Emergency_Management_Consultant_Services.pdf
PDF 624 KB Posted
- Attached to
- Emergency Management Consultant Services
- Solicitation number
- RFP-017-2770706-JL 2
- Issued by
- Orange County, San Francisco City, California
About this file
This Request for Proposal (RFP) is issued by the County of Orange, County Executive Office - Procurement and Contract Services (CPO), seeking qualified firms to provide comprehensive Emergency Management Consultant Services for disaster response and recovery operations. The solicitation encompasses short-term recovery planning (Phase 1, 6 days duration), long-term recovery planning (Phase 2, 3 weeks duration), and long-term community enhancement services (Phase 3) following natural, technological, or man-made disasters affecting Orange County, California. The RFP requires respondents to demonstrate five years of cumulative emergency management response and/or recovery experience within the last ten years, with preference given to firms with California experience, particularly within Orange County, and those within a three-hour commutable distance. The question submission deadline is December 3, 2026, at 2:00 p.m., with RFP responses due electronically via the County's eProcurement Portal by December 17, 2026, at 2:00 p.m. Responses must remain valid for a minimum of 365 calendar days from the closing date. The evaluation process consists of three phases: written response scoring (500 points maximum), presentation/interview scoring (400 points maximum), and cost proposal evaluation (100 points maximum).
The compensation structure requires fully burdened hourly labor rates for all personnel classifications including Recovery Project Director, Recovery Manager/Project Lead, FEMA/Public Assistance Specialist, Emergency Management/Recovery Specialist, Community Outreach/Engagement Specialist, Data/Analytics/GIS Specialist, IT/Web Systems Specialist, and Administrative/Program Support, with separate reimbursement for pre-approved travel, lodging, meals, and third-party costs at actual cost without markup. The contract may be reimbursable through federal and state assistance programs, with terms of those programs to be incorporated as non-negotiable conditions. The County reserves the right to award the contract to one or multiple respondents and may defer award for up to 180 days during which quoted prices and terms remain guaranteed. Respondents must meet minimum qualifications including emergency management experience in California (preferably Orange County), demonstrated crisis management and large-scale project management capabilities, and must comply with all federal requirements including Clean Air Act and Federal Water Pollution Control Act standards (if the agreement exceeds $150,000), Copeland Anti-Kickback Act provisions, and equal employment opportunity requirements. No set-asides are explicitly identified in this solicitation; however, preference policies for Orange County Local Small Business (OCLSB) and Disabled Veteran Business Enterprise (DVBE) certification are available to qualified respondents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| emergency_management_consultant_services-model_contract.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COUNTY OF ORANGE
COUNTY EXECUTIVE OFFICE - CPO
REQUEST FOR PROPOSAL (RFP)
FOR
EMERGENCY MANAGEMENT CONSULTANT SERVICES
RFP NO. RFP-017-2770706-JL 2
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/ocgov
County of Orange RFP # RFP-017-2770706-JL 2
County Executive Office - CPO Emergency Management Consultant Services Page 1 of 58
County of Orange
County Executive Office - CPO
Procurement and Contract Services
400 W. Civic Center Dr.
Santa Ana, CA
92701
SCHEDULE OF ACTIVITIES
Release of RFP Solicitation November 19, 2026
Question Submission Deadline December 3, 2026, 2:00pm
RFP Submittal Closing December 17, 2026, 2:00pm
PROPOSALS MUST BE RECEIVED ON
OR BEFORE
Thursday, December 17, 2026
2:00 pm
County Executive Office - CPO Emergency Management Consultant Services Page 2 of 58
SECTIONS
SECTION 1. INTRODUCTION AND INSTRUCTIONS TO RESPONDENTS
SECTION 2. PROTEST PROCEDURES
SECTION 3. SCOPE OF WORK
SECTION 4. SCORING CRITERIA
SECTION 5. COST PROPOSAL
SECTION 6. SUPPLIER RESPONSES
SECTION 7. FEDERAL GRANT FUNDS
SECTION 8. OCLSB AND DVBE PREFERENCE POLICIES CERTIFICATION
REQUIREMENTS
Attachments:
A - emergency_management_consultant_services-model contract
County Executive Office - CPO Emergency Management Consultant Services Page 3 of 58
SECTION 1. INTRODUCTION AND INSTRUCTIONS TO RESPONDENTS
1.1 INTRODUCTION
The County intends that the successful Respondent shall provide Emergency Management
Consultant Services proposed in accordance with contract requirements set forth in the solicitation and Model Contract.
1.2 COUNTY HOLIDAYS DURING SOLICITATION PERIOD
During this solicitation period, the County Executive Office - CPO will be closed on the following County holidays - https://hrs.oc.gov/employee-relations/employee-resources
1.3 INSTRUCTIONS TO RESPONDENTS AND PROCEDURES FOR SUBMITTAL
A. Responses are to be uploaded via the County's eProcurement Portal at https://procurement.opengov.com/portal/ocgov. For assistance on uploading Response via County’s eProcurement Portal, please contact procurement-support@opengov.com or https://help.procurement.opengov.com/en/
B. Examine the Contract Documents and the site of the proposed work carefully before submitting a Response for the work contemplated. Investigate the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished and as to the requirements of all Contract Documents.
