ECS_DRFP_QA_MAM 12.16.20.pdf
PDF 209 KB Posted
- Attached to
- Marine Corps Systems Command (MARCORSYSCOM) Electronic and Communication Systems (ECS) Multiple Award Task Order Contract (MATOC) Federal contract opportunity
- Solicitation number
- M6785420R7829
- Issued by
- United States Marine Corps
About this file
This is a draft request for proposals (RFP) for an Electronic and Communication Systems (ECS) Multiple Award Task Order Contract (MATOC) issued by the United States Marine Corps. The Marine Corps Systems Command seeks to establish MATOC awards to provide ECS sustainment support for all existing and future Marine Corps training systems and information technology systems. Key services include post deployment software support, software development, cybersecurity support, and material support. The RFP anticipates making awards to all qualifying small businesses. Four task orders are planned for release in fiscal year 2021 to support ECS requirements. The final RFP is targeted for release in the first quarter of fiscal year 2021. Offerors must demonstrate experience through past performance and meet organizational experience requirements, such as a minimum Capability Maturity Model Integration Level 2 assessment, to be eligible for award.
View the file
Other files for this federal contract opportunity
Show all 50
Marine Corps Systems Command (MARCORSYSCOM) Electronic and Communication Systems (ECS) Multiple Award Task Order Contract (MATOC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electronic and Communication Services (ECS) RFP Number: (M67854-20-R-7829)
Version 2 12.016.20
No. Industry Question/Comments ECS DRAFT RFS Responses
Is this a follow-on and if so please provide contract number?
This effort is a new contract action and is not a follow-on.
2 Is this MATOC a new requirement or a re-compete?
This ECS MATOC effort is a new requirement.
3 Cannot find Attachments 6 and 8? Attachment 6 ECS Past Performance Questionnaire_11.09.20; and Attachment 8 Past Performance Proposal_Past Performance Reference_11.09.20 have been updated and uploaded to www.beta.sam.gov
4 Are companies that qualified as a small business under the IT VAR exception below able to bid as a small business?
Please note that dollar values assigned to a NAICS is for services and the other is a reseller of supply items. We are acquiring services so that alternate size standard of 150 would not be appropriate for the ECS effort.
5 What is the suspense for submitting questions?
Per the Pre-solicitation notice:
The Government requests submission of all questions and comments NLT 04 November 2020.
6 Will PM TRASYS evaluate subcontractor capability and past performance in the Final
RFP?
No
7 Will PM TRASYS evaluate relevant past performances from non-DoD agencies?
Yes.
8 The Organization currently holds a class 1 firearms license and is applying for Class 9 Firearms. Will receipt of a Class 9 Firearms license at time of award satisfy the requirement?
The Federal Firearms License is not a requirement for the ECS MATOC award. It is only applicable to TOs that have the requirement to have an FFL.
http://www.beta.sam.gov/
Version 2
9 Will the ECS MATOC be released on SeaPort Next Generation? If so, what’s the expected Final RFP release date?
ECS MATOC will not be released on SeaPort Next Generation. Final RFP release is anticipated for mid to late Q1 FY 21
10 Can offerors utilize the organizational experience of subcontractors to respond to Draft Solicitation Section A.2, Organization Experience, where Offerors are required to describe a single contract for each of the five experience requirements?
No.
11 If a small business forms a mentor/ protege or joint venture with a large business, may that entity compete as a prime?
125.9 What are the rules governing SBA's small business mentor-protégé program?
(d) Benefits. (1) A protégé and mentor may joint venture as a small business for any government prime contract, subcontract or sale, provided the protégé qualifies as small for the procurement or sale. Such a joint venture may seek any type of small business contract (i.e., small business set-aside, 8(a), HUBZone, SDVO, or WOSB) for which the protégé firm qualifies (e.g., a protégé firm that qualifies as a WOSB could seek a WOSB set-aside as a joint venture with its SBA-approved mentor). Similarly, a joint venture between a protégé and mentor may seek a subcontract as a HUBZone small business, small disadvantaged business, SDVO small business, or WOSB provided the protégé individually qualifies as such.
(i) SBA must approve the mentor-protégé agreement before the two firms may submit an offer as a joint venture on a particular government prime contract or subcontract in order for the joint venture to receive the exclusion from affiliation.
Essentially, the above is not the only condition, there are a number of conditions found at:
https://www.ecfr.gov/cgi-bin/retrieveECFR?gp=&SID=9096292d442b42246cbecf21f04833bd&mc=true&r=PART&n=pt13.1.125#se13.1.125_19 https://www.ecfr.gov/cgi-bin/retrieveECFR?gp=&SID=9096292d442b42246cbecf21f04833bd&mc=true&r=PART&n=pt13.1.125#se13.1.125_19 https://www.ecfr.gov/cgi-bin/retrieveECFR?gp=&SID=9096292d442b42246cbecf21f04833bd&mc=true&r=PART&n=pt13.1.125#se13.1.125_19
Version 2
12 Re: Attachment 7 … Pg 126] Attachment 7 states that, “Offerors shall submit all questions in the format provided via Attachment 7 … Only questions submitted using Attachment 7 will be considered …”.
Attachment 7 has not been provided, so are offerors to use their own format for submitting questions at the DRFP stage, and/or will Attachment 7 be provided at the RFP stage?
There is no required format for submission of questions during the Pre-solicitation phase, please use any format.
