Emergency Construction Services Contract Summary

This is an Emergency Construction Services Contract document from the City of California establishing a pre-qualified contractor agreement for immediate deployment following disasters, accidents, or events that threaten public facilities. The contract requires selected contractors to provide comprehensive services including all management, supervision, labor, equipment, tools, health and safety plans, and environmental monitoring necessary to complete emergency construction projects. The solicitation establishes a pre-qualification framework allowing the City to award contracts rapidly to vetted contractors without standard procurement delays, enabling swift response to emergency situations that could damage or destroy public infrastructure.

The contract structure emphasizes operational readiness and resource availability rather than traditional competitive bidding timelines. Contractors must maintain pre-qualified status and demonstrate capability to mobilize quickly upon contract award. Specific pricing, contract duration, renewal options, funding sources, and any set-asides are contingent upon the individual emergency projects undertaken. The agreement positions the City to access pre-vetted contractor resources for immediate disaster response and emergency infrastructure protection without delay.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of San Diego

CONTRACTOR’S NAME:

ADDRESS:

TELEPHONE NO.: FAX NO.:

CITY CONTACT: Abel Martinez, Contract Specialist, Email: MartinezAbel@sandiego.gov

Phone No. (619) 533-5270 J. Pan / M. Antwan / K.E. Ranshaw

REQUEST FOR QUALIFICATIONS

DOCUMENTS

FOR

EMERGENCY CONSTRUCTION

SERVICES CONTRACT

RFQ NO.: K-27-2447-RFQ-3

SAP NO. (WBS/IO/CC): 11004079

CLIENT DEPARTMENT: 2112

COUNCIL DISTRICT: CITYWIDE

PROJECT TYPE: CA

THIS PROJECT IS SUBJECT TO THE FOLLOWING:

PREVAILING WAGE RATES: STATE FEDERAL

STATEMENT OF QUALIFICATIONS (SOQ) DUE:

2:00 PM

December 4, 2026

CITY OF SAN DIEGO’S ELECTRONIC BIDDING SITE, PLANETBIDS

http://www.sandiego.gov/cip/bidopps/

DEPUTY CITY ENGINEER

The engineering Specifications and Special Provisions contained herein have been prepared by or under the direction of the following Registered Engineer:

Seal:

For City Engineer Date

11/12/26

TABLE OF CONTENTS

SECTION PAGE NUMBER

1. INTRODUCTION

2. EQUAL OPPORTUNITY CONTRACTING PROGRAM PROVISIONS

3. ESTIMATED PROJECT COST

4. PROJECT DESCRIPTION

5. PROJECT SCHEDULE

6. PREQUALIFICATIONS OF CONTRACTORS

7. NOMINATING AND SELECTION PROCESS

8. PRE-SUBMITTAL ACTIVITIES

9. ADDITIONAL TERMS AND CONDITIONS

ATTACHMENTS

A. Project Description, Scope of Required Work and Services, and Area of Work Expertise Checklist

B. Submittal Requirements - Evaluation Criteria

C. Equal Opportunity Contracting Program…………………………………………………………30

D. In-Use Off-Road Diesel Fueled Fleet Regulation (Off-Road Regulation) Compliance (CARB)………………………………………………………………………………………...61

E. Certification of Exceptions To Request For Qualifications

Emergency Construction Services Contract

K-27-2447-RFQ-3

3 | Page

REQUEST FOR QUALIFICATIONS

1. INTRODUCTION

1.1 PURPOSE: The City of San Diego (City) is requesting Statements of Qualifications (SOQ) for the Emergency Construction Services Contract (Project). This Request for Qualifications (RFQ) is the first step in the City of San Diego's (City) procurement process for the selection of a qualified Contractor for the Project. The City will not reimburse Contractors for costs incurred in the preparation, submittal and participation in the RFQ process. This RFQ does not commit the City to award a contract, or to procure or contract for work.

1.2 SUMMARY OF WORK: The City is seeking to acquire Emergency Construction Services for emergency projects. Work and Services required of the Contractor will include design, construction, and startup of the Project. The Contractor shall provide all management, supervision, labor, services, temporary facility, equipment, tools, supplies, and any other item needed to complete the design, construction, and start-up of the Emergency Project as described in Attachment A.

1.3 PERFORMANCE PERIOD: The performance period for each contract awarded will include an initial base period of 2 years with an additional 1 year option period for a total performance period of three (3) years. Contracts will automatically renew unless cancelled by the City.

1.4 FORMAT RECEIPT AND OPENING OF SOQs: SOQs will be received in electronic format (eBids) EXCLUSIVELY at the City of San Diego’s electronic bidding (eBidding) site, at:

http://www.sandiego.gov/cip/bidopps/ and are due by the date, and time shown on the cover of this solicitation.

1.5 SUBMITTERS MUST BE PRE-REGISTERED with the City’s bidding system and possess a system-assigned Digital ID in order to submit an electronic proposal.

1.6 The City’s bidding system will automatically track information submitted to the site including IP addresses, browsers being used and the URLs from which information was submitted. In addition, the City’s bidding system will keep a history of every login instance including the time of login, and other information about the user's computer configuration such as the operating system, browser type, version, and more.

Because of these security features, Contractors who disable their browsers’ cookies will not be able to log in and use the City’s bidding system.

1.7 Upon entry of their SOQ, the system will ensure that all required fields are entered.

The system will not accept an SOQ for which any required information is missing. This includes all necessary pricing, subcontractor listing(s) and any other essential documentation and supporting materials and forms requested or contained in these solicitation documents.

