About this file

This document appears to be a solicitation for a federal contract opportunity to replace deteriorated pole mounted transformers with new pad mounted transformers at Camp Hovey in Korea. The solicitation is available only to Area I & II MATOC contractors. The key details are:

The contract requires replacing existing H-frame pole mounted transformers with new pad mounted transformers, including underground high voltage cable riser sets, primary & secondary lines, and necessary accessories. It also requires relocating lighting fixtures and signal lines with new necessary accessories. The solicitation number is W90VN824R0058, and the procuring agency is the Department of the Army Materiel Command Army Contracting Command. This is a defense contract opportunity.

View the file

Other files

File Type Posted
W90VN824R0058.pdf PDF
ELEC_TITLE.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOT TO SCALE

300 BEYOND PAD

ON ALL AROUND

A MINIMUM OF

EXTEND GRAVEL FILL

G

AS REQ'D

G

COOLING

150 MIN.

CORRUGATION

150 MIN.

G

G

AS REQ'D GROUND ROD,

19dia x3000mm LG

COPPER CLAD STEEL

W/WELDING CONNECTION

(TYPICAL)

COMPARTMENTAL TYPE

TRANSFORMER

PAD MOUNTED

BASE COURSE

150 MIN.

CASE GROUND

150 MIN.

EXTEND GRAVEL FILL

A MINIMUM OF

ON ALL AROUND

300 BEYOND PAD

PRIMARY CONDUIT AS REQ'D

GROUND WIRE, AS REQ'D

SECONDARY CONDUIT AS REQ'D

(TYPICAL)

"A" "A"

P L A N

"A-A" SECTION

NFSM

OIL LEVEL GUAGE

TYPE BUSHING

NAME PLATE

TAP CHANGER

HIGH-VOLTAGE SECTION

LIMITING FUSES HOLDERS

BAY-O-NET CURRENT

GL

SECONDARY SPADE

LOW-VOLTAGE SECTION

25.4 DRAIN PLUG

PRESSURE RELIEF DEVICE

G

AS REQ'D

G

CONCRETE PAD REINFORCED

(6"x6"-w2.9xw2.9 WIRE MESH)

G

(TYPICAL)

GROUND ROD

19 diax3000mm LG WITH

WELDING CONNECTION

COPPER CLAD STEEL

WITH 150x150x-4.0 dia.x4.0 dia.WWF

NFSM

SEAL AROUND BASE

W/SEALANT

LOAD BREAK SWITCH

SEE NOTE 1 BELOW

SAFEBREAK BUSHING

GROUND TERMINAL

NEUTRAL AND

PARKING BRACKET

(TYPICAL)

GROUND WIRE, #3/0 "BC"

50 CHAMBER, ALL AROUND

ALL SAFE BREAK BUSHINGS

BEFORE REPLACING FUSES

LABEL ; WARNING-DISCONNECT

FILTERING VALVE

NETURAL TERMINAL

ELBOW TYPE SURGE ARRESTER

CONDUIT COUPLING

SECONDARY PVC CONDUITS

AS REQ'D

G

ANGLE CROSSARM BRACE (TYP)

STEEL CROSSARM,

CONCRETE POLE, 14M-500Kg

G

GROUND WIRE, #4 "BC" (TYP)

18KV (TYP OF 3EA)

LIGHTNING ARRESTER

#2 "BC" (TYP)

G

G

G

G

STEEL BAND (TYPICAL)

CABLE TERMINATION

600V, #1(MAX)x1EA

G.L

CONDUIT

5G

G

CONDUIT COUPLING

CONDUIT (2400mm LG)

#6 "BC" IN 21dia PVC

#6 "BC" IN 21dia STL

G

SEALING BUSHING,

"CSBG 400P(4HOLES)"

AND ADAPTER KIT FOR SINGLE

CONDUCTOR, #1 MAX (TYP OF 3EA)

TERMINATION, 24KV WITH BRACKET

GALV RIGID STEEL

CONDUIT 103dia

19dia x 3000mmLG

W/WELDING CONNECTION

COPPER CLAD STEEL

GROUND ROD,

(MIN)

NOT TO SCALE

POLE KEY

G

"WHITE"

FUSE CUTOUT SWITCH, 15KV,

100A WITH 25A FUSES (TYP OF 3)

G

EXIST O/H PRIM LINE

3PH, 4W, 11.4KV,

AND PLASTIC COVER (TYPICAL)

HOT LINE W/BAIL CLAMP

60HZ SYSTEM

SYMBOL BY

DESIGNED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

ENVIRONMENT

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENERGY MANAGER

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

DES

REMOVAL OF EXISTING ELECTRICAL EQUIPMENT SHALL INCLUDE EQUIPMENT

INCLUDING CONDUCTORS, CABLES, EXPOSED CONDUIT, SURFACE METAL RACEWAYS,

BOXS, AND FITTINGS, BACK TO EQUIPMENT'S POWER SOURCE.

