FY27 - FY28 STRATEGIC WEAPON SYSTEM (SWS) SHIPBOARD NAVIGATION SUPPORT SERVICES FOR THE TRIDENT II D5 FLEET BALLISTIC MISSILE (FBM) PROGRAM
Solicitation number
N0003026R3015
Issued by

About this file

This document is a Sources Sought Statement of Work (SOW) for Strategic Weapon System (SWS) TRIDENT Fleet Support covering fiscal years 2027-2028. The contract encompasses navigation subsystem hardware and software design, testing, installation, and support for United States OHIO and United Kingdom Vanguard (VANG) class submarines, as well as COLUMBIA (CLB) and UK Dreadnought (DRNT) class submarines. The SOW includes multiple Contract Line Item Numbers (CLINs) focused on special projects, production support, repairs, test equipment, and technical services across different fiscal years and submarine platforms.

Key requirements include product-based procurement with technical engineering services, covering areas such as material procurement, production, integration, installation, testing, operational fleet and logistics support, training, and technical services. The contract is structured with specific CLINs for different program components, including US and UK special projects (X007, X011, X013), development special projects (X017), and CLB special projects (X028). Each CLIN includes provisions for program management support, engineering services, incidental materials, other direct costs, and travel, with a focus on maintaining and developing navigation subsystems for strategic submarine programs. The effort supports continuous development, maintenance, and integration of navigation technologies across multiple submarine classes.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sources Sought Notice Enclosure 1 Sources Sought Notice Enclosure 1

FY 27-28 Navigation Omnibus Statement of Work 3 July 2025 Version – SSN

STATEMENT OF WORK

1. SCOPE AND BACKGROUND

0. Scope

This contract is for the Strategic Weapon System (SWS) TRIDENT Fleet Support, SWS TRIDENT II SSP Shipboard Integration (SSI) Increment 8, Shipboard Systems Modernization Portfolio (SSMP), COLUMBIA (CLB) Class and UK Dreadnought (DRNT) Navigation Subsystem hardware and software design, testing, installation, and completion items.

For completion of these efforts, the Contractor shall provide all deliverables set forth in the Statement of Work (SOW) and as listed within the following, which are attached to this contract:

· Exhibit A: Contract Data Requirements List (CDRL)

· Attachment 3: Exhibit Line Item Number (ELIN) Delivery Table Listing

0. Background and Program Description

This contract is for product-based procurement with some technical engineering services for Trident II SWS Shipboard Navigation subsystem development, material procurement, production, integration, installation & testing, operational fleet & logistics support, training & technical services support, and engineering overhaul support for both the United States OHIO and United Kingdom Vanguard (VANG) class submarines. Effort also includes TRIDENT II SWS Shipboard Navigation Subsystem development, material procurement, production, integration, installation & testing, construction, shipbuilding support, and training & technical services support for both the CLB and DRNT Class submarines.

0. CLIN Descriptions

The products and services under this contract are required during the period of FY27 through FY28. Performance of some FY28 option CLINs may have a performance end date FY29, as per section F of the contract.

Special project CLINs that are applicable over this contract period are identified using a “X0NN” notation where “X” denotes the applicable fiscal year and the “NN” denotes a CLIN number that captures work scope that is unique to that CLIN.

For example, CLIN x007 captures work scope unique to the performance of US Special Projects over the period of FY27 and FY28, where CLIN 7007 applies to work performed in FY27 and CLIN 8007 applies to work performed in FY28.

2. CLIN 7001 – Reserved

2. CLIN 7002 – Reserved

2. CLIN 7003 – Reserved

2. CLIN 7004 – Reserved

2. CLIN 7005 – Reserved

2. CLIN 7006 – Reserved

2. CLIN X007 – FY27 OHIO Special Projects (CPFF) (Level of Effort) (OM&N) (Option) Applies only if the Government exercises the CLIN option for this item as annotated below. During the period of performance, the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Table 7007-1 below and Section F, services of others, and materials, and shall use its best efforts to provide technical and management services for the U.S. TRIDENT II Program as defined herein.

Additional CLIN requirements not governed by the general requirements are captured in Section 4.1 (additional requirements) of this SOW.

The estimated composition (prime / subcontractor) of the total man-hours is stated below. The composition of the expended man-hours may vary from the estimated composition.

Table X007-1

CLIN
Period of Performance
Directed LOE

Total Hours

Directed LOE Prime Hours
Directed LOE

Subcontractor Hours

7007
01/01/2027-12/31/2027
2,862
851
2,011
8007
01/01/2028 - 12/31/2028
2,617
895
1,722

2. CLIN 7008 – Reserved

2. CLIN 7009 – Reserved

2. CLIN 7010 – Reserved

2. CLIN X011 – FY27 OHIO Special Projects (CPFF) (Level of Effort) (OPN) (Option) Applies only if the Government exercises the CLIN option for this item as annotated below. During the period of performance, the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Table 7011-1 below and Section F, services of others, and materials, and shall use its best efforts to provide technical and management services for the U.S. TRIDENT II Program as defined herein.

Additional CLIN requirements not governed by the general requirements are captured in Section 4.2 (additional requirements) of this SOW.

The estimated composition (prime / subcontractor) of the total man-hours is stated below. The composition of the expended man-hours may vary from the estimated composition.

Table X011-1

CLIN
Period of Performance
Directed LOE

Total Hours

Directed LOE Prime Hours
Directed LOE

Subcontractor Hours

7011
01/01/2027-12/31/2027
6,273
4,764
1,508
8011
01/01/2028-12/31/2028
6,450
5,158
1,292

2. CLIN 7012 – Reserved

2. CLIN X013 – FY27 VANG & DRNT Special Projects (CPFF) (Level of Effort) (UK) (Option) Applies only if the Government exercises the CLIN option for this item as annotated below. During the period of performance, the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Table 7013-1 below and Section F, services of others, and materials, and shall use its best efforts to provide technical and management services for the UK TRIDENT II Program as defined herein.

Additional CLIN requirements not governed by the general requirements are captured in Section 4.3 of this SOW.

The estimated composition (prime / subcontractor) of the total man-hours is stated below. The composition of the expended man-hours may vary from the estimated composition.

Table X013-1

CLIN
Period of Performance
Directed LOE

Total Hours

Directed LOE Prime Hours
Directed LOE

Subcontractor Hours

7013
01/01/2027-12/31/2027
3,106
1,849
1,257
8013
01/01/2028-12/31/2028
3,059
1,982
1,077

2. CLIN 7014 – Reserved

2. CLIN 7015 – FY27 OHIO Production Support (CPFF) (Task to Complete) (OPN) In support of OHIO Production program, the Contractor shall deliver the hardware listed in ELINs L001, L002, L003, and L004 in accordance with the Government approved Design Disclosure Package (DDP).