1.8 SOQs REMAIN SEALED UNTIL DUE DATE AND TIME. Electronic submissions are transmitted into the City’s bidding system via hypertext transfer protocol secure (https) mechanism using SSL 128-256 bit security certificates issued from

Emergency Construction Services Contract

4 | Page

Verisign/Thawte which encrypts data being transferred from client to server. SOQs submitted prior to the Due Date and Time are not available for review by anyone other than the submitter, who will have until the Due Date and Time to change, rescind or retrieve its proposal should they desire to do so.

1.9 SOQs MUST BE SUBMITTED BY DUE DATE AND TIME. Once the deadline is reached, no further submissions are accepted into the system. Once the Due Date and Time has passed, bidders, proposers, the general public, and City staff are able to immediately see the results on line. City staff may then begin reviewing the submissions for responsiveness, Equal Opportunity Contracting Program (EOCP) compliance and other issues.

1.10 RECAPITULATION OF THE WORK. SOQs shall not contain any recapitulation of the Work. Conditional SOQs may be rejected as being non-responsive. Alternative SOQs will not be considered unless called for.

1.11 SOQs MAY BE WITHDRAWN by the Submitter prior to, but not after, the time set as Due Date and Time.

1.11.1 Important Note: Submission of the electronic SOQ into the system may not be instantaneous. Due to the speed and capabilities of the user’s internet service provider (ISP), bandwidth, computer hardware and other variables, it may take time for the proposer’s submission to upload and be received by the City’s eBidding system. It is the proposer’s sole responsibility to ensure their SOQs are received on time by the City’s eBidding system. The City of San Diego is not responsible for SOQs that do not arrive by the required date and time.

1.12 ACCESSIBILITY AND AMERICANS WITH DISABILITIES ACT (ADA) COMPLIANCE: To request a copy of this solicitation in an alternative format, contact the Purchasing & Contracting Department Contract Specialist listed on the cover of this solicitation at least five (5) working days prior to the due date to ensure availability.

1.13 ELECTRONIC SUBMISSIONS CARRY FULL FORCE AND EFFECT

1.13.1 The submitter, by submitting its electronic SOQ, acknowledges that doing so carries the same force and full legal effect as a paper submission with a longhand (wet) signature.

1.13.2 The submitter, by submitting their electronic SOQ, agrees to and certifies under penalty of perjury under the laws of the State of California, that the certification, forms and affidavits submitted as part of this SOQ are true and correct.

1.14 CONTRACTOR REGISTRATION AND ELECTRONIC REPORTING SYSTEM:

1.14.1 Prior to the Award of a Contract or Task Order, you and your Subcontractors and Suppliers must register with the City’s web-based vendor registration and bid management system. For additional information go to:

http://www.sandiego.gov/purchasing/bids-contracts/vendorreg.shtml

Emergency Construction Services Contract

5 | Page

1.14.2 The City may not award a contract until registration of all subcontractors and suppliers is complete. In the event this requirement is not met within the time frame specified in the Notice of Intent to Award letter, the City reserves the right to rescind the Notice of Award / Intent to Award and to make the award to the next responsive and responsible bidder

1.15 SOQs ARE PUBLIC RECORD: Upon receipt by the City, SOQs shall become public records subject to public disclosure. It is the responsibility of the respondent to clearly identify any confidential, proprietary, trade secret or otherwise legally privileged information contained within the SOQ. General references to sections of the California Public Records Act (PRA) will not suffice. If the Contractor does not provide supply applicable case law that clearly establishes that the requested information is exempt from the disclosure requirements of the PRA, the City shall be free to release the information when required in accordance with the PRA, pursuant to any other applicable law, or by order of any court or government agency, and the Contractor will hold the City harmless for release of this information.

1.16 PUBLIC DISCLOSURE: Selection announcements, contract awards, and all data provided by the City shall be protected from public disclosure. Contractor’s desiring to release information to the public, shall receive prior written approval from the City.

1.16 CONFLICT OF INTEREST: Any architectural firms, engineering firms, specialty consultants, or individuals previously retained by the City to assist in drafting the Project’s preliminary design, General Development Plan or Drawings shall not be eligible to participate in the competition with any Design-Build Entity without the prior written consent of City. Any architectural firms, engineering firms, specialty consultants, or individuals retained by the City to assist in drafting any Reference Documents or other document that was not prepared specifically for this contract, are considered to be eligible to participate.

2. EQUAL OPPORTUNITY CONTRACTING PROGRAM (EOCP) PROVISIONS

2.1 The City is dedicated to the principles of equal opportunity in the workplace and in subcontracting. It is the City’s expectation that firms doing business with the City have and are able to demonstrate the same level of commitment.

2.2 The Contractors are encouraged to take positive steps to diversify and expand their Subcontractor solicitation base and to offer subcontracting opportunities to all eligible Subcontractors. The Contractor shall comply with requirements of San Diego Municipal Code §§ 22.2701 through 22.2708, Equal Employment Opportunity Outreach Program (EEO Program).

2.2.1 Following the award of the Contract, the Contractor will be required to use the City’s web-based contract compliance application for EOCP reporting purposes e.g., Weekly Certified Payroll, Monthly Employment Utilization, and Monthly Payments. Online tutorials are available at:

http://stage.prismcompliance.com/etc/vendortutorials.htm

2.2.2 The City may retain progress payments if:

2.2.2.1 The non-registered Contractor, Subcontractors, or Suppliers fail to register, Emergency Construction Services Contract

6 | Page

2.2.2.2 EOCP reporting is delinquent or inadequate, or

2.2.2.3 Underpayment has occurred.

2.3 For additional Equal Opportunity Contracting Program requirements, see Attachment C.

3. ESTIMATED PROJECT COST: All Contractors must be prequalified under the City’s Pre- Qualification Program for a minimum of $5,000,000.00. Prequalification status for all Contractors must be maintained for the term of the RFQ.