CONTACTOR SHALL VERIFY ELECTRICAL REQUIREMENT OF EQUIPMENT PRIOR TO

ALL ELECTRICAL MATERIAL AND WORKMANSHIP SHALL COMPLY WITH ALL THE

REQUIREMENTS OF NATIONAL ELECTRICAL CODE LATEST EDITION AND NATIONAL

ELECTRICAL SAFETY CODE LATEST EDITION.

THE GOVERNMENT RESERVE THE RIGHT TO POSTPONE THE REQUESTED POWER

MINIMUM OF 14 DAYS PRIOR TO THE ANY SCHEDULED POWER OUTAGE.

THE CONTRACTOR SHALL NOTIFY CONTRACTING OFFICE, AND DPW IN WRITING A

OUTAGE UP TO 8 HOURS PRIOR TO REQUESTED POWER OUTAGE.

GRADING LINE OF NEW DUCTS WILL BE LIMITED TO THE WIDTH OF DUCT EXCAVATION.

OPERATION DURING AND AFTER INSTALLATION OF ELECTRICAL SYSTEM. THE

INCLUDING SODDING, UTILITIES, STRUCTURES TO THEIR ORIGINAL CONDITION AND

THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL DAMAGED AREA

GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

1.

E-1

KIM, SY

ELECTRICAL

TO INSTALLING THE ASSOCIATED CONDUIT & WIRING.

REPLACE EXISTING H-FRAME POLE MOUNTED TRANSFORMERS WITH

CONTACTOR SHALL BE RESPOSIBLE TO RELOCATE EXIST EXTERIOR LIGHTING FIXTURES,

ACCESSORIES TO MEET SITE ADAPT CONDITION.

PRIMARY, SECONDARY LINE, SIGNAL CABLE AND CONTROL PANELS WITH NECESSARY

2.

8.

CATV BEFORE CONSTRUCTION.

CONTRACTOR SHALL COORDINATE WITH AREA MP, NEC, SIGNAL BRIGADE,

SHOP DRAWING FOR EXTERIOR POWER DISTRIBUTION PLAN AND CABLE RISER SET.

BIDING PURPOSE ONLY. CONTRACTOR SHALL VERIFY EXSTING SITE CONDITION AND SUBMIT

SIZE AND COUNT OF POWER DISTRIBUTION LINES ON THE DRAWINGS IS ESTIMATED FOR

CABLE RISER DETAIL

TYPICAL HIGH VOLTAGE UNDERGROUND

TYPICAL TRANSFORMER INSTALL DETAIL

PRIMARY CONDUIT AS REQ'D

SECONDARY STEEL CONDUIT AS REQ'D

1/C, #2/0, 24KV, "XLP" (TYP.)

1/C, #2/0, 600V, "XLP"

(TYPICAL)INSULATOR

LINE POST TYPE POLYMER

(TYPICAL)INSULATOR

LINE POST TYPE POLYMER

STEEL CROSSARM

LINE POST TYPE INSULATOR

DETAILS, GENERAL NOTES & SCOPE OF WORK

VOLTAGE UNDERGROUND CABLE RISER

EXAMPLE OF TRANSFORMER DETAILS & HIGH

SCOPE OF WORK

A. REPAIR/MAINTENANCE ( K )

LINES WITH NECESSARY ACCESSORIES AS SHOWN ON THE DRAWINGS.

HIGH VOLTAGE CABLE RESER SETS, PRIMARY & SECONDARY

NEW PAD MOUNTED TRANSFORMER INCLUDING UNDERGROUND

ACCESSORIES AS SHOWN ON THE DRAWINGS.

