_ELEC_DWG.pdf
PDF 10 MB Posted
- Solicitation number
- W90VN824R0058
About this file
This document appears to be a solicitation for a federal contract opportunity to replace deteriorated pole mounted transformers with new pad mounted transformers at Camp Hovey in Korea. The solicitation is available only to Area I & II MATOC contractors. The key details are:
The contract requires replacing existing H-frame pole mounted transformers with new pad mounted transformers, including underground high voltage cable riser sets, primary & secondary lines, and necessary accessories. It also requires relocating lighting fixtures and signal lines with new necessary accessories. The solicitation number is W90VN824R0058, and the procuring agency is the Department of the Army Materiel Command Army Contracting Command. This is a defense contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W90VN824R0058.pdf | ||
| ELEC_TITLE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOT TO SCALE
300 BEYOND PAD
ON ALL AROUND
A MINIMUM OF
EXTEND GRAVEL FILL
G
AS REQ'D
G
COOLING
150 MIN.
CORRUGATION
150 MIN.
G
G
AS REQ'D GROUND ROD,
19dia x3000mm LG
COPPER CLAD STEEL
W/WELDING CONNECTION
(TYPICAL)
COMPARTMENTAL TYPE
TRANSFORMER
PAD MOUNTED
BASE COURSE
150 MIN.
CASE GROUND
150 MIN.
EXTEND GRAVEL FILL
A MINIMUM OF
ON ALL AROUND
300 BEYOND PAD
PRIMARY CONDUIT AS REQ'D
GROUND WIRE, AS REQ'D
SECONDARY CONDUIT AS REQ'D
(TYPICAL)
"A" "A"
P L A N
"A-A" SECTION
NFSM
OIL LEVEL GUAGE
TYPE BUSHING
NAME PLATE
TAP CHANGER
HIGH-VOLTAGE SECTION
LIMITING FUSES HOLDERS
BAY-O-NET CURRENT
GL
SECONDARY SPADE
LOW-VOLTAGE SECTION
25.4 DRAIN PLUG
PRESSURE RELIEF DEVICE
G
AS REQ'D
G
CONCRETE PAD REINFORCED
(6"x6"-w2.9xw2.9 WIRE MESH)
G
(TYPICAL)
GROUND ROD
19 diax3000mm LG WITH
WELDING CONNECTION
COPPER CLAD STEEL
WITH 150x150x-4.0 dia.x4.0 dia.WWF
NFSM
SEAL AROUND BASE
W/SEALANT
LOAD BREAK SWITCH
SEE NOTE 1 BELOW
SAFEBREAK BUSHING
GROUND TERMINAL
NEUTRAL AND
PARKING BRACKET
(TYPICAL)
GROUND WIRE, #3/0 "BC"
50 CHAMBER, ALL AROUND
ALL SAFE BREAK BUSHINGS
BEFORE REPLACING FUSES
LABEL ; WARNING-DISCONNECT
FILTERING VALVE
NETURAL TERMINAL
ELBOW TYPE SURGE ARRESTER
CONDUIT COUPLING
SECONDARY PVC CONDUITS
AS REQ'D
G
ANGLE CROSSARM BRACE (TYP)
STEEL CROSSARM,
CONCRETE POLE, 14M-500Kg
G
GROUND WIRE, #4 "BC" (TYP)
18KV (TYP OF 3EA)
LIGHTNING ARRESTER
#2 "BC" (TYP)
G
G
G
G
STEEL BAND (TYPICAL)
CABLE TERMINATION
600V, #1(MAX)x1EA
G.L
CONDUIT
5G
G
CONDUIT COUPLING
CONDUIT (2400mm LG)
#6 "BC" IN 21dia PVC
#6 "BC" IN 21dia STL
G
SEALING BUSHING,
"CSBG 400P(4HOLES)"
AND ADAPTER KIT FOR SINGLE
CONDUCTOR, #1 MAX (TYP OF 3EA)
TERMINATION, 24KV WITH BRACKET
GALV RIGID STEEL
CONDUIT 103dia
19dia x 3000mmLG
W/WELDING CONNECTION
COPPER CLAD STEEL
GROUND ROD,
(MIN)
NOT TO SCALE
POLE KEY
G
"WHITE"
FUSE CUTOUT SWITCH, 15KV,
100A WITH 25A FUSES (TYP OF 3)
G
EXIST O/H PRIM LINE
3PH, 4W, 11.4KV,
AND PLASTIC COVER (TYPICAL)
HOT LINE W/BAIL CLAMP
60HZ SYSTEM
SYMBOL BY
DESIGNED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
ENVIRONMENT
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENERGY MANAGER
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
DES
REMOVAL OF EXISTING ELECTRICAL EQUIPMENT SHALL INCLUDE EQUIPMENT
INCLUDING CONDUCTORS, CABLES, EXPOSED CONDUIT, SURFACE METAL RACEWAYS,
BOXS, AND FITTINGS, BACK TO EQUIPMENT'S POWER SOURCE.
