This is a Notice to Contractors issued by Sacramento County for the Elkhorn Boulevard Extension project (Contract #4528), a comprehensive infrastructure development initiative located in Sacramento, California. The project requires furnishing all necessary labor, materials, equipment, and incidental work for clearing and grubbing, installing curb, gutter, sidewalk, ramps, drainage facilities, waterline, sanitary sewer, street lights, traffic signals, pavement removal, slurry seal, roadway striping, and sign relocation. The project will extend West Elkhorn Boulevard from Crossfield Drive to Power Line Road, with a pre-bid meeting scheduled for February 9, 2022, and a non-mandatory site walk on February 10, 2022. Bids are due electronically by March 10, 2022, at 2:00 pm, with pre-bid questions accepted until March 3, 2022, at 4:00 pm.
The estimated construction cost is $18,350,000, and the project requires a General Engineering Contractor (Class A) license. The bid includes multiple line items covering extensive infrastructure work, such as roadway excavation, concrete work, drainage systems, utility installations, traffic control, landscaping, and environmental controls. The pricing proposal is structured as a comprehensive unit price contract with detailed line items for various project components, including base bid and an alternative bid option. Bidders must provide a bid guarantee of at least 10% of the total bid amount, either through a bid bond, certified check, or cash. Additional requirements include compliance with labor regulations, prevailing wage standards, and specific contractor registration and licensing criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Transit_bus_CNG_Fuel_System_Repair.pdf | ||
| CSA_Template.docx | DOCX document | |
| CSA_Insurance_Template.pdf | ||
| Payment_Bond.docx | DOCX document | |
| Ctr_4528_-_Special_Provision_Elkhorn_Boulevard_Extension.pdf | ||
| Ctr_4528_-_Informational_Handout.pdf | ||
| Ctr_4528_-_Plans_Elkhorn_Boulevard_Extension.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE TO CONTRACTORS
ELKHORN BOULEVARD EXTENSION
County of Sacramento
9660 Ecology Lane
Sacramento, CA 95827
RELEASE DATE: January 24, 2022
DEADLINE FOR QUESTIONS: March 3, 2022
RESPONSE DEADLINE: March 10, 2022, 2:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/%7bproject.government.code%7d
NOTICE TO CONTRACTORS
Elkhorn Boulevard Extension
I. Introduction II. Notice to Contractors
III. Pricing Proposal IV. Vendor Submissions
Attachments:
A - Ctr 4528 - Plans Elkhorn Boulevard Extension
B - Ctr 4528 - Special Provision Elkhorn Boulevard Extension
C - Ctr 4528 - Informational Handout
Notice to Contractors #4528 Title: Elkhorn Boulevard Extension
1. INTRODUCTION
1.1. Summary
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County.
1.2. Contact Information
Spencer Ord
Senior Civil Engineer
Email: ords@saccounty.gov
Phone: (916) 876-6601
Department:
Transportation
Department Head:
Ron E. Vicari
Director
1.3. Timeline
Release Project Date January 24, 2022
Pre-Bid Meeting (Non-Mandatory) February 9, 2022, 1:30pm
Via Skype.
Dial (916)875-8000 and enter Conference ID:
87177827
Pre-Bid Site Walk (Non-Mandatory) February 10, 2022, 1:30pm
Meet at:
Pritchard Drive and Earhart Drive
Sacramento, CA 95837
38.705133, -121.590264
Question Submission Deadline March 3, 2022, 4:00pm
Bid Submission Deadline March 10, 2022, 2:00pm mailto:ords@saccounty.gov tel:(916)876-6601
2. NOTICE TO CONTRACTORS
2.1. ADVERTISEMENT SUMMARY
Notice is hereby given that the Board of Supervisors of the County of Sacramento will receive sealed bids for the following project:
Bid Date: Thursday, March 10, 2022
Submit Bids To: COUNTY OF SACRAMENTO. SUBMIT ELECTRONIC RESPONSES VIA THE SACRAMENTO
COUNTY ELECTRONIC BIDDING PORTAL (SACCOUNTYEBIDS). BIDDERS MUST ELECTRONICALLY SUBMIT
THEIR BID ONLINE NO LATER THAN 2:00 PM ON THE DAY OF THE BID. BID OPENING(S) WILL BE ONLINE
AT 2:00 PM AT THE FOLLOWING LINK SACCOUNTYEBIDS. Responses delivered by hand, fax, telephone, e-mail, or any postal carrier will not be accepted. If bidder uploads a file to SacCountyEbids, it is the bidder's responsibility to ensure the file is not corrupt or damaged. If County is unable to open an attachment because it is damaged, corrupt, infected, etc., it may disqualify bidder’s submission. See this training guide for guidance entering your online response.