Note: In the event when a part number listed is superseded by another part number as a result of approved equipment SSP Alteration (SPALT) or Engineering Change Notice (ECN), the superseding part number shall be delivered in place of the superseded part number in accordance with the break-in instructions provided in the approved equipment SPALT or ECN.

2. CLIN 7016 – Reserved

2. CLIN X017 – FY27 Development Special Projects (CPFF) (Level of Effort) (WPN) (Option) Applies only if the Government exercises the CLIN option for this item as annotated below. During the period of performance, the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Table 7017-1 below and Section F, services of others, and materials, and shall use its best efforts to provide technical and management services for the U.S. TRIDENT II Program as defined herein.

Additional CLIN requirements not governed by the general requirements are captured in Section 4.4 of this SOW.

The estimated composition (prime / subcontractor) of the total man-hours is stated below. The composition of the expended man-hours may vary from the estimated composition.

Table X017-1

CLIN
Period of Performance
Directed LOE

Total Hours

Directed LOE Prime Hours
Directed LOE

Subcontractor Hours

7017
01/01/2027-12/31/2027
5,444
5,444
-
8017
01/01/2028-12/31/2028
6,097
6,097
-

2. CLIN 7018 – FY27 DRNT Production Support (CPFF) (Task to Complete) (UK)

In support of the DRNT program, the Contractor shall deliver the hardware listed in the following ELIN tables:

· A001: Non-inertial UK12 SPALT Kit

· A002: UK12 Equipment, Tools, and Materials

· A003: UK Delta Inertial OBRPs

· A004: UK Delta System Stock Spares ()

· A005: Refresh 2 Material Kits for UK09, UK10, UK11, and UK TTF

· A006: Miscellaneous SPALT Refresh Material Kits for UK TTF, Spares, UK09, UK10, UK11, and INEC Sim Upgrade

· A007: VANG LOTB Material

Note: In the event when a part number listed is superseded by another part number as a result of approved equipment SPALT or ECN, the superseding part number shall be delivered in place of the superseded part number in accordance with the break-in instructions provided in the approved equipment SPALT or ECN.

2. CLIN 7019 – Reserved

2. CLIN 7020 – Reserved

2. CLIN 7021 – Reserved

2. CLIN 7022 – Reserved

2. CLIN 7025 – FY27 OHIO Repairs, Test Equipment, Spares, Tools & Materials Procurement (CPFF) (Task to Complete) (O&MN)

The Contractor shall deliver the hardware listed in ELINs E001 & E002 in accordance with the production column of the Requirement Applicability Matrix to Technical Program Management Requirements for Strategic Systems Programs Acquisition (SD-13-19038 (REV -)). In the event when a part number listed is superseded by another part number as a result of approved equipment SPALT or ECN, the superseding part number shall be delivered in place of the superseded part number in accordance with the break-in instructions provided in the approved equipment SPALT or ECN.

The Contractor shall perform repairs on hardware listed in Repairs Table 7025-1 below and return to system stock. The Contractor shall employ facilities and services of it its own and its subcontractors to deliver Navigation System parts as measured in Equivalent Units (EUs). The Contractor is not required to deliver a specific quantity of each category of repair units anticipated above. Rather the Contractor shall deliver the quantity of repair whole combined inducted quantities multiplied by their respective EU value per unit would equal 113 EUs, respectively.

The Contractor shall deliver hardware as measured in EUs and in accordance with the anticipated quantities below:

Table 7025-1

Repair Category
EUs Each
Anticipated QTY

CLIN 7025 (US)

Total EU Units

CLIN 7025 (US)

Passthrough
12
5
60
Complex Assy
6
2
12
Kit / Minor Assy
3
3
9
Simple Assy
1
32
32

TOTAL

2. CLIN 7026 – FY27 VANG Repairs, Test Equipment, Spares, Tools and Materials Procurement (CPFF) (Task to Complete) (UK)

The Contractor shall deliver the hardware listed in ELINs F001, F002 & F003 in accordance with the production column of the Requirement Applicability Matrix to Technical Program Management Requirements for Strategic Systems Programs Acquisition (SD-13-19038 (REV -)). In the event when a part number listed is superseded by another part number as a result of approved equipment SPALT or ECN, the superseding part number shall be delivered in place of the superseded part number in accordance with the break-in instructions provided in the approved equipment SPALT or ECN.

The Contractor shall perform repairs on hardware listed in Repairs Table 7026-1 below and return to system stock. The Contractor shall employ facilities and services of it its own and its subcontractors to deliver Navigation System parts as measured in EUs. The Contractor is not required to deliver a specific quantity of each category of repair units anticipated above. Rather the Contractor shall deliver the quantity of repair whole combined inducted quantities multiplied by their respective EU value per unit would equal 29 EUs, respectively.

The Contractor shall deliver hardware as measured in EUs and in accordance with the anticipated quantities below:

Table 7026-1

Repair Category
EUs Each
Anticipated QTY

CLIN 7026 (UK)

Total EU Units

CLIN 7026 (UK)

Passthrough
12
2
24
Complex Assy
6
0
0
Kit / Minor Assy
3
0
0
Simple Assy
1
5
5

TOTAL

2. CLIN 7027 – FY27 OHIO Test Equipment, Spares, Tools & Materials Procurement (CPFF) (Task to Complete) (OPN)

The Contractor shall deliver the hardware listed in ELINs G001, G002 & G003 in accordance with the production column of the Requirement Applicability Matrix to Technical Program Management Requirements for Strategic Systems Programs Acquisition (SD-13-19038 (REV -)). In the event when a part number listed is superseded by another part number as a result of approved equipment SPALT or ECN, the superseding part number shall be delivered in place of the superseded part number in accordance with the break-in instructions provided in the approved equipment SPALT or ECN.

2. CLIN X028 – FY27 CLB Special Projects (CPFF) (Level of Effort) (SCN) (Option)

Item 7028 applies only if the Government exercises the CLIN options for this item. The Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Section F, services of others, and materials, and shall use its best efforts to provide technical and management services and for the for the U.S. TRIDENT II Program as defined herein.

The estimated composition (prime / subcontractor) of the total man-hours is stated below in Table 7028-1. The composition of the expended man-hours may vary from the estimated composition.