CONTACTOR SHALL VERIFY ELECTRICAL REQUIREMENT OF EQUIPMENT PRIOR TO
ALL ELECTRICAL MATERIAL AND WORKMANSHIP SHALL COMPLY WITH ALL THE
REQUIREMENTS OF NATIONAL ELECTRICAL CODE LATEST EDITION AND NATIONAL
ELECTRICAL SAFETY CODE LATEST EDITION.
THE GOVERNMENT RESERVE THE RIGHT TO POSTPONE THE REQUESTED POWER
MINIMUM OF 14 DAYS PRIOR TO THE ANY SCHEDULED POWER OUTAGE.
THE CONTRACTOR SHALL NOTIFY CONTRACTING OFFICE, AND DPW IN WRITING A
OUTAGE UP TO 8 HOURS PRIOR TO REQUESTED POWER OUTAGE.
GRADING LINE OF NEW DUCTS WILL BE LIMITED TO THE WIDTH OF DUCT EXCAVATION.
OPERATION DURING AND AFTER INSTALLATION OF ELECTRICAL SYSTEM. THE
INCLUDING SODDING, UTILITIES, STRUCTURES TO THEIR ORIGINAL CONDITION AND
THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL DAMAGED AREA
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
1.
E-1
KIM, SY
ELECTRICAL
TO INSTALLING THE ASSOCIATED CONDUIT & WIRING.
REPLACE EXISTING H-FRAME POLE MOUNTED TRANSFORMERS WITH
CONTACTOR SHALL BE RESPOSIBLE TO RELOCATE EXIST EXTERIOR LIGHTING FIXTURES,
ACCESSORIES TO MEET SITE ADAPT CONDITION.
PRIMARY, SECONDARY LINE, SIGNAL CABLE AND CONTROL PANELS WITH NECESSARY
2.
8.
CATV BEFORE CONSTRUCTION.
CONTRACTOR SHALL COORDINATE WITH AREA MP, NEC, SIGNAL BRIGADE,
SHOP DRAWING FOR EXTERIOR POWER DISTRIBUTION PLAN AND CABLE RISER SET.
BIDING PURPOSE ONLY. CONTRACTOR SHALL VERIFY EXSTING SITE CONDITION AND SUBMIT
SIZE AND COUNT OF POWER DISTRIBUTION LINES ON THE DRAWINGS IS ESTIMATED FOR
CABLE RISER DETAIL
TYPICAL HIGH VOLTAGE UNDERGROUND
TYPICAL TRANSFORMER INSTALL DETAIL
PRIMARY CONDUIT AS REQ'D
SECONDARY STEEL CONDUIT AS REQ'D
1/C, #2/0, 24KV, "XLP" (TYP.)
1/C, #2/0, 600V, "XLP"
(TYPICAL)INSULATOR
LINE POST TYPE POLYMER
(TYPICAL)INSULATOR
LINE POST TYPE POLYMER
STEEL CROSSARM
LINE POST TYPE INSULATOR
DETAILS, GENERAL NOTES & SCOPE OF WORK
VOLTAGE UNDERGROUND CABLE RISER
EXAMPLE OF TRANSFORMER DETAILS & HIGH
SCOPE OF WORK
A. REPAIR/MAINTENANCE ( K )
LINES WITH NECESSARY ACCESSORIES AS SHOWN ON THE DRAWINGS.
HIGH VOLTAGE CABLE RESER SETS, PRIMARY & SECONDARY
NEW PAD MOUNTED TRANSFORMER INCLUDING UNDERGROUND
ACCESSORIES AS SHOWN ON THE DRAWINGS.