FOR: Elkhorn Boulevard Extension
CONTRACT NUMBER: 4528
ESTIMATED CONSTRUCTION COST: $18,350,000
CONTRACTOR LICENSE REQUIRED: General Engineering Contractor, Class A
PRE-BID QUESTIONS DUE VIA Q&A: Date: Thursday, March 3, 2022 No later than: 4:00 pm
PROJECT DESCRIPTION: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and and other incidental work for: The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for clearing and grubbing, installation of curb, gutter, sidewalk, ramps, installation of drainage facilities, waterline, and sanitary sewer, street light installation, traffic signal installation, pavement removal, slurry seal, roadway striping, relocation of roadway signs, roadway, ditch, and channel excavation, as well as the structural design and construction of outlet control structures, and doing all other work specified on the plans and in the specifications. Other items or details not mentioned above that are required by these Special
Provisions shall be performed, placed, constructed, or installed in accordance with the Standard
Construction Specifications and these Special Provisions. The construction, materials, and workmanship for items of work on the plans, but not specifically mentioned in these Special Provisions are referred to the Standard Construction Specifications for conformance. The location of work shall be on West
Elkhorn Boulevard with the limits of the project extending from Crossfield Drive to Power Line Road.
CONTRACT INFORMATION: Contract Documents are contained herein and include: Notice to
Contractors, the Sacramento County Standard Construction Specifications, the Special Provisions, the
Bid Proposal form and any attachments, exhibits, drawings, addenda, and/or documents provided by the Project Manager that pertain to this project.
• Contract Documents are available at: SacCountyEbids https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/saccounty http://help.procurenow.com/en/articles/5815468-opengov-procurement-vendor-training https://secure.procurenow.com/portal/saccounty
• The Standard Construction Specifications, which are incorporated by reference in the Contract
Documents, may be downloaded at: www.saccountyspecs.saccounty.gov.
2.2. NON-MANDATORY PRE-BID MEETING
A non-mandatory pre-bid meeting will be held on Wednesday, February 9, 2022, at 1:30 pm, Via Skype.
Dial (916)875-8000 and enter Conference ID: 87177827. The project engineers will be present to provide a project summary and to answer questions.
2.3. BID GUARANTEES
Each bid must be submitted on the bid forms provided in the Contract Documents; however, if none are provided, the surety may issue on its own paper. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the
Treasurer of Sacramento County, or cash for an amount not less than ten percent (10%) of the aggregate sum of the bid.
2.4. BONDS
The successful bidder shall be required to execute a material and labor Payment Bond and Performance
Bond, issued by a corporate surety, acceptable to the County of Sacramento, each for not less than one hundred percent (100%) of the contract price.
Pursuant to Public Contract Code, section 22300, the Contractor may, at its own expense, substitute securities for any money being withheld by the County to ensure performance under this contract. The
Contractor must notify the County of its intent to pursue this option prior to the issuance/execution of a contract.
2.5. LICENSE REQUIREMENTS
Award of this contract requires a valid California contractor's license with the classification identified above.
Public Contract Code, section 4104(a)(1), requires that any person making a bid must submit the name, location of the place of business, and the subcontractor’s license number on the bid form.
No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5.