13 Re: DRFP p127, item 2.c., “Facility Code”] What is the “Facility Code” requested on page 127, item 2.c.?
(2) If it is known that all the work covered by the order is to be performed at an address different from the address represented by the contractor's code, and any contract administration function will be required at that facility, enter in the facility code block the DFARS Procedures, Guidance, and Information PGI 253—Forms 2004 EDITION 253.213-3 organizational entity code for that facility, i.e., H8-1/H8-2 code for a non- Government entity or DODAAD code for a Government entity. (Use DODAAD codes only to indicate “performed at” locations for orders specifying services at a Government location.) If it is known that multiple facilities are involved, enter the codes for all facilities at which work is to be performed, including the contractor's code if work is performed at that address, in the Optional Form 336 Continuation Sheet and mark the facility code block with “See Schedule.”
14 Re: A.2.A the second “1.” And “2.”
Paragraphs] While RFP paragraph “A.2.A.2
– Past Performance Proposal” clearly indicates that “Past Performance for proposed subcontractors will not be evaluated, ” RFP paragraph “A.2.A.1 – Organizational Experience” does not contain the same restriction. May subcontractor organizational experience be included in the response to RFP paragraph A.2.A.1 – Organizational Experience?
Please be advised that Past Performance and Organizational Experience are different evaluation criteria.
Past performance addresses the Offeror’s capability to perform and how well the offeror performed relative to the scope, size, complexity and duration of the requirements described in the MATOC RFP.
On the other hand, the Organizational Experience criteria, which is evaluated on a Go/No-Go basis, address whether the Offeror can demonstrate that it meets the Organizational Experience requirements through its performance on specific contract(s) awarded during the past five (5) years.
Version 2
Past Performance for proposed subcontractors will not be evaluated. Organizational experience will be updated to reflect the same restrictions.
15 Re: Draft RFP A.2.A, second “1.”
Organizational Experience, 4.
Organizational Experience #4 – AND – Attachment 8, Past Performance Reference #4 template] There appears to be a disconnect between the A.2.A instructions and the Attachment 8, Past Performance Reference #4 template. The Draft RFP instruction (pg 129 of 136) asks for “… documentation supporting a CMMI assessment …” and the Past Performance Reference #4 template requests a description of “experience performing similar work in scope and complexity to the work described in the PWS … “ and more specifically, “ … experience with all levels of maintenance on the training systems pursuant to the PWS.” The template does not provide space for the requested CMMI assessment documentation. Please clarify the CMMI experience response requirements indicating: (1) the specific requirement to provide CMMI assessment documentation, along with how to include that in the template; and (2) if the intent is to describe experience in the application of CMMI or something else
Please be advised that Past Performance and Organizational Experience are different evaluation criteria.
Please be advised, the Government understands the confusion with the Past Performance attachments. Past Performance Attachments have been updated and uploaded to the www.beta.sam.gov, to avoid confusion.
Attachment 4 Organizational Experience Information Sheet, is ONLY associated with the Organizational Experience requirement and has not been provided. Attachment 8 has been provided and is related to Past Performance requirements and shall ONLY be used for the Past Performance requirements. The DRAFT RFP instructions (pg 129 of 136), “4.
Organizational Experience #4: Capability Maturity Model Integration (CMMI)” are ONLY associated with the Organizational Experience, Attachment 8 Past Performance Proposal_Past Performance Reference_11.09.20, CMMI Scope and Complexity requirements are as follows: “ECS contractors will be responsible for capability maturity model integration (CMMI) identified in any TO issued pursuant to the PWS. Offerors should describe their experience performing work similar in scope and complexity to the work described in the PWS and include references to the solicitation.
The Government is more likely to find that there is a reasonable expectation Offerors will successfully perform ECS if Offerors provide details regarding their experience with all levels of maintenance on the training systems pursuant to the PWS.”
If the industry partner elects to submit past performance related to the CMMI area, please follow the guidance provide in DRAFT RFP Section A.2A2 Past Performance Proposal; A.2.B; and Attachment 8 Past Performance Proposal_Past Performance Reference_11.09.20.
Version 2
Organizational Experience is not being requested during the Pre-solicitation posting.
16 Re: Updated Announcement published 10/26/2020, Voluntary Past Performance Information] Should the Past Performance that was provided in an early submission be included again in the final proposal, as a duplicate of what was submitted earlier?
The Final solicitation will provide the final requirements and industry partners are encouraged to follow all guidance identified in the solicitation.
17 Re: Draft RFP A.2.A, paragraph “1.”
Organizational Experience, and subparagraphs, pg 128 of 136] Throughout Draft RFP A.2.A, paragraph “1.”
Organizational Experience, and subparagraphs, references are made to Attachment 4. Attachment 4 was not provided in the update that was released on 10/26/2020. It appears that Attachment 8 is the correct attachment for accomplishing the actions related to Attachment 4, such that Attachment 8 is actually the Attachment 4 that the Government is referencing. Please confirm if the presently titled Attachment 8 should actually be titled as Attachment 4, or if there is a different explanation
Please be advised, the Government understands the confusion with the Past Performance attachments. Past Performance Attachments have been updated and uploaded to the www.beta.sam.gov, to avoid confusion.
Attachment 4 Organizational Experience Information Sheet, is associated with the Organizational Experience requirement and has not been provided.
Attachment 8 Past Performance Proposal_Past Performance Reference, is not intended to be Attachment 4 Organizational Experience Information Sheet. Attachment 4 is associated with Organizational Experience and NOT Past Performance.
If volunteering Past Performance is submitted, Attachment 6 ECS Past Performance Questionnaire_11.09.20; and Attachment 8 Past Performance Proposal_Past Performance Reference_11.09.20, have been provided to support all voluntary Past Performance submissions. Organizational Experience is not being requested during the Pre-solicitation posting.