RELOCATE LIGHTING FIXTURES, SIGNAL LINES WITH NEW NECESSARY
TRANSFORMERS CAMP HOVEY
TRANSFORMERS WITH NEW PAD MOUNTED
REPLACE DETERIORATED POLE MOUNTED
,316339 316336,316337,316338
N
45 1
CAMP HOVEY
E A S T S E ACHUNCHON
PYONGTAEK
KUNSAN
KWANGJU
INCHON
S E A
W E S T
MUNSAN
DAEGU
CHINHAE
WAEGWAN
BUSAN
DAEJEON
OSAN
UIJONGBU
SEOUL
TONGYOUNG
MOKPO
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
3849 3868
3800T
3821 3820
A B A B
A
B
C
D M1
M2
A
T
A
B
39104052
4018T
4319T
B A
4360 A
B
A
B
A
B
3453 3401
3673 3674
36763672
3631 3685
T
A
B
A
B
3505T
3595 3596
VEH BR
VEH BR
VEH BR
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
FOOT BR
FOOT BR
FOOT BR
F 4160
F
F
34474042
(3429?)
QA00148-1J
00-54160 BUP 020619
00-54161 BUP 030519
00-54163 BUP 040302
00-54165 BUP 031126
03-57205 REPAIR 040916
03-57206 REPAIR 041018
XX-QA00321 BUP
99-QB00099 BUP
99-QB00131 BUP
XX-QB00156 BUP
99-QB00045 BUP
XX-QB00161 BUP
02-QB00159 BUP
02-QB00160 BUP
XX-QB00156 BUP
XX-QB00163 BUP
XX-QB00164 BUP
VEH BR
VEH BR
B
A
VEH BR
W A
L L
W A
L L
WALL
WALL
WALL
W A
L L
W A L L
W A L L
W A L L
W A
L L
WALL
W
ALL
W
ALL
WALL
WALL
WALL
WALL
W A
L L
WALL
WALL
ACC
COURT
BASKETBALL
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
M U
LT
I- P
U R P
O S E
F
IE
LD
W A
LL
W A
LL
WALL
WALL
WALL
W
ALL
WALL
WALL
W A
L L
WALL
WALL
W
ALL
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
WALL
WALL
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L W
A L
L W
A L
L W
A L
L
W A
L L
W A
L L
W A L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
WALL
W A L L
W A
L L
WALL
W A L L
W A L L
W
ALL
WALL
W A
L L
W A
L L
W A
L L
W A
L L
W A L L
W A
L L
W A
L L
W A
L L
WALL
WALL
WALL
W A
L L
W A L L
W A L L
W A L L
W A
L L
WALL
W
ALL
W
ALL
WALL
WALL
WALL
WALL
W A
L L
WALL
WALL
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
BLEAC
HERS
W A
LL
W A
LL
WALL
WALL
WALL
W
ALL
WALL
WALL
W A
L L
WALL
WALL
W
ALL
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
WALL
WALL
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L W
A L
L W
A L
L W
A L
L
W A
L L
W A
L L
W A L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
W A
L L
WALL
W A L L
W A
L L
WALL
W A L L
W A L L
W
ALL
WALL
W A
L L
W A
L L
W A
L L
W A
L L
W A L L
W A
L L
4-232PN
01-52942
01-52942
01-52942
01-49548
96-44086
4-184PN
01-52942
4-232PN
99-51713
4-200PN
99-51713
4-200PN
99-51823
3-48PN
96-44593
4-200PN
R A
M P
ACC
C
AR W
ASH
R A
M P
ACC
C
AR W
ASH
NOT TO SCALE
: LOCATION OF H-FRAME MOUNTED TRANSFORMER
L O C A T I O N M A P
NOT TO SCALE
DONGDUCHON
PROJECT LOCATION PLAN
ELECTRICAL
CONTRACTING OFFICER DURING THE SITE ORIENTATION.
SHALL BE DETERMINED, DESIGNATED AND COORDINATED WITH THE
THE CONTRACTOR'S HAUL ROUTE, STORAGE AND OPERATIONS AREA
NOTE:
PROJECT LOCATION MAP
PROJECT NO.
