This document is an Enclosure outlining the anticipated work for the USS AUGUSTA (LCS 34) Fiscal Year 2026 Depot Shipyard Repair Availability (DSRA). The availability will take place on the West Coast and involves extensive maintenance and modernization of a Littoral Combat Ship (LCS-2 Class) with approximately 114,380 total man-days (100,861 for maintenance and 13,519 for modernization). Key modernization efforts include TSCE-HW and SW Upgrade, A/C Plant Chill Water Pumps Replacement, 57MM Deck Protection Modification, AUX 5 Tank Top Pitting Modification, and SEARAM Radar Maintenance unit upgrades.
The maintenance requirements span multiple critical ship systems, including hull structure, propulsion plant, electric plant, command and surveillance, auxiliary systems, and outfit and furnishings. Specific work includes condition-based structural repairs, waterjet and shaft assembly replacement, radar component replacements, sea valve repairs, deck non-skid replacement, and various aluminum structural welding repairs. The contractor must provide qualified aluminum welders, integrate Advanced Integration Team (AIT) personnel, manage third-party contractors, and accommodate government personnel within an Integrated Production Schedule. Support services will include temporary air conditioning, lodging, hazardous waste control, and installation team support.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enclosure (1) | Page i
Enclosure (1): Outline of some of the work anticipated to be completed under the expected USS
AUGUSTA (LCS 34) FY26 (DSRA)
A. General
a. Competition Area: Coast Wide – West Coast
b. Rough Estimate Man-Days (including scope for Temporary Services):
i. Maintenance Ship Yard~ 100,861
ii. Modernization Ship Yard~ 13,519
c. Ship Particulars:
i. Length: 421.5 ft. (128.5 m)
ii. Beam: 104 ft. (31.6 m)
iii. Draft: 15.1 ft (4.6 m)
iv. Displacement: 2,377 metric tons light
3,228 metric tons full 851 metric tons deadweight
v. Mean Navigable Water depth draft: >33 ft
d. Facility Particulars:
i. Pier Length: > 505 ft
ii. Electrical: 1,600 amps, 450 volts, three phase, three-wire, 60 Hz., (UFC 4-150-
02Table A-7)
iii. Potable Water: 4,500 GPD (UFC 4-150-02 Table A-4)
iv. Sea Water: 1,000 GPM (UFC 4-150-02 Table A-3), 150 PSI measured at the most remote outlet (UFC 4-150-02, Para 3-3.2.1)
v. Sewage: 250 GPM (UFC 4-150-02 Table A-6). Ability to accommodate and dispose of10,000 GPD of effluent and 10,000 GPD of waste water.
vi. Mean Pier Water depth draft: >33 ft
vii. Dry Dock to support LCS 2 Class Ship
B. The Availability’s modernization scope will largely be the TSCE-HW and SW Upgrade, A/C Plant Chill Water Pumps Replace, 57MM Deck Protection Mod, AUX 5 Tank Top Pitting Mod, SEARAM Radar Maint unit, SEARAM software, combined avail and will include a significant amount of work across multiple trades and spaces. The awarded contractor must be able to include and incorporate AIT integration, 3rd Party contractors, Government personnel, LLTM procurement, etc. in their Integrated Production Schedule (IPS). Key trades & efforts include: Structural welding, cabling pulling, piping, electrical and ventilation work if needed. Both the MSR and AIT will execute the structural/Industrial work. Further direction will be provided in the work specifications to define the work split.
C. The Contractor shall provide qualified aluminum welders for structural repair, fabrication and inspection capabilities that meet the minimum requirements of S9LCS-BF-SRM-010/LCS-2 CL, Inspection, Testing, Fabrication, and Welding for Structural Repair, Alteration, and Modernization, for LCS-2 Variant Ships.
D. The Availability’s maintenance requirements are expected to include the following types of work:
Enclosure (1) | Page ii
Hull Structure
• Condition-based structural weld repair and base metal weld build-up.
• Condition-based repair and replacement of watertight doors, hatches
• Condition-based repair of Stern Doors and Hangar Door
• Preservation and condition-based repairs of Underwater Hull
• Anode replacement
• Condition-based inspection and repair of Ride Control System
• Mooring Station repair
Propulsion Plant
• Condition-based replacement of Waterjet and Shaft assembly
• Clean and repair to the GTMRG Lube Oil Coolers
• Clean and repair to the MPDERG Lube Oil Coolers
• Repair of Number One Main Propulsion Gas Turbine Shaft, Inner Thrust Bearing Block
Assembly
• Replacement of Propulsion Waterjet and Shaft Assembly
Electric Plant and Distribution Equipment
• Cableway inspection and condition-based repair. Additionally, circuit breaker repair.
• Generator support system repairs.
Command and Surveillance
• Condition-based replacement of AN/SPS-77(V)2 Sea Giraffe Agile Multiple Beam (AMB)
Radar Turntable
• Condition-based replacement of AN/SPS-77(V)2 Sea Giraffe Agile Multiple Beam (AMB)
Radar Antenna Unit
• Condition-based replacement of Echosounder Transducer Replacement
• Condition-based preservation of Bridgemaster E Turning Unit
Auxiliary Systems
• Condition-based repair and replacement of insulation and lagging in machinery spaces.
• Condition-based Exhaust Ventilation Cleaning
• Clean A/C plant condensers.
• Sea Valve repair/replacement to include waster sleeve replacement
Outfit and Furnishings
• Condition-based replacement of deck covering and exterior deck non-skid.
• Condition-based replacement of flight and hangar deck non-skid.
• Aircraft Securing Fittings Replacement
• Condition-based replacement of hull insulation.
Support Services
Enclosure (1) | Page iii
• Services are directly related to availability, location, duration, and man-day determination.
Man days can differ by region and whether the availability is performed in a public or private ship repair facility. Services are predominately driven by availability duration with the exception of cleaning and pumping (tanks and bilges), crane, rigging, and temporary refrigeration services which are more ship-specific.
• Temporary Air Conditioning and Lodging
• Hazardous Waste Control
• Support Services for AIT Install Teams
Key Maintenance Work Items (not all inclusive)
• Underwater Hull; inspection, repair and preservation
• Waterjet and Shaft Assembly; install
• Ride Control System Components repairs
• Fire Pump and Motor; overhaul
• Ride Control Roll Fin and Aileron Overhaul; accomplish
• Flight Deck Nonskid; replace
• Various Aluminum Structural Welding Repairs
Key Modernization Work Items (not all inclusive)
• TSCE-HW and SW Upgrade DCLOP Tech Refresh
• AUX 5 Tank Top Pitting Mod
• Sea Water Cooling Mods
• FOCM Padeye Addition