EGS Proposal 26-147 CPSC Office Renovations.pdf
PDF 170 KB Posted
- Attached to
- Renovation Services
- Solicitation number
- RFQ-CPS-2220-26-0086
- Issued by
-
Consumer Product Safety Commission
About this file
This is a Statement of Work (SOW) for the Consumer Product Safety Commission (CPSC) detailing facility modification projects that must be completed by October 1, 2026, at CPSC expense.
The SOW requires four door relocations and the removal of systems furniture in office spaces. The door moves include: Office 2A07 from East Wall to West Wall, Office 2A09 from East Wall to West Wall, Office 2A20 from South Wall to West Wall, and Office 2A28 from North Wall to West Wall. Systems furniture removal is required for Office 2A18. For offices 2A07 and 2A09, systems furniture must be removed as necessary and reinstalled if possible. Each task specifies required labor by trade and hours: Lead Carpenter, Carpenter, Painter (two positions), and Electrician. Office 2A07 and 2A09 each require 74 total hours; Office 2A20 requires 48 hours; Office 2A28 requires 48 hours; and furniture removal for 2A18 requires 28 hours. An optional Sunday work provision (double time) is available, allocating 40 hours each for Lead Carpenter, three Carpenters, Helper, and Electrician across all projects.
The SOW includes a material list organized by trade. Electrical materials include junction boxes, MC wire, device rings, switches, receptacles, and cover plates in almond finish. Carpenter materials include 5/8-inch drywall sheets, steel framing track and studs, self-drilling screws, joint compound, lightweight drywall joint compound, and mesh tape. Paint materials consist of two 5-gallon containers each of Pearly White and Accessible Beige paint.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Local and FAR Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CPSC Statement of Work OT Request
Request the following projects must be completed in the Space before October 1, 2026, at CPSC expense:
a. Move doors:
• Office 2A07: From East Wall to West Wall (remove systems furniture if necessary and/or reinstall if possible)
• Office 2A09: From East Wall to West Wall (remove systems furniture if necessary and/or reinstall if possible)
• Office 2A20: From South Wall to West Wall
• Office 2A28: From North Wall to West Wall
b. Remove systems furniture 2A18.
Office 2A07: From East Wall to West Wall (remove systems furniture if necessary and/or reinstall if possible)
TAG Hours
• Lead Carpenter 24
• Carpenter 24
• Painter 8
• Painter 8
• Electrician 10
Office 2A09: From East Wall to West Wall (remove systems furniture if necessary and/or reinstall if possible
TAG Hours
• Lead Carpenter 24
• Carpenter 24
• Painter 8
• Painter 8
• Electrician 10
Office 2A20: From South Wall to West Wall TAG Hours
• Lead Carpenter 16
• Carpenter 16
• Painter 4
• Painter 4
• Electrician 8
CPSC Statement of Work OT Request
Request the following projects must be completed in the Space before October 1, 2026, at CPSC expense:
a. Move doors:
• Office 2A07: From East Wall to West Wall (remove systems furniture if necessary and/or reinstall if possible)
• Office 2A09: From East Wall to West Wall (remove systems furniture if necessary and/or reinstall if possible)
• Office 2A20: From South Wall to West Wall
• Office 2A28: From North Wall to West Wall
b. Remove systems furniture 2A18.
Office 2A28: From North Wall to West Wall TAG Hours
• Lead Carpenter 16
• Carpenter 16
• Painter 4
• Painter 4
• Electrician 8
Remove systems furniture 2A18.
TAG Hours
• Lead Carpenter 8
• Carpenter 8
• Painter 4
• Painter 4
• Electrician 4
• Option For Working on Sunday (Double Time) Office 2A07: From East Wall to West Wall (remove systems furniture if necessary and/or reinstall if possible)
• Office 2A09: From East Wall to West Wall (remove systems furniture if necessary and/or reinstall if possible)
• Office 2A20: From South Wall to West Wall
• Office 2A28: From North Wall to West Wall
d. Remove systems furniture 2A18.
TAG Hours
• Lead Carpenter 40
• Carpenter 40
• Carpenter 40
• Carpenter 40
• Helper 40
• Electrician 40
Material List
Electrical
Item # Materials 1 Box 1900 junction Box 2 Roll MC Wire 10 5/8 Single Gange Device Rings 1 Box (Almond) Single Pole Switched 1 Box Receptacles Almond 1 Box Each Receptacles/Switches Cover plates (Almond)
Carpenter
Item # Materials 12 Sheets 5/8 in x 4 ft x 10 ft Drywall 1 Bundles 3 5/8 in x 10 ft x 20 GA EQ Steel Track w/ 1 1/4 in Leg 6 Bundles 3 5/8 in x 10 ft x 20 GA EQ Steel Stud 1 Box Self-Drilling Tapping Screw: #6 Size, 1 1/4 in Lg, Steel, Zinc
Plated, Flat, Phillips, 1 Box #7 x 7/16" Self-Drilling Framing Screws / Phillips / Special
Pan Head / Steel / Zinc 5 Buckets Buckets Of Blue Top Mud 3 Bags Bags Of Light Weight 90 Minute 2 Rolls Mesh Drywall Tape - White
Paint
Item # Materials 2 -5 Gallon Pearly White 2- 5 Gallon Accessible Beige