This document is an Enclosure outlining the anticipated work for the USS SAN ANTONIO (LPD 17) Fiscal Year 2026 Selected Restricted Availability (SRA). The availability will be located on the East and Gulf Coast and involves approximately 149,000 total man-days, with 134,000 for maintenance and 15,000 for modernization. The ship is a San Antonio-class amphibious transport dock, 684 feet long with a 24,900-ton displacement.

The modernization scope includes multiple technical upgrades such as LPD Class Voyage Data Recorder installation, BRSE Data Management Hardware, SCDN removal, stern gate control panel modifications, auxiliary sea water system valve replacements, network ring implementation, and various elevator and topside modifications. Maintenance requirements span comprehensive areas including hull structure repairs, propulsion plant work, electrical system maintenance, auxiliary systems servicing, outfit and furnishings updates, and support services. Key maintenance items include fuel oil tank repairs, ballast tank preservation, engine overhauls, crane repairs, and flight deck nonskid replacement. The anticipated contract type is firm-fixed price, with an expected solicitation release in September 2025 and availability period from 07/20/2026 to 03/24/2028.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enclosure (1) | Page i

Enclosure (1): Outline of some of the work anticipated to be completed under the expected USS

SAN ANTONIO (LPD 17) FY26 SRA

A. General

a. Competition Area: Coast Wide – East & Gulf Coast

b. Rough Estimate Man-Days (including scope for Temporary Services):

i. Maintenance ~ 134,000

ii. Modernization ~ 15,000

a. Ship Particulars:

i. Length: 684 ft (overall); 661 ft (waterline)

ii. Beam: 105 ft (extreme); 97 ft (waterline)

iii. Draft: 23 ft

iv. Displacement: 24,900 tons (full)

v. Mean Navigable Water depth draft: > 23ft

vi. Air Draft: 157.65ft

vii. Class and type: San Antonio-class amphibious transport dock

b. Facility Particulars:

i. Pier Length: > 684 ft

ii. Electrical: 8000 amps/ 20 Cables /450 volts, 60 hz, 3 ph (UFC 4-150-02 table C-

7)

iii. Potable Water: 9500 GPD (UFC 4-150-02 Table C-4)

iv. Sea Water: 1250 GPM (UFC 4-150-02 Table C-3), 150 PSI measured at the most remote outlet (UFC 4-150-02, Para 3-3.2.1) for firefighting water

v. Sewage: Ability to accommodate and dispose of 10,000 GPD of effluent and

10,000 GPD of waste water

vi. Mean Pier Water depth draft: >33 ft

B. The Availability’s modernization scope will include significant amount of work across multiple trades and spaces. If the Government identifies a requirement, issues a solicitation, and awards a contract, the awarded contractor must be able to provide an integrated production schedule that incorporates anticipated Alteration Installation Teams (AIT), 3rd Party contractors, and Government workload, as well as management of Long Lead Time Material (LLTM) Procurement. Key trades & efforts would include: Structural welding, piping, electrical and ventilation work. Both the Master Ship Repair (MSR) and AIT would execute the structural/Industrial work. Further direction would be provided in the work specifications to define the work split. Some of the anticipated major modernization work is listed below:

a. SA 30961 K LPD Class Voyage Data Recorder

b. SA 31047 K BRSE Data Management HW

c. SA 31127 K SCDN (AN/SYQ-33) Removal

d. SA 78332 K STERN GATE CONTROL PANEL

e. SA 81157.08K AUXILIARY SEA WATER SYSTEM VALVE REPLACE MENT

f. SA 81157.09K AUXILIARY SEA WATER SYSTEM VALVE REPLACE MENT

g. SA 81157.10K AUXILIARY SEA WATER SYSTEM VALVE REPLACE MENT

h. SA 86344 K HM&E NETWORK RING IMPLEMENTATION

i. SA 86386 K CARGO/WPNS ELEV HMI TOUCH SCRN INSTL

j. SA 86388 K MODIFY TOPSIDE BULWARK ARRANGEMENT/DETAI LS

k. SA 86531 K MAINTENANCE ACCESS AND FALL PROTECTION I MPROVEMENTS

l. SA 86554 K UPPER STERN GATE EMERGENCY RIGGING REMOV AL

m. SA 86659 K STACK FALL PROTECTION ADDITION

n. SA 87181K LPD17 UNREP STATIONS UPGRADES

Enclosure (1) | Page ii

C. The Availability’s maintenance requirements are expected to include the following types of work:

Hull Structure

• Ballast Tank Preservation and Structural repairs

• Hull Structure, Bulkheads, Deck, and Platform repairs/modifications

• Well Deck, Flight Deck, Vehicle Decks and Aircraft Hanger repairs/modifications

• Repair and replacement of watertight doors, hatches, and scuttles

Propulsion Plant

• Main Propulsion Diesel Engine repairs

• Clutch and Coupling repairs

• Sea Water/ Central Fresh Water System repair

• Lube/Fuel Oil Purifiers, pumps, valves and distribution systems repairs

• Diesel Engine Uptake, Intake and Exhaust Piping/Ducting repairs

Electric Plant and Distribution Equipment

• Ship’s Service Diesel Generator (SSDG) Engine repairs

• Electrical Power Distribution and Protective Devices repairs

• Condition-based repair of Lighting Distribution

• Switchboards and Load Center repairs

Command and Surveillance

• AFT Advanced Enclosed Mast System Preservation

Auxiliary Systems

• ASW Piping Mechanical Cleaning

• A/C Plant Condenser Mechanical Cleaning

• A/C Plant Compressor Replacements

• Sea Water, Fresh Water, Potable Water and Gray Water system pumps, valves, and distribution system repairs

• CHT pumps, valves, and distribution system repairs

• Ballast/De-ballast system repairs

• Crane and Elevator repairs

• Replacement of insulation and lagging

Outfit and Furnishings

• Interior/ Exterior Decking Covering and Non Skid Replacement

• Well Deck Preservation

• Critical Coat Flight Deck/ Hangar Bay/ Well Deck Non Skid

Armament

• Cargo/Weapons Elevator repairs

Ship Assembly and Support Services

• Services would be directly related to availability, location, duration, and man-day determination. Man days can differ by region and whether the availability is performed in a public or private ship repair facility. Services would be predominately driven by availability duration with the exception of cleaning and pumping (tanks and bilges), crane, rigging, and temporary refrigeration services which are more ship-specific.

Key Maintenance Work Items (not all inclusive)

• Fuel Oil Storage Tank, repair and preserve

• Ballast Tank; repair and preserve

Enclosure (1) | Page iii

• Fuel Oil Service Tank; repair and preserve

• CHT Tank; clean, repair and preserve

• SSDG Engine/Generator; repair and overhaul

• MPDE; repair/overhaul

• Rescue Boat and Cargo Boat Cranes repair

• Knuckle Boom Crane Repairs

• Flight Deck Nonskid; replace

• Boat Davit Overhaul

File details come from the government source that posted it. Updated .