Table X028-1

CLIN
Period of Performance
Directed LOE

Total Hours

Directed LOE Prime Hours
Directed LOE

Subcontractor Hours

7028
01/01/2027-12/31/2027
3,458
2,829
628
8028
01/01/2028-12/31/2028
3,532
2,993
538

2. CLIN 7034 – FY27 CLB Production Support (CPFF) (Task to Complete) (SCN)

7034.1 In support of the CLB program, the Contractor shall deliver the hardware listed in the following ELIN tables:

· B001: Non-Inertial US05 SPALT Kit

· B002: US05 Equipment, Tools, and Materials

· B003: US02 Non-Inertial OBRPs

· B004: US Delta System Stock Spares

· B005: Refresh 2 Material Kits for US01, US02, US03, US04, KB TTF, Aahore Navigation Center (ANC), and Consolidated Support Ship (CSS)

· ELIN B006: Miscellaneous SPALT Refresh Material Kits for EQT, ANC, CSS, US01, US02, US03, US04, KBTTF, Spares, and INEC Sim Upgrades

· ELIN B007: CLB Shipyard Hazmat Material.

Note: In the event when a part number listed is superseded by another part number as a result of approved equipment SPALT or ECN, the superseding part number shall be delivered in place of the superseded part number in accordance with the break-in instructions provided in the approved equipment SPALT or ECN.

7034.2 In support of the CLB program, the Contractor shall provide 12 months of support beginning Jan 1, 2027 for the following:

· Manage hardware obsolescence and identify parts replacements

· Ship completed CLB hardware per the GFI Management System

· Conduct IFS Cesium Tube Replacements for delivered systems (as required). Note: For labs, IFS Cesium Tubes will run until failure occurs.

2. CLIN 7039 – FY27 TR-E3 Proofing (CPFF) (Task to Complete) (OPN) (Option)

7039.1 The Contractor shall manage the Navigation TR-E3 installation and be responsible for the onsite implementation of TR-E3 SPALT. The Contractor shall:

· Assign Navigation Installation Team Leads to support the SSI Increment 8 Installation Working team

· Collaborate with SP2012 and Installation Working Group (IWG) to provide System Level Integrated Test Plan updates in support of proofing

· Support pre-installation on-site briefings with TYCOM, SSP, Naval Surface Support Center, TRIDENT Refit Facility (TRF), Ships Force, and Supporting Contractors

· Assist the IWG in meeting all Joint Fleet Maintenance Manual requirements for pre-installation, installation and post installation of SPALT to include specific MOA, service request, and HAZMAT, security and installation requirements

· Support TR-E3 Deployment Readiness Review

· Support an IRR for proofing boat in accordance with the IWG.

7039.2 The Contractor shall conduct and complete the TR-E3 SPALT Installation requirements with assistance of Navy personnel in accordance with IWG schedule latest revision, including Travel for installation purposes and procurement of incidental consumable material as needed. The Contractor shall:

· Provide daily FEIMS status reports during the installation and test period.

· Provide daily status reports during the installation and test period to the IWG via the common tool defined by the IWG.

· Perform At-sea System Level Test in conjunction with SP2012 or their contractors to include one INS performance run.

7039.3The Contractor shall deliver a Final Installation/ Summary Report for SSBN Installation including lessons learned to SP24 in accordance with (CDRL A025)
7039.4Conduct the SSBN Proofing pursuant to the SSBN Validation Plan.
7039.5The Contractor shall incorporate changes made during the proofing install and deliver the updated Installation Manual in accordance with (CDRL A015)
7039.6The Contractor shall evaluate and assess the impact of any Program Problem Report (PPR) on SSI requirements, design, and data logging/encryption.

2. CLIN 7043 – FY27 D5LE Materials (CPFF) (Task to Complete) (WPN) In support of D5LE2 program, the Contractor shall:

· Deliver the hardware listed in ELIN M001 in accordance with the Government approved DDP.

· Develop Navigation External Interface Simulator software update as required to support D5LE2 NAV Emulator requirements and/or hardware design changes.

· Update DDP to incorporate hardware changes as required to address component obsolescence.

2. CLIN 7045 – FY27 Contract Data Requirements List (CDRLs)

The Contractor shall provide the data set forth in the CDRL, Department of Defense (DD) Form 1423, attached here to Section J.

Delivery shall comply with SSP security regulations regarding the delivery, handling, and safe keeping of classified information. CDRLs are to be submitted electronically via e-mail except for coordination drawings.

Classified data (e.g., Ordnance Documents and Weapons Specifications) will be hand delivered hard (paper) copies, Compact Disks or Optical Disks.

The cost of the data shall be charged to the item(s) with which the data is associated.

The allocation of rights in technical data and computer software delivered under this contract is governed by clauses and provisions of this contract, including, but not limited to, Defense Federal Acquisition Regulation Supplement (DFARS) 252.227-7013, 252.227-7014, and 252.227- 7017.

2. CLIN 7046 – FY27 Contractor Acquired Property

Delivery of Contractor Acquired Property (CAP) under this line item shall be completed as soon as the CAP item is identified if the value of the item meets or exceeds the capitalization threshold as identified in the memorandum issued jointly by the Under Secretary of Defense (USD) Comptroller and the USD (Acquisition, Technology, and Logistics) on 20 September 2013, entitled, “Elimination of Military Equipment Definition and Increase to Capitalization Thresholds for General Property, Plant and Equipment” or if the item is categorized as special tooling, special test equipment, or equipment designated for preservation and storage under a major defense acquisition program (see Section 815 of the National Defense Authorization Act for Fiscal Year 2009 (Pub. L. 110- 417).

"Residual CAP" means property acquired, fabricated, or otherwise provided by the Contractor for performing this contract, and to which the Government has title pursuant to Federal Acquisition Regulation (FAR) 52.245-1 (e)(3), and that is not incorporated in, or consumed in the production of, a deliverable under this contract. This includes any CAP items identified through plant clearance in accordance with the clause at DFARS 252.245-7004, Reporting, reutilization, and Disposal; inventory reports provided by the Contractor in accordance with FAR clause 52.245-1; or other reporting requirements, as specified in this contract. All Residual CAP shall be delivered upon completion of performance under Contract Line Items (CLINs 7007-7043 and 8007-8034).

During contract performance, oversight and visibility of CAP shall be accomplished through reviews and audits of Contractor business systems, including the Contractors accounting systems, property management systems, and material management and accounting in accordance with FAR 52.245-1, Government Property.

The contractual transfer of accountability for CAP from one contract to another is prohibited. Only upon delivery and acceptance by the Government under this line item can this property be transferred to other contracts and/or other locations not currently specified under a line item or exhibit of this contract as Government-furnished property (GFP), with written authorization by the Contracting Officer. Written authorization may only be accomplished by contract modification(s) issued on a Standard Form 30 by the Contracting Officer, or as delegated to the Administrative Contracting Officer, to execute transfers of Government property accountability between existing contracts. No other forms or documents, such as the DD Form 1149, Requisition and Invoice/Shipping Document, are authorized for the transfer of Government property (CAP or GFP) accountability from one contract to another. Upon delivery and acceptance by the Government, and when retained by the Contractor for use under this contract, the delivered CAP items become GFP and shall be added to the contract and referenced under the GFP list attached to the contract in Section J. A list in the format outlined in CDRL A134 shall accompany all deliveries of CAP under this contract.

