EDR.pdf

PDF 61 KB Posted

Attached to
F-16 Valve, Solenoid
Solicitation number
SPHRA4-26-Q-0393
Issued by

About this file

This document is a Hill AFB Form 462, Engineering Data Requirements attachment that provides manufacturing instructions for a Valve, Nitrogen-Emergency Power Unit for the F-16 aircraft. The part number is 16VH003006-2 with National Stock Number 4810-01-099-6392WF. The document was prepared by Adrian Gustai of the 416 SCMS/GUEAA office on 15 November 2022.

The requirements establish that military specifications and standards will not be furnished in the bid set, and manufacturers must adhere to all listed specifications, standards, and control drawings. Sources and materials listed on standards and specification drawings are the only approved sources; any substitutions require prior approval from the cognizant engineering activity. Deviations from specifications in control drawings are not authorized without prior approval from the cognizant engineering activity. All marking must comply with MIL-STD-130.

View the file

Other files

File Type Posted
EDL.pdf PDF
SPRHA426Q0393.pdf PDF
SOW.pdf PDF
MQR.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REV: ENGINEERING DATA REQUIREMENTS

(ATTACHMENT “A”)

NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.

1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:

VALVE, NITROGEN-EMERGENCY POWER UNIT. F-16

2. PART NUMBER:

16VH003006-2

3. NATIONAL STOCK NUMBER:

4810-01-099-6392WF

PREPARED BY:

ADRIAN GUSTAI

OFFICE SYMBOL:

416 SCMS/GUEAA

DATE:

15 NOVEMBER 2022

HILL AFB FORM 462 Page 1 of 1

4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE

SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.

5. THE SOURCES/MATERIALS IF LISTED ON THE STANDARDS, SPECIFICATION AND DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT

ENGINEERING ACTIVITY.

6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR

APPROVAL BY THE COGNIZANT ENGINEERING ACTIVITY.

7. MARKING PER MIL-STD-130.

File details come from the government source that posted it. Updated .