KIM, SY TRANSFORMERS CAMP HOVEY
TRANSFORMERS WITH NEW PAD MOUNTED
REPLACE DETERIORATED POLE MOUNTED
,316339 316336,316337,316338
E-2
E
E E
E
E
E
E
PRIMARY LINE (TYPICAL)
EXIST OVERHEAD
SECONDARY LINE (TYPICAL)
EXIST OVERHEAD
SIGNAL LINE (TYPICAL)
EXIST OVERHEAD
L
L L
P3-23POLE NUNMER :
SCALE: 1/200SCALE:
EXIST/NEW EXTERIOR POWER LINE DISTRIBUTION PLAN-1
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CONCRETE POLE (TYPICAL)
EXIST PRIMARY ELECTRIC
EXIST PAD MOUNTED TRANSFORMER
O/H O/H
O/H
O /H
O /H
O /H
O /H
O /H
O /H
O/H
O/H
O /H
O /H
O /H
O /H
O /H
O /H
O /H
O /H
O /H
O /H
O /H
O /H
O/H O/H O/H
O/H
O /H
O /H
O /H
O/H O/H
P P
P
P P P
P
P
P P
P
P P
P
P
P
P
S S
S
S S
S S
S
S S S
S S
T
T
T
T
T
T T
T
REMOVE EXIST H-FRAME POLE MOUNTED
TRANSFORMERS AND ASSOCIATED DEVICES
OIL-FILLED, SELF-COOLED, LOAD BREAK SW, 3PH, 11.4KV-120/208V,
NEW PAD MOUNTED TRANSFORMER, METAL ENCL, RADIAL TYPE,
60HZ, 150KVA W/BUILT-IN PROTECTIVE DEVICES (15A FUSE)
EXIST STREET LIGHT FIXTURE
"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V IN 103dia PVC CONDUIT
NEW U/G PRIM LINE, 3-1/C, #2/0,
S
PP
PRIMARY POLE WITH NECESSARY ACCESSORIES. /
CUTOUT SWITCHES, LIGHTNING ARRESTERS ON EXIST
PRIMARY LINE CABLE RISER SET, TERMINATION KITS, FUSE
INTERCEPT EXIST O/H PRIM LINE W/ NEW UNDERGROUND
ACCESSORIES.
EXIST SECONDARY LINE WITH NEW ASSOCIATED
RECONNECT NEW SECONDARY LINE TO
SECONDARY LINE, 2SET OF 4-AWG #4/0 IN 103C
NEW U/G CONCRETE ENCASED
S
KIM, SY
ELECTRICAL
E-3
TRANSFORMERS CAMP HOVEY
TRANSFORMERS WITH NEW PAD MOUNTED
REPLACE DETERIORATED POLE MOUNTED
316336,316337,316338 ,316339
DISTRIBUTION PLAN-1
EXIST/NEW EXTERIOR POWER LINE
E
E
E
E
M1
P4-10POLE NUNMER :
E
O/H
O /H
O /H
O /H
O /H
T
T
P P
P
P
P
P
P
P
P
PRIMARY LINE (TYPICAL)
EXIST OVERHEAD
L
L
L
O/H S
S
CONCRETE POLE (TYPICAL)
EXIST PRIMARY ELECTRIC
EXIST STREET LIGHT FIXTURE
SCALE: 1/300
EXIST/NEW EXTERIOR POWER LINE DISTRIBUTION PLAN-2
ELECTRICAL
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
E
E2E1
E3
R
O /H
O /H
O /H
T T
T
T
L
E
RELOCATE&RECONNECT TO CON C POLE
WITH NECESSARY ACCESSORIES
O/H
O/H
S
S
2- AWG #8 FOR STREET LIGHET
NEW OVERHEAD SEC LINE
O/H
O/H
P
P
P
O/H O/H O/HPPP
P
60HZ, 225KVA W/BUILT-IN PROTECTIVE DEVICES (25A FUSE)
OIL-FILLED, SELF-COOLED, LOAD BREAK SW, 3PH, 11.4KV-120/208V,
NEW PAD MOUNTED TRANSFORMER, METAL ENCL, RADIAL TYPE,
PRIMARY LINE, SECONDARY LINE (TYPICAL)
REMOVE EXIST OVERHEAD
O /H
O /H
O /H
O /H
S
S
S S
S
O /H
O /H
O /H
O /H
P P
P
P
"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V
NEW O/H PRIM LINE, 3-1/C, #2/0,
2- AWG #8
NEW OVERHEAD SEC LINE
SIGNAL LINE
EXIST OVERHEAD
L
"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V IN 103dia PVC CONDUIT
NEW U/G PRIM LINE, 3-1/C, #2/0,
FOR BUILDING S-3821
REMOVE EXIST OVERHEAD SEC LINE
4- AWG #2 FOR BUILDING S-3821
NEW OVERHEAD SEC LINE
WITH NECESSARY ACCESSORIES.