18 Re: Attachment 8, Past Performance Reference #1: Software Development Experience] Attachment 8, Past Performance Reference #1 makes reference to Training System Operator functions in two places in the Scope and Complexity Section. Is this a typo, or is the intent to limit the Software Development
The Government concurs that this is a typo in Attachment 8 and will be revised and posted to www.beta.sam.gov. Please note the term “Training System Operator” shall be replaced with “Software Development.”
Version 2
Experience discussion to applications involving Training System Operator functions only? That is, the guidance provided in the other Scope and Complexity boxes is not specifically limiting, and all of the other guidance only relates, in general, to the Past Performance Reference areas for which they are given.
19 Q. Section 3, Requirements, in the Draft PWS outlines a broad set of tasks that individual TOs may cover. Some of these requirements have specialized qualifications
- e.g., FFL and bilingual personnel. Does the government expect that MATOC offerors must cover all requirements listed in Section 3 of the PWS, or does the government have an expectation on the percentage of coverage of the requirements in Section 3 for successful offerors?
MATOC offerors must cover all requirements listed in Section 3
20 Regarding the Government’s ability to self-initiate off-ramping of MATOC awardees who do not bid towards TOs: will non-bidding against TOs with specialized requirements - e.g., bilingual personnel or holding of an FFL - count towards the ability of the Government to self-initiate off-ramping a MATOC awardee?
Pursuant to the MATOC RFP instructions, the Government may elect to off-ramp and on-ramp MATOC awardees at its sole discretion. Please be advised that the Government’s exercise of its right to off-ramp and on-ramp will be reasonable and based on the specific facts at the time of the proposed off-ramp or on-ramp action. To that end, the Government seeks to maintain the maximum pool of MATOC awardees to ensure that it receives the benefits of competition throughout the MATOC period of performance.
Please reference General Information Section 12 for additional information regarding on-ramp and off-ramp. In this section, there is no discussion of off ramping for the conditions related to non-bidding against TOs with specialized requirements.
21 Can the Government expand upon its acquisition strategy for this MATOC along the following issues: how many vendors does it want on the MATOC? How many TOs does it plan to release annually? Are all vendors meant to be qualified on all
Pursuant to the MATOC RFP, the Government will make MATOC awards to all qualifying offerors. The criteria in the ECS MATOC solicitation will be used to determine whether an offeror is a qualifying offeror. The Government will issue TOs to support its specific ECS requirements. Four TOs are currently planned to be released during FY 21. There is no set amount of TOs planned to be released annually. The Government intends to immediately post new requirements through the GPE as referenced in General
Version 2 requirements or just a subset of requirements? Is the intent to have all vendors qualified to compete for all TOs or will there be TOs that some vendors are not expected to qualify and compete for
Instructions Section 8 Task Order Procedures. Not all small business vendors will be specialized in all ECS MATOC requirement areas, however, IDIQ awards will be made to all qualified offerors as identified in the ECS MATOC solicitation. There are no minimum or maximum proposal restrictions related to TO proposal submissions for qualified offerors that are awarded an IDIQ under the ECS MATOC.TO solicitations will be issued pursuant General Instructions Section 8 and FAR subpart 16.5. TOs will be competed based on the specific criteria identified in the TO RFP. To that end, TO RFPs cannot and will not utilize qualifying offeror criteria to make TO awards. All ECS MATOC awardees are encouraged to participate in any subsequently issued TO RFP.
22 Will TOs be further set aside for specific socio-economic categories?
The Government will analyze the responses from the ECS small business prime contract holders. If the Government determines that the conditions in FAR 19.502-2 exist. The Government may elect to further restrict an order to one of the appropriate socio-economic categories identified in Section 9. If it is determined that the conditions in FAR 19.502-2 do not exist, the requirement will be open as a small business set-aside fair opportunity order amongst all ECS MATOC small business prime contract awardees.
23 Will SB vendors be allowed to team with large businesses in pursuing individual TOs?
Yes, providing that the MATOC awardee meets all of the requirements delineated in FAR clause 52.219-14, Limitation of Subcontracting, (MAR 2020), FAR 52.219-6 (MAR 2020) and (DEVIATION 2020-O0008).
24 Will the Government publish draft evaluation criteria for comment prior to the RFP?
No.
25 Draft ECS MATOC RFP in paragraph
1.4 (Organizational Experience #4: Capability Maturity Model Integration (CMMI)) it states:
“The Offeror shall complete Attachment 4 (note: cannot locate this attachment to reference), and provide documentation supporting a CMMI assessment of level 2 or greater. If the Offeror does not meet a minimum CMMI level 2 assessment
Please note the Pre-solicitation guidance, “As part of this Notice, the MARCORSYSCOM, PM TRASYS, releases a DRAFT Request for Proposal (RFP) and a DRAFT ECS Performance Work Statement (PWS) for review and comments by our industry partners.
The contractor should supply questions or comments to the documents indicating ability to meet specified requirements, specific items requiring clarification for responsive industry proposal, and specified requirements which un-necessarily drive system procurement or lifecycle cost. There is no page limit for receipt of questions or comments.
Received questions or comments will be considered by the Government for basis of modification to the subject documents.”