4. PROJECT DESCRIPTION: See Attachment A.

5. PROJECT SCHEDULE

5.1 The following milestones are provided for reference only. All dates are tentative and are subject to change.

5.1.1. Advertise and Issue RFQ November 16, 2026

5.1.2. SOQ due date December 4, 2026

5.1.3. Shortlist Finalists January 5, 2026

5.1.4. Selection and Notification February 8, 2026

5.2. For future Emergency Projects during the performance period the City will solicit Proposals from the shortlisted Contractors on a rotation basis.

6. PREQUALIFICATION OF CONTRACTORS

6.1. GENERAL

6.1.1. Contractors interested in participating on this project must, at the time of SOQ submittal, be pre-qualified at level equal to or greater than the Engineer’s Estimate for the project.

6.1.1.1. All Contractors applicants must submit a complete prequalification application online to the Purchasing & Contracting Department, Prequalification Program no later than 2 weeks prior to the SOQ due date and time. Complete information and links to the online prequalification application are available at:

http://www.sandiego.gov/cip/bidopps/prequalification

6.1.1.2. Due to the City’s responsibility to protect the confidentiality of the contractors’ information, City staff will not be able to provide information regarding contractors’ prequalification status over the telephone.

Contractors may access real-time information about their prequalification status via their vendor profile on PlanetBids™.

Emergency Construction Services Contract

7 | Page

6.1.2. The City desires to receive SOQs only from qualified and experienced Contractors who demonstrate significant knowledge of emergency construction projects, extensive experience and successful performance on public works infrastructure projects of comparable size and scope.

7. NOMINATING AND SELECTION PROCESS

7.1. This Program's Nominating and Selection Process is based on the policies, procedures, and guidelines set in the San Diego Municipal Code §§ 22.3301 through 22.3309. The nominating and selection process has been established as follows:

7.1.1 A Nominating Panel (Panel) is established and includes representatives from the City. The Panel may also include other interested parties such as additional participating agencies, representative from the community and other appropriate agencies.

7.1.2 After the City receives the SOQs, the Panel will review the qualifications based on the established evaluation criteria set forth in Attachment B of this RFQ.

7.1.3 The Panel will recommend to the Purchasing & Contracting Department Director (Director) or designee the short-listing of the most highly qualified Contractors and, upon approval, only those firms will be allowed to participate in the on-call rotation selection process to perform emergency services.

7.1.4 The Director or designee shall have the sole discretion to ratify the short-list submitted by the Panel.

7.1.5 The initial list order of the Contractors for each area of expertise shall be independently determined using a random placement process.

8. PRE-SUBMITTAL ACTIVITIES

8.1. SUBMISSION OF QUESTIONS

8.1.1. The Director (or Designee) of Purchasing & Contracting Department is the officer responsible for responding to questions and opening, examining, and evaluating the SOQs submitted to the City for the acquisition, construction, and completion of any public improvement except when otherwise set forth in these documents. All questions related to this solicitation shall be submitted to:

Abel Martinez, Contract Specialist, MartinezAbel@sandiego.gov

8.1.2. Questions received less than 14 Days prior to the Statement of Qualifications due date may not be considered.

8.1.3. Clarifications or clarifications deemed by the City to be material shall be answered via issuance of an addendum and posted to the City’s online bidding service.

Emergency Construction Services Contract

8 | Page

8.1.4. Only questions answered by formal written addenda shall be binding.

Oral and other interpretations or clarifications shall be without legal effect. It is the Contractor's responsibility to be informed of any Addenda that have been issued and to include all such information in its Bid.

8.2. PRE-SUBMITTAL MEETING

8.2.1 ONLINE PRE-SUBMITTAL MEETING:

Prospective Bidders are encouraged to attend the Pre-Submittal Meeting.

The Pre-Proposal Meeting will be held on Monday, November 30, 2026, at 10:00 AM (PST) at:

Microsoft Teams Join:

https://teams.microsoft.com/meet/2976347365843994?p=PgKMwmn ywszQCS5Gik Meeting ID: 297 634 736 584 399 4 Passcode: mP3dx6Ap Need help? | System reference Dial in by phone +1 945-468-5511,,580124403# United States, Dallas Find a local number Phone Conference ID: 580 124 403#

For organizers: Meeting options | Reset dial-in PIN

The purpose of the meeting is to discuss the scope of the Project, submittal requirements, and any Equal Opportunity Contracting Program requirements and reporting procedures.

8.2.2. To request a copy of the agenda in an alternative format, or to request a sign language or oral interpreter for this meeting, call the Purchasing & Contracting Department, Public Works Division at (619) 533-3450 at least 5 Working Days prior to the Pre-Submittal Meeting to ensure availability.

8.2.3. REVISION TO THE RFQ: Any changes to the Contract Documents through addendum are made effective as though originally issued with the solicitation. The Contractor shall acknowledge the receipt of any Addenda at the time of SOQ submission.

9. ADDITIONAL TERMS AND CONDITIONS

9.1. CITY’S RIGHT TO CANCEL: City reserves the right to cancel, in part or in its entirety, this RFQ including but not limited to: selection schedule, submittal date, and submittal requirements. If the City cancels or revises the RFQ, all potential Contractors will be notified in writing by the City.