The County has attempted to provide all information available. It is the responsibility of each Respondent to review, evaluate, and, where necessary, request any clarification prior to submission of a Response. If any person contemplating submitting a response to this
Request for Proposal (RFP) is in doubt as to the true meaning of any part of the solicitation documents attached hereto or finds discrepancies in or omissions from the specifications, they may submit a written request for clarification/interpretation to the County Deputy
Procurement Agent (DPA) via the County’s eProcurement Portal under the bid page for this solicitation.
If clarification or interpretation of this solicitation is considered necessary by County, an addendum shall be issued, and the information will be posted via the County’s eProcurement Portal. Any interpretation of, or correction to, this solicitation shall be issued by the DPA. It is the responsibility of each Respondent to periodically check the County’s eProcurement Portal to ensure that they have received and reviewed any and all addenda to this solicitation.
The County will not be responsible for any other explanations, corrections to, or interpretations of the documents, including any verbal information. If an addendum is issued, Respondents must acknowledge the addendum via the County’s eProcurement
Portal.
All questions or requests for interpretations must be received within this solicitation by Thursday, December 3, 2026, before 2:00 pm. The DPA will provide all official https://hrs.oc.gov/employee-relations/employee-resources https://procurement.opengov.com/portal/ocgov https://procurement.opengov.com/portal/ocgov mailto:procurement-support@opengov.com https://help.procurement.opengov.com/en/
County Executive Office - CPO Emergency Management Consultant Services Page 4 of 58 communication concerning this solicitation. Any County response relevant to this solicitation other than through or approved by the DPA is unauthorized and will be considered invalid.
C. Responses must be valid for a period of at least three hundred sixty-five (365) calendar days from the closing date and time of receipt. No Response may be withdrawn after the submission date.
D. Each Respondent must submit their response electronically via the County’s eProcurement
Portal.
E. All pages must be submitted on standard 8.5 x 11-inch sized document, numbered and identified sequentially by section. Responses must be organized and indexed as outlined in the Response Requirements Section. It is imperative that all Respondents comply, exactly and completely, with the instructions set forth herein. All responses to this solicitation shall be type written or word-processed (except where otherwise provided or noted), concise, straightforward, and must fully address each requirement and question. Although not as a substitute for a complete written response, additional material, such as technical documents, may be referenced in any response if the material is included in the same section as additional information.
F. Responses are not to be marked as confidential or proprietary. The County may refuse to consider any Responses so marked. All Responses and supporting documents will be subject to the provisions of the California Public Records Act (California Code
Government Code 7920.000 et seq.) (PRA) and will be disclosed or withheld in accordance therewith. The County shall not be liable in any way for disclosure of any such records.
Additionally, all Responses shall become the property of the County.
Respondents should not request that certain information be treated as exempt, and statements in the Responses should not be marked as confidential or proprietary. In the event that any information is marked as confidential or proprietary, as it may be absolutely necessary, Respondents have the sole responsibility of obtaining any applicable injunctive reliefs to prevent the disclosure of such confidential proprietary information in connection with any request made to County pursuant to PRA or a subpoena for disclosure of such information.
G. Each Respondent shall exercise reasonable care and diligence to avoid submitting a
Response that could result in a conflict of interest if Respondent were to be selected. This obligation shall apply to the Respondent, the Respondent’s employees, agents, and relatives, sub-contractors, and third parties associated with accomplishing work and services in response. In the event Respondent has done work for the County on this Project in the past or has reason to believe that a conflict of interest may exist for Respondent in
County Executive Office - CPO Emergency Management Consultant Services Page 5 of 58 regard to this Project, Respondent should consult with its legal counsel prior to responding to this solicitation. Any Respondent who is found to have an actual conflict of interest may have its response rejected on that ground.
Respondent, its employees and/or consultants may be subject to the provisions of the
California Political Reform Act of 1974 (the “Act”), which (1) requires such persons to disclose any financial interest that may be materially affected by services provided under this Contract, (2) prohibits such persons from making, or participating in making, decisions that could reasonably affect such interest; and (3) may require the filing a Statement of
Economic Interest (Form 700).
If subject to the Act, Respondent shall conform to all requirements of the Act. Failure to do so shall constitute a material breach and is grounds for immediate termination of the
Contract by County. Respondent shall indemnify and hold harmless County for any and all claims for damages resulting from Respondent’s violation of this Section.
H. By submitting a response, the Respondent represents that it thoroughly examined the
County’s requirements, is familiar with the services required under this solicitation and is qualified and capable of providing the services to achieve the County’s objectives.
I. Each Respondent must submit its response in strict accordance with all requirements of this solicitation and compliance must be stated in the response. Deviations, clarifications and/or exceptions must be clearly identified and listed separately as alternative items on additional information section for the County’s consideration as specified in the
Response Requirements Section, “Statement of Compliance.”
Note: Allow sufficient time to upload all required files. The County’s eProcurement Portal will not allow any uploads after the due date and time specified herein, e.g., if Part 1 and 2 uploaded successfully at 1:58:38 P.M. and Part 3 is in progress of being uploaded at 2:00:01
P.M., Part 3 will not upload successfully.
J. Pre-contractual expenses are not to be included in the Cost Proposal, Attachment B, Pricing and Compensation. Pre-contractual expenses are defined as including, but not limited to, expenses incurred by the Respondent in: a) preparing the response to this solicitation; b) submitting that response to the County; c) negotiating with the County any matter related to the Respondent’s response; and d) any other expenses incurred by the Respondent prior to the date of award and execution, if any, of the Contract.