In addition, the following was also provided “As a result of the Government’s aggressive acquisition timeline in supporting our Fleet Marine Corps Forces, the Government
Version 2 the Offeror shall provide a plan with appropriate schedule to achieve a minimum CMMI Level 3 assessment. An Offeror must meet this requirement, and cannot rely on a CMMI assessment provided to any other entity.”
requests that interested industry partners provide Past Performance information IAW
52.212-1 ADDENDUM TO FAR PROVISION 52.212-1 – INSTRUCTIONS TO
OFFERORS-COMMERCIAL ITEMS (MAR 2018) A.2. A. Section 10 (a-e) Past Performance Proposal Information of the DRAFT RFP, to include the submission of Attachments 6 and 8 as appropriate. Satisfaction of this request is voluntary but highly encouraged in order to support an award in early 2nd Quarter FY 21, or sooner.
Voluntary Past Performance submissions shall be due on the date and time identified in BLOCK 8 Page 1 of the FINAL Solicitation.”
Please note there were no requirements to satisfy the Organizational Experience requirements identified in the Pre-solicitation posting.
26 In the draft PWS, a Marine Corps CDT is mentioned. Was the requirement supposed to be under the Army CDT contract? Is a new MCDT requirement expected under the
ECS MATOC?
The information referenced in the ECS MATOC PWS identifies the overarching requirements for the effort.
27 How many ECS MATOC awards are expected?
FAR 15.304 allows the Government to make an award to each and all qualifying offerors.
“Qualifying offeror” is specifically defined in FAR 2.101 as an offeror that is determined to be a responsible source, submits a technically acceptable proposal that conforms to the requirements of the solicitation, and the contracting officer has no reason to believe would likely offer other than fair and reasonable pricing.
28 The notice on Beta.Sam said “The first task order, will immediately following award of the ERS COMS-Systems MATOC”. Should that have said the first task order, will immediately following award of ECS MATOC? What is the first expected task order that will be immediately following the award? It may make sense to include that as a sample task in the ECS MATOC RFP since it is expected to be immediately following
The Government has identified an error with the posting. The referenced items should be related to the ECS MATOC effort and incorrectly reference the ERS COMS-Systems MATOC. The ERS COMS-S MATOC utilizes a similar acquisitions strategy and was inadvertently inserted in the Pre-solicitation.
Observation noted regarding the sample task. The Government IPT has defined the best acquisition strategy that supports the Marines and all stakeholders.
Version 2
29 Will there be a 30, 45, or 60 day proposal turnaround time from ECS MATOC RFP release?
The turnaround time for proposal preparation will be less than 30 days. The Government considers that the Pre-solicitation posting prepared our industry partners with an advance read of the requirements. The Pre-solicitation posting also request input from industry regarding the solicitation. The submission due date will be identified in Block 8 of page 1 of the solicitation.
30 Can you provide more detail on the timing for the final ECS MATOC RFP release due to the upcoming holidays?
The Government anticipates solicitation release mid to late Q1 FY 21, with a goal of releasing before the holidays.
31 How many task orders are expected under the ECS MATOC and will a forecast of those efforts be provided?
The Government anticipates an immediate TO award after the award of the ECS MATOC IDIQ awards. The Government does not have a forecast to share with our industry partners. If that information becomes available, the Government will post additional information on www.beta.sam.gov.
32 Can you provide examples of the type of support that this contract requires? Example - Daily onsite maintenance support for xx simulators
The scope of the ECS MATOC is intended to be broad in nature and entails sustainment support for all existing and any future USMC training systems and any corollary Foreign Military Sales. Requirements are anticipated to include but not limited to Post Deployment Software Support (PDSS), software development, cybersecurity and other non-PDSS support and materiel support.
What military bases are involved in this work?
Location of contractor performance depends on the task order requirement and may or may not require base access. Military bases include Continental United States (CONUS) and Outside the Continental United States (OCONUS) locations.
34 What simulator devices are on each military base?
The Government is unable to provide a specific answer to this question. Devices are located throughout all military bases.
35 Will the contractor be required to perform minor or major modifications to the simulator devices? Describe some recent modifications?
Military Sales. Requirements are anticipated to include but not limited to Post Deployment Software Support (PDSS), software development, cybersecurity and other non-PDSS support and materiel support.
Version 2
36 Does full maintenance documentation exist at each military base to allow a new contractor to learn how to support the devices?
No. The amount of Government Furnished Information (GFI), if any, will vary based on the training system in question. A list of any GFI that will be provided and will be included with the task order RFPs.
37 Will the contractor be performing software upgrades on a regular basis? What software languages are used in these devices?
Military Sales. Requirements are anticipated to include but not limited to Post Deployment Software Support (PDSS), software development, cybersecurity and other non-PDSS support and materiel support.
There are numerous software languages that are utilized in training systems. A non-exclusive list of those more commonly used are Java, Java Script, C, C#, C++ and Perl.
38 Is software source code available for each device
No. The amount of Government Furnished Information (GFI), if any, will vary based on the training system in question. A list of any GFI that will be provided will be included with task order RFPs.
39 These type of contracts often supply a sample task order as part of the RFP, can you supply a sample task order to help contractors understand the work?
The Government IPT has defined the best acquisition strategy that supports the Marines and all stakeholders. A sample task will not be included in the final solicitation. The PWS is provided to provide an understanding of the requirement.
40 Page 131 of 136 B.3 Proposal Submission Instructions Item 3 refers to A.2.A.9 (Organizational Experience) however it is listed as 1. on page 128 and A.2.A.10 (Past Performance) is listed as 2. on page 129 of the document.
Please confirm these sections should be renumbered to A.2.A.9 and A.2.A.10.
The Government agrees that the number system is incorrect and will be updated to reflect A.2.A.9 for Organizational Experience and A.2.A.10 for Past Performance. The Final solicitation will reflect the noted revisions.