RELOCATE LIGHTING FIXTURES, SIGNAL LINES WITH NEW NECESSARY

TRANSFORMERS CAMP HOVEY

TRANSFORMERS WITH NEW PAD MOUNTED

REPLACE DETERIORATED POLE MOUNTED

,316339 316336,316337,316338

N

45 1

CAMP HOVEY

E A S T S E ACHUNCHON

PYONGTAEK

KUNSAN

KWANGJU

INCHON

S E A

W E S T

MUNSAN

DAEGU

CHINHAE

WAEGWAN

BUSAN

DAEJEON

OSAN

UIJONGBU

SEOUL

TONGYOUNG

MOKPO

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

3849 3868

3800T

3821 3820

A B A B

A

B

C

D M1

M2

A

T

A

B

39104052

4018T

4319T

B A

4360 A

B

A

B

A

B

3453 3401

3673 3674

36763672

3631 3685

T

A

B

A

B

3505T

3595 3596

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

FOOT BR

FOOT BR

FOOT BR

FOOT BR

F 4160

F

F

34474042

(3429?)

QA00148-1J

00-54160 BUP 020619

00-54161 BUP 030519

00-54163 BUP 040302

00-54165 BUP 031126

03-57205 REPAIR 040916

03-57206 REPAIR 041018

XX-QA00321 BUP

99-QB00099 BUP

99-QB00131 BUP

XX-QB00156 BUP

99-QB00045 BUP

XX-QB00161 BUP

02-QB00159 BUP

02-QB00160 BUP

XX-QB00156 BUP

XX-QB00163 BUP

XX-QB00164 BUP

VEH BR

VEH BR

B

A

VEH BR

W A

L L

W A

L L

WALL

WALL

WALL

W A

L L

W A L L

W A L L

W A L L

W A

L L

WALL

W

ALL

W

ALL

WALL

WALL

WALL

WALL

W A

L L

WALL

WALL

ACC

COURT

BASKETBALL

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

M U

LT

I- P

U R P

O S E

F

IE

LD

W A

LL

W A

LL

WALL

WALL

WALL

W

ALL

WALL

WALL

W A

L L

WALL

WALL

W

ALL

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

WALL

WALL

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L W

A L

L W

A L

L W

A L

L

W A

L L

W A

L L

W A L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

WALL

W A L L

W A

L L

WALL

W A L L

W A L L

W

ALL

WALL

W A

L L

W A

L L

W A

L L

W A

L L

W A L L

W A

L L

W A

L L

W A

L L

WALL

WALL

WALL

W A

L L

W A L L

W A L L

W A L L

W A

L L

WALL

W

ALL

W

ALL

WALL

WALL

WALL

WALL

W A

L L

WALL

WALL

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

BLEAC

HERS

W A

LL

W A

LL

WALL

WALL

WALL

W

ALL

WALL

WALL

W A

L L

WALL

WALL

W

ALL

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

WALL

WALL

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L W

A L

L W

A L

L W

A L

L

W A

L L

W A

L L

W A L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

WALL

W A L L

W A

L L

WALL

W A L L

W A L L

W

ALL

WALL

W A

L L

W A

L L

W A

L L

W A

L L

W A L L

W A

L L

4-232PN

01-52942

01-52942

01-52942

01-49548

96-44086

4-184PN

01-52942

4-232PN

99-51713

4-200PN

99-51713

4-200PN

99-51823

3-48PN

96-44593

4-200PN

R A

M P

ACC

C

AR W

ASH

R A

M P

ACC

C

AR W

ASH

NOT TO SCALE

: LOCATION OF H-FRAME MOUNTED TRANSFORMER

L O C A T I O N M A P

NOT TO SCALE

DONGDUCHON

PROJECT LOCATION PLAN

ELECTRICAL

CONTRACTING OFFICER DURING THE SITE ORIENTATION.

SHALL BE DETERMINED, DESIGNATED AND COORDINATED WITH THE

THE CONTRACTOR'S HAUL ROUTE, STORAGE AND OPERATIONS AREA

NOTE:

PROJECT LOCATION MAP

PROJECT NO.