2.6. LABOR COMPLIANCE PROGRAM
The County of Sacramento received final approval from the Director of California Department of
Industrial Relations as a Labor Compliance Program effective March 15, 1994. All questions regarding this Labor Compliance Program and prevailing wage requirements should be directed to the Labor
Compliance Section at: 916-875-2711. In accordance with Section 1771.5 of the California Labor Code, the payment of the general prevailing rate of per diem wages or the general prevailing rate of per diem http://www.saccountyspecs.saccounty.gov/ wages for holiday and overtime is not required for any public works project of $25,000 or less when the project is for construction work, or for any public works project of $15,000 or less when the project is for alteration, demolition, repair, or maintenance work.
This is a Construction project in accordance with Labor Code section 1771.5.
Pursuant to California Labor Code, section 1720 and following, and section 1770 and following, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the
Director of the California Department of Industrial Relations. Copies of the prevailing wage determinations are on file at the office of the County of Sacramento Labor Compliance Program, 9700
Goethe Road, Suite D, Sacramento, CA 95827, and are also available at http://www.dir.ca.gov/DLSR/PWD.
2.7. FAA / AIP LANGUAGE
Assurances Required by the FAA: The Contractor shall, at all times during the term of the Contract, comply with the provisions of the “Airport Sponsor Assurances” (Assurances) and any subsequent revisions, updates or amendments hereto. A copy of the current Assurances is attached with the sample agreement in Appendix A of the Special Provisions. The provisions of the Assurances may change during the term of the Contract, and those changes will be incorporated into the Contract without the necessity of a formal amendment. County is not responsible for notifying Contractor of any changes to the
Assurances. Contractor is required to contact the FAA for any updates or revisions. The Assurances document is available on the FAA’s website. Please see FAA.
THIS PROJECT IS NOT AN AIRPORT IMPROVMENT PROGRAM (AIP) FUNDED PROJECT. Contractors must keep this in mind when referring to the following FAA required solicitation terms.
FAA REQUIRED SOLICITATION TERMS
NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY (AIP FUNDED PROJECT ONLY)
A. The Offeror’s or Bidder’s attention is called to the “Equal Opportunity Clause” and the “Standard
Federal Equal Employment Opportunity Construction Contract Specifications” set forth herein.
B. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:
o Timetables o Goals for minority participation for each trade: 16.1% o Goals for female participation in each trade: 6.9% o These goals are applicable to all of the Contractor’s construction work (whether or not it is
Federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With http://www.faa.gov/airports/aip/grant_assurances/media/airport-sponsor-assurances-aip.pdf regard to this second area, the Contractor also is subject to the goals for both its federally involved and non-federally involved construction.
o The Contractor’s compliance with the Executive Order and the regulations in 41 CFR Part 60-
4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a) and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the
Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to
Contractor or from project to project for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part
60-4. Compliance with the goals will be measured against the total work hours performed.
C. The Contractor shall provide written notification to the Director of the Office of Federal Contract
Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed.
D. As used in this notice and in the contract resulting from this solicitation, the “covered area” is
Sacramento County.
BUY AMERICAN PREFERENCE (AIP FUNDED PROJECT ONLY)
The Contractor agrees to comply with 49 USC § 50101, which provides that Federal funds may not be obligated unless all steel and manufactured goods used in AIP funded projects are produced in the
United States, unless the Federal Aviation Administration has issued a waiver for the product; the product is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart
25.108; or is included in the FAA Nationwide Buy American Waivers Issued list.
The Bidder must complete and submit the Buy America certification included herein with their bid or offer. The County will reject as nonresponsive any bid or offer that does not include a completed
Certificate of Buy American Compliance.
DAVIS-BACON REQUIREMENTS (AIP FUNDED PROJECT ONLY)
The Davis-Bacon Act ensures that laborers and mechanics employed under the contract receive pay no less than the locally prevailing wages and fringe benefits as determined by the Department of Labor. 2
CFR § 200, Appendix II(D); 29 CFR Part 5.
CERTIFICATION OF BIDDER REGARDING DEBARMENT (AIP FUNDED PROJECT ONLY)
By submitting a bid/proposal under this solicitation, the Bidder or Offeror certifies that neither it nor its principals are presently debarred or suspended by any Federal department or agency from participation in this transaction.