When delivering CAP and updating this list (CDRL A134):

The value of any delivered CAP item shall be at the Contractor provided fully burdened cost, i.e., normal or provisional burdens to the direct costs in accordance with the applicable disclosed accounting practices, including an appropriate amount for fee or profit (as reflected in the contract under which the estimate is prepared) in addition to the direct and indirect costs.

Unless otherwise noted by the Contractor at the time of delivery to the Government, the placed-in-service date shall be the date of acquisition or, if fabricated, the date of completed manufacture.

2. CLIN 8001 – Reserved

2. CLIN 8002 – Reserved

2. CLIN 8003 – Reserved

2. CLIN 8004 – Reserved

2. CLIN 8005 – Reserved

2. CLIN 8006 – Reserved

2. CLIN 8008 – Reserved

2. CLIN 8009 – Reserved

2. CLIN 8010 – Reserved

2. CLIN 8012 – Reserved

2. CLIN 8014 – Reserved

2. CLIN 8015 – Reserved

2. CLIN 8016 – Reserved

2. CLIN 8018 – FY28 DRNT Production Support (CPFF) (Task to Complete) (UK) (Option)

In support of the DRNT program, the Contractor shall deliver the hardware listed in the following ELIN tables:

· ELIN C001: Non-Inertial UK CR SPALT Kit.

· ELIN C002: UK CR Equipment, Tools, and Materials.

· ELIN C004: UK12 Non-Inertial OBRPs.

Note: In the event when a part number listed is superseded by another part number as a result of approved equipment SPALT or ECN, the superseding part number shall be delivered in place of the superseded part number in accordance with the break-in instructions provided in the approved equipment SPALT or ECN.

2. CLIN 8019 – Reserved

2. CLIN 8020 – Reserved

2. CLIN 8021 – Reserved

2. CLIN 8022 – Reserved

2. CLIN 8025 – FY28 US Repairs, Test Equipment, Spares, Tools & Materials Procurement (CPFF) (Task to Complete) (O&MN) (Option)

The Contractor shall deliver the hardware listed in ELINs H001 & H002 in accordance with the production column of the Requirement Applicability Matrix to Technical Program Management Requirements for Strategic Systems Programs Acquisition (SD-13-19038 (REV -)). In the event when a part number listed is superseded by another part number as a result of approved equipment SPALT or ECN, the superseding part number shall be delivered in place of the superseded part number in accordance with the break-in instructions provided in the approved equipment SPALT or ECN.

The Contractor shall perform repairs on hardware listed in Repairs Table 8025-1 below and return to system stock. The Contractor shall employ facilities and services of it its own and its subcontractors to deliver Navigation System parts as measured in EUs. The Contractor is not required to deliver a specific quantity of each category of repair units anticipated above. Rather the Contractor shall deliver the quantity of repair whole combined inducted quantities multiplied by their respective EU value per unit would equal 153 EUs, respectively.

The Contractor shall deliver hardware as measured in EUs and in accordance with the anticipated quantities below:

Table 8025-1

Repair Category
EUs Each
Anticipated QTY

CLIN 8025 (US)

Total EU Units

CLIN 8025 (US)

Passthrough
12
7
84
Complex Assy
6
4
24
Kit / Minor Assy
3
6
18
Simple Assy
1
27
27

TOTAL

2. CLIN 8026 – FY28 UK Repairs, Test Equipment, Spares, Tools and Materials Procurement (CPFF) (Task to Complete) (UK) (Option)

The Contractor shall deliver the hardware listed in ELINs J001 & J002 in accordance with the production column of the Requirement Applicability Matrix to Technical Program Management Requirements for Strategic Systems Programs Acquisition (SD-13-19038 (REV -)). In the event when a part number listed is superseded by another part number as a result of approved equipment SPALT or ECN, the superseding part number shall be delivered in place of the superseded part number in accordance with the break-in instructions provided in the approved equipment SPALT or ECN.

The Contractor shall perform repairs on hardware listed in Repairs Table 8026-1 below and return to system stock. The Contractor shall employ facilities and services of it its own and its subcontractors to deliver Navigation System parts as measured in EUs. The Contractor is not required to deliver a specific quantity of each category of repair units anticipated above. Rather the Contractor shall deliver the quantity of repair whole combined inducted quantities multiplied by their respective EU value per unit would equal 79 EUs, respectively.

The Contractor shall deliver hardware as measured in EUs and in accordance with the anticipated quantities below:

Table 8026-1

Repair Category
EUs Each
Anticipated QTY

CLIN 8026 (UK)

Total EU Units

CLIN 8026 (UK)

Passthrough
12
3
36
Complex Assy
6
3
18
Kit / Minor Assy
3
5
15
Simple Assy
1
10
10

TOTAL

2. CLIN 8027 FY28 US Test Equipment, Spares, Tools & Materials Procurement (OPN) (CPFF) (Task to Complete) (Option)

The Contractor shall deliver the hardware listed in ELINs K001, K002 & K003 in accordance with the production column of the Requirement Applicability Matrix to Technical Program Management Requirements for Strategic Systems Programs Acquisition (SD-13-19038 (REV -)). In the event when a part number listed is superseded by another part number as a result of approved equipment SPALT or ECN, the superseding part number shall be delivered in place of the superseded part number in accordance with the break-in instructions provided in the approved equipment SPALT or ECN.

2. CLIN 8034 – FY28 CLB Production Support (CPFF) (Task to Complete) (SCN) (Option)

8034.1 In support of the CLB program, the Contractor shall deliver the hardware listed in the following ELIN tables:

· ELIN D001: Non-Inertial US06 SPALT Kit

· ELIN D002: US06 Equipment, Tools, and Materials

· ELIN D003: US03 Non-Inertial OBRPs

· ELIN D005: CLB Shipyard Hazmat Material.

Note: In the event wen a part number listed is superseded by another part number as a result of approved equipment SPALT or ECN, the superseding part number shall be delivered in place of the superseded part number in accordance with the break-in instructions provided in the approved equipment SPALT or ECN.

8034.2 In support of the CLB program, the Contractor shall provide 12 months of support beginning Jan 1, 2028 for the following:

· Manage hardware obsolescence and identify parts replacements

· Ship completed CLB hardware per the GFI Management System

· Conduct IFS Cesium Tube Replacements for delivered systems (as required). Note: For labs, IFS Cesium Tubes will run until failure occurs.

