Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
The above numbered solicitation for ARRA/Stimulus project - Iberia Parish Wastewater Treatment Project, Iberia Parish, LA is hereby amended as follows:
See Government's response to questions attached.
The proposal due date remains unchanged as Tuesday, June 29, 2010 at 8:00AM CST.
US Army Corps of Engineers, New Orleans District Attn: CEMVN-CT-W, RM 184 (A. Jones) 7400 Leake Ave.
New Orleans, LA 70118-3651
US Army Corps of Engineers, Lafayette Area Field Office Attn: Ted Eilts 646 Cajundome Blvd, Suite 101 Lafayette, LA 70506
ED0921-10-S-0007
ED-09-210
1 3
06/28/2010
06/24/2010
Questions and Answers:
For Questions # 1 and 2 below, Reference amendment no. 0001, under Section 01100, paragraph labeled, “22. SPECIAL CONSIDERATIONS, Special Instructions for Option A Item 0030 and Option B Item 0051, “Underground Electrical Distribution”, the specifications state, “
(a) For both Option A and Option B, the Contractor shall provide all underground duct bank, electrical hand holes, conduit, warning tape, pull string, and all other appurtances as indicated in the contract drawings. Where electrical equipment is not furnished and installed under the awarded Option; the Contractor shall cap and stub all conduit min. 6” above grade at the location of future equipment. The exact location of stub up shall be approved and field verified by the Contracting Officer.
(b)For both Option A and Option B, the Contractor shall not provide conductors specified in the Duct bank Schedule on plan sheet TFE‐603. In lieu of the specified conductors, the Contractor shall provide a pull string for each conduit from one termination point to the other. The Contractor’s bid price for “Underground Electrical Distribution” line item shall not include furnishing or installation of these conductors.”
Question #1a. There is some confusion about how the Underground Distribution price should be listed on the bidding schedule (Raceway System – As per Amendment #1).
Should it be broken into two parts (Option A + Option B = Total Underground Raceway) where the total system would be installed only if both Options are built.
Answer 1a. No, the underground distribution price should NOT be separated or broken up into two parts.
Question 1b. Or should it be listed as (Option A = Total System) and (Option B = Total System) so that if either of the Options are chosen they would have a complete raceway system?
A. 1b. Yes, offerors will be required to build a “Total System” or all of the underground duct bank including electrical hand holes, conduit, warning tape, pull string, and all other appurtances for both Option A – Wastewater Treatment plant and Option B – Pump Stations, etc, such that a Complete/Total Underground duct bank system is built, regardless of what Option is awarded. The referenced paragraph in Amendment No. 0001 was intended to clarify to bidders that all underground duct bank shall be provided regardless of what Option is awarded and offerors should include pricing for all of this work, combined, in both Option A and Option B bid schedules. Construction of all of the duct bank or a complete system for both Options A and B is required and will allow for ease in future construction of the unawarded Option. This paragraph goes on to provide further instructions to the offerors of what to do with conduit that is located at a site for future equipment, which is contained in the unawarded option.
For example, when pricing Option A – Wastewater Treatement Plant, Offerors shall include all pricing for the construction of all underground duct bank, electrical hand holes, conduit, warning tape, pull string, and all other appurtances as indicated in the contract drawings for both Options A and B. Additionally, when pricing Option A, offerors shall include pricing to cap and stub all conduit min. 6” above grade at the location of future equipment for ease in future construction of Option B. Offerors shall do the same when pricing Option B.
Question # 2. The Electrical Underground Distribution is now described as being the underground raceway system including Hand Holes, Conduit etc. with none of the conductors included in this item.
Q2a. Do we move the conductors that were included in this item to the “Electrical Installation” items with a portion for each option?
i. Electrical Installation (Treatment Plant – Option A)
ii. Electrical Installation (Pump Station #2 – Option B)
iii. Electrical Installation Distribution Panelboard (PPA-Option B)
Answer 2a. No, the conductors shall be eliminated per Amendment No. 0001.
Q2b. Or do we eliminate the conductors completely? (This would leave a gap in the electrical)
Answer 2b. Yes, the conductors have been eliminated and shall not be provided regardless what option is awarded, per Amendment No. 0001.
Question # 3. It was determine prior to the closing of first bid date that the specification for the 500 KW Natural Gas generator could not be met by any of the major generator suppliers that looked at the project. They offered alternative proposals but we did not see any comment from the engineer or owner regarding this issue. Please clarify this issue or give specific equipment Mfg./Cat #s to be used.
Answer # 3. Offerors should refer to the specifications provided in the solicitation under Section 26 32 13 - Natural Gas Engine Driven Generator, paragraph 2.1.1 Model, which states, “The natural gas driven generator set shall be Model 500 GFJB as manufactured by Cummins (Onan) or approved alternate.
| Amendment0003_draftv.pdf |