DISADVANTAGED BUSINESS ENTERPRISE (AIP FUNDED PROJECT ONLY)
The requirements of 49 CFR part 26 apply to this contract. It is the policy of the County to practice nondiscrimination based on race, color, sex, or national origin in the award or performance of this contract. The Owner encourages participation by all firms qualifying under this solicitation regardless of business size or ownership.
TRADE RESTRICTION CERTIFICATION (AIP FUNDED PROJECT ONLY)
A. By submission of an offer, the Offeror certifies that with respect to this solicitation and any resultant contract, the Offeror:
B. is not owned or controlled by one or more citizens of a foreign country included in the list of countries that discriminate against U.S. firms as published by the Office of the United States
Trade Representative (USTR);
C. has not knowingly entered into any contract or subcontract for this project with a person that is a citizen or national of a foreign country included on the list of countries that discriminate against U.S. firms as published by the USTR; and has not entered into any subcontract for any product to be used on the Federal project that is produced in a foreign country included on the list of countries that discriminate against U.S. firms published by the
USTR. This certification concerns a matter within the jurisdiction of an agency of the United States of
America and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title18 USC Section 1001.
The Offeror/Contractor must provide immediate written notice to the Owner if the Offeror/Contractor learns that its certification or that of a subcontractor was erroneous when submitted or has become erroneous by reason of changed circumstances. The Contractor must require subcontractors provide immediate written notice to the Contractor if at any time it learns that its certification was erroneous by reason of changed circumstances.
Unless the restrictions of this clause are waived by the Secretary of Transportation in accordance with
49 CFR 30.17, no contract shall be awarded to an Offeror or subcontractor:
A. who is owned or controlled by one or more citizens or nationals of a foreign country included on the list of countries that discriminate against U.S. firms published by the USTR, or
B. whose subcontractors are owned or controlled by one or more citizens or nationals of a foreign country on such USTR list, or
C. who incorporates in the public works project any product of a foreign country on such USTR list.
Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith, the certification required by this provision. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
The Offeror agrees that, if awarded a contract resulting from this solicitation, it will incorporate this provision for certification without modification in all lower tier subcontracts. The Contractor may rely on the certification of a prospective subcontractor that it is not a firm from a foreign country included on the list of countries that discriminate against U.S. firms as published by USTR, unless the Offeror has knowledge that the certification is erroneous.
This certification is a material representation of fact upon which reliance was placed when making an award. If it is later determined that the Contractor or subcontractor knowingly rendered an erroneous certification, the Federal Aviation Administration (FAA) may direct through the Owner cancellation of the contract or subcontract for default at no cost to the Owner or the FAA.
CERTIFICATION REGARDING LOBBYING (AIP FUNDED PROJECT ONLY)
The Bidder or Offeror certifies by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
A. No Federal appropriated funds have been paid or will be paid, by or on behalf of the Bidder or
Offeror, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a
Member of Congress in connection with the awarding of any Federal contract, the making of any
Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
B. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of
Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form- LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.
C. The undersigned shall require that the language of this certification be included in the award documents for all sub-awards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all sub-recipients shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than
$100,000 for each such failure.
PROCUREMENT OF RECOVERED MATERIALS (AIP FUNDED PROJECT ONLY)
Contractor and subcontractor agree to comply with Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, and the regulatory provisions of 40 CFR Part
247. In the performance of this contract and to the extent practicable, the Contractor and subcontractors are to use products containing the highest percentage of recovered materials for items designated by the Environmental Protection Agency (EPA) under 40 CFR Part 247 whenever:
A. The contract requires procurement of $10,000 or more of a designated item during the fiscal year; or
B. The contractor has procured $10,000 or more of a designated item using Federal funding during the previous fiscal year.
The list of EPA-designated items is available here: <link>.
Section 6002(c) establishes exceptions to the preference for recovery of EPA-designated products if the contractor can demonstrate the item is:
A. Not reasonably available within a timeframe providing for compliance with the contract performance schedule; or
B. Fails to meet reasonable contract performance requirements; or
C. Is only available at an unreasonable price.
2.8. QUESTIONS
Direct pre-bid questions to the Project Manager, Spencer Ord, via the Q&A tab in the portal. ALL PRE-
BID QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN Thursday, March 3, 2022 BY 4:00
pm. Questions received after that time will not be answered. Responses will be by addenda to the bid documents.