2. CLIN 8044 – Reserved

2. CLIN 8045 – Reserved

2. CLIN 8046 – Reserved

1. REFERENCES / APPLICABLE DOCUMENTS

The following documents are applicable to this SOW, attachments and appendices to the extent specified herein. Unless otherwise specified, the latest revision in effect at the time of the contract award applies. In the event that an applicable document listed herein invokes callouts of other documents, the latest issue of each document which bears an issued date prior to the date of issue of the listed applicable document will apply. In cases where Equipment Specifications and the DDP refer to MIL-HDBK-454, 28 April 1995, the handbook shall be used for guidance only except that ANSI/IPC-A-610 and ANSI J-STD-001 shall apply to electronic assemblies such as printed wiring boards and circuit card assemblies. In cases where Equipment Specifications and/or the DDP refer to MIL-S-13949, ANSI/IPC-4101 may be used as an alternate.

Later versions of the governing documents cannot be imposed on the program without mutual agreement of the parties. For those documents controlled by Lockheed Martin Corporation, Contracting Officer approval of submitted changes shall constitute mutual agreement.

1. Military Standards

Document Number
Description
Date
Requirement (“R”) or Informational (“I”)
MIL-HDBK-454
General Guidelines for Electronic Equipment
15 April 2007
I
MIL-STD-129P, Change 4
Military Marking for Shipment and Storage
April 2019
R
MIL-STD-130 N, Change 1
Identification Marking of US Military Property
16 November 2012
I
MIL-STD-758C
DOD Standard Practice Packaging Procedures for Submarine Support Items
13 April 1990
I
MIL-STD-1285D - Change 3
Department of Defense Standard Practice Marking of Electrical and Electronic Parts
July 2019
I
MIL-STD-1686C
Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment
25 October 1995
I
MIL-STD-2073-1E - Change 4
DOD Standard Practice for Military Packaging
April 2019
R

1. DoD/DoN Regulations, Directives, and Instructions

Document Number
Description
Date
Requirement (“R”) or Informational (“I”)
DoDINST 4140.01
DoD Supply Chain Materiel Management Policy
06 March 2019
I
DoD 4140.64-M – Change 1
Secondary Item Stratification Manual
24 August 2009
I
DoD 4140.65M
DoD Manual Issue, Use, and Disposal of Wood Packaging Material (WPM)
02 July 2020
R
DoD 5220.22-M Change 2
National Industrial Security Program Operating Manual (NISPOM)
18 May 2016
R
DoDM 5220.22, Vol 2
National Industrial Security Program: Industrial Security Procedures for Government Activities
1 August 2018
R
DoD 8570.01-M – Change 4
Information Assurance Workforce Improvement Program
10 November 2015
R

1. Secretary of the Navy (SECNAV) Instructions

Document Number
Description
Date
Requirement (“R”) or Informational (“I”)
SECNAVINST 1543.2
Cyberspace/Information Technology Workforce Continuous Learning
30 November 2012
R
SECNAV-M 5239
DON Cyberspace Information Technology and Cybersecurity Workforce Management and Qualification Manual
June 2016
I

1. NAVSEA Regulations, Directives, and Instructions (US)

Document Number
Description
Date
Requirement (“R”) or Informational (“I”)
NAVICPINST 4030.4N
Packaging of Fleet Ballistic Missile (FBM) Reparable Items and Recoverable Consumables
30 April 2003
I
NAVSEA Drawing 53711-6687749, Revision F
Final Inspection Procedure, Government-Owned Items Returned for Repair, Refurbishment or Modification
11 December 2014
I
NAVSEA INST 4720.14D
Control of Temporary Alterations to Active Fleet Submarines
5 March 2004
I
NAVSEA OD 40392
FBMWS/SWS Navigation Subsystem and Support Equipment Modules Test, Repair, and Acceptance Capabilities
15 April 1998
I
NAVSEA OD 41265 - Revision D, Change 9
Strategic Weapon System (SWS) Authorized Replacement Parts
12 September 2012
R
NAVSEA OD 45240 - Revision 6, Change 4
Strategic Weapon System (SWS) and Attack Weapon System (AWS) Training Materials Management Plan
August 2011
R
NAVSEA OD 45260
TRAINING SYSTEM DEVELOPMENT
Volume 1 General Description Revision 1, May 1979

Volume 2 Planning Revision 1 IC 1 both August 1979 Volume 3 Resource Definition Revision 1 May 1979 R

NAVSEA OD 45953 – Revision 4
Strategic Weapon Systems and Attack Weapons System Training Program Personnel and Training Evaluation Program
August 2008
R
NAVSEA OD 53679
Weapon System Documentation Program Development Guidelines
15 December 1979
I
NAVSEA OD 55340
TRIDENT II Weapon Systems Accuracy Model

R

NAVSEA OD 55569
Configuration Management Plan for TRIDENT II Navigation Subsystem
30 September 1983
R
NAVSEA OD 59266 - Revision 2
SWS Training System Fault Acquisition Requirements and Procedures
November 1989
R
NAVSEA OD 60803 - Revision 4, Change 1
SWS Training Materials Development Guidelines/Production Specifications
July 2011
R
NAVSEA OD 61922 - Revision F
Data Design Specification for SWS IETMs
1 May 2005
I
NAVSEA OD 62055 - Revision 1, Change 1
Strategic Systems Program Open System Implementation Guidance
1 June 2005
I
NAVSEA S9070-AA-MME-01C/SSN/SSBN
Guidance Manual for Temporary Submarine Alterations

I

OD 40825C – Change 2
SSP Non-conforming Material Review and Waiver and Deviation Requests: Definitions, Classifications, and Requirements
15 October 2015
R
OD 41265 – Revision D, Change 9
Strategic Weapon System (SWS) Authorized Replacement Parts
17 September 2012
R
OD 55551
Substitution Guide for Test Measurement and Diagnostic Equipment for TRIDENT Program
July 2017
R
OD 60661
Submarine-Launched Ballistic Missile (SLBM) Classified Hardware List
15 October 2010
R
OD 63504
TRIDENT II SWS Navigation Subsystem Media Handling Guide IETM (Confidential)

R

OD 63505
TRIDENT II SWS Navigation Subsystem Media Handling Guide IETM

R

OD 63767 – Rev C
Strategic Systems Programs (SSP) Shipboard Integration Program
4 March 2015
I
OD 63878
Graphic Standards

I

OD 64757
Work Planning Document for OHIO Class SSBN Engineering Refueling Overhaul
15 March 2016
I
OD 65680
SP24 NAV Software Deployment Policies and Processes