41 Will the Government allow industry to submit digitally due to COVID-19 concerns?
The Government is considering electronic submission due to COVID-19. Updates will be provided in the final solicitation.
42 SF1449 General Information Item 10. Is the Contractor Manpower Reporting Application link correct or has it been switched to
General Information Section 10 is incorrect and will be updated in the final solicitation.
The correct link, www.sam.gov, for Service Contract Reporting will be is identified in final solicitation. The www.sam.gov link reference in Section 3.1.24 of the PWS is correct.
http://www.sam.gov/ http://www.sam.gov/
Version 2 www.sam.gov? It is stated as www.sam.gov in the PWS 3.1.24.
43 Beta SAM lists the PSC for this effort is D318. The Government has stated through SAM.gov that any program with a PSC that starts with “D” does not require manpower reporting, SAM.gov will not list any program where the PSC starts with a “D”. Will the manpower reporting requirement be removed?
The Government is researching the exemption to Service Contract Reporting for PSC D318. Any revisions will be applied to the final solicitation.
44 Will there be a sample task order that industry will be required to bid?
The Government IPT has defined the best acquisition strategy that supports the Marines and all stakeholders. A sample task will not be included in the final solicitation.
45 I just wanted to reach out to verify if this is a new requirement or a follow on. If it is a follow on, would you mind providing that incumbent contract information?
The ECS MATOC effort is a new effort and contract.
46 Will the Government accept an ISO 9000 certification in leu of CMMI level 2 as acceptable for repeatable process improvement for the ECS MATOC?
No, the Government will not accept an ISO 9000 certification in lieu of CMMI level 2.
47 Does the Government intend to accept past performance and technical ability to perform ECS MATOC tasks from teammates on future ECS MATOC IDIQ task orders.
No, the Government will not accept past performance and technical ability to perform ECS MATOC tasks from teammates on future ECS MATOC IDIQ task orders.
https://nam12.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.sam.gov%2F&data=04%7C01%7Ccathomas%40avtsim.com%7Cb2c8a760ccae4d1f869308d87a8ca882%7Cbfb417a610bd47459fd53cf3ed9f573c%7C0%7C0%7C637394091836298087%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=EPBtTKNq3HyDDavMCw0OCvk2eDMUl3fh7QtABd%2FvvMA%3D&reserved=0 https://nam12.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.sam.gov%2F&data=04%7C01%7Ccathomas%40avtsim.com%7Cb2c8a760ccae4d1f869308d87a8ca882%7Cbfb417a610bd47459fd53cf3ed9f573c%7C0%7C0%7C637394091836308083%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=pt9BvRQZBqMp%2FsHv8Pc81aCurac3JsicZFJlqKXq1K4%3D&reserved=0
Version 2
48. Are there any other NAICS codes you will consider that will allow us to respond? We can use 511210- Software Publishers, 541220-Engneering Services as a suggestion
No, the NAICS code 541519 is approved for this requirement and the Government believes the selected NAICS code best represents the ECS MATOC requirement.
49. pages 128 – 129, page 131 I – In regard to the Organizational Experience and Past Performance, it is our assessment and understanding that these are two distinct responses. It is also our assessment and understanding that the Organizational Experience may be answered as a unified Team response VS. the Past Performance which is that of the Prime contractor. Can the Government verify this assessment?
Past Performance for proposed subcontractors will not be evaluated. Organizational experience will be updated to reflect the same restrictions.
50. Within the subject Draft ECS MATOC RFP in paragraph 1.4 (Organizational Experience #4: Capability Maturity Model Integration (CMMI)) it states:
“The Offeror shall complete Attachment 4 (note: cannot locate this attachment to reference), and provide documentation supporting a CMMI assessment of level 2 or greater. If the Offeror does not meet a minimum CMMI level 2 assessment the Offeror shall provide a plan with appropriate schedule to achieve a
Attachment 4 is not included, the information can be found on page 128 and 129 of the
DRFP
Response: Draft ECS MATOC RFP in paragraph 1.4 will be reworded to following:
"4. Organizational Experience #4: Capability Maturity Model Integration
(CMMI)
The Offeror shall complete Attachment 4, and provide documentation supporting a CMMI assessment of level 2 or greater. If the Offeror has CMMI level 2 assessment the Offeror shall provide a plan with appropriate schedule to achieve a minimum CMMI Level 3 assessment. An Offeror must meet this requirement, and cannot rely on a CMMI assessment provided to any other
Version 2 minimum CMMI Level 3 assessment. An Offeror must meet this requirement, and cannot rely on a CMMI assessment provided to any other entity.”
and in the Draft ECS PWS in paragraph
3.1.17 (Software Engineering) it states:
“The Government currently employs a modified agile development methodology for application sustainment. However, the Contractor may employ the approach that best meets the requirements to deliver reliable, high quality and cost effective software solutions. The Contractor shall perform disciplined application development activities consistent with CMMI Level 3 or any other level identified in any TO issued under the
MATOC.”
The two statement above are contradictory as to whether a CMMI assessment is required; please provide guidance/clarification as to what is required qualify to submit a proposal for this endeavor.
entity."
51 The instructions reference the completion of Attachment 4 for Organizational Experience, but this document wasn’t provided in
Please note the Pre-solicitation guidance, “As part of this Notice, the MARCORSYSCOM, PM TRASYS, releases a DRAFT Request for Proposal (RFP) and a DRAFT ECS Performance Work Statement (PWS) for review and comments by our industry partners.