KIM, SY TRANSFORMERS CAMP HOVEY

TRANSFORMERS WITH NEW PAD MOUNTED

REPLACE DETERIORATED POLE MOUNTED

,316339 316336,316337,316338

E-2

E

E E

E

E

E

E

PRIMARY LINE (TYPICAL)

EXIST OVERHEAD

SECONDARY LINE (TYPICAL)

EXIST OVERHEAD

SIGNAL LINE (TYPICAL)

EXIST OVERHEAD

L

L L

P3-23POLE NUNMER :

SCALE: 1/200SCALE:

EXIST/NEW EXTERIOR POWER LINE DISTRIBUTION PLAN-1

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

CONCRETE POLE (TYPICAL)

EXIST PRIMARY ELECTRIC

EXIST PAD MOUNTED TRANSFORMER

O/H O/H

O/H

O /H

O /H

O /H

O /H

O /H

O /H

O/H

O/H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O/H O/H O/H

O/H

O /H

O /H

O /H

O/H O/H

P P

P

P P P

P

P

P P

P

P P

P

P

P

P

S S

S

S S

S S

S

S S S

S S

T

T

T

T

T

T T

T

REMOVE EXIST H-FRAME POLE MOUNTED

TRANSFORMERS AND ASSOCIATED DEVICES

OIL-FILLED, SELF-COOLED, LOAD BREAK SW, 3PH, 11.4KV-120/208V,

NEW PAD MOUNTED TRANSFORMER, METAL ENCL, RADIAL TYPE,

60HZ, 150KVA W/BUILT-IN PROTECTIVE DEVICES (15A FUSE)

EXIST STREET LIGHT FIXTURE

"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V IN 103dia PVC CONDUIT

NEW U/G PRIM LINE, 3-1/C, #2/0,

S

PP

PRIMARY POLE WITH NECESSARY ACCESSORIES. /

CUTOUT SWITCHES, LIGHTNING ARRESTERS ON EXIST

PRIMARY LINE CABLE RISER SET, TERMINATION KITS, FUSE

INTERCEPT EXIST O/H PRIM LINE W/ NEW UNDERGROUND

ACCESSORIES.

EXIST SECONDARY LINE WITH NEW ASSOCIATED

RECONNECT NEW SECONDARY LINE TO

SECONDARY LINE, 2SET OF 4-AWG #4/0 IN 103C

NEW U/G CONCRETE ENCASED

S

KIM, SY

ELECTRICAL

E-3

TRANSFORMERS CAMP HOVEY

TRANSFORMERS WITH NEW PAD MOUNTED

REPLACE DETERIORATED POLE MOUNTED

316336,316337,316338 ,316339

DISTRIBUTION PLAN-1

EXIST/NEW EXTERIOR POWER LINE

E

E

E

E

M1

P4-10POLE NUNMER :

E

O/H

O /H

O /H

O /H

O /H

T

T

P P

P

P

P

P

P

P

P

PRIMARY LINE (TYPICAL)

EXIST OVERHEAD

L

L

L

O/H S

S

CONCRETE POLE (TYPICAL)

EXIST PRIMARY ELECTRIC

EXIST STREET LIGHT FIXTURE

SCALE: 1/300

EXIST/NEW EXTERIOR POWER LINE DISTRIBUTION PLAN-2

ELECTRICAL

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

E

E2E1

E3

R

O /H

O /H

O /H

T T

T

T

L

E

RELOCATE&RECONNECT TO CON C POLE

WITH NECESSARY ACCESSORIES

O/H

O/H

S

S

2- AWG #8 FOR STREET LIGHET

NEW OVERHEAD SEC LINE

O/H

O/H

P

P

P

O/H O/H O/HPPP

P

60HZ, 225KVA W/BUILT-IN PROTECTIVE DEVICES (25A FUSE)

OIL-FILLED, SELF-COOLED, LOAD BREAK SW, 3PH, 11.4KV-120/208V,

NEW PAD MOUNTED TRANSFORMER, METAL ENCL, RADIAL TYPE,

PRIMARY LINE, SECONDARY LINE (TYPICAL)

REMOVE EXIST OVERHEAD

O /H

O /H

O /H

O /H

S

S

S S

S

O /H

O /H

O /H

O /H

P P

P

P

"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V

NEW O/H PRIM LINE, 3-1/C, #2/0,

2- AWG #8

NEW OVERHEAD SEC LINE

SIGNAL LINE

EXIST OVERHEAD

L

"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V IN 103dia PVC CONDUIT

NEW U/G PRIM LINE, 3-1/C, #2/0,

FOR BUILDING S-3821

REMOVE EXIST OVERHEAD SEC LINE

4- AWG #2 FOR BUILDING S-3821

NEW OVERHEAD SEC LINE

WITH NECESSARY ACCESSORIES.