R

OD 66138 – Revision B
Strategic Systems Programs (SSP) Consolidated Support Ship (CSS) USNS WATERS (T-AGS 45) Operations and Maintenance
19 October 2016
I
OD 66139
Requirements Management Using DOORS (Dynamic Object Oriented Requirements System) for the D5BF/SSI Navigation Subsystem Implementation & User’s Guide

R

OD 68327
Information Assurance Vulnerability Management for Non-Enterprise Systems
30 November 2009
R
OD 68340 Revision C
Cybersecurity Processes for Non-Enterprise Systems
07 June 2018
R
OD 68347
SSBN Replacement Program Strategic Weapon System Integrated Test Requirements Outline

I

OD 68923
Navigation Branch Risk Management Plan

I

OD 71001 – Change 1
Strategic Systems Programs United States/United Kingdom Common Terminology and Documentation Standards
August 2015

R

OD 70077
Strategic Systems Programs Work Execution Requirements for SSBN Replacement New Construction

I

SSP Memorandum Ser SP20123/090117004
Fiscal Year 2018 Cyber Planning Factor
14 September 2017
R
SSPINST 1500.6
Strategic Weapon System (SWS) Attack Weapon System (AWS) Training Effectiveness System (TES)
2 October 2007
I
SSPINST 3100.1K
Trouble and Failure Report Program
12 April 2005, as implemented by GJ-2229-1260 N.1 (NP) Rev. F, 27 July 2021
R
SSPINST 3440.6D
Strategic Systems Programs Root Cause Analysis and Corrective Action Guide Significance Assessment
2 September 2016
R
SSPINST 4130.4B
Requirements for Configuration Management Plans
12 June 2006
R
SSPINST 4200.7C
TRIDENT SSBN and OHIO Class SSGN Test and Measurement Equipment (T&ME) Life Cycle Support (LCS)
14 March 2007
I
SSPINST 4423.27D – Change 1
Procedures for the Determination of Repair Parts Support Requirements for TRIDENT Strategic Weapon System Equipment’s
08 July 2002
I
SSPINST 4423.39J
Repair and Return of Strategic Systems Programs Cognizance Reparable and Recoverable Consumable Material
23 February 2018
R
SSPINST 4423.52C Change 1
Loading, Maintenance and Reconciliation of SSP Consolidated Data File – Next Generation
30 July 2013
I
SSPINST 4423.55E
Assignment of Strategic Systems Program

s (SSP) Activity Control Numbers (ACNs), Use of National Stock Numbers (NSNs) and ACN/NSN Migrations

13 January 2021
I
SSPINST 4423.70C Change 1
Policy and Procedures for Shore Based Facilities Operating Space Allowance Equipage Lists (OS/AELs)
4 June 2015
I
SSPINST 4423.78A
Procedures and Responsibilities for Establishment and Operation of Strategic Systems Programs Shipboard Electronic Repair Facility
20 March 2012
I
SSPINST 4440.2G
Management and Transaction Reports of Material Assets
06 August 2002
I
SSPINST 4570.2F - Change 2
Policy and Procedures for Disposal of Excess Strategic Weapon System Material
18 May 2020
I
SSPINST 4600.1A – Change 2
TRIDENT Strategic Weapons Systems Movement Plan
15 May 2020
I
SSPINST 4700.2F
Procedures and Responsibilities for Establishment and Operation of TRIDENT SWS Third Level Maintenance Facilities
07 July 2005
I

SSPINST 4700.5B

Strategic Weapon System Maintenance Policy
11 July 2017
I
SSPINST 4720.1H Change 1
SPALT Policies and Procedures for Alteration of Strategic Systems Programs Weapons Systems Equipment
14 July 2017
R
SSPINST 4855.3
Corrective Action Review Program for Technical Evaluations and Assessments
17 February 2012
I

SSPINST 4855.6C

Procedures and Responsibilities for Evaluations and Assessments Activities
14 December 2020
R
SSPINST 5100.15A
SSP Continuous Process Improvement (CPI) Manual
January 2009
I
SSPINST 5100.6B
SSP Safety Program
16 September 2014
R
SSPINST 5200.4C
SSP Participation Requirements in the Government-Industry Data Exchange Program (GIDEP)
18 February 2021
R
SSPINST 5230.11A
Electronic Transmission of Controlled Unclassified Information
18 January 2019
I
SSPINST 5239.5B
Handling of TRIDENT II Strategic Weapon Systems (SWS) and CCS Data
20 August 2002
I
SSPINST 5239.7B
Strategic Systems Programs Cybersecurity Implementation for Technical Divisions
13 March 2019
I
SSPINST 5239.8A Change 1
Strategic Systems Programs Information Assurance Approval Process for Platform Information Technology Systems
22 May 2012
I
SSPINST 5239.9A
Information Assurance Vulnerability Management Program
3 March 2017
R
SSPINST 5239.10B
Strategic Systems Network Connection Policy for Fleet Ballistic Missile Partners
01 March 2021
R
SSPINST 5239.11A
Cyberspace Information Technology and Cybersecurity Workforce Qualification Program
31 December 2019
I
SSPINST 5239.12
Strategic Systems Programs Information Assurance Program
11 October 2011
I
SSPINST 5239.13C
Electronic Mail Digital Signature and Encryption Policy
17 August 2020
I
SSPINST 5239.14
Use of Encryption for Strategic Systems Programs Controlled Unclassified Information Data At Rest
23 February 2017
I
SSPINST 5239.15B
User Access Program for Strategic Systems Programs Information Systems
24 September 2020
I
SSPINST 5600.11N
Preventive Maintenance Management Program for Strategic Weapon System Equipments and Associated Material
21 July 2009
I
SSPINST 5600.16D
Control and Reporting of Strategic Systems Programs Assigned Document Numbers and Documents
03 April 2012
R
SSPINST 5600.29A
Technical Documentation Programs
04 June 2014
I
SSPINST 7320.1 Change 3
Strategic Systems Programs Government Property Management Policies and Procedures
9 October 2018
R
SSPINST 7720.4H
Integrated Program Management, Schedule, and Cost Reporting Requirements for Contracts
9 September 2020
R
SSPINST 8822.7F
Policies and Procedures for SWS Coordination Drawings
7 September 2016
R
SSPINST 9000.5Q
Strategic Systems Programs Welding and Other Hotwork Restrictions
17 July 2017
I
SSPINST 9030.4
Policies and Procedures for the United States Capability and Proficiency Effort Program
14 July 2017
I
SSPINST 9780.17E
Duties, Responsibilities and Organization for Work on TRIDENT Strategic Weapons System (SWS) and Strategic Weapons Support Systems (SWSS) on Fleet Ballistic Missile (FBM) Submarines; Including Work on Attack Weapons System (AWS) and Attack Weapons Support Systems (AWSS) on Ship, Submersible, Guided Missile, Nuclear (SSGN) Submarines
12 June 2008
I
SSP/NOLSCINST 4600.2 Change 1
United States and United Kingdom Strategic Weapon System Movement Plan
26 March 2010
I
SSP 0652-032-6
TRIDENT II SWS Navigation Subsystem Media Handling Guide IETM