SECONDARY LINE TO EXIST ELEC POLE
AND RE-ARRANGE/RE-CONNECT EXIST PRIMARY LINE,
REMOVE EXIST PRIMARY ELEC POLE (TYPICAL OF 2EA)
(INSTALL LOCATION APPROXIMATELY 4M FROM
PRIMARY POLE "E1" TO PRIMARY POLE "E3")
O /H
S
"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V
NEW O/H PRIM LINE, 3-1/C, #2/0,
O/H O/H O/H O/H SSS
S
4- AWG #4/0
NEW OVERHEAD SEC LINE
SECONDARY LINE (TYPICAL)
EXIST OVERHEAD
TRANSFORMERS AND ASSOCIATED DEVICES
REMOVE EXIST H-FRAME POLE MOUNTED
R
RELOCATE&RECONNECT TO NEW CON C POLE
EXIST O/H SIGNAL LINE , STREET LIGHT
O /H
O /H
O /H
T
T
S
S
S O /H
O /H
P
P
O /H
NEW GUY WIRE
WITH NECESSARY ACCESSORIES. /
CUTOUT SWITCHES, LIGHTNING ARRESTERS
PRIMARY LINE CABLE RISER SET, TERMINATION KITS, FUSE
NEW PRIMARY POLE(14M) "E3" & UNDERGROUND
RELOCATE&RECONNECT FROM REMOVE PRIM CON C POLE TO NEW PRIM CON C POLE
EXIST O/H PRIMARY LINE, SECONDARY LINE , SIGNAL LINE
NEW PRIMARY ELECTRIC CONCRETE POLE "E3"
REMOVE EXIST TREES FOR NEW PAD MOUNTED TRANSFORMER AND
TRANSFORMERS CAMP HOVEY
TRANSFORMERS WITH NEW PAD MOUNTED
REPLACE DETERIORATED POLE MOUNTED
KIM, SY
,316339 316336,316337,316338
PROJECT NO.
E-4
DISTRIBUTION PLAN-2
EXIST/NEW EXTERIOR POWER LINE
SECONDARY LINE, 2SET OF 4-AWG #350KCMIL IN 103C
NEW U/G CONCRETE ENCASED
P4-5-1POLE NUNMER :
SCALE: 1/300
EXIST/NEW EXTERIOR POWER LINE DISTRIBUTION PLAN-3
ELECTRICAL
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
E-5
A
B
W A
L L
W A
L L
W A
L L
W A
L L
E1
E2
E
E
FOOT BR3705
O /H
O/H
O /H
O /H
P
P
P
S
S
S
L L
L
L
L
E
L O /H
O /H
P
P
EXIST PAD MOUNTED TRANSFORMER
CONCRETE POLE (TYPICAL)
EXIST PRIMARY ELECTRIC
EXIST SEC LINE CON C POLE (TYPICAL)
E
E
WITH NECESSARY ACCESSORIES.
SECONDARY LINE TO EXIST ELEC POLE
AND RE-ARRANGE/RE-CONNECT EXIST PRIMARY LINE,
O/H
O/H
O/H
S
S
S
S
RECONNEXT TO NEW OVERHEAD SEC LINE
EXIST STREET LIGHT FIXTURE (TYPICAL) /
W A
L L
W A
L L
3505T
E
TRANSFORMERS AND ASSOCIATED DEVICES
REMOVE EXIST H-FRAME POLE MOUNTED
O
/HO
/H
O /H
O /H
O /H
O /H
O /H
O /H
O /H
P
P
P
P S
S
S
S
"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V IN 103dia PVC CONDUIT
NEW U/G PRIM LINE, 3-1/C, #2/0,
60HZ, 300KVA W/BUILT-IN PROTECTIVE DEVICES (25A FUSE)
OIL-FILLED, SELF-COOLED, LOAD BREAK SW, 3PH, 11.4KV-120/208V,
NEW PAD MOUNTED TRANSFORMER, METAL ENCL, RADIAL TYPE,
PRIMARY LINE
REMOVE EXIST OVERHEAD
SECONDARY LINE
REMOVE EXIST OVERHEAD
2- AWG #8
NEW OVERHEAD SEC LINE
"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V
NEW O/H PRIM LINE, 3-1/C, #2/0,
PRIMARY LINE (TYPICAL)
EXIST OVERHEAD
EXIST OVERHEAD SECONDARY LINE (TYPICAL)
REMOVE EXIST PRIMARY ELEC POLE "E1"
O /H
S
FOR BUILDING S-3820
EXIST OVERHEAD SEC LINE
4- AWG #4/0
NEW OVERHEAD SEC LINE
PRIMARY POLE WITH NECESSARY ACCESSORIES. /
CUTOUT SWITCHES, LIGHTNING ARRESTERS ON EXIST
PRIMARY LINE CABLE RISER SET, TERMINATION KITS, FUSE
INTERCEPT EXIST O/H PRIM LINE W/ NEW UNDERGROUND
LINE WITH NEW ASSOCIATED ACCESSORIES.
