Electrical Utility Transformer & Door
Solicitation number
2026-RFP-00115
Issued by
San Mateo County, San Bernardino City, California

About this file

The document is a Request for Proposals (RFP) No. 2026-RFP-00115 issued by the County of San Mateo Parks Department for an Electrical Utility Transformer & Door replacement project located at Coyote Point Recreation Area. The project involves removing and replacing a high-voltage electrical transformer and a single door on a separate transformer unit, with the existing transformer enclosure being in poor condition with significant rust and deterioration beyond its service life. The RFP was released on September 25, 2025, with a pre-proposal meeting scheduled for October 15, 2025, at 11:00am at the Coyote Point Recreation Area. Proposals are due by October 29, 2025, at 5:00pm, with an anticipated contract award date of November 13, 2025. The contract term is set for 6 months.

The evaluation and selection will be primarily price-based, with 100% of the scoring focused on the proposed fee. The County has implemented a Procurement Preference for Local Businesses Ordinance, which may provide advantages to local businesses, non-profits, and small/micro businesses located in San Mateo County. Proposers must meet minimum qualifications, including having provided similar services for at least four years within the last seven years and having an account manager with two years of experience in account services. The RFP is being conducted as a Cooperative Procurement, allowing other organizations to potentially use the resulting contract terms, though this does not commit them to do so.

View the file

Other files

File Type Posted
Electrical_Utility_Transformer_&_Door.pdf PDF
Electrical_Utility_Transformer_&_Door.pdf PDF
Transformer_R_&_R.jpg JPG image
Transformer_R_&_R_gauges.jpg JPG image
Transformer_R_&_R_inside.jpg JPG image
Transformer_R_&_R_gauges.jpg JPG image
Door_Replacement_Rust.jpg JPG image
Transformer_R_&_R_inside.jpg JPG image
Door_Replacement.jpg JPG image
Door_Replacement_Rust.jpg JPG image
Transformer_R_&_R_rust.jpg JPG image
Door_Replacement_Rust.jpg JPG image
Transformer_R_&_R.jpg JPG image
Transformer_R_&_R_inside.jpg JPG image
Transformer_R_&_R_rust.jpg JPG image
Transformer_R_&_R.jpg JPG image
Transformer_R_&_R_gauges.jpg JPG image
Transformer_R_&_R_rust.jpg JPG image
Door_Replacement.jpg JPG image
Door_Replacement.jpg JPG image
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

County of San Mateo

Request for Proposals (RFP) for Electrical Utility

Transformer & Door

Parks Department

RFP No. 2026-RFP-00115

RFP Contact: Travis Dunn tdunn1@smcgov.org

1. Introduction and Schedule

The County of San Mateo (the “County” or “SMC”) covers most of the San Francisco Peninsula. The region covers 744 mi and is home to nearly 800,000 residents and 20 incorporated cities. The County provides for the health and welfare of all people within its borders and serves as the local government for the unincorporated areas. Innovation thrives here in industries including bioscience, computer software, green technology, hospitality, financial management, health care, education and transportation. The

County prides itself on how that prosperity fosters its commitment to protecting and enhancing the health, safety, welfare and natural resources of the community.

1.1. Summary

The San Mateo County Parks Department seeks to remove and replace a high-voltage electrical transformer, as well as a single door on a separate transformer unit, located within Coyote Point

Recreation Area.

The existing transformer enclosure is in poor condition, with significant rust and deterioration beyond its service life. Replacement is necessary to address safety concerns.

The transformer is situated along the Promenade Trail inside Coyote Point Recreation Area in San Mateo

County, California.

1.2. Contact Information

Project Contact:

German Castaneda Park Ranger III Email: gcastaneda-moreno@smcgov.org Phone: (650) 464-0058

Procurement Contact:

Travis Dunn Contract Administrator II Email: tdunn1@smcgov.org Phone: (650) 599-1229

Department:

Parks Department

Department Head:

Nicholas Calderon Director

1.3. Timeline

RFP Released September 25, 2025 mailto:gcastaneda-moreno@smcgov.org tel:(650)464-0058 mailto:tdunn1@smcgov.org tel:(650)599-1229

Page 3 of 14 Release date of September 25, 2025

Pre-Proposal Meeting (Non-Mandatory) October 15, 2025, 11:00am

Coyote Point Recreation Area 1701 Coyote Point Drive, San Mateo, CA Follow the posted signs to the Beach

Deadline for Questions, Comments and

Contract Exceptions

October 22, 2025, 5:00pm

Proposal Due Date and Time October 29, 2025, 5:00pm

Anticipated Contract Award Date November 13, 2025

2. Scope of Work

1.Preparation & Safety

• Verify clearances and permits with the utility/company.