R

SSP OD 62413 – Revision G

Style Specification for Strategic Weapons System Interactive Electronic Technical Manuals
14 December 2009
I
SSP OD 63768
Requirements for Common Elements
15 July 2004
I
SSP OD 64497 – Revision 7
Strategic Systems Programs (SSP) Test Program Test Requirements
13 December 2012
I
SSP OD 65406 – Revision A, with tailoring
Strategic Systems Programs Systems Engineering Management Guidance
19 April 2018
R
SSP OD 66162
Program Plan for Obsolescence Management of Navigation Subsystem Equipment
March 2012
R
SSP OD 66167
Obsolescence Management Plan for D5BF Navigation Subsystem Equipment
December 2007
R
SSP OD 66171
System Requirements Document (SRD) for the TRIDENT D5 Backfit Navigation Subsystem
8 April 2009
I
SSP OD 66194
SP24 Shipboard Systems Fleet Documentation Development and Deployment Policies and Procedures
11 September 2009
R
SSP OD 66274
Implementation Plan for Unique Identification (UID) of Navigation Subsystem Equipment

R

SSP OD 68392
Strategic Weapons Systems Network (SWSNET) Connection and Operating Requirements for Fleet Ballistic Missile (FBM) Partners

R

SSP OD 66275 - Revision 5
Program Plan for Strategic Systems Programs Shipboard Integration (SSI) Program Inc 8 – Navigation
June 2018
I
SSP OD 69523
Navigation Segment Specification (SSS)
3 March 2018
I
SSP OD 70263
SSBN Maintenance Concerns, Considerations, and Restrictions
30 June 2019
I
SSPODETC TD1121
Content and Style Guide for Navigation Subsystem Technical Manuals
Volume 1, Change 3, 15 April 1987

Volume 2, Change 2, 15 April 1987 Volume 3, Advance Change 1/5, 27 February 1989 Volume 4, Change 4, 15 April 1987 I

WS20400
Technical Objective Guidelines

I

WS22129
Frequency Standard Equipment Specification

I

WS27719
Performance Specification for Navigation Embedded GPS Receiver

I

WS27721
NAVAIDS Equipment Specification

I

WS27725
Navigation Workstation Equipment Specification

I

WS27726
Subsystem Specification for D5BF Navigation Subsystem

I

WS27727
ESGN Equipment Specification

I

WS27728
Navigation Control Panel Equipment Specification

I

WS 27827
Navigation Subsystem Specification

I

JCSSE/SSPINST 4710.14D
UK TRIDENT II (D5) Joint Capability Review (JCR) and Follow-on JCR (FJCR) Programs
18 May 2007
I
OD 30669 Vol. 2 – Fourth Revision, Change 8
Strategic Weapon System and FBM Trouble and Failure Report Symbol Sheets for Training Activities
15 January 2008
I
OD 66331 - Revision B
Requirements for Facility Technical Proficiency Evaluation (FTPE) at Her Majesty’s Naval Base CLYDE (HMNB(C))
18 July 2012
I
SSPINST 4200.10A
Life Cycle Support (LCS) of United Kingdom TRIDENT Test and Measurement Equipment (T&ME)
23 March 2005
R
SSPINST 4330.13C
TRIDENT II (D5) Program U.K. Subcontractor Monitoring/Reporting Procedures
20 April 2005
R
SSPINST 4408.4G
Repair of United Kingdom (U.K.) - Owned Strategic Weapon System Material in the United States (U.S.)
2 July 2009
I
SSPINST 4720.6H
Procedures For Configuration Control of Strategic Weapon System (SWS) Hardware and Computer Software Supplied to the United Kingdom (U.K.)
15 November 2007
I
SSPINST 5050.9K
Visit of United States Personnel to the United Kingdom in Connection with the Polaris Sales Agreement
19 May 2011
I
SSPINST 5510.14N
Policy and Procedures for Release of Controlled Unclassified and Classified Military Information to the United Kingdom in Support of the Polaris Sales Agreement
28 June 2011
I
SSPINST 5600.7B
Technical Documentation for the United Kingdom
18 May 2007
I
SSPINST 5600.22C
Preventive Maintenance Program for the United Kingdom TRIDENT II (D-5) Strategic Weapon System
03 September 2009
I
SSPINST 9000.1F
General Instructions for U.K. Strategic Weapon System (SWS) Cabling Program
04 March 1998
I
SSPINST 9030.3C
United Kingdom (U.K.) TRIDENT II Strategic Weapon System (SWS) Supporting Facilities’ Capability and Proficiency Evaluation (CAPE) Program
18 March 1993
I
SSPINST 12306.6D
U.S. Contractor Representatives Assigned to Duty in the UK in Support of the U.S./U.K. POLARIS-TRIDENT Program
16 July 2007
I
NAVEDTRA 131A
Personnel Performance Profile Based Curriculum Development Manual
July 1997
I
NAVORD OD 45240 - Revision 6 Change 2
Strategic Weapon System Training Materials Management Plan
11 August 2009
R
NAVSEA OD 26998 - Revision 4
Fleet Ballistic Missile and Strategic Weapon System Training Systems Documentation Requirements
15 August 1988
R
NAVSEA OD 55218
Navigation System Trainer Equipment Condition Verification Plan (TRIDENT II)
15 December 1997
R
NAVSEA OD 57057 – Second Revision
FBM/SWS Training Systems Training Unique Software Development Production and Support Requirements and Procedures

I

NAVSEA OD 59266 – Revision 2
Strategic Weapons System Training System Fault Acquisition Requirements and Procedures
15 November 1989
R
NAVSEA OD 60803
Strategic Weapon System Training Materials Development Guidelines/Production Specifications
08 March 2000
R
OD 30669 Vol. 1 – Fourth Revision, Change 8
Strategic Weapon System and FBM Trouble and Failure Report Symbol Sheets for Training Activities
15 January 2010
I
OD 42150
FBM Subsystem Logistic Parameters Documents