Emergency Construction Services Contract

K-27-2447-RFQ-3

9 | Page https://teams.microsoft.com/meet/2976347365843994?p=PgKMwmnywszQCS5Gik https://aka.ms/JoinTeamsMeeting?omkt=en-US https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZTA1MjRiZGQtMTRhNi00OTY0LWI5ODgtN2EzMzk0YTZhNjIz%40thread.v2/0?context=%7b%22Tid%22%3a%22ab26ceb7-278f-4dcb-8df6-4e2363556459%22%2c%22Oid%22%3a%226e0950ee-7d3a-49a6-bc80-d4f7fc7d8745%22%7d tel:+19454685511,,580124403 https://dialin.teams.cloud.microsoft/67310406-9fc0-49fb-a885-57cc2f23b004?id=580124403 https://teams.microsoft.com/meetingOptions/?organizerId=6e0950ee-7d3a-49a6-bc80-d4f7fc7d8745&tenantId=ab26ceb7-278f-4dcb-8df6-4e2363556459&threadId=19_meeting_ZTA1MjRiZGQtMTRhNi00OTY0LWI5ODgtN2EzMzk0YTZhNjIz@thread.v2&messageId=0&language=en-US https://dialin.teams.cloud.microsoft/usp/pstnconferencing

9.2. ALLOCATION OF RISK:

9.2.1. The selected Contractor shall indemnify and hold harmless the City for claims, suits, losses or damages arising out of the negligent acts, errors, or omissions of the Contractor, Subcontractors, or Subcontractors attributable to the design effort.

9.3. PREVAILING WAGE RATES: Prevailing wage rates will apply to this contract.

9.3.1. Standardize labor rates for emergency projects shall be paid at California State prevailing wage rates plus 48.5% total markup.

9.3.1.1. The 48.5% total markup and base pay shall include all profit, overhead, fringe benefits, and any other labor surcharge.

9.3.1.2. Hourly rate for Foreman shall be determined from California State prevailing wage rate for Operator Group 8 plus $10/hr.

9.3.1.3. Hourly rate for Superintendent shall be determined by adding 15% to the Foreman’s hourly rate.

9.3.1.4. Hourly rate for Project Manager shall be determined by adding 15% to the Superintendent hourly rate.

9.3.1.5. Trucking work that is subcontracted will be marked up 10% by the prime contractor.

9.3.2. The contractor shall submit summary of work associated with the invoiced hours for the Project Manager for Resident Engineer’s verification of work done off site.

9.3.3. Trucks associated with transporting tools and equipment, such as foreman and superintendent, shall be compensated per Caltrans Equipment Rental Rates.

9.3.3.1. Cost associated with any vehicle for transportation of personnel shall not be compensated.

10 | Page

ATTACHMENTS

11 | Page

ATTACHMENT A

PROJECT DESCRIPTION, SCOPE OF REQUIRED WORK AND SERVICES, AND AREA OF

WORK EXPERTISE CHECKLIST

12 | Page

1. Project Description:

1.1 Emergency Project.

If the Mayor or City Council declares a Local State of Emergency due to natural disaster, accident or other event, or if a project is designated as an emergency under Municipal Code §22.3208(d), the City may need immediate assistance to protect public facilities, to keep roadways, sewer and water facilities, electrical equipment, and storm drains functioning, reduce the potential for contamination, prevent health problems, protect public and private property, and ensure public safety. Many emergency repairs are beyond the capacity of City forces because of the extent and complexity of the work and the need for accelerated completion.

Due to the critical nature of emergencies, it is imperative that an on call rotating list of Contractors be maintained to ensure quick and effective response. The Contractor must be able to provide services, including but not limited to:

1. Traffic control

2. Building Construction

3. Roadway Construction

4. Erosion Control

5. Excavation

6. Dewatering

7. Sewer, Water, and Storm Drain System Construction

8. Backfill and compaction

9. Debris removal (may include hazardous materials)

10. Environmental monitoring and sampling

11. Restoration of work

2. Scope of Required Work and Services:

The City intends to award contracts to pre-qualified Contractors immediately following disasters, accidents, or other events which threaten to damage or destroy public facilities.

The Contractor shall provide all management, supervision, labor services, equipment, tools, health, and safety plans, environmental monitoring, and any other items required for the Project.

2.1 Services.

2.1.1 The specific scope of work and the specification of materials to be used for any Work assigned under the Contract will be determined by the City Engineer or designee. Design and construction will be in accordance with City Standard Specifications for Public Works Construction, the GREENBOOK and WHITEBOOK, as last revised and adopted by the City, any supplements thereto, and additional references outlined in the actual contract for emergency service Work.

Emergency Construction Services Contract

13 | Page

2.1.2 The selected firm will enter into an agreement with the City.

2.2 Assignment of Work.

2.2.1 During or shortly after a disaster, accident or other event which threatens, damages or destroys public facilities, when emergency restoration and construction needs are identified, the City may elect to use the lists to assign design and construction tasks in one of two ways:

2.2.1.1 Method One (No Bid Work): The City will contact the first Contractor at the top of the applicable list to see if they are able and willing to perform the required work. If the Contractor accepts and the City concurs, the Contractor can perform the task and a contract will be awarded to perform the agreed upon work. The duration of this initial contract will vary depending on the required services. It is anticipated the most will be of a short duration to resolve just the most pressing needs. If the first Contractor does not accept the work or is otherwise unable to respond, the City will contact the next Contractor on the list. This will continue until all the required emergency services are complete. The City may contract with one or more for each incident. After being contacted, whether or not being assigned the work, the Contractor will be rotated to the bottom of the list. Each list rotation and order will be independent of the others.