The contractor should supply questions or comments to the documents indicating ability
Version 2 beta.sam.gov. Will the Government release this attachment prior to the official RFP?
to meet specified requirements, specific items requiring clarification for responsive industry proposal, and specified requirements which un-necessarily drive system procurement or lifecycle cost. There is no page limit for receipt of questions or comments.
Received questions or comments will be considered by the Government for basis of modification to the subject documents.”
In addition, the following was also provided “As a result of the Government’s aggressive acquisition timeline in supporting our Fleet Marine Corps Forces, the Government requests that interested industry partners provide Past Performance information IAW
52.212-1 ADDENDUM TO FAR PROVISION 52.212-1 – INSTRUCTIONS TO
OFFERORS-COMMERCIAL ITEMS (MAR 2018) A.2. A. Section 10 (a-e) Past Performance Proposal Information of the DRAFT RFP, to include the submission of Attachments 6 and 8 as appropriate. Satisfaction of this request is voluntary but highly encouraged in order to support an award in early 2nd Quarter FY 21, or sooner.
Voluntary Past Performance submissions shall be due NLT 10:00 am EDT, on 12 November, 2020.”
52 Does the Government have an anticipated range or maximum number of awarded offerors?
No, FAR 15.304 allows the Government to make an award to each and all qualifying offerors. “Qualifying offeror” is specifically defined in FAR 2.101 as an offeror that is determined to be a responsible source, submits a technically acceptable proposal that conforms to the requirements of the solicitation, and the contracting officer has no reason to believe would likely offer other than fair and reasonable pricing.
53 Does the Government consider members of a Joint Venture (JV) ineligible to submit separate bids as Prime contractors?
Yes, please reference A.1 General Instructions, Section 5.
54 Paragraph 2.a states, “Offerors will be required to identify three (3) contract efforts of recent and relevant past performance that demonstrates the Offeror’s ability to successfully perform in accordance with the PWS.” Attachment 8 provides a template for five (5) past performance references. Can the Government confirm that offerors are allowed to use the same past performance
Yes, the Government will permit the industry partner to submit the same past performance references to validate recency and relevancy across the multiple organizational experiences areas 1-5 in Attachment 8 via three (3) contract efforts.
Version 2 references to validate recency and relevancy across the multiple organizational experiences areas 1-5 in Attachment 8 via three (3) contract efforts?
55 Will the Government please remove the headers from each of the reference areas (“Past Performance Reference #1: Software Development Experience”; “Past Performance Reference #2: Post Deployment Software Support Experience”;
“Past Performance Reference #3: Cyber Security Experience”; “Past Performance Reference #4: Capability Maturity Model Integration (CMMI) Experience”; “Past Performance Reference #5: Geographic Dispersed Contract Performance Experience” to be renamed “Past Performance Reference”) to better allow offerors to utilize all three (3) past performance references to describe their organizational experiences areas 1-5 within the “Scope and Complexity” section in Attachment 8?
Section A.2.B Section 3 states the following, “Please note, the three (3) Past Performance submissions can be any combination of the five (5) Organization Experience categories associated with the PWS. Only three (3) Past Performance submissions will be reviewed. If more than three Past Performance references are submitted, the first three will only be reviewed.”
56 Organizational Experience #4: Capability Maturity Model Integration (CMMI) states that offerors must “provide documentation supporting a CMMI assessment of level 2 or greater. The instructions in Attachment 8 state, “Offerors should describe their experience performing work similar in scope and complexity to the work described in the PWS and include references to the solicitation.”
Please note that Organizational Experience and Past Performance are two distinctly different criteria. Attachment 8 Past Performance Reference provide a scope and complexity section associated with 5 areas, to include CMMI. The Past Performance requirements are distinctly different and are captured in the Scope and Complexity Sections of the document.
“Documentation supporting a CMMI assessment of level 2 or greater,” is a specific Organizational Experience requirement and not a past performance requirement. Please review both section carefully.
Version 2
CMMI is a component of our overall management approach on all our engagements, as such we assume providing evidence of the CMMI certifications at level 2 or higher is sufficient.
Please confirm.
57 If vendors submit their Past Performance Proposals (Attachment 6 and Attachment 8) by 12 November 2020, will they also need to resubmit this information in the official response to Requests for Proposals due on 11 December 2020?
Additional guidance will be provided in the Final solicitation regarding submission of voluntary past performance submissions.
58 The beta.sam.gov notice lists a voluntary submission deadline for offerors’ Past Performance Proposals of 12 November 2020, but Attachment 6 indicates that this deadline is a “Required Response Date.”
We request the Government revise the Attachment 6 document to read “Requested Response Date,” which will allow offerors to remain compliant should they decide to provide their Past Performance Proposals post-RFP release.
Additional Past Performance guidance will be identified in the final solicitation. All Attachments will be reviewed and revised as appropriate before the final solicitation is released.
59 Coordinating PPQ requests is a time-consuming process, and a resubmission of PPQs from our customers to the Government can become an inconvenience to them. Can the Government please confirm that the instructions and evaluation criteria for submission of Past Performance Proposals on 12 November 2020 will not change between this draft and the final version of
“DRAFT+M7895421R8001+ECS+MATOC”?
Any revisions to the Pre-solicitation will be captured in the final solicitation.
Version 2
60 Who is the Incumbent?
This is a new requirement and contract vehicle.
61 What is the acquisition timeline?
The RFP is anticipated for release in Q1 of FY 21. It is the Government’s goal to release before the holiday break.
62 Will this be coming out on a contract vehicle? If yes, which vehicle?
The ECS requirement will be established on a Multiple Award Task Order Contract
(MATOC).