The Board reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in their judgment, is the lowest responsive bid of a responsible Bidder.
By order of the Board of Supervisors of the County of Sacramento, Sacramento County, California, dated: January 11, 2022.
Clerk of the Board http://www.epa.gov/smm/comprehensive-procurement-guidelines-construction-products
3. PRICING PROPOSAL
BASE BID
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 CSPP/SPCB Document Preparation 1 Allowance $5,000.00
2 SWPPP Preparation 1 Allowance $50,000.00
3 Water Pollution Control
Implementation 1 Allowance $200,000.00
4 Dewatering 1 Allowance $100,000.00
5 Protection of Existing Trees 1 Allowance $6,000.00
6 California Licensed Land Surveyor or
California Registered Civil Engineer 1 Allowance $15,000.00
7 Mobilization 1 LS
8 Clearing & Grubbing 1 LS
9 Project Information Signs 2 EA
10 Business Advisory Signs 3 EA
11 Portable Changeable Message Signs 4 EA
12 GGS Exclusion Fence 4,909 LF
13 Survey Monument Well 5 EA
14 Roadway Excavation 11,810 CY
15 Imported Borrow 62,060 CY
16 Ditch Excavation 1,550 CY
17 Cold Plane Aspahlt Concrete Pavement
(3" Max)
4,248 SF
18 Asphalt Concrete (Type A) 16,610 TN
Line Item Description Quantity Unit of
Measure Unit Cost Total
19 Aggregate Base (Class 2) 61,610 TN
20 Geogrid 3,750 SY
21 Slurry Seal (Type 2) 4,137 SF
22 Decomposed Granite 55,861 SF
23 PCC Mountable Curb 721 LF
24 PCC Curb & Gutter (Type 1A) 71 LF
25 PCC Curb & Gutter (Type 2) 10,377 LF
26 PCC Curb & Gutter (Type 2 Reinforced) 815 LF
27 PCC Curb (Type 3) 458 LF
28 PCC Curb (Type 4) 9,345 LF
29 PCC Curb (Type 4 Modified) 53 LF
30 PCC Curb (Type 4A) 3,607 LF
31 PCC Curb (Type 5 Modified) 564 LF
32 PCC Median 513 SF
33 Stamped Colored Concrete 20,305 SF
34 PCC Sidewalk 37,561 SF
35 PCC Colored Stamped Truck Apron 7,263 SF
36 Detectable Warning Surface (3'x4') 5 EA
37 Detectable Warning Surface (3'x5') 3 EA
38 Detectable Warning Surface (3'x6') 5 EA
39 AC Dike (Type E) 1,797 LF
Unit Cost Total
40 AC Dike (Type F) 609 LF
41 Detail 9 - 6" (Thermoplastic) 11,026 LF
42 Detail 22 - 6" (Thermoplastic) 25 LF
43 Detail 25A - 6" (Thermoplastic) 3,025 LF
44 Detail 27B - 4" (Thermoplastic) 260 LF
45 Detail 27B - 6" (Thermoplastic) 4,312 LF
46 Detail 27C Modified (Thermoplastic) 428 LF
47 Detail 29 - 6" (Thermoplastic) 1,889 LF
48 Detail 32 - 6" (Thermoplastic) 351 LF
49 Detail 36 (Thermoplastic) 130 LF
50 Detail 37B (Thermoplastic) 607 LF
51 Detail 37D (Thermoplastic) 384 LF
52 Detail 38 (Thermoplastic) 180 LF
53 Detail 38A (Thermoplastic) 1,366 LF
54 Detail 39 (Thermoplastic) 10,054 LF
55 Detail 39A (Thermoplastic) 133 LF
56 12" White Stripe (Thermoplastic) 318 LF
57 "H" Marker (Detail Modified 26) 368 EA
58 "D" Marker (Detail 22) 30 EA
59 "G" Marker (Detail 9) 48 EA
60 "RY" Marker (Detail 25A) 150 EA
Unit Cost Total