2.2.1.2 Method Two (Bid Work): The City may use the established pre-qualified contractor lists as a source of firms to contact for services using a bidding process. In addition to any notice required to be given by applicable law, the City may directly notify the pre-qualified Contractors using the method most appropriate under the circumstances. It shall be the Contractors’ sole responsibility to ensure accurate contact information is provided to the City at all times, including a telephone number, fax number, e-mail address and mailing address. The failure of a Contractor to provide current contact information or to receive direct notice of an invitation to bid shall not be a basis for challenging an award. The Contractor submitting the lowest responsive bid will be awarded the contract.

2.2.2 At the discretion of the City Engineer or designee, if the Contractor is unable to commence the Work within 24 hours of notification, the next Contractor on the rotational list may be notified and offered the project.

2.2.3 If the project requires Long Term Maintenance and Monitoring, the Contractor would be required to perform this work.

14 | Page

3. Area of Work Expertise Checklist

Instructions to Contractors

Contractors shall place an “X” in the checkbox next to each category of work for which they wish to be considered for qualification and potential assignment of emergency construction, repair, restoration, or related services for the City of San Diego (City).

Contractors shall select only those work categories for which they possess the necessary experience, technical capabilities, qualified personnel, equipment, and applicable California contractor licenses.

Selection of a work category does not constitute a determination of qualification, placement on the City's emergency contractor list, or a guarantee of future work. The City reserves the right to evaluate and verify each Contractor's qualifications, licensing, experience, personnel, equipment, and technical capabilities before approving the Contractor for a particular work category or assigning work.

List 1 ☐ Metal Beam Guardrail and Fencing.

Applicable References: Caltrans Standard Specifications, Sections 80 and 83; CSI:

Divisions 01, 02, 05, 06, 10, 11, and 32

General Scope of Work:

Work may include emergency repair, replacement, and restoration of damaged metal beam guardrails, posts, blocks, rails, terminal sections, connections to structures, and associated hardware, as identified in the field or directed by the City.

Additional work may include repairing, replacing, or installing rockfall fencing, roadside debris fencing, and other protective fencing systems. Activities may include drilling, grouting posts into soil or rock, furnishing and installing fencing materials, and providing associated fittings, connections, and hardware.

The Contractor shall implement applicable stormwater pollution prevention and erosion control measures and perform related work as directed by the City.

Required Contractor's License: California Class A (General Engineering) or C-13 (Fencing), as appropriate for the work performed and subject to applicable licensing requirements

List 2 ☐ Earthwork, Slope Stabilization, Shoring, Hydroseeding and K-Rail

Applicable References: Caltrans Standard Specifications, Sections 10, 17–22, 72, and 83; CSI Divisions 01, 02, 03, 17, 31, 32, and 35.

15 | Page

General Scope of Work:

Work may include emergency removal, hauling, and proper disposal of soil, rock, debris, and other materials resulting from slope failures, landslides, slip-outs, debris flows, rockfalls, ground subsidence, erosion, flooding, earthquakes, or other emergency events.

Activities may include slope and ground stabilization, temporary or permanent shoring, slope restoration, rock and soil anchorage, installation of gravel bags and check dams, and hydroseeding using specified seed mixtures and application materials.

Additional work may include protecting public and private facilities affected or threatened by unstable slopes, erosion, flooding, or ground movement.

Work may also include furnishing, installing, maintaining, relocating, and removing temporary or permanent concrete traffic barriers (K-rail), reflectors, pavement markers, temporary crash cushions, and protective end treatments.

Related activities may include clearing and grubbing, excavation, grading, hauling, disposal, pavement striping, traffic control, erosion control, and other work necessary to stabilize affected areas and restore or protect public infrastructure.

All work shall be performed at locations designated by the City and in accordance with applicable safety and environmental requirements.

Required Contractor's License: California Class A (General Engineering) or C-12 (Earthwork and Paving), as appropriate for the work performed. Specialized work may require additional classifications or appropriately licensed subcontractors.

List 3 ☐ Bridge and Structural Repair, Reconstruction, and Temporary Structures

Applicable References: Caltrans Standard Specifications, Sections 45–60; CSI Divisions 01, 02, 03, 05, 32, and 34.

General Scope of Work:

Work may include emergency inspection support, stabilization, repair, rehabilitation, reconstruction, demolition, or removal of damaged bridges and other structures, as directed by the City.

Activities may include structural repairs, installation of temporary structural supports, foundation repairs, excavation, earthwork, and construction of temporary vehicular crossings, access routes, and detours.

Additional work may include installing temporary protective structures, implementing traffic control, maintaining access to affected facilities, and performing related construction activities necessary to protect public safety and restore transportation infrastructure.

16 | Page

Professional engineering evaluations, designs, or certifications, when required, shall be performed by appropriately licensed professionals.

The Contractor shall implement applicable stormwater pollution prevention and erosion control measures and perform related work as directed by the City.

Required Contractor's License: California Class A (General Engineering). Specialized structural work may require additional classifications or appropriately licensed subcontractors.

List 4 ☐ Culverts and Storm Drainage Facilities

Applicable References: Caltrans Standard Specifications, Sections 61–71; CSI Divisions 01, 02, 22, and 33.

General Scope of Work:

Work may include emergency repairs, replacement, rehabilitation, and restoration of damaged or failed culverts, storm drain pipelines, drainage structures, and associated facilities identified in the field or as directed by the City.

Activities may include pavement sawcutting, excavation, shoring, removal and disposal of damaged pipes and structures, temporary dewatering, stormwater diversion, bypass pumping, trench preparation, pipe installation, backfilling, compaction, and restoration of affected pavement and surface improvements.

