ElmPointRFP.pdf
PDF 884 KB Posted
- Attached to
- Elm Point Road Stormwater - Final (100%) Design
- Solicitation number
- 77298
- Issued by
- Rutland County, Vermont
About this file
This Request for Proposals document is issued by the South Lake Clean Water Service Provider in Vermont for Final Design (100%) services related to a rain garden/bioretention stormwater project located on private property in Addison, Vermont. The project builds upon a completed conceptual design from an initial Scoping Study and requires a qualified consultant to develop comprehensive final design documents. The RFP outlines the need for detailed engineering and design deliverables to advance the project from the conceptual phase to construction-ready documentation.
The document establishes the technical and professional requirements for consultant selection, including relevant experience with stormwater management, green infrastructure design, and bioretention systems. Specific pricing information, contract term details, response deadlines, and award timelines should be referenced within the RFP sections; funding for the project is anticipated to support the final design phase through project completion pending successful consultant procurement.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS FOR THE SOUTH LAKE CWSP
45 ELM POINT ROAD STORMWATER – FINAL DESIGN - ADDISON
Please submit proposals to:
Contact Information: South Lake Champlain (SLC) CWSP;
Hilary Solomon and Emily Friedman
Hilary Solomon, PMNRCD Emily Friedman, RRPC Po Box 209, Poultney, VT 05764 PO Box 430, Rutland, VT 05702
(802) 558-3515 / hilary@pmnrcd.org (802) 774-1346 / emily@rutlandrpc.org
Project Name: 45 Elm Point Road Stormwater – Final Design - Addison Project ID number: 15019 Project Location: Lower Lake Champlain Watershed, Addison Project Type: Stormwater Project Stage: Final Design Funds Available: $15,000
Project Summary
The South Lake CWSP is interested in hiring a consultant to oversee Final Design (100%) of a rain garden/bioretention project in Addison, VT. The proposed project was identified through a Project Scoping Study. This study assessed and prioritized potential stormwater projects in the Tri-Town neighborhood (located adjacent to Lower Lake Champlain).
The project site is a residential property located at 45 Elm Point Road. The property occupies a relatively steep slope above the roadway. The stormwater treatment practice would be located at the bottom of this slope, where runoff from the surrounding upland areas and adjacent developed surfaces converge. A conceptual design for the project was completed as part of the initial Scoping Study.
Project Description
This project includes working with a bare bones conceptual design to develop a final design.
The consultant will then finalize phosphorous reduction numbers, estimate project implementation costs, and engage project partners. The CWSP would like a report back at (approximately) the 30% design phase with more detailed information about project details and potential cost.
The goals of this project include:
• Develop a 100% design for the bioretention project, with a check-in at approximately 30% to make sure the project still meets the Formula Grant goals;
• Signed site access agreement from the involved landowner(s) and identify the responsible parties;
• Find potential cost efficiencies (cost per KG phosphorous reduced) based on DEC recommendations and the CWIP funding policy;
• Additionally, the CWSP and the consultant will manage, track, and report the results of this project per DEC requirements and will interface with Vermont DEC technical staff.
Applicable Milestones from the 2023 CWIP Funding Policy:
• Project initiated;
• Stakeholder meetings;
• DEC Programmatic Staff Engagement;
• Approximately 30% design check-in/report;
• 10-year (minimum) DEC Operation and Maintenance (O&M) Plan drafted; refer to DEC template for guidance;
• 10-year (minimum) access license or easement (if applicable) drafted; refer to DEC template for guidance;
• Other permit-required assessments or plans completed (if applicable);
• 100% design complete;
• Required permit applications drafted (if applicable);
• Final VDHP Project Review (if applicable);
• Project complete.
Applicable Performance Measures from the 2023 CWIP Funding Policy
• Draft 10-year (minimum) DEC Operations and Maintenance (O&M) Plan and documentation of support/commitment from O&M responsible party and landowner;
• Draft 10-year (minimum) access license or easement and documentation of project support/commitment from landowner;
• Draft permit application materials (including associated assessment reports or plans (if applicable), wetlands individual permit (if applicable);
• DEC programmatic staff comments on design;
• Signed VDHP Project Review Form;
• Final Design Report;
• Media Announcement;
• Final Performance Report or ANR Online Clean Water Project – Project Closeout Form
(once available);
• Batch Import File or ANR Online Clean Water Project – New Project Form (once available).