61 8" White Chevron Stripe
(Thermoplastic)
96 LF
62 Pavement Marking (Thermoplastic) 1,834 SF
63 Adjust Water Valve Box to Grade 4 EA
64 Relocate Double Check Detector Valve 1 EA
65 Relocate Fire Hydrant 1 EA
66 12" DIP 5,764 LF
67 6" DIP (For Hydrants) 24 LF
68 12" WSP 23 LF
69 4" Inline Blow Off Valve 2 EA
70 4" Temp Blow Off Valve 4 EA
71 2" ARV 2 EA
72 12" BFV 11 EA
73 12" Gate Valves 2 EA
74 Fire Hydrant 4 EA
75 6" Gate Valves (For Hydrants) 4 EA
76 Disinfect New Water Line 1 LS
77 12" Pressure Reducing Valve 1 LS
78 Precast Vault, Lid & Sump Pump 1 LS
79 Electrical For Waterline 1 LS
80 48" SSMH 7 EA
81 Reconstruct SSMH 1 EA
Unit Cost Total
82 Adjust SSMH to Grade 1 EA
83 10" C900 DR-18 111 LF
84 10" SDR-26 2,289 LF
85 Trench Dam 7 EA
86 48" SDMH 2 EA
87 48" Flat Top SDMH 2 EA
88 60" SDMH 1 EA
89 60" Flat Top SDMH 8 EA
90 12" Class III RCP 1,140 LF
91 18" Class III RCP 988 LF
92 18" Class V RCP 62 LF
93 24" Class III RCP 544 LF
94 24" Class V RCP 158 LF
95 30" Class III RCP 868 LF
96 42" Class III RCP 195 LF
97 Drainage Inlet (Type B) 14 EA
98 Drainage Inlet (Type C) 1 EA
99 Drainage Inlet (Type F) 4 EA
100 Reconstruct Existing Catch Basin Top 2 EA
101 12" Precast Concrete Flared End
Section
2 EA
Unit Cost Total
102 24" Precast Concrete Flared End
Section
1 EA
103 30" Precast Concrete Flared End
Section
1 EA
104 42" Precast Concrete Flared End
Section
2 EA
105 Outlet Control Structure 1 LS
106 Modified Under Sidewalk Drain 7 EA
107 RSP (20 LB, Class I, Method B) 75 TN
108 RSP Fabric (Class 8) 168 SY
109 Relocate Roadside Sign 11 EA
110 Remove Roadside Sign 32 EA
111 Roadside Sign - One Post 93 EA
112 Roadside Sign - Two Post (Wood) 8 EA
113 Roadside Sign - Two Post (Laminated
Wood Box)
9 EA
114 Type K-1 Object Marker 2 EA
115 Type Q Object Marker 8 EA
116 Sidewalk Barricade 9 EA
117 Street Closure Barricade 3 EA
118 Relocate Street Light 1 EA
119 Relocate Electrical Pullbox 4 EA
120 Relocate Electrical Cabinet 2 EA
Unit Cost Total
121 Relocate Bollards 4 EA
122 Street Light (Type A) 48 EA
123 Street Light Electrical System 1 LS
124 Electrical System (Roundabout) 1 LS
125 Lighted Stop Sign System 559 LF
126 Traffic Monitoring System 3,125 LF
127 Traffic Signal 1 LS
128 Signal Interconnect 1 LS
129 Unmetered Service Enclosure Cabinet 1 EA
130 Single Pipe Gate 2 EA
131 Staging and Traffic Control System 1 LS
132 Remove Guardrail 442 LF
133 Midwest Guardrail System 237.5 LF
134 Vegetation Control (Minor Concrete) 209 SY
135 WB-31 Transition Railing 4 EA
136 MGS Terminal System 4 EA
137 Chainlink End Post Assembly 4 EA
138 Repair and Replace Existing
Landscaping
1 LS
139 Topsoil 505 TN
140 Preparing Planting Areas 14,484 SF
141 1 Gallon Shrub & Ground Cover 27 EA
Unit Cost Total
142 Barch Mulch 86 CY
143 Turf (Sod) 22,826 SF
144 Permanent Hydroseed 24,985 SY
145 Fiber Rolls 4,762 LF
