EDR.pdf

PDF 138 KB Posted

Attached to
SCS Radio Amplifier Federal contract opportunity
Solicitation number
SPRHA3-25-R-0138
Issued by
Defense Logistics Agency Aviation

About this file

This is an Engineering Data Requirements (EDR) document from Hill AFB that provides manufacturing instructions for a Radio Frequency Amplifier (AN/FPS-85) with part number BHE5819-300/3158A and National Stock Number 5996-01-499-6546ZA.

The document specifies that military specifications and standards will not be furnished in the bid set. It mandates that sources and materials listed on standards, specifications, and drawings are the only authorized options, with substitutions requiring prior engineering approval. No deviations from control drawing specifications are permitted without engineering approval. The document references UID statement 200827954 and was prepared by Kendric R Hornsby of office 415 SCMS/GUEA on November 19, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to SCS Radio Amplifier, newest first.
File Type Posted
SPRHA325R0138_______0001.pdf PDF
SPRHA325R0138.pdf PDF
CDRLCPP.pdf PDF
CDRLFATR.pdf PDF
EDL.pdf PDF
SOW.pdf PDF
SPI.pdf PDF
CDRLFATP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REV: ENGINEERING DATA REQUIREMENTS

(ATTACHMENT “A”)

NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.

1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:

RADIO FREQUENCY AMPLIFIER (AN/FPS-85)

2. PART NUMBER:

BHE5819-300/3158A

3. NATIONAL STOCK NUMBER:

5996-01-499-6546ZA

PREPARED BY:

Hornsby, Kendric R

OFFICE SYMBOL:

415 SCMS/GUEA

DATE:

NOV. 19, 2024

HILL AFB FORM 462 Page 1 of 1

4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE

SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.

5. THE SOURCE / MATERIALS IF LISTED ON THE STANDARDS, SPECIFICATIONS AND DRAWINGS ARE THE ONLY SOURCE/MATERIALS FOR THOSE ITEMS. SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT

ENGINEERING ACTIVITY.

6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR

APPROVAL BY ENGINEERING.

7. USE UID STATEMENT 200827954.

File details come from the government source that posted it. Updated .