East Lansing High School Plumbing and HVAC improvements summer 2019.docx

DOCX document 13 KB Posted

Attached to
High School Plumbing and HVAC improvements summer 2019
Solicitation number
RFP ELP 190000001753 1
Issued by
Grand Traverse County, Michigan

About this file

This is a sealed bid solicitation document from East Lansing Public Schools for plumbing and HVAC improvements at East Lansing High School. The project scope includes installation of a new high-temperature domestic hot water line from the existing boiler room to two new mixing valves; replacement of two existing mixing valves in the same location; installation of a new high-temperature hot water return line with circulating pump; rebuilding of existing shower valves; adjustment of existing point-of-use mixing valves at indicated lavatories; installation of new hot water reheat coils in existing ductwork; new piping for the reheat coils; and new controls for the reheat coils. A mandatory prebid walkthrough is scheduled for April 11, 2019 at 9:30 a.m. in Conference Room 204, with contractors required to report to Main Entrance Door #1 for check-in at the Main Office in Room 200. Sealed bids are due by 2:00 p.m. on April 30, 2019 at East Lansing High School, 501 Burcham Drive, East Lansing, Michigan 48823, at which time bids will be opened and read aloud.

The document does not specify pricing terms, bid amounts, set-asides, funding sources, or other financial details. No information regarding contract term, renewal options, or award dates is provided in this solicitation document.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

East Lansing High School Plumbing and HVAC improvements summer 2019

1. East Lansing Public Schools is seeking sealed bid proposals for a Plumbing and Heating Upgrades at East Lansing High School. The project will consist of the following:

0. Installation of a new high temperature domestic hot water line from the existing boiler room to two new mixing valves.

0. Two new mixing valves will replace two existing mixing valve in same location.

0. Installation of new high temperature hot water return line and circulating pump.

0. Rebuilding of existing shower valves.

0. Adjusting existing point of use mixing valves at indicated lavatories.

0. New hot water reheat coils in existing ductwork.

0. New piping for hot water reheat coils.

0. New controls for hot water reheat coils.

1. A mandatory prebid walk through will be held April 11, 2019 at 9:30 a.m. in Conference Room 204. ALL Exterior Doors are LOCKED. Contractors are to report to Main Entrance Door # 1 where they will be buzzed in far right door, come up stairs to Main Office Room 200 and sign in get visitor pass then proceed to conference room 204

1. Bids will be due by 2:00 p.m., April 30, 2019 at East Lansing High School, 501 Burcham Drive, East Lansing, MI 48823, at which time bids will be opened and read aloud.

File details come from the government source that posted it. Updated .