• Confirm transformer is de-energized through switching orders.

• Post lock-out/tag-out (LOTO) on all associated breakers/switches.

• Test and verify absence of voltage with approved test equipment.

• Inspect and prep the pad for access

2. Disconnecting the Transformer

• Open the transformer’s cabinet.

• Mark and document all cable phasing and connections (photos/labels).

• Remove low-voltage secondary cables (usually bolted lugs). Cap/tape ends.

• Remove high-voltage primary cables (elbow connectors or bolted bushings).

• Remove neutral/ground connections.

• Close and secure cables with protective caps to keep dirt/moisture out.

3. Removing the Old Transformer

• Attach lifting eyes or rigging to transformer lifting provisions.

• Use crane, boom truck, or forklift rated for the transformer’s weight.

• Carefully lift transformer straight up to clear the pad.

• Load and secure transformer for transport/disposal per environmental regulations (oil containment, PCB rules if older).

4. Preparing the Pad & Site

• Inspect pad for cracks or unevenness.

• Verify conduit stub-ups are intact and in correct location.

• Clean debris and level the surface if needed.

• Place grounding grid/bonding straps in proper positions.

5. Installing the New Transformer

• Rig and lift new transformer with crane/forklift.

Page 4 of 14 Release date of September 25, 2025

• Lower carefully onto pad, align with conduit stub-ups.

• Bolt transformer to pad if required by spec.

• Bond the transformer tank to ground grid/ground rods.

6. Reconnecting Cables

• Connect primary cables (install elbows onto bushings or bolt connections, torque to spec).

• Connect secondary cables (phase-marked, torque lugs per manufacturer).

• Reconnect neutral/ground conductors.

• Verify phasing is correct before energization.

• Dress and secure all cables for clearance inside cabinet.

7. Testing & Energizing

• Perform insulation resistance tests (megger) on windings and cables.

• Check transformer oil level (if oil-filled) and pressure relief.

• Verify tap changer is set correctly.

• Close and secure transformer cabinet.

• Coordinate with utility dispatcher to energize primary, then check correct secondary voltage and phasing.

• Load test and check for abnormal noise, heating, or leaks.

8. Final Steps

• Install barriers/guards if required.

• Replace safety labels.

• Document installation, connections, and test results.

• Clean up site and remove rigging/equipment.

2.1. Remove & Replace single door.

1. Safety Precautions

• Confirm that the transformer is de-energized prior to opening the cabinet, if necessary.

• Apply lock-out/tag-out (LOTO) procedures in accordance with County and OSHA safety requirements.

2. Door Removal

• Remove the existing transformer cabinet door, including all mounting hardware, hinges, and latches as required.

• Inspect mounting surfaces for corrosion or damage.

3. Door Installation

• Install replacement door using existing or new hardware compatible with the enclosure.

• Verify proper alignment, secure closure, and integrity of any weather seals.

• Ensure the enclosure maintains its original NEMA rating for outdoor use.

4. Finalization

Page 5 of 14 Release date of September 25, 2025

• Replace any missing or damaged high-voltage warning labels, nameplates, or operational signage on the door.

• Clean up work area and remove all debris and equipment.

3. Submission Requirements

3.1. Submission Deadline

Proposals must be electronically received by 5:00 pm, on Wednesday, October 29, 2025 via eProcurement system.

Allow sufficient time for the upload to complete by the Due Date and Time. Partial uploads will automatically terminate, and proposals will be rejected. The eProcurement system submission time will be the official submission time. The County will not be responsible for and may not accept proposals that are late due to slow internet connections or for any other failure of the eProcurement system.

