Elevation Rotary Joint (R400-2A1A5) Statement of Work 12 May 2022.doc
DOC document 33 KB Posted
- Solicitation number
- NW-WG3401-22-162
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Evaluation Factors.docx | DOCX document | |
| CAR 1352.209-74.docx | DOCX document | |
| 52.222-48 Exemption from Appl of the SC Labor Standards.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Repair and Recondition: Next Generation Radar (NEXRAD) Waveguide Assembly, Elevation Rotary Joint
ASN: R400-2A1A5, NSN: 5985-01-362-0598
Version: May 12, 2022 Description: The Contractor shall repair and recondition the NEXRAD Elevation Rotary Joint to "Like New" operating condition, including cosmetic appearance in accordance with National Weather Service specification drawing no. 1213624 Revision B. The repair and reconditioning price shall include the parts, materials, labor, inspection and return shipping necessary to return the Elevation Rotary Joint to operational specifications. Repair materials or specifications differing from the NWS source specification must be approved by the National Weather Service prior to use.
Definition: “Like New” Condition means reconditioned to the listed specification to meet all applicable electrical, mechanical, and cosmetic specifications and Engineering documentation, including the replacement of damaged or missing non-functioning parts.
Government Furnished Equipment: None Government Furnished Data: The following documents provided upon request:
Specifications Drawing No. 1213624 Revision B.
Vendor Furnished Equipment: As required to accomplish repair and reconditioning actions.
Recommended Equipment and Supplies: None
First Article: Please check the Purchase Order (SF1449) for any First Article requirements. If First Articles are required, they must pass inspection by the NRC’s Inspection Branch before you are given the “Notice to Proceed” from the Contracting Officer for the remaining units.
Description of Work – Work Procedures: Repair and recondition to ensure the unit meets all requirements in the documents listed in the “Government Furnished Data” and is returned to “Like New” condition. If unforeseen problems arise or major defects exist that would prevent repair of the unit, contact the Contracting Officer for directions.
Warranty Terms: The contractor will provide a 1-year warranty against material workmanship and against faults occurring during operation. This 1-year warranty will begin after passing the final equipment inspection and acceptance for stock.
NRC Final Acceptance: All repaired and reconditioned Waveguide Assembly, Elevation Rotary Joints are subjected to Performance Quality Assurance testing/inspection and will be returned for corrections if discrepancies are found in accordance with NWS specification drawing no. 1213624 Revision B. To meet the material workmanship requirements, the Waveguide Assembly, Elevation Rotary Joint will need to be in a “Like New” operating condition to include external appearance; surfaces which are normally painted be painted. Any inspected item that does not meet the acceptance criteria will be returned to the vendor for rework at no additional cost to the government.
Deliverables: Each repaired and reconditioned Waveguide Assembly, Elevation Rotary Joint, by serial number, shall be supplied with a Repair Report documenting the repair, reconditioning, and inspection to include results of all tests and failure analysis.
Shipping Address:
NATIONAL RECONDITIONING CENTER (NRC)
14200 MERRITT RD.
GRANDVIEW, MO. 64030
Transportability: Vendor is responsible for returning repaired products in a shipping container designed to withstand the vibration and shock encountered during transportation by ship, rail, truck, and aircraft. The units shall be packaged to prevent damage to include: physical, electrical, mechanical, cosmetic, and the units shall not be damaged or lose performance capability.
Final Note: When unforeseen problems arise that may need clarification, please contact the Contracting Official who will notify the NRC. If the unit has any problem that prevents a quality repair, do not work on the item until the issue can be resolved.
NRC Reviewed:
NEXRAD Repair Branch Review: Richard Vogel, Branch Chief, May 12, 2022 TI&MR Branch Review: Gregory Flores, Branch Chief, May 11, 2022