K. Any response may be construed as non-responsive and ineligible for consideration if it does not comply with the requirements of the solicitation, including but not limited to technical features, acknowledgment of receipt of addenda, and page number limits, etc. These are common causes for deeming a response non-responsive.
L. Where two or more Respondents desire to submit a single response to this solicitation, they must do so on a prime/subcontractor basis rather than as a joint venture. The County intends
County Executive Office - CPO Emergency Management Consultant Services Page 6 of 58 to contract with a single firm that may subcontract with multiple firms (team) but not with multiple firms doing business as a joint venture.
M. County does not require and neither encourages nor discourages the use of lobbyists or other consultants for the purpose of securing business.
N. The County requires a valid D-U-N-S number prior to Contract Award. If needed, your company may obtain one at no cost at www.dnb.com. If you are unable to provide/obtain a D-U-N-S number, please indicate so in your submission response.
O. The County requires a valid UEI number and full registration prior to Contract
Award. Your company must obtain one at no cost at www.usfcr.com. If you are unable to provide/obtain a UEI number, please indicate so in your submission response.
P. Effective from the issuance date of this solicitation until a Contract is awarded or the solicitation is withdrawn, all individuals or entities responding—including their employees, agents, representatives, proposed partners, subcontractors, members, lobbyists, or attorneys (collectively "Respondents")—are prohibited from engaging in any direct or indirect communication with County personnel involved in the selection process, except with the designated Deputy Procurement Agent (DPA). Respondents may continue conducting business with the County on matters unrelated to this solicitation and may communicate with County staff, provided the solicitation is not discussed. Any attempt to engage in discussion regarding this solicitation with anyone other than the designated DPA will be presumed to create an unfair competitive advantage and may result in disqualification.
Q. After the closing date and time for receipt of Responses, evaluation, and if requested by the County, in-person interviews will commence. Respondents who submit Responses most responsive to the County’s requirements may be asked to give a presentation of their response to County staff. The County makes no guarantee as to the number of Respondents selected for in-person interviews. Selected Respondents should be prepared to make its presentation within five (5) business days after notification and be prepared to discuss all aspects of its response in detail, including technical questions regarding the response.
Respondents shall not be allowed to alter or amend its response through the use of the presentation process.
County Deputy Procurement Agent (DPA) for this solicitation is: Jessica Loy, jessica.loy@ceo.oc.gov
1.4 COMMUNICATION
Bidders are not to contact other County personnel with any questions or clarifications concerning this solicitation. All questions regarding this solicitation must be submitted via the Question
& Answer section of this solicitation within the County’s eProcurement Portal at:
http://www.dnb.com/ http://www.usfcr.com/
County Executive Office - CPO Emergency Management Consultant Services Page 7 of 58 https://procurement.opengov.com/portal/ocgov. Any County response relevant to this solicitation other than through or approved by County is unauthorized and will be considered invalid.
County's Deputy Procurement Agent, Jessica Loy, jessica.loy@ceo.oc.gov, will provide all official communication concerning this solicitation.
1.5 MINIMUM QUALIFICATIONS/REQUIREMENTS
Respondent’s shall meet the following minimum requirements and qualifications to proceed to the evaluation process. Failure to have the ability to, upon County request, provide any of the items requested below may result in disqualification of your response. These qualifications must be maintained during the term of any resultant Contract.
A. Complete all required sections of the RFP, i.e., provide all required information.
B. Proposer must have five (5) years’ cumulative experience, within the last ten (10) years, in providing emergency management response and/or recovery services. This experience may include:
C. Proposer must have emergency management response or recovery experience within the
State of California, preferably within Orange County.
D. Proposer must demonstrate crisis management and large scale project management experience.
E. Preference may be given to those within a daily commutable distance of 3 hours to
Orange County, California.
1.6 EVALUATION PROCESS
Responses deemed to meet all minimum solicitation requirements will be scored based on the established evaluation criteria, and will be assigned points that measure the responsiveness to each identified criterion. The total number of points earned will be tallied for each response, based upon the Respondent(s) submitted written materials.
Responses shall be evaluated by an Evaluation Panel of job knowledge experts on the basis of the responsiveness to the requirements in this RFP. The County may request clarifications, or otherwise verify the contents of the response, including information about the Respondent, Contractors and sub-contractors.
The scoring is based on evaluation of the response as measured against the Scoring Criteria, which includes County of Orange Procurement Preference Policy, in accordance with Sections 1.8-103 and 4.3-112 of the 2026 County Contract Policy Manual (CPM). A copy of the 2026 CPM can be found at https://cpo.oc.gov/cpm. Responses will be evaluated from the most advantageous to the least advantageous to the County.
https://procurement.opengov.com/portal/ocgov https://cpo.oc.gov/cpm
County Executive Office - CPO Emergency Management Consultant Services Page 8 of 58
1.7 SELECTION/AWARD PROCEDURES
Upon the completion of the evaluation process, the Evaluation Committee will make a recommendation for an award to the County’s DPA. Final award determination shall be subject to reference checks and past performance.