Please find attached:
• TriTown Stormwater Project Scoping Study
BIDS
Bids shall be electronically submitted via email, clearly marked, and sent to hilary@pmnrcd.org and emily@rutlandrpc.org by 7:00 PM on December 7th, 2026.
Site visits, though not required, can be planned. Please contact us as soon as possible if you are interested in visiting, and we will set up a site visit with you.
All bids, upon submission, become the property of the South Lake CWSP. The expense of preparing, submitting, and presenting a bid is the sole responsibility of the contractor. The South Lake CWSP retains the right to reject any and all bids received, to negotiate with any qualified source, or to cancel in part or in its entirety this RFP as in the best interest of the CWSP, project partners, or the landowner. This solicitation in no way obligates the CWSP to award a contract. Bid openings will not be open to the public for in-person viewing.
Bids should include:
• A brief description of similar projects completed by the bidder;
• Project Budget: A budget should include staff time and expenses calculated with as much transparency as possible. Please include as much information as necessary to show itemized costs and include budget narratives, if needed.
Please include names and billable rates for staff listed in the budget, as well as hourly rates and estimated number of hours for equipment to be used in the project;
• It is helpful if the budget reflects the deliverables listed above.
BID EVALUATION CRITERIA:
• Completeness of proposal
• Qualifications of proposer
• Experience with similar projects
• Knowledge of the site
• Clarity of the budget
Bids will be evaluated by CWSP staff and board members. Input may be received from other partners and/or the landowner.
TIMELINE
11/12/2026 – Request for Bids emailed and publicly posted
12/7/2026 @ 7:00 PM EST – Bid Proposals Due mailto:hilary@pmnrcd.org
12/11/2026 – Contractor Notification
12/22/2026 – Kick-off and Scoping Site Visit to be completed no later than this date (unless the project partners agree).
11/30/2027 – Project completion including listed milestones and performance measures.
CONTRACTING PROVISIONS
This project will be funded wholly or in part by the South Lake CWSP FY23 and FY24 Formula Grants. Invoices will be submitted to the Rutland RPC and payments are generally within 45 days of invoice receipt.
The South Lake CWSP will not be considered liable or obligated to the selected consultant(s) for all phases of this project (specifically work that is planned but uncompleted), however, we may choose to hire the consultant that wins this bid award for future stages of project work.
All contractors, and any sub-contractors, must comply with applicable laws, statues, ordinances, rules, regulations, and/or requirements of federal, state, and local governments and agencies thereof, which relate to or in any manner affect the performance of this agreement. Those requirements imposed upon the South Lake CWSP, as a recipient of federal funds, are thereby passed along to the contractor and any subcontractors.
Contractors shall not assign or subcontract any portion of the awarded contract to another party without the prior written permission of the South Lake CWSP. If approved, subcontractors must also adhere with all the terms of the agreed upon contract. All contractors and sub-contractors must comply with all pertinent federal, state and local laws, affirm to being an equal opportunity employer with an affirmative action plan, and must carry adequate insurance coverage, both for the benefit of PMNRCD and Rutland RPC (not less than $1,000,000 single occurrence general and professional liability; $2,000,000 aggregate, and workers compensation insurance).
No warranty is made that these coverage amounts and limits are sufficient to cover the interests of the contractor, but instead act as minimum amounts required for contract award. It is further stated that per best practices, a good-faith effort to obtain services from disadvantaged business enterprises will be made.
Prior to project start, we will need a copy of the COI with PMNRCD and Rutland RPC listed as additional insured and a current W-9.