I

OD 43853
Strategic Weapons System Documentation Requirements List

I

OD 45260
Training

R

OD 55551
Substitution Guide for General Purpose Test Equipment for TRIDENT Program
7 January 2013
R
SSPINST 1500.6
Strategic Weapon System (SWS) Attack Weapon System (AWS) Training Effectiveness System (TES)
2 October 2007
I
SSP OD 36763 – Revision 5
Strategic Weapon System (SWS) and Attack Weapon System (AWS) Training System Development, Production and Support Process
25 March 2016
R
SSP OD 53031 – Revision D
FBM/SWS Training Subsystems and Equipments General Information and Procurement Data
30 June 1997
I
SSP OD 61207
TRIDENT II (D5) Bangor Training Equipment Work In-Process Inventory Plan
18 February 1993
I
SSP OD 61208 – Revision 2, Change 3
TRIDENT II (D5, D5 UK, and D5 Backfit) Programs Design Configuration Control and Management of Missile Training Hardware (MTH) Training Unique Equipment
20 September 2005
I
SSP OD 61534
Strategic Weapon System Training System Prefaulted Module Program

I

NAVSEA Dwg 7123431
TRIDENT II Navigation and Fire Control to Data Recording Instrumentation Subsystem Electrical Interconnections

I

NAVSEA Dwg 7123438
TRIDENT II Backfit Fire Control and Navigation Electrical Interconnections

I

NAVSEA Dwg 7123439
TRIDENT II Backfit Navigation and Ship Electrical Interconnections

I

NAVSEA Dwg 7123458
TRIDENT II Fire Control and Navigation Electrical Interconnections

I

NAVSEA Dwg 7123481
TRIDENT II Navigation and Ship Electrical Interconnections

I

NAVSEA Dwg 7123483
TRIDENT II Navigation and Fire Control to Shipboard Data System and Instrumentation Subsystem

I

SSP OD 69515
Revision B, Subsystem Specification (SS) for the TRIDENT Shipboard Systems Integration (SSI) Increment 8 Navigation Subsystem,
11 February 2015
I
SSP OD 69523
Navigation Subsystem Segment Specification (SSS)
23 March 2015
I
SSP OD 65406
Strategic Systems Programs Systems Engineering Management Guidance Revision A, with tailoring

R

SSP/NOLSCINST 4600.2. Change Transmittal #1
United States and United Kingdom Strategic Weapon System Movement Plan

I

7134170
Identification Marking Specification, TRIDENT Equipment

I

NAVSEA OD 41265-4
Fleet Ballistic Missile Weapons System (FBMWS)/SWS Authorized Replacement Parts

I

1. Non-Government Documents (Industry Standards)

Document Number
Description
Date
Requirement (“R”) or Informational (“I”)
AIM-BC1
Uniform Symbology Specification Code 39
18 June 1997
I
IPC-A-610E-2010 – Revision E
Acceptability of Electronic Assemblies
April 2010
I
IPC-J-STD-001E
Requirements for Soldered Electrical and Electronic Assemblies
April 2010
I
ISO 9001
Quality System – Model for Quality Assurance in Design /Development, Production, Installation and Servicing
2008
I

1. Contractor Plans/Documents

Document Number
Description
Date
Requirement (“R”) or Informational (“I”)
T9001C
Technical Program Management Requirements for Strategic Systems Programs Acquisitions 27 March 2020

as modified by Lockheed Martin Requirements Applicability Matrix (RAM) to Technical Program Management Requirements for Strategic Systems Programs Acquisitions SD Pub. No. SD-13-17626 (NP) Revision H

15 December 2023
R
SD Pub. No. GJ-13-2291(NP) A-1
FBM Strategic Weapons System Navigation Subsystem Safety Program Guidelines
30 September 1983
I
SD Pub. No. GJ-13-2790 - Revision J
Supplement 1 to NAVSEA OD 55569 Configuration Management Plan for TRIDENT II Navigation Subsystem and D5BF Equipments under Lockheed Martin NE&SS Mitchel Field Cognizance
6 April 1999
I
SD Pub. No. GJ-13-3256 - Revision F
Amendment 1 to NAVSEA OD 55569 Configuration Management Plan for TRIDENT II Navigation Subsystem
6 April 1999
I
SD Pub. No. GJ-2229-1260 N.1 (NP) – Revision F
Fleet Ballistic Missile Weapon System and Strategic Weapon System Trouble and Failure Report Program
23 September 2009
R
SD Pub. No. SD-10-17696 Revision D
Software Development Plan for TRIDENT Navigation Subsystem
21 December 2015
I
SD Pub. No. SD-10-17758 (NP) Revision H.
Auxiliary Systems Development Plan (ASDP) For the TRIDENT Navigation Subsystem
21 February 2016
I
SD Pub. No. SD-13-16374(NP)
Navigation D5 Backfit Implementation Manual at Refit Site for SSBN 734 thru 743

I

SD Pub. No. SD-13-17721
SSI INC 4 Navigation SPALTs 40374/14203 Implementation Manual for SSBN 730 through 743, UK 05 Class and US/UK Navigation Shore Facilities

I

SD Pub. No. SD-2223-16000
SQAP for D5BF

I

SD Pub. No. SD-2223-16117(NP)
NPDS Software Development Plan (SDP)

I

SD Pub. No. SG-10-1015
Government Property Manual
September 1998
I

1. GENERAL REQUIREMENTS (SOW ITEMS APPLICABLE TO ALL CLINS, UNLESS OTHERWISE STATED)

2. INTEGRATED PROGRAM MANAGEMENT

0. Contractor Performance Management System

The Contractor shall establish, maintain, and use in the performance of this contract an integrated performance management system. Central to this integrated system shall be an Earned Value Management System (EVMS) in accordance with DFARS 252.234-7001, DFARS 252.234-7002, DFARS 252.242-7005, and the EVMS guidelines contained in Electronic Industries Alliance Standard 748, Earned Value Management Systems (EIA-748-C). To establish the integrated performance management system, the EVMS shall be linked to and supported by the Contractor’s management processes and systems to include the Integrated Master Plan (IMP), Integrated Master Schedule (IMS), Contract Work Breakdown Structure (CWBS), change management, material management, procurement, cost estimating, and accounting. The correlation and integration of these systems and processes shall provide for early indication of cost and schedule problems, and their relation to technical achievement. (IPMR CDRL DI-MGMT-81861A approved per Strategic Systems Programs Instruction (SSPINST) 7720.4)

0. Contractor Work Breakdown Structure

The Contractor shall maintain the CWBS and dictionary in accordance with DI-MGMT-81334D using MIL-STD-881D per the CDRL. The CWBS shall provide the basis for further extension by the Contractor to lower levels during the performance of the contract. The Contractor shall extend the CWBS to the appropriate level required to provide adequate internal management, surveillance, and performance measurement, regardless of the reporting level stipulated in the contract for Government visibility.