The Model Contract contained herein this RFP is the Contract proposed for execution. It may be modified to incorporate negotiated items and other pertinent terms and conditions set forth in this
RFP, including special conditions and requirements and those added by addendum, necessary attachments and/or exhibits, and to reflect Respondent’s response and qualifications. Any additional exceptions to the terms and conditions made by any Respondent after submission of its response may result in its elimination from further consideration.
Exceptions to the terms and conditions of the Model Contract or the statements regarding
Respondent’s inability to comply with any of the provisions thereof are to be declared in the response to the RFP in SUPPLIER RESPONSES - Statement of Compliance.
Negotiations may or may not be conducted with the finalist(s); therefore, the response submitted should contain Respondent(s) most favorable terms and conditions, since the selection and award may be made without further discussion or need for clarification. Any additional exceptions to the terms and conditions made by any Respondent(s) after submission of its response may result in elimination from further consideration.
The County will enter into negotiations with the selected Respondent and award a contract upon completion of negotiation of fees and contract terms. Entering into negotiations and the Contract award may be subject to/requires approval(s) by the County Board of Supervisors.
If a satisfactory Contract cannot be negotiated in a timely manner, County, in its sole discretion, may terminate negotiations with the selected Respondent and begin negotiations with the next
Respondent.
1.8 RIGHTS RESERVED TO COUNTY
The County reserves the right to:
A. Make use of any information or ideas in the responses submitted.
B. Request response revisions and hold discussions and negotiations with any Respondent as necessary to serve the best interests of the County.
C. Seek publicly available information about the Respondents.
D. Conduct, or not to conduct, in-person interviews and/or presentations with the highest-scored
Respondent(s).
E. Waive, at its discretion, any procedural, non-material defects, irregularity, or informality, which
County deems correctable or otherwise not warranting rejection of the response that do not result in any unfair competitive advantage. Any waiver will not excuse a proponent from full compliance.
F. Verify and validate any information prior to Contract Award and during the entire term of the
Contract.
County Executive Office - CPO Emergency Management Consultant Services Page 9 of 58
G. Negotiate the final Contract with any Respondent(s), including pricing/fee schedule, as necessary to serve the best interests of the County;
H. Withdraw or cancel in part or in its entirety this solicitation at any time without prior notice and furthermore makes no representations that any Contract will be awarded to any Respondent responding to this solicitation;
I. Award its total requirements to one Respondent or to apportion those requirements among two or more Respondents as the County may deem to be in its best interests;
J. Reject any response if it is conditional, incomplete or deviates significantly from the services requested in this solicitation; and/or
K. Request Best and Final Offer from any Respondent determined to be within the competitive range.
Unless requested by the County, late Best and Final Offers will not be accepted by the County for any reason. In addition, negotiations may or may not be conducted with Respondents.
L. Make multiple awards to Respondent(s) for services requested in this solicitation, at its sole discretion, to serve the best interests of the County.
M. Defer award of this Contract for a period of 180 days after the solicitation opening. During this period, Respondent shall guarantee the prices and terms quoted in their responses. The County and the responsive, responsible Respondent may mutually agree in writing to extend this deferral period.
Therefore, responses submitted shall contain the Respondent’s most favorable terms and conditions, since the selection and award may be made without discussion with any Respondent.
1.9 TITLE VI SOLICITATION NOTICE
The County of Orange, in accordance with the provisions of the Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC §§ 2000d to 2000d-4) and the Regulations, hereby notifies all
Respondents that it will affirmatively ensure that any contract entered into pursuant to this advertisement, will be afforded full and fair opportunity to submit response to this solicitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
1.10 DEPARTMENT OF THE TREASURY, INTERNAL REVENUE SERVICE FORM
W-9/W-8 REQUIREMENTS
Effective June 3, 2006, all Contractors, entering into a Contract with County, who are not already established in Countywide Enterprise Resource Planning (ERP) System as an Auditor-Controller supplier, will be required to submit to County a federal Form W-9, or form W-8 for foreign suppliers. County will inform Contractor, at the time of award, if the Form W-9 or W-8 will be required.
In order to comply with this County requirement, within ten (10) days of notification of selection of award of Contract but prior to official award of Contract, the selected Contractor agrees to furnish to Contract administrator, or the Deputy Procurement Agent (DPA) the required W-9 or
W-8.
County Executive Office - CPO Emergency Management Consultant Services Page 10 of 58
1.11 CAMPAIGN CONTRIBUTION DISCLOSURE REQUIREMENT
Effective January 1, 2023, all contractors entering into a contract with the County, will be required to submit the Campaign Contribution Disclosure Form for any contributions made on or after
January 1, 2023. In order to comply with this requirement, Respondent agrees to furnish the required Campaign Contribution Disclosure Information form as a required submittal with its response. Failure to include the form as required will render the response nonresponsive.
SECTION 2. PROTEST PROCEDURES
Any actual or prospective bidder or respondent who alleges an error or impropriety in the solicitation or award of a contract may submit a grievance or protest to Jessica Loy at jessica.loy@ceo.oc.gov, as set forth herein.
