This document is a Sources Sought notice for the USS AMERICA (LHA 6) FY26 Docking Selected Restricted Availability (DSRA) procurement. The Naval Sea Systems Command (NAVSEA) is conducting market research to determine industry capability and interest, with a focus on small businesses, to perform the anticipated dry-dock and pier-side maintenance, repair, and alteration work from 11/20/2025 - 5/8/2027.
The work is expected to include a significant amount across multiple trades and spaces, including structural welding, cabling, piping, electrical, and ventilation work. Key maintenance and modernization efforts are outlined, such as hull structure preservation, propulsion plant repairs, electric plant and distribution equipment repairs, and Command and Surveillance system upgrades. NAVSEA is requesting responses from interested companies, including those without current NAVSEA Master Ship Repair Agreements, to provide details on their capabilities, past performance, and plans to obtain necessary qualifications. Responses are due by 12/04/2024, and the anticipated RFP release is in January 2025. The anticipated contract type will be firm-fixed price.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enclosure (1) | Page i
Enclosure (1): Outline of some of the work anticipated to be completed under the expected USS
AMERICA (LHA 6) FY26 DSRA
A. General
a. Competition Area: Coast Wide – West Coast
b. Rough Estimate Man-Days (including scope for Temporary Services):
i. Maintenance ~ 90,000
ii. Modernization ~ 10,000
c. Ship Particulars:
i. Length: 844 ft.
ii. Beam: 118 ft.
iii. Draft: 27.4 ft.
iv. Displacement: 44,971 tons
v. Air Draft (mast height above BL): 216 ft. 9.5 inches
vi. Navigational Draft: 30 ft.
d. Facility Particulars:
i. Pier Length: >844 ft.
ii. Electrical: 7200 amps, 450 volts, 60 hz, 3 ph (UFC 4-150-02 table C-7)
iii. Compressed Air: 800 SCFM, 125 PSIG (UFC 4-150-02 Table C-2)
iv. Potable Water: 32,000 GPD, 2.5 inch hose connection (UFC 4-150-02 Table C-4)
v. Sea Water: 4 Inch Connections (UFC 4-150-02 Table C-3), 2500 GPM (NAVSEA
Technical Publication S0570-AC-CCM-010/8010), 150 PSI measured at the most remote outlet (UFC 4-150-02, Para 3-3.2.1)
vi. Sewage: 4 inch connections (UFC 4-150-02 Table C-6). Ability to accommodate and dispose of ~25,000 GPD.
vii. Mean Pier Water depth draft: ~35 feet
B. The Availability’s modernization scope will include a significant amount of work across multiple trades and spaces. The successful contractor must be able to provide an integrated production schedule that incorporates AIT, 3rd Party contractors, and Government workload. Key trades & efforts include:
structural welding, cabling pulling, piping, electrical, and ventilation work if needed. Both the prime contractor and AIT contractors will execute the structural/industrial work. Further direction will be provided in the work specification package to define the work split.
C. The Availability’s maintenance requirements are expected to include the following types of work:
Hull Structure
• Sea Valves/Ballast Valves/Waster Sleeves
• Condition-based repair and replacement of watertight doors, hatches, and scuttles
• Preserve Superstructure
• Preserve underwater hull
• Preserve freeboard
Propulsion Plant
• MRG L/O Heaters and Coolers clean and inspect
• NR1 and 2 Main uptake / intake repairs
• Remove/inspect/repair rudder seal assemblies
• Main Feed Pump Repairs
• Main Feed Booster Pump repairs
Enclosure (1) | Page ii
Electric Plant and Distribution Equipment
• Cableway inspection and condition-based repair
• Circuit breaker repair
Command and Surveillance
• CANES HW 1.2
• SSEE INC F
Auxiliary Systems
• Condition-based repair and replacement of insulation and lagging in machinery spaces
• Overhaul A/C plant compressors
• Condition-based repair to ASW/FM piping (in place) as identified by the maintenance team
• Overhaul HPACs
• Overhaul LPACs
• Clean the CHT piping system. Also, condition-based repair to CHT pumps, piping, and valve repair
• Remove/preserve Port/Starboard anchors/chain
• Fire and Flushing Pump; overhaul
• Aircraft Elevator Repairs
• Vent Plenum repair and preservation
• Stern Gate Hydraulic Ram repair
• Sideport door repairs
Outfit and Furnishings
• Condition-based interior preservation
• Condition-based exterior preservation
• Condition-based repair and preservation of the stacks
• Condition-based replacement of deck covering and exterior deck non-skid
• Condition-based replacement of flight and hangar deck non-skid
• Condition-based replacement of hull insulation
Armament
• Condition-based repair and preservation of RSLs
• Accomplish SOT Level III on Cargo Weapons Elevators
Ship Assembly and Support Services
• Services are directly related to availability, location, duration, and man-day determination.
Man-days can differ by region and whether the availability is performed in a public or private ship repair facility. Services are predominately driven by availability duration with the exception of cleaning and pumping (tanks and bilges), crane, rigging, and temporary refrigeration services which are more ship-specific.
• Temporary Air Conditioning/Lodging
• Hazardous waste control
Key Maintenance Work Items (not all inclusive)
• Ballast Tank repair, inspect, repair and preserve
• Fuel Oil Service Tank; repair and preserve
• Fuel Oil Compensating tanks; repair and preserve
• CHT Tanks; repair and preserve
• Potable Water Tanks; repair and preserve
• Anchor/Chain/Chain Locker preservation
• Propulsion shafting inspect/repairs
Enclosure (1) | Page iii
• Rudder inspect/repairs
• Ventilation Duct Cleaning; accomplish
• Ventilation Duct repairs; accomplish
• Low Pressure Air (LPAC) Compressor repairs
• Boat Davit weight test
• Collection, Holding and Transfer (CHT) Piping System; hydroblast cleaning
• Helo Safety Net and Frame; repair
• Underwater Log Trunk; repair and preserve
• Flight Deck Nonskid; replace
• CHT Pump Replacement
• NR 1 and 2 GTM intake/uptake repairs
• Radar Tank Level Indicator Installation (partial)
Key Modernization Work Items (not all inclusive)
• SSDS
• NAB- Troop Rifle Lockers
• CANES HW 1.2
• NMT AN/WSC-9 Antenna Shock Upgrade
File details come from the government source that posted it. Updated .