Tri-Town Road Project Development Stormwater Remediation Project Development Report Addison, Vermont
Prepared for:
South Lake Champlain (SLC) CWSP
June 16, 2026
300 Cornerstone Drive, Suite 330 Williston, VT 05495
Table of Contents
Tri-Town Road Project Development: Stormwater Remediation Project Development Report
Addison, Vermont
1.0 EXECUTIVE SUMMARY
2.0 PROJECT PURPOSE AND BACKGROUND
3.0 PROJECT DEVELOPMENT METHODOLOGY
4.0 WATERSHED CHARACTERISTICS AND EXISTING CONDITIONS
5.0 SUMMARY OF PROJECTS EVALUATED
6.0 SUMMARY OF TOP FIVE PROJECTS
6.1 Project One: Gravel Wetland at 164 Elm Point Road
6.2 Project Two: Rain Garden at 45 Elm Point Road
6.3 Project Three: Tri-Town Road Western Roadside Drainage Swale
6.4 Project Four: Gravel Wetland at Western Side of Tri-Town Road Near Existing Water Treatment Facility
6.5 Project Five: Native Revegetation on Public Land
7.0 RECOMMENDED NEXT STEPS
8.0 SUMMARY
Appendices
Appendix A Conceptual BMP Details
Appendix B Order of Magnitude Cost Estimates
Appendix C Stormwater Treatment Practice Calculator
F:\P2024\1401\A11\Deliverables\Report\DRAFT Tri-Town Road Top Five Project Summary Report-BB.docx 3
1.0 EXECUTIVE SUMMARY
The South Lake Champlain (SLC) Clean Water Service Provider (CWSP) retained Fuss & O’Neill, Inc.
(Fuss & O’Neill) to complete project development services for stormwater remediation opportunities within the Tri-Town Road and Elm Point Road neighborhoods in Addison, Vermont.
The project area encompasses approximately 400-acres of predominantly residential, shoreline, and agricultural land that drains either directly to Lake Champlain or through small unnamed tributaries before reaching the lake. Residents within the project area have reported concerns related to stormwater runoff, localized flooding, erosion, and sediment transport.
The purpose of this project was to identify, evaluate, and prioritize potential stormwater remediation opportunities that could reduce phosphorus loading to Lake Champlain while improving local drainage conditions and watershed resiliency.
Project development activities included desktop review, field investigations, landowner outreach, identification of candidate project locations, conceptual project development, phosphorus reduction modeling, and preparation of planning level costs estimates.
A total of twelve potential projects were identified and evaluated. Based on anticipated phosphorus reduction benefits, implementation feasibility, landowner support, and conceptual costs, five projects were selected for conceptual development and further consideration.
Table 1: Summary of Top Five Projects Ranked by Cost-Effectiveness
Project Potential Project Type
& Location Practice Description
Cost per kg/Removed
1.
Rain Garden – 45 Elm Point
Rd.
Bioretention at bottom of slope near
Tri-Town/Elm Point intersection.
Filters nutrient load via vegetative uptake.
$17,500/kg removed
2.
Gravel Wetland – Public Land at 164 Elm Point Rd.
Large gravel wetland on public land.
Utilizes shallow cells to filter and treat nutrient load from stormwater runoff from Elm Point and Tri-Town
Roads.
$51,737 /kg removed
3.
Native Revegetation – Public
Land
1.88-acre revegetation area. would improve soil stability and reduce rate of erosion. Increased nutrient uptake in the long-term.
$66,667/kg removed
F:\P2024\1401\A11\Deliverables\Report\DRAFT Tri-Town Road Top Five Project Summary Report-BB.docx 4
4.
Gravel Wetland – Western
Side of Tri-Town Rd.
(Treatment Facility)
Large gravel wetland serving lower
Tri-Town Road watershed. It would filter and treat nutrient load and is able to receive a larger volume of stormwater runoff.
$141,000/kg removed
5.
Tri-Town Rd. – Western
Roadside Drainage Swale
Long roadside swale on western side of Tri-Town Road. Reduces nutrient load through sediment settling. Also, it can reduce flow velocity of runoff.
$255,000/kg removed
The projects identified through this effort represent opportunities for future advancement into design, permitting, and implementation phases as funding becomes available.
2.0 PROJECT PURPOSE AND BACKGROUND
In recent years, residents within the Tri-Town Road and Elm Point Road neighborhoods have reported concerns regarding flooding, erosion, and stormwater runoff. In response, the SLC CWSP issued a
Request for Proposals seeking assistance with identification and development of potential stormwater remediation projects within the watershed.