PROTEST PROCEDURES
All protests shall be typed under the protestor’s letterhead and submitted in accordance with the provisions stated herein. All protests shall include at a minimum the following information:
A. The name, address, and telephone number of the protestor;
B. The signature of the protestor or the protestor’s representative;
C. The solicitation or contract number;
D. A detailed statement of the legal and/or factual grounds for the protest; and, E. The form of relief requested.
Protest of Solicitation Specifications:
A. All protests related to solicitation specifications must be submitted to the Deputy
Procurement Agent (DPA), Jessica Loy at jessica.loy@ceo.oc.gov, no later than five
(5) business days prior to the Closing Date of the solicitation. Protests received after the five (5) business-day deadline will not be considered by the County.
B. In the event the protest of specifications is denied, and the protestor wishes to continue in the solicitation process, the protestor must still submit a bid/response prior to the close of the solicitation in accordance with the solicitation submittal procedures provided in this solicitation.
Protest of Solicitation Results:
A. Protests related to solicitation results must be submitted to the Deputy Procurement
Agent, Jessica Loy at jessica.loy@ceo.oc.gov, no later than five (5) business days after the Notice of Solicitation Results is provided by the DPA.
B. Protests relating to solicitation results received after the five (5) business day deadline will not be considered by the County.
County Executive Office - CPO Emergency Management Consultant Services Page 11 of 58
C. If the five (5) business day period expires without the receipt of a protest, the department may move forward with contract negotiation and award or if necessary, file the item for approval by the Board of Supervisors.
Protest Process
A. In the event of a timely protest, the County shall not proceed with the solicitation or award of the contract until the DPA issues a decision on the protest.
B. Upon receipt of a timely protest, the DPA will, within ten (10) business days of receipt of the protest, issue a decision in writing which shall state the reasons for the actions taken.
C. The County may, after providing written justification, make the determination that an immediate award of the contract is necessary to protect the substantial interests of the
County. The award of a contract shall in no way compromise the protester’s right to the protest procedures outlined herein.
D. If the protestor disagrees with the decision of the DPA, the protestor may submit a written appeal to the County Procurement Officer requesting an appeal to the
Procurement Appeals Board, in accordance with the process stated below.
APPEALS PROCESS
A. If the protestor wishes to appeal the protest decision of the Deputy Procurement Agent, the protestor must submit, within three (3) business days from receipt of the Deputy
Procurement Agent’s decision, a written appeal to the Office of the County Procurement
Officer.
Written appeals must be sent by mail to the address below with a courtesy copy by email;
County of Orange/County Executive Office
County Procurement Office
400 W. Civic Center Drive, 5th Floor
Santa Ana, CA 92701
Attn: County Procurement Officer
CPOAppeals@ceo.oc.gov
B. Within fifteen (15) business days, the County Procurement Officer will review all materials in connection with the appeal, assess the merits of the protest and provide a written determination that shall contain his or her decision on whether the appeal shall be forwarded to the Procurement Appeals Board.
mailto:CPOAppeals@ocgov.com
County Executive Office - CPO Emergency Management Consultant Services Page 12 of 58
C. The decision of the County Procurement Officer on whether to allow the appeal to go forward will be final and there shall be no right to any administrative appeals of this decision.
SECTION 3. SCOPE OF WORK
3.1 GENERAL INFORMATION:
The County of Orange is comprised of 22 Departments and over 18,000 employees located throughout the County. The County’s core businesses are public safety, public works, construction management, public health, environmental protection, regional planning, public assistance, social services, and aviation.
1. Scope of Work
Scope of work
The County of Orange is comprised of 22 Departments and over 18,000 employees located throughout the County. The County’s core businesses are public safety, public works, construction management, public health, environmental protection, regional planning, public assistance, social services, and aviation.
This Scope of Work defines the responsibilities and expectations for the Contractor selected to provide comprehensive disaster recovery services to the County of Orange, California
(“County”) ensuring rapid response, effective recovery, and mitigation following natural, technological or man-made disasters. This Scope of Work is developed based on the County of
Orange and Orange County Operational Area Recovery Plan. Modifications to activities outlined in the Recovery Plan will be made on an ad-hoc basis to adapt to the needs of the incident, as determined by the County Executive Officer acting as the Director of Emergency Services during the Recovery Phase. The following is a non-exhaustive list of potential services to be proposed under this Agreement. The County reserves the right to award a contract for all or a portion of this Scope of Work based on the disaster/incident impacting the County.
Definitions:
A. County Recovery Manager- County employee appointed by the County Executive Office to lead the recovery effort and will act as the main point of contact on the County side.
B. LAC- Local Assistance Centers
C. MARC- multi-agency resource center
D. MCOT – Mobile Community Outreach Teams
E. RSF – Recovery Support Function
F. RAP-Recovery Action Plan
County Executive Office - CPO Emergency Management Consultant Services Page 13 of 58
G. COAD – Collaborating Agencies Active in Disaster (United Way, Catholic Charities, etc.)
H. COG – Continuity of Government
I. COOP – Continuity of Operations
J. FAC- Family Assistance Centers
K. PPP- Public Private Partnerships
L. Project Scope: This Scope of Work is intended to be public-facing work specific to disaster-related recovery operations.
This Scope of Work is not intended to include Continuity of Government or Continuity of
Operations activities. If a disaster/incident is significant enough to trigger proposed materials and COOP activities, these will be handled by the County and may impact the resources available to dedicate towards this Scope of Work.
