EDR.pdf
PDF 81 KB Posted
- Attached to
- UMTE Receiver Subassembly
- Solicitation number
- SPRHA5-26-Q-0584
- Issued by
-
Defense Logistics Agency Aviation
About this file
This document is a Hill AFB Form 462 Engineering Instructions for the manufacture of a Receiver Subassembly. The part number is SC5985-0211-1 with National Stock Number 5840015237479FD. The instructions were prepared by Andrew Webb from office symbol 415 SCMS on 04/08/2026.
The engineering instructions establish mandatory manufacturing requirements and compliance procedures. Contractors must certify in writing prior to contract award their full compliance with all drawings, specifications, and standards required for assembly manufacture. The sources and materials listed in standards, specifications, and drawings are the only approved sources; any substitutions require prior approval from the cognizant engineering activity. Deviations from control drawings are not authorized without prior engineering approval, and the system engineer retains the right to review and accept discrepant items before shipment. All deviations from engineering drawings must be submitted for engineering review and disposition. Additionally, contractors bear responsibility for completely searching all drawings, specifications, and standards to fully understand manufacturing requirements. Unique Identification (UID) must be applied per MIL-STD-130, including minimum 1/8-inch human-readable markings with CAGE code (17V), part number (1P), and serial number (1S), and minimum 1/4-inch square machine-readable 2D matrix with the same data elements. If replacing an existing label, all existing label data must be retained using the same label material specified in the drawing. Compliance with MIL-STD-130, ANSI/AIM BCII, ISO 15434, ISO 15415, and ISO 15418 is required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CDRL_CPP.pdf | ||
| SPRHA526Q0584.pdf | ||
| CDRL_FATP.pdf | ||
| CDRL_FATR.pdf | ||
| SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV:
ENGINEERING INSTRUCTIONS
NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.
1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:
RECEIVER SUBASSEMBL
2. PART NUMBER:
SC5985-0211-1
3. NATIONAL STOCK NUMBER:
5840015237479FD
PREPARED BY:
Andrew Webb
OFFICE SYMBOL:
415 SCMS
DATE:
04/08/2026
HILL AFB FORM 462
4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.i
5. THE SOURCES/MATERIALS IF LISTED ON THE STANDARDS, SPECIFICATION AND DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT ENGINEERING ACTIVITY.
6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR APPROVAL BY
THE COGNIZANT ENGINEERING ACTIVITY.
7. SYSTEM ENGINEER RETAINS ALL RIGHTS TO REVIEW AND ACCEPT DISCREPANT ITEM PRIOR TO SHIPMENT. ANY DEVIATION FROM THE ENGINEERING DRAWING SHALL BE SUBMITTED FOR ENGINEERING REVIEW AND DISPOSITION.
8. PRIOR TO CONTRACT AWARD, THE CONTRACTOR SHALL CERTIFY TO THE GOVERNMENT IN WRITING FULL COMPLIANCE WITH DRAWINGS, SPECIFICATIONS AND STANDARDS CALLED OUT AND REQUIRED FOR THE MANUFACTURE OF THIS ASSEMBLY. THE CONTRACTOR IS RESPONSIBLE TO COMPLETELY SEARCH THESE DRAWINGS, SPECIFICATIONS AND STANDARDS AND FULLY
UNDERSTAND THE REQUIREMENTS NECESSARY TO MANUFACTURE THE ITEM.
9. UNIQUE IDENTIFICATION (UID) SHALL BE APPLIED PER MIL-STD-130:
a. MINIMUM 1/8TH INCH ON HUMAN READABLE TO INCLUDE:
i. CAGE (17V)
ii. P/N (1P)
iii. SERIAL NUMBER (1S)
b. MINIMUM 1/4 INCH SQUARE ON MACHINE READABLE 2D MATRIX – CONSTRUCT 2 – TO INCLUDE:
i. CAGE (17V)
ii. P/N (1P)
iii. SERIAL NUMBER (1S)
c. LABEL SHALL CONTAI/N ALL DATA ON EXISTING LABEL, IF EXISTING LABEL IS TO BE REPLACED.
d. SAME LABEL MATERIAL SHALL BE USED AS SPECIFIED IN DRAWING FOR EXISTING LABEL.
e. MIL-STD-130, ANSI/AIM BCII, ISO 15434, ISO 15415, AND ISO 15418.
REV:
ENGINEERING INSTRUCTIONS
NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.
1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:
RECEIVER SUBASSEMBL
2. PART NUMBER:
SC5985-0211-1
3. NATIONAL STOCK NUMBER:
5840015237479FD
PREPARED BY:
Andrew Webb
OFFICE SYMBOL:
415 SCMS
DATE:
04/08/2026
HILL AFB FORM 462
i
File details come from the government source that posted it. Updated .