The project was intended to identify locations where stormwater treatment practices, drainage improvements, erosion control measures, and other water quality improvements could be implemented to reduce phosphorus loading to Lake Champlain.
The report documents the project development process completed by Fuss & O’Neill and summarizes the highest-ranked projects identified during the evaluation.
3.0 PROJECT DEVELOPMENT METHODOLOGY
To identify potential stormwater remediation opportunities within the project area, Fuss & O’Neill completed a desktop review, field investigations, and landowner outreach. Existing mapping, aerial photography, LiDAR topography, parcel information, soils data, and available environmental resource information were reviewed to identify areas with potential runoff, erosion, and drainage concerns.
Field investigations were completed throughout the Tri-Town Road and Elm Point Road neighborhoods to observe drainage patterns, document existing conditions, and discuss stormwater concerns with participating landowners. Observations collected during the site visits were compiled and reviewed by the project team.
Potential project locations were then screened and evaluated based on anticipated water quality benefits, implementation feasibility, site constraints, landowner interest, and conceptual construction costs. Twelve potential projects were identified and evaluated, and the five highest ranked projects were advanced for conceptual development.
F:\P2024\1401\A11\Deliverables\Report\DRAFT Tri-Town Road Top Five Project Summary Report-BB.docx 5
4.0 WATERSHED CHARACTERISTICS AND EXISTING CONDITIONS
The project area consists of approximately 400 acres located within the South Lake Champlain watershed in Addison, Vermont. Runoff generated within the watershed is conveyed through a combination of roadside drainage swales, overland flow paths, private drainage features, and small unnamed tributaries before discharging to Lake Champlain.
Land uses within the watershed consist primarily of low-density residential development, shoreline properties, local roadways, and agricultural land. The project area generally lacks formal stormwater treatment infrastructure and contains several locations where runoff is conveyed directly toward Lake
Champlain.
Site observations identified opportunities to improve stormwater treatment, reduce erosion, slow runoff velocities, and increase pollutant removal prior to discharge.
Figure 1: Scoping Site Visit Evaluation Area
F:\P2024\1401\A11\Deliverables\Report\DRAFT Tri-Town Road Top Five Project Summary Report-BB.docx 6
5.0 SUMMARY OF PROJECTS EVALUATED
A total of twelve candidate projects were identified and evaluated during the project development process. Potential projects included stormwater treatment practices, drainage improvements, erosion control measures, culvert upgrades, and revegetation opportunities.
Projects were evaluated based on anticipated phosphorous reduction, sediment reduction, infrastructure resiliency benefits, implementation feasibility, conceptual construction costs, and landowner support.
Table 2: Summary of All Projects Evaluated
Effectiveness Ranking
(In Order from Most to Least
Effective)
Potential Project and
Location
VTDEC Practice Type
Practice Description
Nutrient Load
Reduction
Sediment Load
Reduction
State/Municipal Infrastructure
Resiliency
1. Gravel Wetland –
Public Land
Stormwater BMP (Gravel Wetland)
Large gravel wetland on public land
High (7.85 kg/yr load;
5.18 kg/yr reduction)
High High
2. Rain Garden
– 45 Elm
Point
Stormwater BMP (Rain
Garden/Bioretention)
Bioretention at bottom of slope near
Tri-Town/Elm Point intersection
High (2.02 kg/yr load;
2.00 kg/yr reduction)
High Moderate
3. Tri-Town Road – Western Roadside Drainage
Swale
Stormwater BMP (Grass Conveyance
Swale)
Long roadside swale on western side of Tri-Town
Road
Moderate- Low (10.05 kg/yr load;
1.6 kg/yr reduction)
Moderate Moderate
4. Gravel Wetland –
Western Side of Tri-Town
Road (Treatment
Facility)
Stormwater BMP (Gravel Wetland)
Large gravel wetland serving lower Tri-Town
Road watershed
Moderate- High (1.5 kg/yr load;
1.00 kg/yr reduction)
High High
5. Native Revegetation
– Public Land