63 Coordinating PPQ requests is a time-consuming process, and a resubmission of PPQs from our customers to the Government can become an inconvenience to them. Can the Government please confirm that the instructions and evaluation criteria for submission of Past Performance Proposals on 12 November 2020 will not change between this draft and the final version of
“DRAFT+M7895421R8001+ECS+MATOC”?
The Government is unable to guarantee that certain areas of the RFP are not updated.
The Government receives interest and questions daily, for the ECS MATOC effort. The question and Government answers may impact the Final RFP. The Government also understands industry’s concern regarding the Past Performance PPQs and has not considered any revisions to the PPQ section. The Government does not foresee any revisions being made to the PPQ section of the RFP.
64 Questions for ECS MATOC POC: a question was answered regarding the ECS MATOC that said a mentor/protégé all small JV cannot bid the effort since it is a SBSA acquisition. According to All Small Mentor- Protégé and its mentor will qualify as a small business for any procurement for which the protégé individually qualifies as small. Why is a SB entity such as a JV between a mentor/protégé prohibited from bidding on the ECS MATOC
The Government has revised the original position to this question as the initial review of the questions resulted in an inaccurate response. A SB such as a JV between a mentor/protégé is NOT prohibited from bidding on the ECS MATOC as long as the conditions identified in 13 CFR § 125.9 are satisfied in qualifying the entity to propose on this Small Business set-aside. The following excerpt is provided:
13 CFR § 125.9 What are the rules governing SBA's small business mentor-protégé program?
(d) Benefits. (1) A protégé and mentor may joint venture as a small business for any government prime contract, subcontract or sale, provided the protégé qualifies as small for the procurement or sale. Such a joint venture may seek any type of small business contract (i.e., small business set-aside, 8(a), HUBZone, SDVO, or WOSB) for which the protégé firm qualifies (e.g., a protégé firm that qualifies as a WOSB could seek a WOSB set-aside as a joint venture with its SBA-approved mentor). Similarly, a joint venture
Version 2 between a protégé and mentor may seek a subcontract as a HUBZone small business, small disadvantaged business, SDVO small business, or WOSB provided the protégé individually qualifies as such.
(i) SBA must approve the mentor-protégé agreement before the two firms may submit an offer as a joint venture on a particular government prime contract or subcontract in order for the joint venture to receive the exclusion from affiliation.
Essentially, the above is not the only condition, there are a number of conditions found at:
https://www.ecfr.gov/cgi-bin/retrieveECFR?gp=&SID=9096292d442b42246cbecf21f04833bd&mc=true&r=PART&n=pt13.1.125#se13.1.125_19
65 In hand out, ECS Task Order slide 7 shows PDSS for MTWS in FY24-25. Will rearchitecture/non-PDSS support be performed under this MATOC
Re-architecture and non-PDSS support is not anticipated to be placed on an ECS task order.
66 Is there and update for ECS as to when Q&A from the DRFP will be released?
The initial 63 questions were provided to industry on November 24, 2020 at the following link:
https://beta.sam.gov/opp/7796776b7f694d9999883db60b7e0afb/view?keywords=%22ecs%20marine%20corps%22&sort=-relevance&index=&is_active=true&page=1
67 Is the use of the Attachment 8 format for the Past Performance proposals, at the contractor’s discretion?
The Past Performance Proposal_ Past Performance Reference document is available for use as appropriate. There are a number of methods available for submitting Past Performance, per the RFP. Please review the Past Performance section for submitting of the most appropriate method(s). The total page count of the submission shall not exceed 20 pages.
68 Is a contractor format for the past performance Proposal acceptable, as long as it is less than the 20 page limit?
Please be aware of the individual document instruction and RFP A.2.B Proposal Submission Instructions.
69 Since Since there is no explicit statement in the DRFP that cover pages, tables of
Please review RFP Section A.2.B, which provides Proposal Submission Instructions. The Government will only review required information. Please note A.2.B.3 “…In addition, https://www.ecfr.gov/cgi-bin/retrieveECFR?gp=&SID=9096292d442b42246cbecf21f04833bd&mc=true&r=PART&n=pt13.1.125#se13.1.125_19 https://www.ecfr.gov/cgi-bin/retrieveECFR?gp=&SID=9096292d442b42246cbecf21f04833bd&mc=true&r=PART&n=pt13.1.125#se13.1.125_19 https://beta.sam.gov/opp/7796776b7f694d9999883db60b7e0afb/view?keywords=%22ecs%20marine%20corps%22&sort=-relevance&index=&is_active=true&page=1 https://beta.sam.gov/opp/7796776b7f694d9999883db60b7e0afb/view?keywords=%22ecs%20marine%20corps%22&sort=-relevance&index=&is_active=true&page=1
Version 2 contents, cover letters, and appendices are either included or excluded from the 20-page limit for the Past Performance Proposal, is it correct to assume that the 20-page limit is with regard to the actual verbiage content of the Past Performance Proposal, excluding cover pages, tables of content, cover letters, and appendices offerors are cautioned, however, that the Government will not review documents that are not responsive to the documents requested…”
70 Will previously submitted Voluntary Past Performance Proposals be required to be resubmitted using the Attachment 8 format?
If early Past Performance was submitted during the Pre-Solicitation Phase, the Government requests that the industry partner not resubmit previously submitted Past Performance again with the FINAL RFP and confirm the early Past Performance submission is still valid. Contractor format of confirmation is acceptable and will not count against the total page limitation of the proposal submission. Attachment 8 is to be used as appropriate.
71 If previously submitted Voluntary Past Performance Proposals are not required by the Government to be resubmitted using the Attachment 8 format, then do contractors still retain an option at the contractor’s discretion to resubmit their previously submitted Voluntary Past Performance Proposals (either in the Attachment 8 format or in their contractor format, as may be based upon the Government’s response to a previous question in regard to the format)?
Government requests that the industry partner not resubmit previously submitted Past Performance again with the FINAL RFP and confirm the early Past Performance submission is still valid. Contractor format of confirmation is acceptable and will not count against the total page limitation of the proposal submission.
The Past Performance Proposal_ Past Performance Reference document is to be used as appropriate. Please review RFP Section A.2.B, which provides Proposal Submission Instructions.
72 Does the Government prefer a revised proposal, either early or at the time of response to the Final RFP, if a different
Please be aware of the individual document instruction and RFP A.2.B Proposal Submission Instructions.
Version 2 format was used in the earlier Voluntary Past Performance Proposal submission?
Government requests that the industry partner not resubmit previously submitted Past Performance again with the FINAL RFP and confirm the early Past Performance submission is still valid. Contractor format of confirmation is acceptable and will not count against the total page limitation of the proposal submission. If a contractor submits another Past Performance volume at time of RFP submission, the latest version will be reviewed.
73 Should five (5) Attachment 8 templates be provided, including Past Performance Reference #1 and #2 templates that reference Contract Reference 1, Past Performance Reference #3 and #4 templates that reference Contract Reference 2, and Past Performance Reference #5 that references Contract Reference 3?
Please review Section A.2.A.10 for submission Past Performance Proposal submission requirements with emphasis on “Offerors will be required to identify three (3) contract efforts of recent and relevant past performance…”
Please also review Section A.2.B.2 with emphasis on “Please note, the three (3) Past Performance submissions can be any combination of the five (5) Organization Experience categories associated with the PWS. Only three (3) Past Performance submissions will be reviewed. If more than three Past Performance references are submitted, the first three will only be reviewed.”
74 Should three (3) Attachment 8 templates be provided, one for each of the three Contract References, selecting those portions of the Attachment 8 template according to the experience area that is most applicable to each selected Contract Reference?
The Past Performance Proposal_ Past Performance Reference document is available for use as appropriate.
Please review Section A.2.B.2 with emphasis on “Please note, the three (3) Past Performance submissions can be any combination of the five (5) Organization Experience categories associated with the PWS. Only three (3) Past Performance submissions will be reviewed. If more than three Past Performance references are submitted, the first three will only be reviewed.”
75 Is it possible to relax the requirement to something such as, “The Offeror shall complete Attachment 4 demonstrating its experience providing support to Department of Defense training systems at multiple geographic locations, including OCONUS locations, for a period of one year of continuous
No. The requirement remains unchanged.
Version 2
78 Are sole source, directed awards possible under this IDIQ contract?
The ECS MATOC is a 100% Small Business set-aside procurement.
Pursuant to FAR 16.505(b)(1), the Contracting Officer must provide each awardee a fair opportunity to be considered for each order in excess of $3,500 and DFARS 216.505-70, Ordering Under Multiple Award Contracts, except as provided for in FAR 16.505(b)(2)(i). An Exception to Fair Opportunity (EFO) listed at FAR 16.505(b) (2), may be utilized at the TO Contracting Officer’s performance where a portion of the performance occurred within the past 5 years?”
76 Will the Government eliminate the line numbering requirement in its entirety, with regard to Attachment 8, and the forthcoming Attachment 4 (if Attachment 4 is similar in format to Attachment 8), due to the limitations of MS Word?
The Offeror shall use a standard page numbering system. All lines of text per page shall be consecutively numbered. Please note which section this requirements is found in.
77 Will this be coming out on Seaport NxG and what is the timeline of the solicitation release?
The Government is anticipating a release of the ECS MATOC RFP by the end of the 1st Quarter and before the holiday break. The ECS MATOC effort will not be an effort competed on the Seaport NxG vehicle. The ECS MATOC effort will be competed on the ECS MATOC vehicle.
Version 2 discretion. However, the exception to fair opportunity at FAR 16.505(b) (2)(i)(B) is not permitted to be used. IAW FAR 16.505(b)(1) and DFARS 216.505-70 task order selection will be tailored to specific project requirements and awarded IAW task order established evaluation criteria. Additionally, efforts justified under the auspices of FAR 6.302-4, International Agreement, are not permitted to be executed under the ECS MATOC.
79 What is the content and intent of attachment 7? Will Exhibit 1- Addendum 212-1 (Instructions) & Exhibit 2 Addendum 212-2 (Evaluations) replace the instructions and evaluation in the draft IDIQ or supplement them? Or are they for TO competitions?
This document was included in error and will be removed from the attachment list.
80 Why do the instructions specify the scope and complexity of submitted past performance must be compared to “Contractor Logistics Support for maintenance, logistics, and training requirements” when that is not the focus of this MATOC and is not what is required on the attachment 8 form for past performance references?
The Government appreciates the questions as the referenced requirements are incorrect and not applicable. The RFP will be revised to support the following:
“v) The scope and complexity of the effort in comparison to this solicitation with respect to Software Development, PDSS, Cybersecurity, CMMI and performance at geographically dispersed locations in support of a Department of Defense training system or information technology system.”
81 The instructions state to have past performance POCs return the past performance questionnaire “no later than the closing date and time specified in Block 8 on page 1 of the solicitation”.
If we prepare our past performance proposal for early submission (12 November), what date and…