Amendment_0001.pdf

PDF 5 MB Posted

Attached to
Provide Hydraulic, Winch & Deck Equipment Upgrades for NOAA R/V Gloria Michelle
Solicitation number
EE133F-16-RQ-0864
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
Solicitation_EE133F-16-RQ-0864.pdf PDF
Attachment_A_-_Past_Performance_Template.docx DOCX document
Attachment_B_-_SAM_registration_info.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Hydraulic, Winch & Deck Equipment Upgrade for NOAA R/V Gloria Michelle

EE133F-16-RQ-0864, Amendment 0001

QUESTIONS AND ANSWERS

Q1: What is the thickness of the deckplate?

A1: Deck plate is ¼”.

Q2: Are you looking for a complete powerpack or to use the existing PTO?

A2: Power the pump from a PTO on the Main Engine.

Q3: Are you at capacity in terms of power usage?

A3: A power audit would be necessary to confidently confirm. The 21kw generator is loaded near capacity. See Attachment A for generator specifications.

Q4: Can you send literature on the current Hydraulic pump?

A4: See Attachment B for “Sperry Vickers Pump”

Q5: Can we reuse the escape hatch?

A5: Yes

Q6: Will the large hatch be discarded?

A6: Yes

Q7: Will we supply new wire or reuse the existing wire?

A7: This requirement does not include new trawl wire. Reuse the existing wire.

Q8: Can the contract be split into a dry dock package and a hydraulic install package?

A8: The solicitation will result in a single award. However, if necessary, the contractor may use subcontractors to perform some of the work.

Q9: How much power does the anchor windlass need?

A9: The anchor is 300 lb and there is no ground tackle. The anchor windlass will need to have the same flow as is currently provided.

Q10: Will the steering plumbing be disturbed?

A10: The steering is a separate hydraulic system. It shall be disturbed only if it is in the way of hotwork to be performed in reconfiguring the deck.

Q11: Is the PTO ratio 1:1?

A11: It appears to be 1:1. Model number can be used to verify.

Q12: How much weight do you lift with the ship’s boom?

A12: We usually do not lift more than 1200 lbs.

EE133F-16-RQ-0864, Amendment 0001

QUESTIONS AND ANSWERS

Q13: Is there any flexing in the deck with the current configuration?

A13: No

Q14: Will there be an engineer approving the deck changes in regards to stability?

A14: The vessel has been given approval by our inspector to make these changes as they will increase overall stability. If needed, the Government can arrange to have further stability tests completed.

Q15: Do we want a pneumatic PTO switch at the wheelhouse as well as the winch control station?

A15: Yes.

Q16: Can the pier handle a large crane?

A16: Yes.

Q17: Who takes necessary precautions again welding?

A17: We can create a checklist of vulnerable ship systems but the contractor will be responsible for disconnecting such systems.

Q18: Do we want vessel steering on the winch control station?

A18: Not a requirement of this solicitation.

Q19: Is the contractor responsible for making new cable transits through the deck (replacing the roxtec box on the hatch)?

A19: Yes, the Government requires a rectangular port to fit our existing Roxtec transit.

Q20: Who is responsible for moving/relocating the scientific stations?

A20: The scientific stations will be removed by the Government prior to the commencement of work.

Q21: Does the existing bracket at the base of the vessel’s boom serve a current purpose?

A21: The existing bracket does not have current purpose. It may be used for the small winch or removed.

Q22: Is the hydraulic oil in the tank to be stored and reused or replaced?

A21: The hydraulic oil in the tank shall be reused. The contractor will be responsible for replacing any fluid lost during the project.

Q23: Can we reuse hydraulic lines?

A23: Any hydraulic lines removed may not be reused.

Q24: At what RPMs will we be fishing?

EE133F-16-RQ-0864, Amendment 0001

QUESTIONS AND ANSWERS

A24: The vessel typically fishes between 600-1500 RPMs but the new pump shall offer full range of speeds from 500-1800RPMs.

Q25: Does the vessel have information on the existing MARCO winch?

A25: See the Attachment C for “Marco Specs”

Q26: Is the contractor to insulate the fish hold following new deck installation, namely at the site where the hatch is to be removed?

A26: Yes, the insulation should match the existing insulation in the fish hold.