NOTE: The County does not maintain the eProcurement system and is not liable for site failures or technical problems. To resolve technical issues, contact OpenGov Technical Support by using the real time chat located in the lower right hand corner of the screen, or via email at procurement-support@opengov.com https://procurement.opengov.com/portal/smcgov

3.2. Pre-submission Registration

Organizations or individuals interested in responding to this solicitation must register online with the

County of San Mateo at:

• https://procurement.opengov.com/portal/smcgov

It is recommended that organizations complete this registration as soon as possible. The County will not be responsible for and may not accept proposals that are late due to a failure to register in the eProcurement system.

3.3. Submission via eProcurement Portal

Required Documents

Please refer to the Technical Proposal section for submittal documents and requirements.

Electronic Submissions

Include the proposer name and the RFP title and number in each filename. Submit proposals via the eProcurement website, allowing sufficient time for the upload to complete by the Due Date and Time. As noted above, the eProcurement portal submission time will be the official submission time, and partial uploads will automatically terminate, and proposals will be rejected. Contact eProcurement Portal with technical questions regarding this site.

Conflicts between Certain Requirements mailto:procurement-support@opengov.com mailto:procurement-support@opengov.com https://procurement.opengov.com/portal/smcgov https://procurement.opengov.com/portal/smcgov https://procurement.opengov.com/portal/smcgov/projects/202255/document?section=1892809

Page 6 of 14 Release date of September 25, 2025

Prior to the submission deadlines and solely relating to a determination of the timeliness of questions, comments, and proposal submissions, information displayed on the eProcurement portal site will take precedence in the event of a discrepancy between that information and the information within the solicitation documents. For all other discrepancies, the information in the solicitation documents will take precedence.

Format

Documents should be created in the following format:

• Text should be Times New Roman (12-point minimum font size) and unjustified (i.e., with a ragged-right margin)

• Pages should have margins of at least one inch on all sides (excluding headers and footers)

• If the proposal is lengthy, a Table of Contents should be included.

• PDF format is preferred.

Errors in Proposals

The County will not be liable for any errors in proposals. Proposals may be rejected as unresponsive if they are late, incomplete, missing pages or information, or cannot be opened for any reason. The County may waive minor irregularities, but such waiver will not modify any remaining RFP requirements.

3.4. Procurement Preference for Local Businesses and Local Non-Profits

The County of San Mateo has adopted a Procurement Preference for Local Businesses Ordinance (County

Ord. Code Ch. 2.89.) The purpose of this Ordinance is to promote a strong local economy by giving preference to local businesses, local non-profits, local small and micro businesses, and local small and micro non-profits in County procurements, to the extent consistent with the law and interests of the public. The County’s process for applying local preferences to competitive procurements is set forth in

County Ordinance Code Section 2.89.030. The Ordinance and exemptions (e.g. the ordinance will be exempt when all bids or proposals received are from Non-Profit Organizations) can be reviewed here:

Chapter 2.89 - PROCUREMENT PREFERENCE FOR LOCAL BUSINESSES | Code of Ordinances |

San Mateo County, CA | Municode Library

The requirements for bidders to establish eligibility for a local preference for this solicitation are detailed below in Section III (Submission Requirements) The Ordinance does not apply if a procurement is determined to be exempt (County Ord. Code sec. 2.89.050), and the County reserves the right to waive application of the Ordinance to this procurement if determined to be in the best interests of the County

(County Ord. Code sec. 2.89.060).

4. Minimum Qualifications, Local Preference Ordinance, and Technical Proposal

4.1. Minimum Qualifications

4.1.1. Has Proposer has been providing similar services for a minimum of four (4) years within the last seven (7) years?*

☐ Yes https://library.municode.com/ca/san_mateo_county/codes/code_of_ordinances?nodeId=TIT2AD_ART2.8INFIPRCOCO_CH2.89PRPRLOBU https://library.municode.com/ca/san_mateo_county/codes/code_of_ordinances?nodeId=TIT2AD_ART2.8INFIPRCOCO_CH2.89PRPRLOBU

Page 7 of 14 Release date of September 25, 2025

☐ No

*Response required

4.1.2. Account manager has a minimum of two (2) years of experience within the last five (5) years in providing account services?*

☐ Yes

☐ No

*Response required

4.1.3. Vendor is not excluded, suspended, or debarred from the System for Award

Management (SAM).*

SAM.gov

☐ Please confirm

*Response required

4.1.4. What is the registered Business Name and Unique Entity ID (UEI) No.? (If Any)

• UEI number can be obtained by registering your business through SAM.GOV

• Should you be in the process of obtaining your UEI number, please enter the digits ‘123’ temporarily for your response below in order to proceed with proposal. This temporary number should be replaced with the correct registration number for submission of the proposal.