Native Revegetation 1.88-acre revegetation area
Moderate- High (0.95 kg/yr load;
0.90 kg/yr reduction)
Moderate Low-Moderate
F:\P2024\1401\A11\Deliverables\Report\DRAFT Tri-Town Road Top Five Project Summary Report-BB.docx 7
6. Stone Forebay at
Culvert Inlet – Oven Bay (57
& 9 Oven Bay)
Stormwater BMP (Extended Dry
Detention Basin)
Forebay at Oven Bay inlet to reduce coarse/fine sediment
Moderate- Low (9.57 kg/yr load;
1.08 kg/yr reduction)
Moderate Moderate
7. Tri-Town Road – Eastern
Roadside Drainage
Swale
Stormwater BMP (Grass Conveyance
Swale)
Roadside swale between 728- 606 Tri-Town
Rd
Low– Moderate (6.98 kg/yr load; 0.76 kg/yr reduction)
Low– Moderate
Moderate
8. Swale on Western Side of Elm Point
(to Boat Launch)
Stormwater BMP (Grass Conveyance
Swale)
Swale carrying runoff to stone seawalls at boat launch
Low– Moderate (4.74 kg/yr load; 0.34 kg/yr reduction)
Low– Moderate
Moderate
9. Cross-Culvert at Tri-Town and Elm Point
Intersection
Culvert Replacement & Private Road
Erosion Remediation
Culvert upgrade plus private road erosion issues
Low; 0.19 kg/yr reduction
Low Moderate
10. Driveway Cross Culvert
– 820 Tri- Town Road
Culvert Replacement & Private Road
Erosion Remediation
Culvert upgrade plus private road erosion issues
Low; 0.38 kg/yr reduction
Low– Moderate
Moderate
11. Cross-Culvert at 904 Tri-
Town Road
Culvert Replacement & Private Road
Erosion Remediation
Culvert upgrade plus private road erosion issues
Low; 0.02 kg/yr reduction
Low Moderate
12. Tree Canopy Expansion – Public Land
Tree Canopy Expansion
~80 new trees on public lakeshore parcel
Low (0.09 kg/yr load;
0.021 kg/yr reduction)
Low Low
The five highest-ranked projects were advanced for conceptual development and are summarized in
Section 6.0.
F:\P2024\1401\A11\Deliverables\Report\DRAFT Tri-Town Road Top Five Project Summary Report-BB.docx 12
Permitting requirements will depend on final project design and site conditions.
Recommendation
Based on the phosphorus reduction potential, available treatment area, public ownership, and anticipated ease of implementation, this project is recommended for advancement into future design and funding discussions.
6.2 Project Two: Rain Garden at 45 Elm Point Road
Project Location
The proposed project is located at 45 Elm Point Road, a residential property situated on the northern side of Elm Point Road near its intersection with Tri-Town Road. The property occupies a relatively steep slope above the roadway and received runoff from both the surrounding upland areas and adjacent developed surfaces.
During field investigations, stormwater runoff was observed concentrating along portion of the property before flowing downslope toward Elm Point Road and ultimately toward Lake Champlain. The homeowner reported recurring drainage and runoff concerns, particularly during larger storm events, and expressed interest in potential stormwater improvements that could help reduce runoff impacts on the property.
The proposed rain garden is situated near the lower portion of the slope where runoff naturally converges. This location provides an opportunity to intercept, temporarily store, and treat stormwater prior to discharge to downstream drainage systems. Due to the concentrated drainage patterns, available treatment area, and landowner support, the site was identified as one of the most favorable opportunities within the project area for implementation of a small-scale stormwater treatment practice.
F:\P2024\1401\A11\Deliverables\Report\DRAFT Tri-Town Road Top Five Project Summary Report-BB.docx 13
Figure 4: Project Location
Figure 7: Existing Site Conditions
Existing Conditions
The property is characterized by a steeply sloping lawn area that conveys stormwater runoff toward
Elm Point Road. Existing drainage patterns result in concentrated runoff reaching the lower portions of the property before entering roadside drainage features. Limited stormwater treatment occurs prior to runoff leaving the site.
The homeowner indicated that runoff and drainage issues have been observed during larger storm events. The property’s topography and existing drainage patterns provide an opportunity to intercept runoff before it reaches the roadway and downstream receiving waters.
