EEQA-926 Vacuum Testing Contract - Rev 2 Amend 1.pdf
PDF 19 KB Posted
- Attached to
- IFb69C-22
- Solicitation number
- BD-22-1206-40000-42602-75488
- Issued by
- Suffolk County, Massachusetts
About this file
This document is a Technical Specification from the Massachusetts Bay Transportation Authority (MBTA) for IFB69C-22, a contract to provide vacuum testing services along the MBTA's Green Line. The MBTA is seeking a qualified environmental services company to perform one-time vacuum services to remove leaves and debris from up to 5 miles of the Green Line right-of-way. The contract is expected to last up to 4 days, including 1 day for inspection, 1 day for vacuuming, 1 day for offloading debris, and 1 contingency day. The vacuuming must be performed during non-revenue service hours between 11 PM and 4 AM, and the contractor must coordinate with the MBTA. The contractor's equipment, including a hi-rail vacuum truck, must meet specific dimensional and operational requirements outlined in the specification.
The specification also details the bidder qualifications, which include prior MBTA right-of-way experience and status as a qualified environmental services company. The contractor will be responsible for all labor, services, equipment, materials, training, and other resources required to safely vacuum and dispose of the debris. The MBTA will not verify the presence or lack of hazardous materials. The contractor will be held responsible for any damages to MBTA infrastructure during the work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EEQA-926 Vacuum Testing Contract Technical Spec.pdf | ||
| IFB69C-22 Insurance Requirements.pdf | ||
| Amendment 1 - IFC 69C-22 DRAFT.docx | DOCX document | |
| COMMBUYS-IFB69C-22 Services Template.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MASSACHUSETTS
BAY
TRANSPORTATION
AUTHORITY
TECHNICAL SPECIFICATION
EE&QA-926
RIGHT OF WAY VACUUM TESTING
ISSUED: 5/24/2022
REVISION: 1.0 2.0
EQUIPMENT ENGINEERING AND QUALITY ASSURANCE
Equipment Engineering and Quality Assurance Technical Specification
Specification:
EE&QA-926
RIGHT OF WAY VACUUM TESTING Page 2 of 6
Release Date: Revision Date: 5/24/2022 Revision: 1.0 2.0
TABLE OF CONTENTS
REVISION HISTORY
1.0 PURPOSE
2.0 BIDDER QUALIFICATIONS AND BID REQUIREMENTS
3.0 DESCRIPTION OF EQUIPMENT
4.0 SCOPE OF WORK
5.0 APPROVALS
Specification:
EE&QA-926
RIGHT OF WAY VACUUM TESTING Page 3 of 6
Release Date: Revision Date: 5/24/2022 Revision: 1.0 2.0
REVISION HISTORY
Revision Number
Revision Date
Revised sections Description, Reason for changes
1.0 - Initial Release for Review
2.0 5/24/2022 3.1 and 4.2 Amendment 1 – IFB 69C-22
Specification:
EE&QA-926
RIGHT OF WAY VACUUM TESTING Page 4 of 6
Release Date: Revision Date: 5/24/2022 Revision: 1.0 2.0
1.0 PURPOSE
1.1 The Massachusetts Bay Transportation Authority (MBTA), herein referred to as the
Authority, needs to procure a qualified vendor, herein referred to as Contractor, to vacuum leaves and debris, one-time, along the Authority’s Green Line with a Hi-Rail Vacuum Truck. This contract is to support the Authority in understanding capacity needs for a new vacuuming system.
1.2 The contract is not expected to exceed 4 days; one day for inspection, one day for vacuuming right of way, one day for offloading vacuumed debris and one day for contingency.
1.3 Details for each day will be provided by MBTA.
1.4 The MBTA cannot verify the presence of or lack of any hazardous material.
2.0 BIDDER QUALIFICATIONS AND BID REQUIREMENTS
2.1 The Contractor selected by the Authority shall adhere to all the requirements set forth by the Authority in this Specification. Any deviations from the Authority’s requirements, as well as other proposals presented by the Contractor, must be submitted in writing to the MBTA for approval prior to proceeding. The Authority intends to take all suggestions regarding methods for vehicle removal that are proposed by the selected Contractor into consideration. The Contractor shall be held responsible for any excessive damages to the Authority’s infrastructure that occur during the loading and removal of the vehicle. The Authority reserves the right to access any damages that occur and charge the Contractor accordingly. The Contractor shall acquire, at his/her cost, all permits required to transport these vehicles over public roadways. The Contractor shall submit all pick plans to MBTA Safety for review if a crane system will be utilized. The Contractor shall adhere to these terms, as well as all local, state, and federal laws when the contract is awarded.
2.2 The Contractor must be MBTA “Right of Way” Trained and has previously worked on MBTA property.
2.3 The Contractor must be a qualified environmental services company.
2.4 The Contractor shall provide all labor, services, equipment, materials, training, and any other required resources to safely vacuum and dispose the leaves and debris along the mutually agreed section of track. This includes but is not limited to ensuring that all personnel in the work area are always fitted with the appropriate Personal Protective Equipment (PPE).
Specification:
EE&QA-926
RIGHT OF WAY VACUUM TESTING Page 5 of 6
Release Date: Revision Date: 5/24/2022 Revision: 1.0 2.0
3.0 DESCRIPTION OF EQUIPMENT
3.1 Hi Rail Truck:
3.1.1 The height of the Hi Rail truck must be no more than 13’4” tall.
3.1.2 The width of the Hi Rail truck must be no more than 8’-2” 8’6” wide.
3.1.3 The Hi Rail wheels back-to-back measurement gauge must be no less than 53”.
3.1.4 The Hi Rail Truck must be compliant with 49 CFR 214.523.
3.1.5 The Hi Rail Truck must be capable of operating on MBTA track with a nominal rail gauge of 56-1/2”.
3.2 Vacuum System
3.2.1 The vacuum tank must be at least 17 cubic yards.
3.2.2 The vacuum tank USDOT certified to handle RCRA hazardous waste.
3.2.3 The vacuum system must be equipped with at least a 6400 CFM blower.
3.2.4 The vacuum system must be equipped with at least a 50’ hose.
4.0 SCOPE OF WORK
4.1 The Hi Rail truck must be inspected and accepted by the Authority, at an Authority’s Rail yard, prior to vacuuming the right of way.
4.2 The vacuum services will occur on a mutually agreed date between the Contractor and Authority before June 2022 within one (1) month from receiving a Purchase Order. The services must be completed during non-revenue service hours, between 11 PM and 4
AM.
4.3 The locations to be vacuumed are to be determined but will take place on the green line.
The vacuuming services will take place on the Green Line covering no more than 5 miles.
4.4 The contractor must coordinate and follow Authority’s direction while on the Authority’ right of way.
4.5 The contractor must offload vacuumed material at a mutually agreed location.
Specification:
EE&QA-926
RIGHT OF WAY VACUUM TESTING Page 6 of 6
Release Date: Revision Date: 5/24/2022 Revision: 1.0 2.0
5.0 APPROVALS
Prepared By: Date:
Hatch LTK MBTA Consultant
Reviewed By: Date:
Jay Berry – Deputy Director Heavy Rail Maintenance
Approved By: Date:
Michael F. Walsh – Director Subway Maintenance and Engineering