4.2. Procurement Preference for Local Businesses and Local Non-Profits

4.2.1. Is the Proposer a "Local Business"?

As Defined by Chapter 2.89.020 of the San Mateo County Ordinance Code, a “Local Business” means any for-profit business which has its principal place of business, or is headquartered, in San Mateo

County. If this designation applies to the proposer, a self-attestation form must be completed and provided with this response.

Please download the below documents, complete, and upload. If this designation is not applicable, please leave blank.

• SMC_LocalBusiness_self-atte...

4.2.2. Is the Proposer a Non-Profit?*

A Non-Profit is defined as a tax-exempt public charity organization (within the meaning of section

501(c)(3) of the Internal Revenue Code) that is formed for purposes other than making a profit, is exempt from paying federal income taxes on the income generated for their exempt purposes.

☐ Yes

☐ No

*Response required

When equals "Yes"

4.2.3. Is the Proposer a "Local Non-Profit"

https://sam.gov/content/home https://government-project.s3.us-west-2.amazonaws.com/153456/a16ffdc0-a0ee-44ca-b6de-1fddd010042f_SMC_LocalBusiness_self-attestation_form_120424.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4OKHERKWZ%2F20250925%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250925T231534Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEPf%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQDg6HJD5T84wC0uZukk1BgXvpJ%2Fd%2FWoCewBnCLhk%2BEePwIgS5GI%2Br%2BKUVMWv4mFyfb8qxfmVG03eAnj%2FHBVjaMNtf8qjAUIgP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDJI9RJGXV%2F9SmPPRwSrgBGpXE9NR%2F3sEpUxkpHO2USV%2BeJZ8kbJkcX9Sh9KvFI9isAwlJjcJwErBMS4m9N8%2BjKhrYeojdKXMSB4pwXfHJB%2FRFPXHRuxnyU5eM4W7DzpKFmmOCAu6dXbw2I4tOLcc%2BcZQl2SrprcBWiGYf85RJZSneMdR45uY1Y%2FOCpoNvbLcO7HUCEjMGGutK5YyJqAGr2WvB0eF1uSfVGb8IaVhE8slthZoLA0%2Byu37RnHH%2BLCqshLMkesTnNv8940SdkcQLSiDq6j75z%2FWKqJBnnu9knJ8oZGvw8oBKloxB4IDT92aPhO%2B9u8rtQiyG2OV1DFMhG11crf%2FbO82aadRp5ov3gRTEp42WV1gTfwALihUCmGurqDbOxW7smvaXNLYIkyLPv4%2BEleg9hTmG6MKJLXb4wIcJvXeLMxA0JR2FW68r23Pl%2FKqAWmr8hlWd9nhvJoKb3qgfY7rE6gNzflTKXET8DfiqzRZujMVJxu8TWXdslf1xlOXWmzOqp3wRWk0pW%2FA6ndKAQrYekIQdf6nq7y4WmhH%2BYsKDT9wCRuoKc15HJSt8cp%2BQz%2F0TlI7vdOSR6o6rtUZ5fup1%2FBX3fNDyMtPzi4FK96HqjOSiiHFfDG0o7xi3UoBM7TThgroXDFHcgQaRbXMAOX1xrNnv9wzSroRh2iHW6dWxnzqjOJRVqJdAu2KwutrG7%2BEYQ621yhVsew3p4u0VkCiO5AGbRtGI8VR3e6k5m35FjCLZPujUDSl1Rcwo3VtgElqbW1Go7btB2UsLHzArex9SVPl19OUd6HEhXgeT2znIJWE%2B8r3PgqbkDoBMOSQ18YGOpsBseUTNQaWumN%2F3eTYOdp%2FshaED9%2B1o6hzBY0fWJgeUVAs%2FDYw8l0FoxsA0PQ%2BRk108jDjK6Zdgi1xvd682VGq07FTOoP66o8ulpQtsgg%2FSjanwHqJw0vPNE84mZBNQWY%2FEsPz9pVntpavjX9LeTUYSfVUE2XEYoa5rMgSQumQnELjJJ963MxreOavfdG6TAOlEa1QDAqaGg284Vk%3D&X-Amz-Signature=b8c789315c4413095e05b964cc5e16f669f2b3a4dfe169331b161b48a38781fb&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22SMC_LocalBusiness_self-attestation_form_120424.pdf%22&x-id=GetObject