Additional work may include repairing or replacing catch basins, storm drain inlets, manholes, headwalls, junction structures, outlet structures, and associated drainage improvements.

Related activities may include erosion control, slope stabilization, sediment removal, traffic control, and other work necessary to restore drainage capacity and protect public infrastructure.

The Contractor shall implement applicable stormwater pollution prevention measures and comply with relevant environmental and safety requirements.

Required Contractor's License: California Class A (General Engineering) or another classification authorized for the specific work, subject to verification of applicable Contractors State License Board (CSLB) requirements.

List 5 ☐ Wet Utilities: Water and Wastewater Systems

Applicable References: Greenbook and City of San Diego Whitebook, Sections 207– 209, 212, 306–308, and 500–503; CSI Divisions 01 and 02.

17 | Page

General Scope of Work:

Work may include emergency repair, replacement, restoration, and installation of damaged or inoperable components associated with potable and nonpotable water distribution systems, wastewater collection systems, and small wastewater treatment facilities with capacities of less than 0.5 million gallons per day (MGD).

Activities may include repairing or replacing pipelines, valves, pumps, motors, blowers, control panels, electrical conduits, wiring, aeration systems, impermeable liners, and associated mechanical and electrical equipment.

Additional work may include temporary water or wastewater bypass systems, temporary pumping, temporary liquid or solid waste storage, wastewater spill containment and cleanup, sludge hauling, chemical cleanup and disposal, and restoration of damaged facilities.

Related construction activities may include excavation, trenching, concrete repair, asphalt pavement removal and replacement, earthwork, and construction or repair of earthen berms.

The Contractor shall comply with applicable environmental, health, safety, wastewater discharge, and hazardous materials handling requirements.

Required Contractor's License: California Class A (General Engineering). Specialized electrical, mechanical, plumbing, or other work shall be performed by appropriately licensed contractors or subcontractors.

List 6 ☐ Road Reconstruction and Pavement Repair

Applicable References: Caltrans Standard Specifications, Sections 23–42; CSI Divisions 01, 02, 31, 32, and 34.

General Scope of Work:

Work may include emergency repair, reconstruction, rehabilitation, and replacement of damaged roadways, pavement sections, and related transportation improvements identified in the field or as directed by the City.

Activities may include pavement sawcutting, removal and disposal of damaged pavement, excavation, grading, subgrade preparation, backfilling, compaction, and furnishing and placing suitable aggregate base, subbase, asphalt concrete, and other pavement materials.

Additional work may include repairing or replacing curbs, gutters, minor drainage improvements, roadway shoulders, pavement markings, and other improvements necessary to restore safe roadway conditions.

18 | Page

The Contractor shall implement applicable stormwater pollution prevention and erosion control measures, provide traffic control as required, and perform related work as directed by the City.

Required Contractor's License: California Class A (General Engineering) or C-12 (Earthwork and Paving), as appropriate for the work performed.

List 7 ☐ Debris Removal, Hauling, and Disposal

Applicable References: Applicable Cal/OSHA and CalEPA requirements; CSI Divisions 01, 02, 41, and 44.

General Scope of Work:

Work may include emergency collection, removal, segregation, loading, transportation, recycling, and disposal of debris generated by storms, flooding, fires, structural failures, or other emergency events.

Debris may include concrete, metal, wood, vegetation, soil, sediment, fire-related ash, mixed construction materials, damaged building components, and other materials encountered at designated work locations.

Activities may include clearing debris from public facilities, roadways, drainage systems, rights-of-way, and private property where access and work have been properly authorized by the City.

Work may also include environmental monitoring, sampling of air, water, or soil, and implementation of measures necessary to minimize environmental impacts.

The Contractor shall prepare and implement a site-specific Health and Safety Plan, when required by applicable regulations or the City. The plan shall be prepared or reviewed by appropriately qualified personnel based on the nature of the work and associated hazards.

The Contractor shall comply with all applicable federal, state, and local requirements governing waste characterization, handling, transportation, recycling, and disposal.

Hazardous Materials:

During debris removal activities, the Contractor may encounter hazardous or potentially hazardous materials, including pesticides, chemicals, paints, petroleum products, electronic waste, asbestos-containing materials, lead-based paint, and other regulated substances.

When hazardous materials are involved, the Contractor shall possess or obtain the required licenses, registrations, certifications, and permits applicable to the work and shall provide evidence of such qualifications before performing regulated activities.

Emergency Construction Services Contract

19 | Page

Hazardous materials removal, handling, transportation, and disposal shall be performed only by appropriately qualified and authorized personnel or subcontractors.

The Contractor shall implement applicable stormwater pollution prevention measures and perform related work as directed by the City.

Required Contractor's License: California Class A (General Engineering) where applicable to the contracted scope. Other classifications, registrations, or certifications may be required depending on the nature of the debris removal, demolition, hazardous materials, and disposal activities.

List 8 ☐ Electrical Reconditioning, Repair, and Replacement

Applicable Codes and Standards: 2025 California Electrical Code (California Code of Regulations, Title 24, Part 3); NFPA 70, NFPA 70E, NFPA 70B, NFPA 101, NFPA 110, NFPA 111, and NFPA 820, as applicable; and CSI MasterFormat Divisions 26, 27, 28, and 48, where applicable and specifically incorporated into the Contract Documents.

General Scope of Work:

Work may include emergency inspection, assessment, testing, reconditioning, repair, replacement, and restoration of electrical systems and equipment damaged or rendered unsafe or inoperable by storms, flooding, water intrusion, power failures, electrical faults, or other emergency conditions, as directed by the City.

