Amend001.pdf
PDF 826 KB Posted
- Solicitation number
- EA-133F-17-RQ-0069
About this file
Amendment A0001, Q&A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ0069.pdf | ||
| SOW_for_RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
A0001
Attachment Page
PAGE 2 OF 2 EA133F17RQ0069A0001
Questions and Responses for RFQ EA-133F-17-RQ-0069
Question 1: Can you specify what information of the species caught needs to be recorded (e.g.
weights, lengths, number, type, etc.)?
Response: Lengths needs to be tested by number of individuals and type are most critical.
Question 2: Is the government looking for a system that collects the depth as part of the continuous meta data stream along with the vessel position, date and time during the entire tow or is the intent to collect depth at the end of each haul? Could the depth be added during the analysis phase?
Response: Depth is not a required data field.
Question 3: Can an electronic reporting log be used by the vessel master in conjunction with electronic monitoring tools to record the species caught and the disposition of the released species?
Response: No, we are developing an independent method of recording bycatch outside the vessel logbooks.
Question 4: The video equipment specifications request waterproof armored dome cameras.
1. Are other camera housings acceptable as long as they have been designed and proven for the marine environment (e.g., housings with an ingress protection rating 66/68?
2. Is the specified brand of image sensor (Sony) required or is another brand acceptable as long as all other specifications are met or surpassed.
Response: (1) Yes. (2) Brand is not important.
Question 5: Is the use of rapid capture high definition still image camera an acceptable alternative to video as long as we can demonstrate that all catch handling is captured?
Response: Video is preferred.
RFQ EA-133F-17-RQ-0069 Amendment 0001 Attachment 1 Page 1
| topmostSubform[0]: |
| Page1[0]: |
| Descript[0]: a. Several questions have been received. The questions and the Government's responses are provided in Attachment 1 to this amendment. |
b. The time and date for receipt of quotes is hereby extended to 1:00 p.m., local time, December 16, 2016.
c. All other terms and conditions of the solicitation remain unchanged.
| Descript1[0]: |
| AMENDMENT_OF_SOLICITATIONMODIFICATION_OF_CONTRACT[0]: |
| IDCode[0]: |
| pdfpage1[0]: 1 |
| Pages[0]: 2 |
| EffDate[0]: DEC 05, 2016 |
| ReqNo[0]: NFFN7110-17-00204 |
| ProjNo[0]: |
| IssuedByCode[0]: FN711023 |
| IssuedBy[0]: PANAMA CITY BRANCH /F/SEC11 |
NMFS 3500 DELWOOD BEACH RD
PANAMA CITY FL 32408-7499
| AdminByCode[0]: AJ930073 |
| AdminBy[0]: NOAA/ERAD |
200 GRANBY STREET
NORFOLK VA 23510
| ContractorCode[0]: |
| FacCode[0]: |
| SolChg[0]: Yes |
| AwdChg[0]: Off |
| SolNo[0]: EA-133F-17-RQ-0069 |
| SolDate[0]: NOV 18, 2016 |
| AwdNo[0]: |
| AwdDate[0]: |
| NoCopies[0]: 1 |
| Amended[0]: Yes |
| OffrExt[0]: Yes |
| OffrNoEx[0]: Off |
| ApprData[0]: See Schedule |
| ChgeOrd[0]: Off |
| ChgeOrder[0]: |
| Modify[0]: Off |
| B_THE_ABOVE_NUMBERED_CONTRACTORDER_IS_MODIFIED_TO_REFLECT_THE_ADMINISTRATIVE_CHANGES_such_as_changes_in_paying_office__appropriation_date__etc_SET_FORTH_IN_ITEM_14__PURSUANT_TO_THE_AUTHORITY_OF_FAR_43103b[0]: |
| SuppAgre[0]: Off |
| SuppAuth[0]: |
| ModOthr[0]: Off |
| OthrSpec[0]: |
| NoReq[0]: Off |
| Require[0]: Off |
| Copies[0]: |
| SignName[0]: |
| SignTitl[0]: |
| ContDate[0]: |
| ContrOfficerInfo[0]: |
| CODate[0]: |
| ContratorInfo[0]: |
| ContractorPOC[0]: |
| Contractor[0]: |
| ModAmount[0]: |
| Header[0]: |
| _15B_CONTRACTOROFFEROR[0]: |
| Footer1[0]: |
| signature[0]: |
File details come from the government source that posted it. Updated .