Q27: Does the vessel’s 20kw generator have the capacity to power a 3, 5, or 7.5 horsepower pump?

A27: A power audit is necessary to confidently answer this question but it is suspected we are near capacity. See Attachment A for the 21kw generator. The generators are able to put out 240V but modifications may be necessary as we are currently running 120V.

Q28: Is the contractor to load test the crane?

A28: Yes. The contractor will need to load test the crane as well as the other installed deck equipment to test the deck strength and new welds at the equipment bases.

Q29: Please confirm or update the following material specification for the hydraulic system piping/hose: All piping/tube and fittings below deck to be standard steel. All fittings above deck (exposed) to be stainless steel, except crimped hose fittings, which can be standard steel with petro tape.

A29: This is correct. All exposed metal above deck shall be stainless except crimped hose fittings. Metal below deck may be standard steel.

Q30: Would it be possible to supply a deck scantling drawing and/or any drawing that details the current structure?

A30: The awarded contractor will be provided with all ship plans (blueprint paper or electronic) as requested.

Q31: Who will develop testing procedure for all equipment? Who will provide testing weights/tooling etc?

A31: The contractor will be responsible for developing the test procedure. The Government Contracting Officer Representative (COR) will be available for testing and to answer all operational questions.

Q32: Please confirm if the Government is to supply the trawl winch wire? Who will be responsible for spooling the wire if OFE?

A32: The Government will supply the wire. The contractor will be responsible for spooling the wire onto the drum.

M20CRW3 Specifications and Dimensions

Engine Block

• Four cycle, 4 cylinder, liquid cooled, naturally aspirated, overhead valve diesel.

• Swirlcombustionchambersimprovefuelefficiencyandreducesmoke.
• Glowplugsforquickcoldstarting.

Cooling System

• Jacket-watercoolingsysteminheatexchangerorkeelcooledconfiguration.
• One-pieceheatexchangerhousing,expansiontankandliquidcooled
exhaustmanifold.Fewertroublesomehosesandgaskets.Castirontoresist
corrosionandelectrolysis.
• Keelcoolingconfigurationisstandard
• Heatexchangercoolingisoptional.Cupro-nickel,tube-typeheatexchanger
elementcanberemovedforeasycleaning.Easilyaccessible,rubber
impellerseawaterpumpofbronzeandstainlesssteelisgeardriven;no
pumpdrivebeltstofail.Cast-ironwetexhaustelbowisincluded.

AC Generator

• NorthernLights,d irectcoupled,brushlessACgeneratoris
maintenancefree.12leaddesignisreconnectablefor1or3phase,
60Hzoutput.Conservative heatriserating:95°C/50°Cambient.
• AutomaticVoltageRegulator(AVR)ispoweredbydedicatedACwinding
fortrue300%shortcircuitcapability.Quick±1%RMSnoloadtofullload
voltageregulation.AVRhascircuitbreakerprotection.
• GeneratorfeatureshighqualityClass“H”epoxyinsulation,accessible
diodes,over-sizedbearingandjunctionboxforwiring.

Intake and Exhaust

• MeetsUSEPATierIIemissionrequirementsforacleanerenvironment.
• Disposabledryaircleaner.
• 11/2inchNPTexhaustoutlet.

Lubrication System

• Fullflow,spin-onoilfilterwithbypass.
• 8.6qt.(8.2ltr)oilcapacityforbetterlubrication.200hroilchangeintervals.
• Oildrainforquick,cleanoilchanges.
•Closedcrankcaseventsystemkeepsoilvaporinsideengineforcleanengine

room.

Fuel System

• Fuelsystemisself-venting.
• Injectionpumpwith5% mechanicalgovernorforcloseACfrequency

control.

• Pintleinjectorswithreplaceabletips.
• Mechanicalliftpumpwithhandprimer.Noelectricpumptofail.
• Largespin-onfuelfilter.
• Stopsolenoidcontrolsthefuelrack,notthrottle,toeliminatespeedvariance
andlinkageproblems.

DC Electrical System

• DCsystemusesreliablerelaysinsteadofunrepairableprintedcircuitboard.
• 12voltstartermotorandbatterychargingalternatorwithregulatorandbelt

guard.