146 30 Day Plant Establishment Period 1 LS
147 Filter Fabric 4,206 SY
148 Sandy Loam 229 CY
149 Sand-Peat Layer 842 CY
150 AASHTO #8 Gravel 342 CY
151 36" Moisture Barrier 3,093 LF
152 4" Perforated Pipe 1,528 LF
153 Obliterate Surfacing 4,409 SF
154 Telecom System 1,795 LF
TOTAL
BID ALTERNATIVE A
Measure Unit Cost Total
155 Water Pollution Control
Implementation 1 Allowance $50,000.00
156 Repair of Existing Public Roadways on
Haul Route 1 Allowance $50,000.00
157 Mobilization 1 LS
Unit Cost Total
158 Clearing & Grubbing 1 LS
159 Project Information Signs 2 EA
160 GGS Exclusion Fence 2,234 LF
161 Survey Monument Well 1 EA
162 Roadway Excavation 4,580 CY
163 Cold Plane Aspahlt Concrete Pavement
(1.5" Max)
4,865 SF
164 Cold Plane Aspahlt Concrete Pavement
(3" Max)
16,692 SF
165 Asphalt Concrete (Type A) 2,252 TN
166 Aggregate Base (Class 2) 5,405 TN
167 Geogrid 11,047 SY
168 Slurry Seal (Type 2) 36,486 SF
169 PCC Curb & Gutter (Type 2) 301 LF
170 PCC Curb & Gutter (Type 2 Reinforced) 246 LF
171 PCC Curb (Type 3) 123 LF
172 PCC Curb (Type 4) 1,062 LF
173 PCC Curb (Type 4 Modified) 88 LF
174 PCC Curb (Type 4A) 89 LF
175 PCC Median 245 SF
176 Stamped Colored Concrete 1,236 SF
177 PCC Sidewalk 1,202 SF
Unit Cost Total
178 Detectable Warning Surface (3'x4') 3 EA
179 Detectable Warning Surface (3'x5') 3 EA
180 Detail 9 - 4" (Thermoplastic) 406 LF
181 Detail 22 - 4" (Thermoplastic) 152 LF
182 Detail 25A - 4" (Thermoplastic) 233 LF
183 Detail 27B - 4" (Thermoplastic) 1,423 LF
184 Detail 29 - 4" (Thermoplastic) 1,510 LF
185 Detail 38 (Thermoplastic) 1,333 LF
186 Detail 38A (Thermoplastic) 450 LF
187 Detail 39 (Thermoplastic) 1,541 LF
188 Detail 39A (Thermoplastic) 135 LF
189 12" White Stripe (Thermoplastic) 454 LF
190 "H" Marker (Detail Modified 26) 75 EA
191 8" White Chevron Stripe
(Thermoplastic)
46 LF
192 Pavement Marking (Thermoplastic) 503 SF
193 Adjust Water Valve Box to Grade 6 EA
194 Adjust Blow-Off Valve Box to Grade 2 EA
195 Relocate Fire Hydrant 1 EA
196 15" Class III RCP 19 LF
197 Drainage Inlet (Type G) 1 EA
198 Relocate Roadside Sign 1 EA
Unit Cost Total
199 Remove Roadside Sign 9 EA
200 Roadside Sign - One Post 10 EA
201 Type K-1 Object Marker 2 EA
202 Type Q Object Marker 6 EA
203 Sidewalk Barricade 4 EA
204 Traffic Signal 1 LS
205 Signal Interconnect 1 LS
206 Staging and Traffic Control System 1 LS
207 Permanent Hydroseed 920 SY
208 Obliterate Surfacing 3,405 SF
TOTAL
4. VENDOR SUBMISSIONS
4.1. Please type in your Total Bid Amount in WRITTEN format.*
Ex.) one million dollars
*Response required
4.2. Bid Guaranty*
Upload a copy of your fully executed bid bond here. Bid security must be a bidder bond, a certified check or cashier’s check payable to the Treasurer of the County of Sacramento, or cash. Bids secured by personal checks or personal guarantees will be rejected.