M. Project Management: The County Executive Office will appoint an individual to serve as the County Recovery Manager. As outlined in the Recovery Plan, the County
Recovery Manager will be supported by individuals within the County departments and agencies, as well as identified Private, Non-Profit, and Non-Governmental
Organizations. The County will continue to serve as the authorization point for resource requests to the California Office of Emergency Services or other state and federal agencies for support of the activities outlined below.
The Contractor shall designate a qualified Project Lead who will serve as the primary point of contact for all disaster recovery activities performed under this agreement. The
Project Lead must possess relevant experience in emergency management, disaster recovery operations, and coordination with federal, state, and local agencies, including
FEMA. Project Lead shall be responsible for overseeing day-to-day operations, ensuring compliance with all applicable regulations, managing subcontractors, and maintaining clear and consistent communication with the County’s designated representatives. The
Contractor shall provide the County with the Project Lead’s name, contact information, and résumé within 7 days of contract execution or notice to proceed. Any changes to this assignment must be approved by the County in advance.
N. Mutual Aid Resources: In the event of a disaster/incident of significant size and scope, mutual aid personnel and equipment may be called into the County or overlapping jurisdictions in order to assist in response and recovery operations. These resources will operate under the incident’s Unified Command and may or may not be available to assist
County Executive Office - CPO Emergency Management Consultant Services Page 14 of 58 in achieving the Scope of Work detailed within this agreement. The County will strive to keep the Contractor aware of the mutual aid resources operating within or on behalf the
County, including providing contact information and delegations of authority or mission tasks where appropriate and available.
D. County Priorities: The Project Lead will identify and prioritize the County’s service needs upon activation of this contract in support of a disaster/incident response. These activities may include, but may not be limited to:
• Conducting damage and safety assessments.
• Assessing the housing situation, identify potential solutions, and request support.
• Assessing damage to public facilities and initiate temporary repairs.
• Assessing damage to private property and issue permits for repairs and demolition.
• Removing debris.
• Opening transportation routes.
• Restoring services such as power, water, sewer, and transportation.
• Providing disability related assistance and functional needs support services.
• Providing essential health and safety services.
• Providing security and reestablish law enforcement functions.
• Activating LACs to assist individuals, households, and businesses.
• Activating FACs to provide information and services about missing or unaccounted for persons and deceased as well as those people otherwise impacted by the incident.
• Coordinating program assistance to individuals and businesses.
• Documenting disaster-related costs for reimbursement through State and Federal grant programs.
• Working with State and Federal officials to assess damage, identify needs, and secure financial assistance.
• Resuming governmental functions.
• Beginning planning for long-term community recovery.
• Enacting appropriate zoning variances to accommodate business and commercial repairs.
County Executive Office - CPO Emergency Management Consultant Services Page 15 of 58
• Assisting with identification of temporary housing and business space.
• Assisting with re-establishment of schools and childcare centers.
• Establishing a post-disaster recovery prioritization and planning process for restoration of economic and social systems of the community.
E. County Approval of Public-Facing Information: The Contractor shall obtain prior written approval from the County for all public-facing materials related to disaster recovery operations, including but not limited to press releases, social media content, signage, informational brochures, and website updates. No public statements or communications referencing the County’s recovery efforts shall be issued without explicit authorization. This requirement ensures consistency, accuracy, and alignment with the County’s communication protocols. Any unauthorized dissemination of information may be considered a breach of contract.
F. Quality Assurance: The Contractor shall establish and maintain a robust Quality
Assurance (QA) program specifically designed for disaster recovery operations performed under this agreement. This program shall ensure that all services and public interactions are performed in accordance with industry best practices, FEMA guidelines, and all applicable federal, state, and local regulations. The QA program must include procedures for monitoring work quality, identifying and correcting deficiencies, and documenting all findings and corrective actions. The Contractor shall provide the County with a copy of its QA plan within 14 days of contract execution and shall submit periodic
QA reports throughout the duration of recovery activities. The County reserves the right to review, audit, and require modifications to the QA program as needed to ensure service quality and regulatory compliance.
G. Project Coordination: The County will collaborate with the Contractor on the following to facilitate the complete all phases of this Scope of Work:
1. Outline the relationship the County and community members impacted by the disaster.
2. Provide known information about the disaster related impacts, including but not limited to data generated by the Damage Inspection Teams and Safety Assessment
Task Force.
3. Develop a County (RAP), including determining which (RSF) will be established
(e.g., Economic, Natural and Cultural, Housing, Infrastructure, Safety and Security, and Community Services).
a. When the Housing RSF is activated:
County Executive Office - CPO Emergency Management Consultant Services Page 16 of 58
i. Describe any available financial assistance funds for any extreme cases to cover hotel, food, and transportation costs for 1-3 days.
ii. Describe availability of Rapid Re-Housing funds and processes.
iii. Discuss perspective on those living in unconventional housing without addresses (motor homes, sheds, converted garages, RVs, shipping containers, cars, tents on public land, etc.)
iv. Describe how recovery plans will include provisions for home-based businesses.
1. Develop and facilitate a public communications and messaging strategy, to be included in the County Recovery Action Plan with a focus on:
a. Public outreach
i. Establishing communications process, including identifying resources, for translating and printing materials, signs, and other materials to be distributed at outreach events.
ii. Providing phone tree resources.
iii. Establishing a secure website to create and store a secure intake forms and community member data.
b. Educational information
c. Community recovery priorities
d. Public input opportunities
e. Mitigation activities during reconstruction
E. PHASE 1: Short Term Recovery Planning (Duration - 6 days)
Create a short-term disaster recovery plan for Orange County residents.
