EXHIBIT 6

Performance Requirements Summary (PRS)

Task Statement Performance Standard AQL Method of Surveillance Incentive/Disincentive

PB 100 - Gravel Crushing

Production of Gravel

Gradation

See Performance Work

Statement - PWS and

Task Statement and

Quality Standards

85% Quality Assurance

Gradation Testing

I - Good performance evaluation

D - Poor performance evaluation

D - Rework without compensation

PB 100 - Gravel Crushing

Sampling and Testing

MSHA conformance

Stormwater Permit compliance

Pit development plan conformance

Topsoil stripped and stockpiled

Unsuitable material stockpiled

Oversize material utilized

Areas sloped to drain

Drainages protected

Side slope rehabilitation

Stockpiles and buffers maintained

Disturbed areas seeded

Filler sources rehabilitated

Access roads maintained

See Performance Work

Statement - PWS and

Task Statement and

Quality Standards

100% Periodic and Final Inspection

I - Good performance evaluation

D - Poor performance evaluation

D - Rework without compensation

Cover
SECTION C - Performance Work Statement
SECTION J - Technical Exhibits
EXHIBIT 1 - Project Location Map
EXHIBIT 2 - Pit Site Plan
EXHIBIT 3 - Gravel Crushing Task Statement and Quality Standards
EXHIBIT 4 - Aggregate Specification, E (Base)
EXHIBIT 5 - Quality Assurance Plan (QASP)
EXHIBIT 6 - Performance Requirements Summary (PRS)
EXHIBIT 7 - Sample Daily Production Log