Page 8 of 14 Release date of September 25, 2025

As Defined by Chapter 2.89.020 of the San Mateo County Ordinance Code, a “Local Non-Profit" means a tax-exempt public charity organization (within the meaning of section 501(c)(3) of the

Internal Revenue Code) that is formed for purposes other than making a profit, is exempt from paying federal income taxes on the income generated for their exempt purposes, and has its principal place of business, or is headquartered, in San Mateo County. If this designation applies to the proposer, a self-attestation form must be completed and provided with this response.

Please download the below documents, complete, and upload. If this designation is not applicable, please leave blank.

• SMC_LocalBusiness_self-atte...

4.2.4. Is the Proposer a Local "Small" or "Micro" Business?

As Defined by Chapter 2.89.020 of the San Mateo County Ordinance Code:

“Small Business” means any business which holds a Small Business Certification awarded by the

California Office of Small Business and Disabled Veteran Business Enterprise Services (OSDS).

“Micro Business” means any Small Business certified by the OSDS which is automatically designated by the OSDS as a Micro Business due to gross annual receipts falling below the OSDS-designated dollar amount.

If the above designations apply, please provide the OSDS provided Certification ID.

If this designation is not applicable, please leave blank.

4.2.5. Is the Proposer a Local "Small" or "Micro" Non-Profit?

As Defined by Chapter 2.89.020 of the San Mateo County Ordinance Code:

“Small Non-Profit" means a Local Non-Profit with an annual revenue of $1,000,000 to $2,500,000 according to its most recently filed IRS Form 990.

“Micro Non-Profit" means a Local Non-Profit with an annual revenue of less than $1,000,000, according to its most recently filed IRS Form 990.

If the above designations apply, please provide your latest filed IRS form 990. A filing from the last two calendar years is acceptable.

If this designation is not applicable, please leave blank.

4.3. Technical Proposal

4.3.1. Proposed schedule *

Attach proposed schedule reference ability to complete the project within the County's required time frame

*Response required

4.3.2. Fee Proposal*

The Fee Proposal should be submitted as a separate PDF file from the Technical Proposals detailed in

Required Documents.

https://government-project.s3.us-west-2.amazonaws.com/153456/80d29c2f-acda-4b87-837e-cb4ead1fb303_SMC_LocalBusiness_self-attestation_form_120424.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4OKHERKWZ%2F20250925%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250925T231534Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEPf%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQDg6HJD5T84wC0uZukk1BgXvpJ%2Fd%2FWoCewBnCLhk%2BEePwIgS5GI%2Br%2BKUVMWv4mFyfb8qxfmVG03eAnj%2FHBVjaMNtf8qjAUIgP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDJI9RJGXV%2F9SmPPRwSrgBGpXE9NR%2F3sEpUxkpHO2USV%2BeJZ8kbJkcX9Sh9KvFI9isAwlJjcJwErBMS4m9N8%2BjKhrYeojdKXMSB4pwXfHJB%2FRFPXHRuxnyU5eM4W7DzpKFmmOCAu6dXbw2I4tOLcc%2BcZQl2SrprcBWiGYf85RJZSneMdR45uY1Y%2FOCpoNvbLcO7HUCEjMGGutK5YyJqAGr2WvB0eF1uSfVGb8IaVhE8slthZoLA0%2Byu37RnHH%2BLCqshLMkesTnNv8940SdkcQLSiDq6j75z%2FWKqJBnnu9knJ8oZGvw8oBKloxB4IDT92aPhO%2B9u8rtQiyG2OV1DFMhG11crf%2FbO82aadRp5ov3gRTEp42WV1gTfwALihUCmGurqDbOxW7smvaXNLYIkyLPv4%2BEleg9hTmG6MKJLXb4wIcJvXeLMxA0JR2FW68r23Pl%2FKqAWmr8hlWd9nhvJoKb3qgfY7rE6gNzflTKXET8DfiqzRZujMVJxu8TWXdslf1xlOXWmzOqp3wRWk0pW%2FA6ndKAQrYekIQdf6nq7y4WmhH%2BYsKDT9wCRuoKc15HJSt8cp%2BQz%2F0TlI7vdOSR6o6rtUZ5fup1%2FBX3fNDyMtPzi4FK96HqjOSiiHFfDG0o7xi3UoBM7TThgroXDFHcgQaRbXMAOX1xrNnv9wzSroRh2iHW6dWxnzqjOJRVqJdAu2KwutrG7%2BEYQ621yhVsew3p4u0VkCiO5AGbRtGI8VR3e6k5m35FjCLZPujUDSl1Rcwo3VtgElqbW1Go7btB2UsLHzArex9SVPl19OUd6HEhXgeT2znIJWE%2B8r3PgqbkDoBMOSQ18YGOpsBseUTNQaWumN%2F3eTYOdp%2FshaED9%2B1o6hzBY0fWJgeUVAs%2FDYw8l0FoxsA0PQ%2BRk108jDjK6Zdgi1xvd682VGq07FTOoP66o8ulpQtsgg%2FSjanwHqJw0vPNE84mZBNQWY%2FEsPz9pVntpavjX9LeTUYSfVUE2XEYoa5rMgSQumQnELjJJ963MxreOavfdG6TAOlEa1QDAqaGg284Vk%3D&X-Amz-Signature=08f05dc6ed2527d783d3c0f8bf6f07ba9e6bf8156a00b56012d7dbf966cce445&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22SMC_LocalBusiness_self-attestation_form_120424.pdf%22&x-id=GetObject

