AMENDMENT 0001 - Questions and Government Response
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
2018 Dry Dock NOAA R/V Gloria Michelle EE133F-18-RQ-0132, Amendment 0001
QUESTIONS AND ANSWERS
CLIN 0002:
Q1: Are there any plans to move the main engine for hull access?
A1: Space is tight. Some interferences may need to be moved in order to perform the interior welds on the hull but we are not anticipating moving the main engine. Removal of the shaft in CLIN0004 will clear some space for access as well.
CLIN0003
Q2: How much clad welding is to be done on the propeller?
A2: Following a recent dive, it was confirmed that there is one quarter-sized (1”x1”) spot centered at the outside edge of one blade that will need material. The remainder of the propeller is visually sound.
CLIN0004
Q3: What is the length of the shaft extension?
A3: The shaft extension is roughly 12’. It is coupled to a stainless tail shaft.
Q4: What type of bearing is at the FishHold-Engine Room bulkhead?
A4: The shaft penetrates the bulkhead via a coupling.
CLIN0006
Q5: How much fuel will need to be removed from the port tank?
A5: Roughly 1200 gallons.
Q6: Are there any known problems with the port fuel tank?
A6: No. The starboard fuel tank was inspected in 2015. The port fuel tank will be opened and inspected as routine maintenance.
CLIN0007
Q7: Is the forward water tank simply in need of a cleaning and inspection?
A7: There are known areas of paint sloughing in the water tank. The contractor will need to blast and paint the interior surfaces of the water tank. See SOW 18.7c-d.
CLIN0008
Q8: Can the new plumbing be threaded to the manifold?
A8: Yes. The new plumbing can be threaded.
Q9: How many new valves must be added to the manifold?
A9: Two valves, one for the steering gear room and one for the lazarette.
CLIN0008 (continued) Q10: How much hard pipe needs to be added to the vessel?
A10: All lengths of line must be hardpiped from suction to manifold. In accordance with 46 CFR 182.510, all pipe must be at least 1-1/2”. An estimate of new pipe lengths needed are as follows:
Discharge Line: ~15’ Aft Steering Line: ~31’ Lazarette Line: ~23’ Potable water stripping valve to pump: ~15’ Pump to Manifold: ~7’ Aft E/R: ~6’ Fish Hold Line: ~6’
Q11: Can the existing Lazarette and Steering Room plumbing be cleaned, inspected, and reused to avoid breaking up concrete in the Fish Hold?
A11: The current pipes do not meet the nominal diameter requirements. To avoid breaking the concrete, the new pipe may be routed above the concrete on deck, so long as it does not create a tripping hazard.
This can be accomplished by routing it all the way starboard, through the berthing space at the deck/bulkhead interface. The estimated length of pipe in the above question reflects this route. Old pipe must be sealed at the bulkhead to preserve watertight integrity of each space.
CLIN0009
Q12: What items will remain in the steering room?
A12: All buckets and loose items can be removed from the space prior to preservation work. Fixed items, such as hydraulic rams and bilge float switch, must be covered prior to sand blasting.
CLIN0011
Q13: How are the rub rails currently attached?
A13: The current rub rails are sections of half pipe welded to the vessel.
Q14: How much fuel will need to be removed from the vessel prior to welding?
A14: The port fuel tank will already be empty via CLIN0006. There will be approximately 1700 more gallons (800 in starboard tank and 450 in each of two tanks aft) to remove or inert. The forward tanks (port ballast and stbd hydraulic) will not need to be pumped, as the rub rails begin aft of these tanks.
End of Question and Answer Section
| Attachment A - Gen Specs.pdf |
| S114 M20CRW3 spec sheet v1 |
| 20160826114708558 |
| Attachment C - Marco Specs.pdf |
| 20160413135351472 |
| IMG_4133 |
| IMG_4136 |
| IMG_4137 |
| IMG_4139 |
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0001 |
| Code[0]: |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: 1. Amendment 0001 is hereby issued to post questions and Government responses. |
2. The response date for quotes remains unchanged at Friday, February 2, 2018 (2:00pm EST).
3. Except for the changes made herewith, all other terms, conditions, and provisions remain unchanged.
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: NOAA/National Marine Fisheries Service |
Northeast Fisheries Science Center 166 Water Street Woods Hole, MA 02543
| NameandAddress[0]: |
| AdministeredBy[0]: NOAA/National Marine Fisheries Service |
Northeast Fisheries Science Center 166 Water Street Woods Hole, MA 02543
| ContractIDCode[0]: |
| ReqNumber[0]: EE133F-18-RQ-0132 |
| AmendmentNo[1]: EE133F-18-RQ-0132 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 1 |
| EffectiveDate[0]: 01/30/2018 |
| Dated9B[0]: 01/16/2018 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: 1 |
| Extended[0]: Off |
| NotExtended[0]: 1 |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: 1 |
| CopiesReturned[0]: 1 |
File details come from the government source that posted it.