Activities may include the following:

1. Electrical Equipment Inspection and Assessment

Inspect and evaluate damaged or deteriorated electrical equipment, including circuit breakers, fuses, fused disconnect switches, switchgear, switchboards, panelboards, distribution panels, transformers, junction boxes, wiring, conduits, grounding systems, and associated electrical components.

Inspections may include thermal imaging, insulation resistance testing, continuity testing, and other appropriate diagnostic procedures to identify overheating, deterioration, electrical faults, and unsafe conditions.

2. Reconditioning, Repair, and Replacement

Repair, recondition, or replace electrical equipment and components, as appropriate, based on their condition, manufacturer recommendations, applicable codes, and recognized industry standards. Electrical equipment exposed to flooding, water intrusion, or other hazardous conditions shall be evaluated to determine whether reconditioning is permitted and technically appropriate. Equipment that cannot be safely reconditioned shall be replaced.

Reconditioned equipment shall be tested and documented before being returned to service.

20 | Page

3. Electrical System Upgrades and Modernization

Perform necessary rewiring, electrical system modifications, equipment upgrades, and modernization of existing electrical infrastructure, including associated auxiliary equipment, as identified in the City-approved scope of work. Work may include the replacement of electrical panels, switchgear, disconnect switches, distribution equipment, wiring, conduits, and associated components.

4. Equipment Compatibility and Code Compliance

For equipment replacement, including one-for-one replacement, the Contractor shall verify that the existing electrical system can safely accommodate the replacement equipment. Verification shall include, as applicable, available fault current, equipment interrupting and short-circuit current ratings, circuit protection, conductor sizing and condition, grounding and bonding, equipment compatibility, working clearances, and other applicable electrical code requirements. The Contractor shall identify deficiencies requiring correction and obtain City authorization before performing additional work outside the approved scope.

5. Emergency Electrical Restoration

Provide emergency electrical isolation, temporary electrical connections, temporary power distribution, and restoration of electrical service, as authorized by the City. Temporary and permanent electrical installations shall comply with applicable codes, safety requirements, and approved project specifications.

6. Hazardous and Special Environments:

Identify and evaluate site-specific hazards before commencing work, including wet or flooded environments, confined spaces, underground facilities, elevated work areas, and locations containing potentially hazardous or explosive atmospheres. Work in such environments shall be performed by appropriately qualified and trained personnel using applicable safety procedures, protective equipment, and required permits.

7. Electrical Safety and Protection:

Implement appropriate electrical safety procedures, including de-energization, lockout/tagout, verification of absence of voltage, arc-flash hazard assessment, shock protection, fall protection, confined-space entry procedures, and other applicable occupational safety requirements. Energized electrical work shall be limited to circumstances permitted by applicable safety regulations and shall be performed by qualified personnel under approved safety procedures.

8. Testing, Inspection, and Documentation:

Perform required inspections, electrical testing, functional verification, and commissioning before returning repaired or replaced equipment to service.

Provide the City with applicable test results, equipment documentation, manufacturer recommendations, inspection records, and updated record drawings reflecting completed modifications.

Emergency Construction Services Contract

21 | Page

9. Additional Electrical Work:

Perform other electrical repair, replacement, stabilization, and restoration activities associated with emergency conditions, as authorized by the City and within the Contractor's applicable license classification.

Required Contractor’s License:

The Contractor shall possess and maintain an active California Class C-10 Electrical Contractor license issued by the CSLB.

Electrical work shall be performed by appropriately qualified personnel holding any certifications required by California law. Work requiring additional specialty licenses or professional engineering services shall be performed by appropriately licensed individuals or subcontractors.

Applicable Standards and Requirements:

All work shall comply with applicable federal, state, and local laws, regulations, adopted building and electrical codes, occupational safety requirements, and the City's applicable construction standards and specifications.

The Contractor shall obtain required permits and approvals and coordinate necessary inspections with the appropriate authorities, unless otherwise provided in the Contract Documents.

Documentation Requirements Applicable to All Work Categories

For each work category selected, the Contractor shall provide documentation required by the City to support contract administration, regulatory compliance, cost verification, and potential emergency reimbursement.

When applicable, documentation may include daily work reports, labor and equipment records, material quantities, load tickets, disposal receipts, photographs, subcontractor records, invoices, work location records, and other supporting documentation.

Documentation shall comply with applicable Federal Emergency Management Agency (FEMA), California Governor's Office of Emergency Services (Cal OES), and other funding or regulatory requirements identified by the City.

The Contractor shall maintain accurate and complete records and submit the required documentation in the format and within the timeframes establish

22 | Page

ATTACHMENT B

SUBMITTAL REQUIREMENTS - EVALUATION CRITERIA

Emergency Construction Services Contract

23 | Page

ATTACHMENT B

SUBMITTAL REQUIREMENTS - EVALUATION CRITERIA

1. SUBMITTAL REQUIREMENTS

1.1. The SOQ shall be concise, well organized, and demonstrate the Contractor's qualifications and experience applicable to the Project. The SOQ shall be limited to 25 one-sided pages (8 1/2 x 11) - exclusive of resumes, graphics, forms, pictures, photographs, dividers and front/back cover - that address the RFQ requirements. Font Type shall be Times New Roman in a minimum 12 point font size, with a minimum 1” margin for text pages. A cover letter may be submitted but shall not contain any information that is a required element of the RFQ as per Attachment B, Submittal Requirements and Evaluation Criteria. Any SOQ that does not comply with these formatting standards may not be considered.

