

SA 75309 SFGD PRESSURIZATION OF DLS SPR

76227 SONAR DOME RELIEF VALVE FLANGE

SA 79196 SSL TRNSN; INCR MACH HGT

SA 80246 F-76 SMALL BOAT FUELING STATION

AER 92044 ICAS PDT REPLACEMENT

AER 64125 ADDITION OF LAUNCHER LIGHTS

AER 64153 OILY WASTE TANK ZINK ANODES

AER 64185 ANCHOR CHAIN CHAFING PLATE

AER 64233 IMPROVED FAN ROOM ACCESS MODS

AER 64238 CPS SPLY/EXH HOODS, CORR MOD

AER 64241 SCTY FORC ISS RM OVHD STWG MOD

AER 64245 CMWD BHD PEN SLEEVES-CRES316

AER 66048 ACCOM LADDER SECURITY PINS

AER 66051 GTM EXHAUST LOUVER SCREENS

SA 72424 MAFO-HOLTKAMP WT DOOR INSTALL (SPECIFIC DOORS TO BE IDENTIFIED

BY THE MAINTENANCE TEAM.)

SA 77228 INSTALL ALL CRES INDIVIDUAL DOG WTRTT DOOR (SPECIFIC DOORS TO

BE IDENTIFIED BY THE MAINTENANCE TEAM.)

AER 83007 INCREASE DECK PLATE THICKNESS (AS REQUIRED WHERE DECK

THINNING IS DOCUMENTED)

AER 90219 REPLACE OBSOLETE CONTROL PANEL ON PLASTIC SHREDDER

AER 90237 REPLACE OBSOLETE CONTROL PANEL ON METAL/GLASS SHREDDER

HENL/BENL BCPO-S6212/BENL-R1075/BENL-R9587/HCPO-S6214/HENL-R1076/HENL-

R9588

Key Modernization Work Items (not all inclusive)

SA 70403K Digital Fuel Control

SA 71604K DDG MOD Single CCS

SA 71605K DDG MOD Advanced Galley

SA 71726K DDG MOD Single Bridge

SA 73088K DDG MOD GEDMS

SA 76253K MRG/CPP LO Purifier, Replace

SA 76648K DDGM, REFR PLNT OVBD PRES RLV

SA 76974K MWS HW FOR DDG MOD

SA 77259K Replace Legacy EM LOG

SA 77269K Install Redundant TLIS

SA 77419K DDGM Textile Ducting Install

SA 77427K DDGM, Digital Indicators

SA 77829K INSTL RADAR AND TDR TLIS

SA 81798K NAVMACS TECH REFRESH

SA 81961K TTWCS V5.4.0.2 SHIPALT

SA 85114K TC2S 5.0.1V7 HW SHIPALT

Enclosure (1) | Page iv

SA 89715K SSEE INC F SFF

SA 91014K CANES HW2

SA 91027K GPNTS(V)4

SA 92104K AN/SQQ-89A(V)15 with TI-18 HARDWARE

SA 94979K DDG HM&E CONDITION SYSTEM 2.0

SA 95946K C2P Tech Refresh