• Standardpanel:RemotemountS-3Chashourandvoltmeters,oilpressure
andcoolanttemperaturegauges,stop-startswitchandpreheatswitch.
• 20foot(6m)plug-inpanelharnessletsyoumountyourpanelanywhereon
board.DCsystemisexpandabletosixpanelsupto110feetfromtheset.

• Low oil pressure and high coolant temperature shutdowns are standard.

Special Equipment

• Rigidweldedsteelbaseframe.
• Fourplateformmountsisolatevibration.
• Toughgrayenamelpaintforlonglifefinish.
• Operator’sandpartsmanualsstandard.

M20CRW3 Features and Benefits www.northern-lights.com

Dealer

M20CRW3 - 20 kW

NorthernLights,Inc.•442014thAve.NW.,•SeattleWA98107
Tel:206-789-3880•1-800-762-0165•Fax:206-782-5455
Informationanddimensionssubjecttochangewithoutnotice.
NorthernLightsandLuggerareregisteredtrademarksofNorthernLights,Inc.
©2012Allrightsreserved.LithoUSA.S1148/12

Dimensional Drawing

M20CRW3 Overall Dimensions L x W x H: 43.2 x 20.7 x 32.8 inch (1098 x 526 x 833 mm)

Dimensionsgivenininches(mm).Dimensionssubjecttochangewithoutnotice.
Contactdealerorvisitwww.northern-lights.comformostcurrentinstallationdrawings.

AC Ouptut1

20 kW60Hz,1800RPM
Amperage120-240V/83A,120V/166A
Phase/powerfactorStd:1/1.0(Opt.3/0.8)
Voltageregulation±1%

Lugger L844L2 Engine

TypeVerticalinline4cylinderdiesel
Displacement135in3(2.2ltr)
Bore/Stroke3.30/3.90in(84/100mm)
HP@RPM32/1800
Approx.fueluse
1800RPM@fullload21.7gph(6.5lph)
1800RPM@halfload21.0gph(3.9lph)

Installation Data & Weight

Wetexhaustelbow2inchOD
Dryexhaustoutlet11/2inchNPT
HErawwaterinlet3/4inch(19mm)OD
KCcoolantinlet/outlet11/4inchOD
KeelCooler6ftturbotube/12ftplaintube
Fuelinlet5/16inchJICmale
Fuelreturn1/4inchJICmale

Approximate dry weight 820 lbs (372 kg)

1. Based on SAE J1995 and ISO 3046.

2. Actual fuel consumption will vary depending on operating conditions

ATTACHMENT A

ntynan Highlight

ATTACHMENT A

ATTACHMENT B page 1 of 5

ATTACHMENT B

page 3 of 5ATTACHMENT B page 4 of 5ATTACHMENT B

ATTACHMENT B

ATTACHMENT C page 1 of 4 page 2 of 4ATTACHMENT C

ATTACHMENT C PAGE 3 of 4

ATTACHMENT C page 4 of 4

Attachment A - Gen Specs.pdf
S114 M20CRW3 spec sheet v1
20160826114708558
Attachment C - Marco Specs.pdf
20160413135351472
IMG_4133
IMG_4136
IMG_4137
IMG_4139
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0001
Code[0]:
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: 1. Amendment 0001 is hereby issued to post questions and Government responses and to establish a cut-off date for questions of August 30, 2016 at 4:00 PM, EST.

2. The response date for quotes is extended to Tuesday, Sept 6, 2016 (11:00am EST).

3. Except for the changes made herewith, all other terms, conditions, and provisions remain unchanged.

FacilityCode[0]:
Code[2]:
IssuedBy[0]: NOAA/National Marine Fisheries Service

Northeast Fisheries Science Center 166 Water Street Woods Hole, MA 02543

NameandAddress[0]:
AdministeredBy[0]: NOAA/National Marine Fisheries Service

Northeast Fisheries Science Center 166 Water Street Woods Hole, MA 02543

ContractIDCode[0]:
ReqNumber[0]: EE133F-16-RQ-0864
AmendmentNo[1]: EE133F-16-RQ-0864
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 1
EffectiveDate[0]: 08/29/2016
Dated9B[0]: 08/15/2016
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: 1
Extended[0]: 1
NotExtended[0]: Off
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]: 1

File details come from the government source that posted it. Updated .