SECONDARY LINE TO EXIST ELEC POLE

AND RE-ARRANGE/RE-CONNECT EXIST PRIMARY LINE,

REMOVE EXIST PRIMARY ELEC POLE (TYPICAL OF 2EA)

(INSTALL LOCATION APPROXIMATELY 4M FROM

PRIMARY POLE "E1" TO PRIMARY POLE "E3")

O /H

S

"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V

NEW O/H PRIM LINE, 3-1/C, #2/0,

O/H O/H O/H O/H SSS

S

4- AWG #4/0

NEW OVERHEAD SEC LINE

SECONDARY LINE (TYPICAL)

EXIST OVERHEAD

TRANSFORMERS AND ASSOCIATED DEVICES

REMOVE EXIST H-FRAME POLE MOUNTED

R

RELOCATE&RECONNECT TO NEW CON C POLE

EXIST O/H SIGNAL LINE , STREET LIGHT

O /H

O /H

O /H

T

T

S

S

S O /H

O /H

P

P

O /H

NEW GUY WIRE

WITH NECESSARY ACCESSORIES. /

CUTOUT SWITCHES, LIGHTNING ARRESTERS

PRIMARY LINE CABLE RISER SET, TERMINATION KITS, FUSE

NEW PRIMARY POLE(14M) "E3" & UNDERGROUND

RELOCATE&RECONNECT FROM REMOVE PRIM CON C POLE TO NEW PRIM CON C POLE

EXIST O/H PRIMARY LINE, SECONDARY LINE , SIGNAL LINE

NEW PRIMARY ELECTRIC CONCRETE POLE "E3"

REMOVE EXIST TREES FOR NEW PAD MOUNTED TRANSFORMER AND

TRANSFORMERS CAMP HOVEY

TRANSFORMERS WITH NEW PAD MOUNTED

REPLACE DETERIORATED POLE MOUNTED

KIM, SY

,316339 316336,316337,316338

PROJECT NO.

E-4

DISTRIBUTION PLAN-2

EXIST/NEW EXTERIOR POWER LINE

SECONDARY LINE, 2SET OF 4-AWG #350KCMIL IN 103C

NEW U/G CONCRETE ENCASED

P4-5-1POLE NUNMER :

SCALE: 1/300

EXIST/NEW EXTERIOR POWER LINE DISTRIBUTION PLAN-3

ELECTRICAL

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

E-5

A

B

W A

L L

W A

L L

W A

L L

W A

L L

E1

E2

E

E

FOOT BR3705

O /H

O/H

O /H

O /H

P

P

P

S

S

S

L L

L

L

L

E

L O /H

O /H

P

P

EXIST PAD MOUNTED TRANSFORMER

CONCRETE POLE (TYPICAL)

EXIST PRIMARY ELECTRIC

EXIST SEC LINE CON C POLE (TYPICAL)

E

E

WITH NECESSARY ACCESSORIES.

SECONDARY LINE TO EXIST ELEC POLE

AND RE-ARRANGE/RE-CONNECT EXIST PRIMARY LINE,

O/H

O/H

O/H

S

S

S

S

RECONNEXT TO NEW OVERHEAD SEC LINE

EXIST STREET LIGHT FIXTURE (TYPICAL) /

W A

L L

W A

L L

3505T

E

TRANSFORMERS AND ASSOCIATED DEVICES

REMOVE EXIST H-FRAME POLE MOUNTED

O

/HO

/H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

P

P

P

P S

S

S

S

"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V IN 103dia PVC CONDUIT

NEW U/G PRIM LINE, 3-1/C, #2/0,

60HZ, 300KVA W/BUILT-IN PROTECTIVE DEVICES (25A FUSE)

OIL-FILLED, SELF-COOLED, LOAD BREAK SW, 3PH, 11.4KV-120/208V,

NEW PAD MOUNTED TRANSFORMER, METAL ENCL, RADIAL TYPE,

PRIMARY LINE

REMOVE EXIST OVERHEAD

SECONDARY LINE

REMOVE EXIST OVERHEAD

2- AWG #8

NEW OVERHEAD SEC LINE

"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V

NEW O/H PRIM LINE, 3-1/C, #2/0,

PRIMARY LINE (TYPICAL)

EXIST OVERHEAD

EXIST OVERHEAD SECONDARY LINE (TYPICAL)

REMOVE EXIST PRIMARY ELEC POLE "E1"

O /H

S

FOR BUILDING S-3820

EXIST OVERHEAD SEC LINE

4- AWG #4/0

NEW OVERHEAD SEC LINE

PRIMARY POLE WITH NECESSARY ACCESSORIES. /

CUTOUT SWITCHES, LIGHTNING ARRESTERS ON EXIST

PRIMARY LINE CABLE RISER SET, TERMINATION KITS, FUSE

INTERCEPT EXIST O/H PRIM LINE W/ NEW UNDERGROUND

LINE WITH NEW ASSOCIATED ACCESSORIES.