1. The Contractor shall:
a. Review the County’s Recovery Plan
b. Review existing recovery resources and partnership agreements.
c. Create and publish recovery resource lists for all immediate needs.
d. Identify disaster-displaced populations, determine their immediate needs, and identify potential resources to address unmet needs.
County Executive Office - CPO Emergency Management Consultant Services Page 17 of 58
e. Draft process to collect families’ calls and information for follow-up.
f. Plan to establish Local Assistance Centers, multi-agency resource center, or outreach events.
2. Days 1 and 2: Initial Assessment and Planning:
a. The County shall provide official damage assessment information (CalFire and/or
County data). The Contractor will review and assess the number of homes, businesses, and other structures with confirmed destroyed, major, minor, or unaffected status.
b. The County shall provide available data for disaster-affected populations. This may include names, addresses, contact information, and demographic data (e.g., household composition, languages, known access and functional needs), and a rough estimate of affected pre-disaster unhoused community members.
c. The County shall brief the Contractor on incident-specific care and sheltering operations to date, including any known congregate and non-congregate sheltering. The Contractor will integrate this information into the Recovery
Action Plan).
d. The Contractor shall prepare to attend, open and/or operate a LAC, MARC
(MCOTs) within the first two weeks.
i. The County will provide County personnel as additional staff as necessary and when available.
ii. The Contractor shall coordinate with the County to identify language needs and coordinator document translation and in-person translator options for outreach events.
iii. The Contractor shall identify available local recovery resources, including
County agencies and shelters, and read existing community partnership agreements. This may include facilitating with the Red Cross, United Way, Catholic Charities, Tzu Chi and other outreach event participants about event logistics and available resources for community members.
iv. The Contractor shall identify mental health support resources for impacted community members, including hotlines, helplines, and live chats.
a. The Contractor shall establish an OC Disaster Recovery Helpline for families to call for information and support, including the phone tree script and integrated phone numbers. The County will be responsible for the cost of the service.
1. Days 3 and 4: Draft Recovery Resources and Coordinate Initial Response
County Executive Office - CPO Emergency Management Consultant Services Page 18 of 58
a. The Contractor shall establish multiple modes of distribution to communicate available disaster recovery resource lists for families. These may include 211, County offices and websites, media, LAC, MARC, outreach teams, local law enforcement personnel, etc. Such resources may include:
i. Places to go for immediate needs (shelter, food, transportation, and clothing)
ii. Disaster cleanup, repairs, and recovery program applications
Information should include considerations for diverse populations including but not limited to:
o Children o Veterans o People with disabilities, access, and functional needs, including languages.
o Pre-disaster unhoused people o Undocumented community members; and o Those with pets.
b. The Contractor shall share the resource lists with County leadership for edits, approval, Orange County logo and distribution.
c. The Contractor shall create a secure intake form to collect families’ and businesses pre- and post-disaster information. This will include an information-sharing agreement with County and external partners. The Contractor will develop instructions for the form and train others if needed (and available).
d. The Contractor shall coordinate with County teams to avoid duplicating work.
e. The Contractor shall relay all info to leadership and Communications teams.
f. The Contractor shall finalize plans for weekend LAC/MARC.
1. Days 5-6: Host/attend LAC/MARC outreach events
J. PHASE 2: Long Term Recovery Planning (Duration - 3 weeks)
1. The Contractor shall coordinate with the County to develop, implement, and maintain a (RAP) to support and stabilize County residents through the next three weeks and beyond.
a. The RAP will use information from residents and businesses to determine recovery roadblocks and draft a needs assessment.
County Executive Office - CPO Emergency Management Consultant Services Page 19 of 58
b. The RAP will include specific guidance to impacted agencies and jurisdictions on situational status report required essential elements of information, and timeframes for reporting.
c. The RAP will identify the (RSFs) to be activated.
i. This decision will be informed by meetings with County agencies, community leaders and COAD members to discuss long-term support options and their plans.
ii. Activation of each RSF will include the identification of which organization will lead the Long-Term Recovery efforts in that area and set goals and objectives to define RSF success.
1. The Contractor may identify and recommend to the County Recovery Manager where outside service or supply contracts may be beneficial or preferred to using County-resources.
2. The Contractor shall develop and implement a specific plan to follow-up with impacted community members and businesses on how the recovery process is progressing. This may include but is not limited to phone calls, emails, or community meetings. Written reports tracking statistics jointly identified by the County and
Contractor may be necessary based upon the size and scope of the disaster/incident.
K. PHASE 3: Long-Term Community Enhancement
When a catastrophic incident occurs, an opportunity may present itself to rebuild the community in a stronger, more resilient manner. To that end, the Contractor may be asked to assist in rebuilding discipline-specific areas of County operations. This may include, but is not limited to:
5. Health Care System
a. Assess the current conditions and options for healthcare strategies through assessment of market trends, identification of best practices in other comparable locations, and application of advanced analytics. These strategies may include financing, delivery, coverage, infrastructure, health IT and other strategies, and may include response to external changes (e.g., federal healthcare reform).
b. Support Participating Agency in the design of healthcare innovation models, with non-exhaustive examples including transitions to Medicaid Managed Care;
statewide value-based payment programs; strategies for special needs populations;
rural health access; market stabilization; and cross-cutting collaborative approaches for other population health priorities (e.g., opioids).