Page 9 of 14 Release date of September 25, 2025

The County reserves the right to accept other than the lowest priced offer and to reject any proposals that are not responsive to this request.

*Response required

5. Evaluation and Selection Criteria

The proposals will be evaluated by a selection committee with relevant expertise. The County intends to evaluate the proposals generally in accordance with the criteria itemized below. Proposers with the highest scoring proposals may be interviewed by the committee to make the final selection.

No. Evaluation Criteria Scoring Method Weight (Points)

1. Price Points Based 100 (100% of Total)

6. Instructions to Proposers

6.1. Communications

A. As of the issuance date of this RFP and continuing until it is canceled or an award is made, no proposer or person acting on behalf of a prospective proposer may discuss any matter relating to the RFP with any officer, agent, or employee of the County, other than through eProcurement portal, to the Authorized Contact Person, or as outlined in the evaluation or protest procedures.

B. Proposers (including any agent, owner, employee, board members, or other such affiliates) shall not offer any gift, favor, or other personal benefit to any County officer or employee during the procurement process for this agreement, including during the solicitation period and contract negotiations.

Violation of the foregoing prohibitions may result in a proposer being found non-responsible and barred from participating in this or future procurements.

6.2. Contract Award

A. Award Procedure

Contract negotiations are neither an offer nor guarantee that a contract will be executed. A contract award, if any is made, will be to the responsive, responsible proposer offering the overall best value to the County for the services and goods described in this solicitation, or as applicable, for a specific portion of the services and goods described. Any agreement reached will be memorialized in a formal agreement using the attached template, executed by the appropriate authority.

B. Notice of Intent to Award

If a decision is made to take steps to enter into an agreement with one or more proposers, the

County will post a Notice of Intent to Award or otherwise notify proposers the remaining proposers of their non-selection. Notice may instead be provided by including approval of the agreement as an item on an agenda for a meeting of the Board of Supervisors.

Page 10 of 14 Release date of September 25, 2025

C. Commencement of Performance

After all parties have signed the agreement, the County will notify the contractor and performance may proceed. Prior to execution of the agreement by the County, no County employee may authorize work under the agreement. Any work performed prior to the full execution of the Agreement may not be compensated.