RECONNECT NEW SECONDARY LINE TO EXIST SECONDARY

SECONDARY LINE, 3SET OF 4-AWG #250KCMIL IN 103C

NEW U/G CONCRETE ENCASED

TRANSFORMERS CAMP HOVEY

TRANSFORMERS WITH NEW PAD MOUNTED

REPLACE DETERIORATED POLE MOUNTED

KIM, SY

,316339 316336,316337,316338

PROJECT NO.

DISTRIBUTION PLAN-3

EXIST/NEW EXTERIOR POWER LINE

VEH BR

VEH BR

P2-18POLE NUNMER :

E

E

E2

E1

O /H

O /H

O/H

O/H

O/H

O/H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

T

T

TT

T

T

T

T T

T T T

T

P

P

S

S

S

S S

S

S

S

S

S

SECONDARY LINE (TYPICAL)

EXIST OVERHEAD

PRIMARY LINE (TYPICAL)

EXIST OVERHEAD

SIGNAL LINE (TYPICAL)

EXIST OVERHEAD

L

L

L L

L L

CONCRETE POLE (TYPICAL)

EXIST PRIMARY ELECTRIC

EXIST SEC LINE CON C POLE (TYPICAL)

E

E

E

E

SCALE: 1/300

EXIST/NEW EXTERIOR POWER LINE DISTRIBUTION PLAN-4

ELECTRICAL

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

E-6

"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V IN 103dia PVC CONDUIT

NEW U/G PRIM LINE, 3-1/C, #2/0,TRANSFORMERS AND ASSOCIATED DEVICES

REMOVE EXIST H-FRAME POLE MOUNTED S

P

FOR BUILDING S-4367

REMOVE EXIST OVERHEAD SEC LINE

O /H

O /H

S

S

4- AWG #4/0 FOR BUILDING S-4367

NEW OVERHEAD SEC LINE

O /H

O /H

P

P

"XLP" 25KV & 1-1/C, #2/0, "XLP" 600V

NEW O/H PRIM LINE, 3-1/C, #2/0,

T

7FEET CLEARANCE FORM CHAIN FENCE TO NEW PAD MOUNTED TRANSFORMER

60HZ, 225KVA W/BUILT-IN PROTECTIVE DEVICES (25A FUSE)/

OIL-FILLED, SELF-COOLED, LOAD BREAK SW, 3PH, 11.4KV-120/208V,

NEW PAD MOUNTED TRANSFORMER, METAL ENCL, RADIAL TYPE,

WITH NECESSARY ACCESSORIES.

SECONDARY LINE TO EXIST ELEC POLE

AND RE-ARRANGE/RE-CONNECT EXIST PRIMARY LINE,

REMOVE EXIST PRIMARY ELEC POLE "E1"

PRIMARY POLE WITH NECESSARY ACCESSORIES. /

CUTOUT SWITCHES, LIGHTNING ARRESTERS ON EXIST

PRIMARY LINE CABLE RISER SET, TERMINATION KITS, FUSE

INTERCEPT EXIST O/H PRIM LINE W/ NEW UNDERGROUND

LINE WITH NEW ASSOCIATED ACCESSORIES.

RECONNECT NEW SECONDARY LINE TO EXIST SECONDARY

PRIMARY LINE

REMOVE EXIST OVERHEAD

O /H

O /H

S

S

EXIST OVERHEAD SEC LINE

EXIST OVERHEAD SEC LINE

S

S

5- AWG #8

NEW OVERHEAD SEC LINE

E

TRANSFORMERS CAMP HOVEY

TRANSFORMERS WITH NEW PAD MOUNTED

REPLACE DETERIORATED POLE MOUNTED

KIM, SY

,316339 316336,316337,316338

PROJECT NO.

DISTRIBUTION PLAN-4

EXIST/NEW EXTERIOR POWER LINE

SECONDARY LINE, 2SET OF 4-AWG #350KCMIL IN 103C

NEW U/G CONCRETE ENCASED

1
2
3
4
5
6

File details come from the government source that posted it. Updated .