Project Description
A rain garden, also referred to as a bioretention practice, is a shallow landscaped depression designed to collect, temporarily store, and treat stormwater runoff. Runoff is filtered through engineered soil media and vegetation, allowing pollutants to be removed through filtration, biological uptake, and infiltration.
The proposed rain garden would capture runoff generated from the contributing drainage area and provide treatment prior to discharge to downstream drainage systems. In addition to phosphorus
F:\P2024\1401\A11\Deliverables\Report\DRAFT Tri-Town Road Top Five Project Summary Report-BB.docx 14 reduction benefits, the practice would reduce runoff volumes, improve infiltration, and decrease peak runoff rates during storm events.
Project Treatment Characteristics
Item Value
Treatment Volume 51,064 CF
Treatment Area 2,863 SF
STP Capacity 3.91 inches
Treatment Efficiency 99%
Primary Function Infiltration, Nutrient Removal, Peak Flow Reduction
Estimated Phosphorus Reduction
Using the Vermont Stormwater Treatment Practice Calculator, the project is estimated to treat approximately 2.02 kg/year of phosphorus loading and reduce phosphorus export by approximately
2.00 kg/year.
Although the total phosphorus reduction is lower than some larger projects evaluated as part of this study, the rain garden demonstrated one of the highest treatment efficiencies and best cost-effectiveness ratios among all candidate projects.
Conceptual Cost Estimate
Item Value
Practice Type Rain Garden / Bioretention
Estimated Construction Cost $35,000
Cost Effectiveness $17,500/kg Phosphorus Removed
The estimate is intended for planning purposes only and is expected to be accurate within approximately -30 percent to +50 percent.
Property Ownership
The project is located on privately owned residential property at 45 Elm Point Road.
Landowner Support
The property owner expressed support for implementation of a rain garden and indicated interest in pursuing potential stormwater improvements to address existing drainage concerns. Landowner support contributed positively to the project’s overall ranking and feasibility.
Implementation Constraints
No significant implementation constraints were identified during the project development phase. Future project advancement should include confirmation of subsurface conditions, utility locations, and final grading requirements. Due to the sloping nature of the site, careful consideration should be given to grading and overflow routing during future design phases.
F:\P2024\1401\A11\Deliverables\Report\DRAFT Tri-Town Road Top Five Project Summary Report-BB.docx 15
Operation and Maintenance Responsibility
If implemented, long-term operation and maintenance would likely be the responsibility of the property owner.
Typical maintenance activities would include periodic weeding, mulch replacement, sediment removal, vegetation management, and inspection of inflow and overflow structures.
Permitting Considerations
Permitting requirements will depend on final project design and site conditions. At the conceptual level, no significant permitting constraints were identified. Future project advancement may require coordination with application local and state agencies depending on final design and disturbance limits.
Recommendation
Based on the high phosphorus removal efficiency, relatively low implementation cost, existing drainage concerns, and strong landowner support, this project is recommended for advancement into future design and funding discussions. The rain garden represents one of the most cost-effective stormwater treatment opportunities identified during the project development process.
6.3 Project Three: Tri-Town Road Western Roadside Drainage Swale
Project Location
The proposed project is located along the western side of Tri-Town Road between approximately 822
Tri-Town Road and 1102 Tri-Town Road in Addison, Vermont. The project area consists primarily of roadway shoulder, roadside embankment, and grassy areas within or immediately adjacent to the right-of-way.
Runoff from Tri-Town Road and adjacent upland areas is currently conveyed along this corridor through a combination of shallow overland flow and poorly defined roadside drainage pathways. During field investigations, evidence of concentrated runoff and erosion was observed along portions of the roadway edge and embankment. Stormwater collected along this corridor ultimately flows toward lower portions of the watershed before discharging to Lake Champlain.
Due to the length of the drainage corridor, available treatment area, and opportunity to improve both water quality treatment and drainage conveyance, the location was identified as a favorable candidate for a roadside storm water improvement project.
F:\P2024\1401\A11\Deliverables\Report\DRAFT Tri-Town Road Top Five Project Summary Report-BB.docx 32
Project 2: Rain Garden — 45 Elm Point
| RFP - Final Design |
| Project Development Report 6.16.2026 |
File details come from the government source that posted it. Updated .