D. Levine Act DisclosureThe Levine Act (California Government Code Section 84308) imposes certain requirements on parties contracting with the County of San Mateo related to campaign contributions to County “officers,” including elected County officers and candidates seeking elective office, who may participate in making a decision on certain County contracts. Elected

County officers in San Mateo County include: the San Mateo County Board of Supervisors, Assessor-County Clerk-Recorder, County Controller, Coroner, District Attorney, Sheriff, and Tax

Collector-Treasurer.Generally, under current County policy, approval by the Board of

Supervisors is required for any agreement for services above $200,000, and agreements for services below that threshold may be approved by Department heads.If your proposal is selected, you will be required to certify compliance with the Levine Act.As part of this process, you will need to certify and warrant that you have fully complied, and will remain in full compliance, with all applicable requirements of the Levine Act in connection with the

Agreement, including making any required disclosures of campaign contributions to County

Officers, which includes but may not be limited to elected County Officers. Elected County

Officers include members of the San Mateo County Board of Supervisors, as well as the

Assessor-County Clerk-Recorder, Controller, Coroner, District Attorney, Sheriff, and Tax

Collector-Treasurer. Any campaign contribution required to be disclosed under the Levine Act in connection with this Agreement shall be disclosed on the County of San Mateo Levine Act

Disclosure Form, a copy of which is available from the County upon request.Parties are solely responsible for accurate certification and disclosure. The Levine Act is complex, and this brief description is not legal advice. For example, certain contributions must be aggregated when determining whether contributions have exceeded the $500 threshold. If your proposal is selected, you are urged to review the Levine Act and consider consulting an attorney.

6.3. Term

Parks Department is issuing Request for Proposal (RFP) No. 2026-RFP-00115 for Electrical Utility

Transformer & Door.

The agreement shall have a term of 6 months. The County’s standard contract template has been included with this solicitation. The awarded contractor will be expected to sign an agreement prepared by the

County using this template. Please ensure that your firm has completed legal review of these contract terms. If your firm wishes to request exceptions to these standard terms, submit a Contract Exceptions

Request by the Deadline for Questions, Comments and Contract Exceptions listed in the Solicitation

Schedule below. The County will consider Contract Exceptions Requests but reserves the right to reject requested modifications to its standard terms.

7. Terms and Conditions for Receipt of Proposals

Page 11 of 14 Release date of September 25, 2025

7.1. Errors, Omissions and Inquiries regarding the RFP

Proposers are responsible for reviewing all portions of this RFP. Proposers are to notify the department, in eProcurement portal, if the proposer discovers any ambiguity, discrepancy, omission, or apparent error in the RFP. Such notification should be made promptly after discovery, but in no event later than five business days prior to the deadline for receipt of proposals. Modifications and clarifications will be made by addenda as provided below.

Inquiries regarding the RFP should be lodged in eProcurement portal.

7.2. Objections to RFP Terms

Should a proposer object on any ground to any provision or legal requirement set forth in this RFP, the proposer must, not more than ten calendar days after the RFP is issued, provide written notice to the department, via eProcurement portal, setting forth with specific grounds for the objection.

7.3. Addenda

The County may cancel, revise, or reissue this RFP, in whole or in part, for any reason. Revisions will be posted as Addenda on eProcurement portal. No other revision of this RFP is valid. Proposers shall be responsible for ensuring that their proposals reflects any and all Addenda issued by the County prior to the proposal due date regardless of when a proposal is submitted. Therefore, the County recommends that proposers consult eProcurement portal frequently, including shortly before the proposal due date, to confirm that all Addenda have been downloaded.

7.4. Term of Proposal

Submission of a proposal signifies that the proposed services and prices are valid for the duration of the proposed agreement term and that the quoted prices are genuine and not the result of collusion or any other anti-competitive activity.

7.5. Revision or Withdrawal of Proposal

A proposer may revise a proposal on the proposer’s own initiative at any time before the deadline for submission of proposals. The proposer must submit the revised proposal in the same manner as the original on or before the proposal due date.

A proposer may withdraw a proposal at any time before the deadline for submission of proposals. After that time, whether or not a new RFP is issued for the same subject matter, withdrawal of a proposal may preclude the proposer from participating in the procurement as a proposer or subcontractor, except that an original equipment manufacturer may participate indirectly through a reseller.

7.6. Errors and Omissions in Proposal

The County will not be liable for any errors in proposals. Proposals may be rejected as unresponsive if they are incomplete, are missing pages or information, or cannot be opened for any reason. The County may waive minor irregularities, but such waiver will not modify any of the remaining RFP requirements.

7.7. No Commitment

Neither submission of a proposal nor the County’s receipt of proposal materials confers any right to the proposer nor any obligation on the County. This RFP does not commit the County to award a contract.

Page 12 of 14 Release date of September 25, 2025

7.8. Financial Responsibility

The County shall have no financial responsibility for any costs incurred by a firm in responding to this

RFP or participating in any presentations or negotiations.