County Executive Office - CPO Emergency Management Consultant Services Page 20 of 58
c. Support the implementation of innovation models and other priority areas including project management; stakeholder engagement; grant applications, waiver applications, RFP design and evaluation; support for contract development and performance management approaches; and related activities.
d. Reduce state Medicaid costs by improving program integrity (i.e., payment in accordance with negotiated contracts, prevention of fraud/waste/abuse, timely recovery of overpayments) and by stronger medical policy to ensure appropriate use levels.
e. Deliver healthcare analytics and/or data management to support any of the above strategies. Further healthcare transparency through reporting including the design and/or delivery of reports for providers, health plans, or other entities.
6. Public Safety
f. Diagnose current performance and define strategies to improve the overall performance of public safety organizations, leverage best practices, analytic tools, and decision-making, increase use of technology to drive greater operational transparency, develop tools to drive improvements in areas like population management, housing assignment, violence reduction, and improved reintegration.
g. Develop people/workforce strategies to increase frontline efficiency, to assist in the up skilling of the workforce through capability building and culture change, improve community engagement, and provide objective evaluation and improvement of the performance of front line and back-office functions within and across public safety agencies.
h. Aid in the design of facilities to be cost- and resource-effective, as well as conducive to positive performance outcomes (e.g., reduced incident response time).
i. Support the implementation of strategies to improve the performance of public safety organizations.
6. Public Works
a. Assess current performance of infrastructure to understand the performance relative to benchmarks and best practices across asset classes (e.g., roads and bridges, water/wastewater, transit, energy, broadband etc.) and geographies.
Determine potential drivers for lagging (or leading) performance across asset life cycle.
County Executive Office - CPO Emergency Management Consultant Services Page 21 of 58
b. Develop a set of strategies and initiatives to improve infrastructure outcomes addressing challenges and introduce innovation across planning, permitting, procurement, funding/financing and maintenance and operations. Review best practices and consider innovative models for improving outcomes, including
PPPs.
c. Determine changes to strategy, processes, operations or organization within relevant departments and agencies (e.g., transportation, transit, utilities) to enable the delivery of strategies and initiatives, for example optimizing delivery in areas like fleet management, maintenance operations, total cost of ownership, risk-based maintenance, and budget rightsizing.
d. Support implementation of any strategies to improve infrastructure, infrastructure performance, or related department/agency performance in the state.
6. Tax Assessor; Treasurer-Tax Collector
a. Develop recommendations for assessor and tax collector operational changes in support of individual and business recovery from disaster/incident impacts.
b. Conduct benchmarking and evaluation of efficiency and effectiveness of tax administration (including of in-flight programs), along with identification of specific opportunities for improvement through effective use of technology, including building multi-year business cases for large scale IT investments.
c. Design initiatives to improve performance including innovative tax compliance approaches, use of advanced analytics to identify cash revenue non-reporting by small and medium businesses improving collections of past due taxes by adopting best practices, and improved fraud prevention.
d. Evaluate the taxpayer customer service journey, identifying key pain points across service channels (web, phone, in person), and creating approach to addressing highest impact issues.
6. Orange County Community Resources – Economic Growth
a. Assess current economic trajectory through independent analysis of sectors, geographies, and demographics in order to define effective growth strategies for localities, regions or states, including defining clear sector strategies to spur economic growth through targeted investment and driving innovation that spurs increased entrepreneurship and business development.
b. Define specific economic and/or job growth strategies in rural or urban areas, or statewide.
County Executive Office - CPO Emergency Management Consultant Services Page 22 of 58
c. Support cohorts of high-potential companies to drive firm growth and job creation.
d. Develop workforce development initiatives with employers, higher education institutions, and government to meet the specific skills needs of local companies, to create more economic opportunities for residents, and to make regions more competitive.
e. Support implementation of any economic development priorities, initiatives, or programs.
M. After Action Reporting
2. The Contractor will provide the County with a written report recommending opportunities to better respond to future events.
3. The Contractor will support implementation of action plans, best practices, capabilities, and strategies to promote increased resilience and/or improved crisis response.
M. Additional Expenses Clause:
1. Federal and State Reimbursement Requirements: Costs under this agreement may be reimbursable through assistance programs at the federal or state level.
As part of the negotiation process, the terms of these federal programs will be adopted into the agreement between the County and Contractor as non-negotiable terms.
a. Reimbursement of Additional Expenses: The Contractor may incur reasonable and necessary additional expenses directly related to the performance of services under this agreement, including but not limited to travel, lodging, meals, and
Third-Party Costs described below.
b. Third-Party Costs: Hosting, software licensing, secure data storage, translation, printing, and similar third-party costs required to perform the Scope of Work are reimbursable at actual cost, without markup, when pre-approved in writing by the
County and supported by itemized invoices or receipts. These costs are not included in the hourly rates. The cost of the OC Disaster Recovery Helpline telephone service is the County’s responsibility as stated in Phase 1.
c. Pre-Approval of Expenses: All additional expenses, including Third-Party Costs must be pre-approved in writing by the County to qualify for reimbursement. The
County Executive Office - CPO Emergency Management Consultant Services Page 23 of 58
Contractor is required to…