RECONNECT NEW SECONDARY LINE TO EXIST SECONDARY
SECONDARY LINE, 3SET OF 4-AWG #250KCMIL IN 103C
NEW U/G CONCRETE ENCASED
TRANSFORMERS CAMP HOVEY
TRANSFORMERS WITH NEW PAD MOUNTED
REPLACE DETERIORATED POLE MOUNTED
KIM, SY
,316339 316336,316337,316338
PROJECT NO.
DISTRIBUTION PLAN-3
EXIST/NEW EXTERIOR POWER LINE
VEH BR
VEH BR
P2-18POLE NUNMER :
E
E
E2
E1
O /H
O /H
O/H
O/H
O/H
O/H
O /H
O /H
O /H
O /H
O /H
O /H
O /H
T
T
TT
T
T
T
T T
T T T
T
P
P
S
S
S
S S
S
S
S
S
S
SECONDARY LINE (TYPICAL)
EXIST OVERHEAD
PRIMARY LINE (TYPICAL)
EXIST OVERHEAD
SIGNAL LINE (TYPICAL)
EXIST OVERHEAD
L
L
L L
L L
CONCRETE POLE (TYPICAL)
EXIST PRIMARY ELECTRIC
EXIST SEC LINE CON C POLE (TYPICAL)
E
E
E
E
SCALE: 1/300
EXIST/NEW EXTERIOR POWER LINE DISTRIBUTION PLAN-4
ELECTRICAL
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
E-6
"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V IN 103dia PVC CONDUIT
NEW U/G PRIM LINE, 3-1/C, #2/0,TRANSFORMERS AND ASSOCIATED DEVICES
REMOVE EXIST H-FRAME POLE MOUNTED S
P
FOR BUILDING S-4367
REMOVE EXIST OVERHEAD SEC LINE
O /H
O /H
S
S
4- AWG #4/0 FOR BUILDING S-4367
NEW OVERHEAD SEC LINE
O /H
O /H
P
P
"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V
NEW O/H PRIM LINE, 3-1/C, #2/0,
T
7FEET CLEARANCE FORM CHAIN FENCE TO NEW PAD MOUNTED TRANSFORMER
60HZ, 225KVA W/BUILT-IN PROTECTIVE DEVICES (25A FUSE)/
OIL-FILLED, SELF-COOLED, LOAD BREAK SW, 3PH, 11.4KV-120/208V,
NEW PAD MOUNTED TRANSFORMER, METAL ENCL, RADIAL TYPE,
WITH NECESSARY ACCESSORIES.
SECONDARY LINE TO EXIST ELEC POLE
AND RE-ARRANGE/RE-CONNECT EXIST PRIMARY LINE,
REMOVE EXIST PRIMARY ELEC POLE "E1"
PRIMARY POLE WITH NECESSARY ACCESSORIES. /
CUTOUT SWITCHES, LIGHTNING ARRESTERS ON EXIST
PRIMARY LINE CABLE RISER SET, TERMINATION KITS, FUSE
INTERCEPT EXIST O/H PRIM LINE W/ NEW UNDERGROUND
LINE WITH NEW ASSOCIATED ACCESSORIES.
RECONNECT NEW SECONDARY LINE TO EXIST SECONDARY
PRIMARY LINE
REMOVE EXIST OVERHEAD
O /H
O /H
S
S
EXIST OVERHEAD SEC LINE
EXIST OVERHEAD SEC LINE
S
S
5- AWG #8
NEW OVERHEAD SEC LINE
E
TRANSFORMERS CAMP HOVEY
TRANSFORMERS WITH NEW PAD MOUNTED
REPLACE DETERIORATED POLE MOUNTED
KIM, SY
,316339 316336,316337,316338
PROJECT NO.
DISTRIBUTION PLAN-4
EXIST/NEW EXTERIOR POWER LINE
SECONDARY LINE, 2SET OF 4-AWG #350KCMIL IN 103C
NEW U/G CONCRETE ENCASED
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
File details come from the government source that posted it. Updated .