7.9. Estimated Quantity

If the RFP results in an indefinite quantity or a requirements agreement, the goods and services actually requested by the County may be less than the maximum value of the agreement and there is no guarantee, either expressed or implied, as to the actual quantity of goods and services that will be authorized under the agreement.

7.10. Public Record

A. General

1. All proposals, protests, and information submitted in response to this solicitation will become the property of the County and will be considered public records. As such, they may be subject to public review.

2. Any contract arising from this RFP will be a public record.

3. The County is not seeking proprietary information and will not assert any privileges that may exist on behalf of the proposer.

4. Submission of any materials in response to this RFP constitutes:

▪ Consent to the County’s release of such materials under the Public Records Act without notice to the person or entity submitting the materials; and

▪ Waiver of all claims against the County and/or its officers, agents, or employees that the

County has violated a proposer's right to privacy, disclosed trade secrets, or caused any damage by allowing the proposal or materials to be inspected; and

▪ Agreement to indemnify and hold harmless the County for release of such information under the Public Records Act; and

▪ Acknowledgement that the County will not assert any privileges that may exist on behalf of the person or entity submitting the materials.

7.11. Reservations of Rights by the County

The issuance of this RFP does not constitute an agreement by the County that any contract will actually be entered into by the County. The County expressly reserves the right at any time to:

• Waive or correct any defect or informality in any response, proposal, or proposal procedure;

• Reject any or all proposals;

• Reissue an RFP;

Page 13 of 14 Release date of September 25, 2025

• Prior to submission deadline for proposals, modify all or any portion of the selection procedures, including deadlines for accepting responses, the specifications or requirements for any materials, equipment or services to be provided under this RFP, or the requirements for contents or format of the proposals;

• Procure any materials, equipment or services specified in this RFP by any other means; or

• Determine that no project will be pursued.

7.12. No Waiver

No waiver by the County of any provision of this RFP shall be implied from any failure by the County to recognize or take action on account of any failure by a proposer to observe any provision of this RFP.

7.13. Cooperative Agreement (Piggyback)

This competitive solicitation is being conducted as a Cooperative Procurement. The services, terms and conditions of any agreement resulting from this solicitation may be used by other organizations as a

Cooperative Agreement.

This provision in no way commits any affiliate to procure services from any awarded contractor, nor does it guarantee that any additional orders will result. At their discretion, and subject to their own procurement policies, interested organizations may make use of this competitive procurement and contract directly from the awarded contractor.

8. Protest Procedures

8.1. Protest of Non-Responsiveness Determination

Within five (5) working days of the County's issuance of a notice of non-responsiveness, any firm that has submitted a proposal and believes that the County has incorrectly determined that its proposal is non-responsive may submit a written notice of protest. Such notice of protest must be received by the County on or before the fifth working day following the County's issuance of the notice of non-responsiveness. The notice of protest must include a written statement specifying in detail each and every one of the grounds asserted for the protest. The protest must be signed by an individual authorized to represent the proposer, and must cite the law, rule, local ordinance, procedure or RFP provision on which the protest is based. In addition, the protestor must specify facts and evidence sufficient for the County to determine the validity of the protest.

8.2. Protest of Contract Award

Within five (5) working days of the County's issuance of a notice of intent to award the contract, any firm that has submitted a responsive proposal and believes that the County has incorrectly selected another proposer for award may submit a written notice of protest. Such notice of protest must be received by the

County on or before the fifth working day after the County's issuance of the notice of intent to award.

The notice of protest must include a written statement specifying in detail each and every one of the grounds asserted for the protest. The protest must be signed by an individual authorized to represent the

Page 14 of 14 Release date of September 25, 2025 proposer, and must cite the law, rule, local ordinance, procedure or RFP provision on which the protest is based. In addition, the protestor must specify facts and evidence sufficient for the County to determine the validity of the protest.

8.3. Delivery of Protests

All protests must be received by the due date. If a protest is mailed, the protestor bears the risk of non-delivery within the deadlines specified herein. Protests should be transmitted by a means that will objectively establish the date the County received the protest. Protests or notice of protests made orally

(e.g., by telephone) will not be considered. Protests must be delivered to:

Protests@smcgov.org

Subject: Electrical Utility Transformer & Door, 2026-RFP-00115