*Response required
4.3. Non-collusion Declaration*
The undersigned declares:
I am an authorized representative with binding authority for my company, the party making the foregoing bid.
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on the date this bid is submitted.
☐ Please confirm
*Response required
4.4. Designation of Subcontractors - Unit Price Contracts*
Please download the below documents, complete, and upload.
• Designation_of_Subcontracto...
*Response required
4.5. Iran Contracting Act Disclosure Form *
(California Public Contract Code, sections 2202-2208)
When responding to a bid or proposal or executing a contract or renewal for a County of Sacramento contract for goods or services of $1,000,000 or more, a vendor must either:
A. certify it is not on the current list of persons engaged in investment activities in Iran created by the California Department of General Services (“DGS”) pursuant to Public Contract Code section
2203(b) and is not a financial institution extending twenty million dollars ($20,000,000) or more in credit to another person, for 45 days or more, if that other person will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS; or
B. demonstrate it has been exempted from the certification requirement for that solicitation or contract pursuant to Public Contract Code section 2203(c) or (d).
To comply with this requirement, please select one of the options below. Please note: California law establishes penalties for providing false certifications, including civil penalties equal to the greater of
$250,000 or twice the amount of the contract for which the false certification was made; contract termination; and three-year ineligibility to bid on contracts. (Public Contract Code section 2205.)
OPTION #1 - CERTIFICATION
I certify I am duly authorized to execute this certification on behalf of the vendor/financial institution, and the vendor/financial institution is not on the current list of persons engaged in investment activities in Iran created by DGS and is not a financial institution extending twenty million dollars ($20,000,000) or more in credit to another person/vendor, for 45 days or more, if that other person/vendor will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS.
OPTION #2 – EXEMPTION
Pursuant to Public Contract Code sections 2203(c) and (d), a public entity may permit a vendor/financial institution engaged in investment activities in Iran, on a case-by-case basis, to be eligible for, or to bid on, submit a proposal for, or enters into or renews, a contract for goods and services. If you have obtained an exemption from the certification requirement under the Iran Contracting Act, please select
"EXEMPTION" below, and attach documentation demonstrating the exemption approval with your electronic submission.
☐ Certification
☐ Exemption https://government-project.s3.us-west-2.amazonaws.com/14260/24ab65cf-a692-47a7-9030-a6d3f30d6ea3_Designation_of_Subcontractors_Form.pdf?AWSAccessKeyId=AKIAJX4CP36AEOP5JL2A&Expires=1646335146&Signature=iTDyyxatSBVGD9Zg%2B1GGYBgrPLw%3D&response-content-disposition=attachment%3B%20filename%3D%22Designation_of_Subcontractors_Form.pdf%22
4.6. Type of Business*
☐ C Corporation
☐ S Corporation
☐ Limited Liability C Corporation
☐ Partnership
☐ Limited Liability Partnership
☐ Sole Proprietor/Individual
☐ Other
*Response required
4.7. Type your Legal Company Name Here*
State your Company's Name Here. This will be verified against the California Secretary of State's
Website.
*Response required
4.8. Contractors State License Board (CSLB) Number*
Please enter your License Number here. This will be verified against the state database
*Response required
4.9. Contractors State License Board (CSLB) Expiration Date & Classifications*
Expiration Date:
Classification(s):
*Response required
4.10. California Department of Industrial Relations Registration*
Please enter your Public Works Contractor Registration Number. This will be verified against the state database.
*Response required
4.11. I hereby certify under penalty of perjury that the above statements are true.*
☐ Please confirm
4.12. Please provide the full contact name, title, and e-mail of the signatory for your firm. (If an initial review is required by another recipient, please also include their information).*
*Response required
4.13. If awarded, please provide contact information (i.e. Full Name, E-mail address, phone number) for the Contract Manager for your firm in order to distribute Contract Documents, including other recipients requiring a copy.*
File details come from the government source that posted it. Updated .