1.2. Documentation required by Attachment B, Section 2.8.4, Subcontractor Documentation, shall be in addition to the page limit stated above.

1.3. SOQs shall be signed by an individual or individuals authorized to execute legal documents on behalf of the Contractor.

1.4. SOQs shall be received no later than the time and place specified on the cover of this RFQ. SOQs and related materials received after the date and time specified above may not be considered.

1.5. Failure to comply with the requirements of this RFQ may result in disqualification.

1.6. SOQs submitted in response to this RFQ shall be in the following order and shall include:

1.6.1. Acknowledgment of Addenda to this RFQ.

1.6.2. Identification of the Contractor.

1.6.3. Exceptions to this RFQ.

1.6.4. Executive Summary.

1.6.5. Experience and Technical Competence.

1.6.6. Ability to Respond to Emergency Construction Services with Key Personnel

1.6.7. Knowledge and Understanding of Local Environment.

1.6.8. Equal Employment and Contracting Information.

SOQs that do not contain the aforementioned components may not be considered.

2. EVALUATION CRITERIA

2.1. Addenda to this RFQ: The Contractor is to confirm in its SOQ the receipt of all addenda issued to this RFQ. Failure to acknowledge all addenda issued may result in the SOQ being considered non-responsive and ineligible for further consideration.

Emergency Construction Services Contract

24 | Page

2.1.1. The Contractor is not required to include copies of the actual addenda in its

SOQ.

2.2. Identification of the Contractor: Failure to provide the Identification of the Contractor may result in the SOQ being considered non-responsive and ineligible for further consideration.

2.2.1. Legal name and address of company.

2.2.2. Legal form of company (partnership, corporation, joint venture, etc.). If joint venture identify the members of the joint venture and provide all information required under this section for each member.

2.2.3. Year of establishment of entity.

2.2.4. If company is subsidiary of a parent company, identify the parent company.

2.2.5. Address of main office.

2.2.6. Address of San Diego satellite office if applicable.

2.2.7. Contact information for firm, including name, title, email address and telephone number.

2.2.8. Number of employees in San Diego County.

2.2.9. Applicable Licenses:

2.2.9.1. City of San Diego Business License Number, including expiration date.

2.2.9.2. State Contractor’s License Number, including expiration date and all classifications.

2.2.9.3. Professional Engineering/Architect License Number, including expiration date.

2.2.10. Name, title, address and telephone number of person to contact concerning the SOQ.

2.3. Exceptions to this RFQ: The Contractor shall certify that it takes no exceptions to this RFQ and its attachments by signing and submitting with its SOQ the Certification of Exceptions to the Request for Qualifications. If the Contractor does take exception to any portion of the RFQ, the specific portion of the RFQ to which exception is taken shall be submitted to the City in writing prior to the Pre-submittal Meeting. Although the “Exceptions to the RFQ” is an evaluation criterion, an exception may be determined by the City to be of such a material nature that such exception may cause the SOQ to be considered non-responsive.

2.4. Executive Summary (5 Points Max): Include a one- to two-page overview of the entire SOQ describing the highlights of the SOQ. Failure to provide the executive summary may result in the SOQ being considered non-responsive and ineligible for further consideration.

25 | Page

2.5. Experience and Technical Competence (25 Points Max):

2.5.1. Describe the Contractor's experience performing construction activities comparable to the areas of work expertise selected in Attachment A, Section 3, Area of Work Expertise Checklist.

Provide information for at one comparable projects completed within the past two years, if available. Projects currently in progress may also be submitted for consideration, provided the Contractor clearly identifies the work completed to date.

For each project, provide the project name, location, owner, owner's representative and contact information, description of work performed, contract value, and completion date or current status.

The Contractor shall identify the areas of work expertise demonstrated by each project and describe any emergency response, expedited mobilization, or specialized construction activities performed.

The City will evaluate the relevance, complexity, and successful performance of the Contractor's experience in relation to the areas of work expertise for which qualification is requested.

2.6. Ability to Respond to Emergency Construction Services and Availability of Key Personnel (35 Points Maximum)

The Contractor shall demonstrate its ability to respond to emergency construction assignments within the City of San Diego, including its availability of qualified personnel, specialized equipment, and other resources necessary to perform work in the areas of expertise selected in Attachment A.

The Contractor shall provide the following information:

2.6.1. Emergency Response and Mobilization Capabilities (10 Points Maximum)

Describe the Contractor's ability to respond to emergency construction assignments, including:

2.6.1.1. Availability to provide emergency construction services 24 hours per day, seven days per week, including weekends and holidays.

2.6.1.2. Anticipated time required to mobilize personnel and equipment following notification by the City.

2.6.1.3. Procedures for responding to multiple or concurrent emergency assignments.

2.6.1.4. Availability of resources necessary to perform emergency work under adverse weather, hazardous conditions, or other emergency circumstances.

2.6.1.5. Ability to obtain additional personnel, equipment, materials, and subcontractor support when necessary.

2.6.2. Equipment and Operational Resources (10 Points Maximum)

Emergency Construction Services Contract

26 | Page

Provide a list of major equipment and specialized resources available to perform the work identified in Attachment A.

For each major piece or category of equipment, identify:

2.6.2.1. Equipment type and intended use.

2.6.2.2. Quantity available.

2.6.2.3. Primary location.

2.6.2.4. Whether the equipment is owned, leased, rented, or available through a subcontractor.

2.6.2.5. Anticipated availability and mobilization time during an emergency.

The City will evaluate the suitability, availability, and mobilization capabilities of the equipment and resources relative to the areas of work expertise selected by the Contractor.

2.6.3. Emergency Notification and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .