EB-TOCA_RFQRev1.docx

DOCX document 155 KB Posted

Attached to
CSU East Bay. TOCA MEA
Solicitation number
0000034581
Issued by
Alameda County, Alameda City, Hayward City, California

About this file

This document is a Request for Qualifications (RFQ) issued by the California State University, East Bay for a Task Order-Construction Agreement (TO-CA MEA) with multiple projects. The university is seeking qualified General Contractors to provide Construction Manager services for a three-year contract with a total maximum budgeted cost of $30,000,000. The projects include HVAC replacements, roof replacement and repairs, fire alarm upgrades, access control upgrades, and door & hardware replacement, with individual projects not exceeding $7,000,000. The RFQ follows a two-step selection process, with Statements of Qualifications (SOQ) due on April 9, 2025, and the successful proposer expected to be announced on May 29, 2025.

The contract requires the selected General Contractor to be licensed in California with a 'B' license and prequalified with the CSU Office of the Chancellor, with a prequalification rating of at least $15,000,000. The contractor must comply with prevailing wage rate laws, subcontract a minimum of 3% to Disabled Veteran Business Enterprises (DVBE), and incorporate LEAN practices and integrated project management. The contractor will be responsible for preconstruction services, design coordination, cost estimating, and construction phase management. The contract includes provisions for developing Lump Sum Price or Guaranteed Maximum Price (GMP) proposals, with no guaranteed minimum volume of task orders or construction agreements.

View the file

Other files

File Type Posted
EB-TOCA_RFQ_Notice_Contractor.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Qualifications for Task Order-Construction Agreement for Multiple Projects—Master Enabling Agreement California State University, East Bay –03042025

Request for Qualifications for Task Order-Construction Agreement for Multiple Projects—Master Enabling Agreement California State University, East Bay – 03042025

{ATTENTION - In this document comments and instructions for editing, such as this one, are in red font and enclosed in brackets. Delete the brackets and enclosed text in the final document before publication. Some text is in red font, outside brackets. Be sure to make the requisite changes, change the font color to black, and delete this note before finalizing.}

REQUEST FOR QUALIFICATIONS

FOR

TASK ORDER-CONSTRUCTION AGREEMENT FOR MULTIPLE PROJECTS—

MASTER ENABLING AGREEMENT

03042025 California State University, East Bay 25800 Carlos Bee Boulevard, Hayward, CA 94542

1.0 INTRODUCTION

The State of California, acting through the Board of Trustees of the California State University, hereinafter called Trustees, on behalf of California State University, East Bay, hereinafter called University, is requesting Statements of Qualifications (SOQ) from interested and qualified General Contractors (Respondents) to provide Construction Manager services with Lump Sum Price or GMP pricing for the design and construction of multiple projects under a master enabling agreement (MEA).

The delivery method for this contract is Task Order-Construction Agreement for Multiple Projects—Master Enabling Agreement (TO-CA MEA). The TO-CA MEA will include two types of agreements for the multiple projects: a task order for the design and preconstruction phase services for each project, and individual project construction agreements for the construction phase. During the design and preconstruction phase and under a Trustees-issued task order, the selected Respondent will collaborate with the Trustees on the design, constructability, cost, and schedule of the Project and develop a Lump Sum Price or GMP proposal to construct the Project. Upon the Trustees’ acceptance of the Lump Sum Price or GMP, the Trustees will issue a Construction Agreement to the General Contractor for the construction phase. If the Trustees and the General Contractor do not agree upon a Lump Sum Price or GMP, the Trustees will not award the construction phase of a Project to the General Contractor.

2.0DESCRIPTION OF TO-CA MEA
2.1Description

· The Trustees’ TO-CA MEA is a three-year contract.

· The Total Maximum Budgeted Cost for all Projects is defined as the total cost for the Work for all projects, including all design, preconstruction and site management fees, and overhead and profit..

· The Total Maximum Budgeted Cost for all Projects shall not exceed $30,000,000.

· The Budgeted Direct Construction Cost for all Projects is defined as the total cost of the work for all projects, excluding design, preconstruction, and site management fees, and overhead and profit.

· No single project shall exceed $7,000,000 in Total Budgeted Cost.

· Every project in this Contract is subject to prevailing wage rate laws as detailed in the Contract General Conditions; the California Department of Industrial Relations will be monitoring the projects under this Contract for payment of prevailing wage rates.

· The Trustees shall not guarantee a minimum volume of Task (service) Orders or Construction Agreements to be awarded as part of the TO-CA MEA.

· The General Contractor shall be licensed in the State of California with a ‘B’ license. The General Contractor must be prequalified with the Capital Planning, Design and Construction Department of the CSU Office of the Chancellor.

2.2 Projects

The Projects may include, but are not limited to HVAC replacements, roof replacement and repairs, fire alarm upgrades, access control upgrades, and door & hardware replacement. All project will be CM@Risk.

Project details are provided in Exhibit A issued with this RFQ and listed below.

No.
Project Description
Budget
1
HVAC Replacement
$ 3,600,000
2
Roof Replacement and Repairs
$ 1,000,000
3
Fire Alarm Upgrades
$ 500,000
4
Access Control Upgrades
$ 1,000,000
5
Door & Hardware Replacement
$ 300,000
Subtotal of Projects Identified
$ 6,400,000
Other Projects to be Identified
$ 1,280,000
TOTAL
$ 7,680,000

3.0 SCOPE OF WORK

The contract terms and conditions, along with work to be performed by the General Contractor are specified in the following TO-CA MEA Contract Documents:

· TO-CA MEA, which includes Rider B, Scope of Work;

· Task Order (for Design and/or Preconstruction Services);

· Construction Agreement;

· Contract General Conditions; and

· Supplementary General Conditions Form contracts may be viewed and obtained at https://www.calstate.edu/csu-system/doing-business-with-the-csu/capital-planning-design-construction/project-center/infrastructure/Construction/Pages/TOCA-Construction-Manager-at-Risk/B3.aspx. In submitting a response to this RFQ, the Respondent represents that it is qualified and capable to provide all the requirements of the TO-CA MEA, which would include both the Task Order for Design and/or Preconstruction Services and any potential Construction Agreements.

The following is a brief overview of the work the General Contractor will be required to perform, if awarded the TOCA MEA and any subsequent task order and construction phase agreement:

3.1 Each TO-CA MEA Task Order shall have a separate Budgeted Cost and shall include:

· Collaboration with the Trustees Architect and Engineering consultants; and preconstruction coordination, scheduling, constructability, and cost estimating services.

3.2Review the initial cost estimates and provide continuous cost management to assure the design is within the budgeted cost estimate.
3.3Develop the design and provide constructability reviews and analysis. Offer suggestions to improve the quality of the Projects.
3.4Provide construction planning, phasing, and scheduling during design and through construction completion.
3.5Develop and maintain Project schedules that incorporate all tasks and approvals of all involved parties necessary to complete the Project within the contract durations.
3.6Incorporate LEAN practices and tools into the process.
3.7Incorporate integrated project management practices into the Project.
3.8Provide quality assurance.
3.9Bring design-assist trade subcontractors into the design phase appropriate for the Project and as approved by the Trustees.
3.10Provide cost estimating and value engineering. Reconcile General Contractor cost estimates with Owner’s budget.
3.11Coordinate with and provide information as required to regulatory agencies. Schedule and monitor required agency approvals, obtain Campus Building Permit.
3.12Advertise all projects before the first project bids. Prequalify trade contractors to comply with General Contractor’s and Trustees’ standards, to create a subcontractor bidding pool for all subsequent projects.
3.13Comply with requirements to subcontract a minimum of three percent (3%) of the Project to Disabled Veteran Business Enterprises.
3.14Develop Trade Contractor Bid Packages and receive bids in the most logical, competitive, and seamless manner.
3.15Submit a Lump Sum Price or GMP proposal.
3.16Manage and administer the Project construction phase to achieve construction completion within the contract time and budget and with high quality workmanship.
4.0SELECTION PROCESS / REQUIREMENTS
4.1Selection Process
The Trustees will select the General Contractor using a two-step process—the Request for Qualifications and the Request for Proposals. In the first step of the selection process, the Trustees focus on selecting the most qualified firms by issuing this Request for Qualifications (RFQ), from which Respondents may submit Statements of Qualifications (SOQ) to the Trustees. The Trustees will appoint a selection committee to review and score the Respondents’ SOQ, and the highest scoring four firms will continue in the selection process. The Trustees will notify the unsuccessful firms, and will send the successful firms the Request for Proposals (RFP).
In the second step of the selection process (the RFP process), the Trustees focus on the selection of the firm with team members that are most suited to the Project. The Trustees’ selection committee will score the responding proposals from the finalists, conduct interviews, and may conduct reference checks. The Trustees may award the TO-CA MEA to the highest scoring firm, or to multiple firms as specified in the RFP. The judgment of the Trustees in this selection process is not subject to appeal.
If the Trustees do not award the TO-CA MEA, or if the Trustees award the TO-CA MEA and do not award a construction phase agreement, the Respondents will not be entitled to recover any monetary awards of any type whatsoever. The Trustees reserve the right to reject all responses to this RFQ. The Trustees may terminate the TO-CA MEA agreement prior to a construction phase and/or seek alternate competitive public bids for a construction phase. There is no guarantee any construction phase agreement will be awarded.
4.2Requirements for Qualification
a.Prequalification.
All Respondents (general contractors) must be prequalified with the Trustees one day prior to the SOQ due date, or their SOQ submission will not be considered. The last day to submit an application for CSU prequalification is indicated on the enclosed schedule. Respondents must submit the CSU prequalification applications online. For more information regarding prequalification with the Trustees, go to www.calstate.edu/contractor-prequalification to apply for prequalification, go to this website and click on PlanetBids. The Respondent’s available prequalification rating (rating minus receivables on any current contracts held with the Trustees) for the TO-CA-MEA must be $15,000,000 or more, and shall not be less than the total of the project budgets listed in RFQ 2.2. Construction phase contract awards may not exceed their prequalification rating at any time during the contract duration.
b.Affidavit of Joint Venture.

If two or more prospective firms desire to submit a proposal as a joint venture on a single project, they must file an affidavit of joint venture with the Trustees at least five (5) Days prior to the date and time set for opening SOQ on Form 703.12, Affidavit of Joint Venture. The affidavit of joint venture is valid only for the specific project for which it is filed. Each party to the joint venture must be prequalified, as provided herein, at least one (1) Business Day prior to the deadline identified in the Proposal Documents.

If the Trustees announce that the joint venture is the successful bidder, the joint venture shall, prior to Trustees’ award of Contract:

(1)obtain the joint venture license (Business and Professions Code sections 7029 and 7029.1), and
(2)register the joint venture with the Department of Industrial Relations.
4.3Documents
Interested parties may obtain selection documents and Project description documents by registering at the California Department of General Services’ CAL eProcure (eProcure) website at the link below:

https://caleprocure.ca.gov/pages/index.aspx

If you have problems viewing this website, contact Chris Lam-Vazquez, 510-885-7606, chris.lam-vazquez@csueastbay.edu for assistance.
5.0SELECTION PROCESS SCHEDULE:
Schedule Activities
Schedule
RFQ Advertised
Tuesday, March 11, 2025
Last day to submit application for prequalification
Wednesday, March 26, 2025
Last day to submit RFQ questions
Tuesday, March 25, 2025
Last day to submit Affidavit of Joint Venture
Wednesday, April 2, 2025
RFQ Addenda issued (if required)
Tuesday, April 1, 2025
Statements of Qualifications due
Wednesday, April 9, 2025 @ 2:00 p.m.
Proposer shortlist published by e-mail
Thursday, April 17, 2025
RFP distributed to shortlist
Friday, April 18, 2025
Last day to submit RFP questions
Monday, April 28, 2025
Proposals due date and time
May 19, 2025 at 12:00 PM
Proposing firms interviewed
Wednesday, May 28, 2025
Successful Proposer announced
Thursday, May 29, 2025
TO-CA MEA executed
TBD
First task order issued
TBD
First construction agreement executed
TBD

This is a proposed schedule that is subject to change. The task orders and construction agreements (if awarded) will identify the schedule commitments. Any changes to the schedule for the RFQ/RFP process will be issued to all Proposers via addenda.

6.0 INSTRUCTIONS FOR SUBMITTING A STATEMENT OF QUALIFICATIONS

Respondents shall submit their Statement of Qualifications (SOQ) to the Managing Office shown herein before the date and time shown in the Selection Process Schedule, in accordance with the following instructions:

6.1Provide all information requested by this RFQ.
6.2Provide information as it pertains to your firm. When referencing projects that were joint ventures, indicate such and explain your firm’s role in the project.
6.3The SOQ should be well organized and as concise and complete as possible while still providing the requested information.
6.4Information you believe is relevant to the selection of your firm for this Project but not requested by the RFQ may be submitted as an appendix to the SOQ.
6.5Where contact information is requested, include the company name, address and a company representative’s name, phone number and e-mail address.
6.6Submit five copies of the SOQ in “8 ½ x 11” format and one copy as a digital file in PDF format.
6.7Deliver the SOQ in a sealed package marked on the outside “SOQ for” and add the Contract Name, Contract No., and Campus.
6.8Deliver the SOQ to the Managing Office for the Selection Process prior to the date and time indicated in the Selection Process Schedule.
7.0MANAGING OFFICE FOR THE SELECTION PROCESS

All communications concerning the selection process should be directed to the Managing Office for the Selection Process. In e-mail communications, place the name and number of the Contract in the subject line. The Managing Office for the CM Selection Process is:

Name
Chris Lam-Vazquez
Campus
California State University, East Bay
Address (mailing):
25800 Carlos Bee Boulevard, Hayward, CA 94542
Telephone:
510-885-7606
Fax:
chris.lam-vazquez@csueastbay.edu
E-Mail:
Chris Lam-Vazquez

8.0 SOQ REQUIRED INFORMATION AND SCORING

Provide the following information in your SOQ. Each question will be scored against an ideal response which, in the opinion of the Trustees’ Selection Committee, would receive the maximum number of points possible, as indicated herein. If all information is not provided, the SOQ may not be considered. The Trustees may, at their discretion, call the contacts provided or others as may become known for reference checks. SOQs should be organized with numbered tabs corresponding to the following required information. Provide concise and complete responses. Non-requested information and lengthy responses are discouraged.

Tab
Required Information:
Points
1
Cover letter stating:

1) that your firm’s submittal is in response to this RFQ;

2) that your firm agrees to enter into preconstruction services and construction agreements if selected; and

3) under penalty of perjury, that all information in the SOQ is accurate.

0 points

2
Organization Information:

· Identify your firm’s full legal name, address, phone, fax, website, and point of contact.

· Include organization chart. Give titles and names of positions.

0 points

3
Provide the address of the office that will manage this Project.
0 points
4
Copy of your firm’s CSU prequalification letter, which also contains your firm’s Composite Safety Score.
0 points
5
Copy of your firm's California Contractor License.
0 points
6
Your firm’s past experience on CSU projects.
0 points
7
Your firm’s present contracts on CSU projects.
0 points
8
Your Team’s general qualifications and experience managing CM at Risk projects of similar size and type. List up to five projects and provide contact information for the owners; include names and e-mail addresses.
60 points
9
Your Team’s qualifications and demonstrated successful experience with CM at Risk projects in the public sector. Provide the following information: at least three projects in California that were completed, or are 75% complete, within the last five (5) years. Your Team must have provided CM at Risk services for these projects, and worked directly with the owner. Include:

A. A project description in summary form showing key data for each project submitted.

B. A narrative project description and include the processes that were used to:

(1) Provide design coordination and review with the architect and owner.

(2) Address constructability issues and incorporate solutions into the design.

(3) Provide cost estimating to assure conformance to the owner’s budget.

(4) Demonstrates the firm’s ability to effectively use TO-CA MEA delivery.

C. Provide reference and contact information (names and e-mail addresses) for the project owner or the owner’s representative, and architect, and their roles, responsibilities and everyday interaction with your project team.

D. Describe any lawsuits involving any of your projects’ owners in the last five years to which you have been a party. Describe if you were the plaintiff or defendant, a brief summary of each case, and the outcome.

60 points

10
Your firm’s experience incorporating subcontractors into the design phase by methods such as design-assist. Provide contact information for owner and architect.
25 points
11
Your firm’s experience utilizing DVBEs.
10 points
12
Your firm will be assigned points according to the Composite Weighted Score (CWS) which is indicated in your firm’s prequalification letter. The highest possible CWS is 50; the lowest, 25 (contractors are not prequalified with scores below 25). One point will be assigned for each increment higher than 25, for a maximum assignment of 25 points. For example, a CWS of 43 will be assigned 18 points, and a CWS of 30, 5 points.
25 points
13
Your Team’s unique qualifications to perform on this Project.
50 points
14
Your firm’s experience within 50 miles of the Project.
20 points
15
Your firm’s experience using LEAN tools and Integrated Project Management methods.
20 points
16
Your firm’s process for assuring the Project cost is within the scope and budget and completed on time.
50 points
17
During the past five (5) years was your firm required to pay penalties for failure to pay prevailing wages? If yes, provide a description of each instance and the amount of penalties paid.
25 points
18
During the past five (5) years has your firm been assessed CAL-OSHA fines in the serious, repeat, or willful category? If yes, provide circumstances, number of instances, and the amount of fine(s).
25 points
19
Response to RFQ was clear, concise and responsive. (No tab required)
30 points
TOTAL
400 points

9.0 QUESTIONS

All questions regarding this RFQ for the TO-CA MEA selection process listed herein must be submitted in writing by e-mail, fax or mail to the Managing Office and received no later than the due date indicated in the Selection Process Schedule. Questions received after the due date will not be considered. Written responses to submitted questions will be sent to all registered Respondents. Clarifications may be requested verbally, however, verbal responses will not be considered binding.

-End of Request for Qualifications-