| CONTRACT: | PUMPS AND MOTORS CONTINGENCY |
| CONTRACT NO: | |
| CONTRACTOR: | |
| SHIP: | USS STOCKDALE (DDG-106) |
| LOCATION: | NAVY REGION SOUTHWEST |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EA01-3394 | 4-220-0-E, NR-2 A/C CHILL WATER PUMP MOTOR | 1 | | |
| | ELIN 0001 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO MECHANICALL AND ELECTRICALLY DISCONNECT AND REMOVE THE EXISTING NR-2 A/C CHILL WATER PUMP MOTOR FROM THE FOUNDATION AND ASSOCIATED PIPING. AFTER REPAIR, INSTALL THE NR-2 A/C CHILL WATER PUMP MOTOR ONTO THE FOUNDATION AND CONNECT TO THE ASSOCIATED PIPING IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK. (SEE NOTE # 1 AND #2) | 1 | | | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EA01-3394 | 4-220-0-E, NR-2 A/C CHILL WATER PUMP MOTOR | 1 | | |
| | ELIN 0002 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH THE REPAIR OF THE NR-2 A/C CHILL WATER PUMP MOTOR TO INCLUDE THE SHAFT, SHAFT SLEEVES, WEARING RINGS, BEARINGS SIDE IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK. (SEE NOTE #1 AND #2) | 1 | | | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EA01-3394 | 4-220-0-E, NR-2 A/C CHILL WATER PUMP MOTOR | 1 | | |
| | ELIN 0003 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (ONLOAD AND OFFLOAD), CRANE SUPPORT, AND TRANSPORTATION OF THE NR-2 A/C CHILL WATER PUMP MOTOR FROM THE FOUNDATION TO THE SHOP FOR REPAIR AND BACK ONTO THE FOUNDATION AFTER REPAIR IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK.. | 1 | | | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EA01-3394 | 4-220-0-E, NR-2 A/C CHILL WATER PUMP MOTOR | 1 | | |
| | ELIN 0004 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHOP AND SHIPBOARD OPERATIONAL TESTING OF THE REPAIRED NR-2 A/C CHILL WATER PUMP MOTOR IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK.. | 1 | | | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EA01-3394 | 4-220-0-E, NR-2 A/C CHILL WATER PUMP MOTOR | 1 | | |
| | ELIN 0005 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS TO DRAIN AND DISPOSE ANY LIQUID IN SUPPORT OF THE REPAIR OF THE NR-2 A/C CHILL WATER PUMP MOTOR IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK.. | 1 | | | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EA01-3394 | 4-220-0-E, NR-2 A/C CHILL WATER PUMP MOTOR | 1 | | |
| | ELIN 0006 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PREPARATION AND PAINTING OF NEW AND DISTURBED SURFACE IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK. | 1 | | | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EA01-3394 | 4-220-0-E, NR-2 A/C CHILL WATER PUMP MOTOR | 1 | | |
| | ELIN 0007 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE REPAIR AND REPLACEMENT OF NEW AND DISTURBED LAGGING AND INSULATION IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK. | 1 | | | | |
PAUL DAMIAN, SBS TOTAL:
| MILESTONE EVENT | DATE |
| 1. Purchase Order Start Date | 22 June 2020 |
| 2. Removal of Motor assembly from foundation. Rigging and crane offload. | 22-24 June 2020 |
| Motor unit repair, assembly and shop testing. | 24 June - 20 July 2020 |
| 4. Crane and rigging. onboard installation. Shipboard testing | 20 - 24 July 2020 |
| 5. Purchase Order End. Date | 24 July 2020 |
| NOTES: |
| 1. The problem discovered the Motor was noisy with high vibrations. The motor is Sealed Insulated and may or may not required a rewind after inspection. The KTR shall make a recommendation and cost invoking 009-113 vice 009-17 to proceed with the repair if required upon completion of the Open and Inspect requirement. |
2. The Contractor shall notify the Ship’s Authorized Representative (SAR) prior to start of work noting equipment and systems that require isolation so that tag outs can be accomplished as required. The Contractor shall ensure complete tag-out of the system to include interferences is accomplished prior to the execution of the disconnection and removal of the Pump and Motor Unit.
| 3. The Contractor shall remove the Pump and Motor Unit from its foundation and delivery to shop for repairs in accordance with technical manual S6226-C9-MMA-010 and DWG A-365TN-58. |
| 4. Remove and reinstall all interferences and lagging. |