This document is a firm fixed price contract (N6449824P5109) awarded to MARBERRY MACHINE INC. for shaft sleeve machining services.
The contract includes 12 contract line items (CLINs) - 5 firm fixed price (FFP) CLINs and 7 option CLINs. The scope of work covers off-site rough machining of 70/30 copper-nickel shaft sleeves to specific dimensions and surface finish requirements. The contract has a total value of $149,688.00 and covers a period of performance from April 30, 2024 to April 29, 2026. The contract was awarded by the Department of the Navy Naval Sea Systems Command on April 30, 2024. Key quality and material control requirements are detailed, including mandatory compliance with Appendix A for Level I materials. The contractor must also follow specific procedures for receipt, storage, and marking of the government-furnished shaft sleeves.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF79
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N6449824P5109
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot $12,474.00 $12,474.00 Shaft Sleeve Machining Service
FFP
All work shall be completed in accordance with Section C, Statement of Work. All work must be completed within 75 calendar days thereafter (15 JUL 2024), including Government inspection and delivery to the Government.
FOB: Destination
PURCHASE REQUEST NUMBER: 1301156361
PSC CD: K099
NET AMT $12,474.00
ACRN AA
CIN: 130115636100001
$12,474.00
0002 1 Lot $12,474.00 $12,474.00 Shaft Sleeve Machining Service
FFP
All work shall be completed in accordance with Section C, Statement of Work. All work must be completed within 75 calendar days thereafter (15 JUL 2024), including Government inspection and delivery to the Government.
FOB: Destination
CIN: 130115636100002
0003 1 Lot $12,474.00 $12,474.00
EXERCISED
OPTION
Shaft Sleeve Machining Service
FFP
All work shall be completed in accordance with Section C, Statement of Work. All work must be completed within 75 calendar days after exercising the option (15 JUL 2024), including Government inspection and delivery to the Government.
FOB: Destination
CIN: 130115636100003
0004 1 Lot $12,474.00 $12,474.00
EXERCISED
OPTION
Shaft Sleeve Machining Service
FFP
All work shall be completed in accordance with Section C, Statement of Work. All work must be completed within 75 calendar days after exercising the option (15 JUL 2024), including Government inspection and delivery to the Government.
FOB: Destination
CIN: 130115636100004
0005 1 Lot $12,474.00 $12,474.00 Shaft Sleeve Machining Service
FFP
All work shall be completed in accordance with Section C, Statement of Work. All work must be completed within 75 calendar days after exercising the option (15 JUL 2024), including Government inspection and delivery to the Government.
FOB: Destination
CIN: 130115636100005
0006 1 Lot $12,474.00 $12,474.00 OPTION Shaft Sleeve Machining Service
FFP
All work shall be completed in accordance with Section C, Statement of Work. All work must be completed within 75 calendar days after exercising the option, including Government inspection and delivery to the Government.
FOB: Destination
0007 1 Lot $12,474.00 $12,474.00 OPTION Shaft Sleeve Machining Service
FFP
All work shall be completed in accordance with Section C, Statement of Work. All work must be completed within 75 calendar days after exercising the option, including Government inspection and delivery to the Government.
0008 1 Lot $12,474.00 $12,474.00 OPTION Shaft Sleeve Machining Service
FFP
All work shall be completed in accordance with Section C, Statement of Work. All work must be completed within 75 calendar days after exercising the option, including Government inspection and delivery to the Government.
0009 1 Lot $12,474.00 $12,474.00 OPTION Shaft Sleeve Machining Service
FFP
All work shall be completed in accordance with Section C, Statement of Work. All work must be completed within 75 calendar days after exercising the option, including Government inspection and delivery to the Government.
0010 1 Lot $12,474.00 $12,474.00 OPTION Shaft Sleeve Machining Service
FFP
All work shall be completed in accordance with Section C, Statement of Work. All work must be completed within 75 calendar days after exercising the option, including Government inspection and delivery to the Government.
0011 1 Lot $12,474.00 $12,474.00 OPTION Shaft Sleeve Machining Service
FFP
All work shall be completed in accordance with Section C, Statement of Work. All work must be completed within 75 calendar days after exercising the option, including Government inspection and delivery to the Government.
0012 1 Lot $12,474.00 $12,474.00 OPTION Shaft Sleeve Machining Service
FFP
All work shall be completed in accordance with Section C, Statement of Work. All work must be completed within 75 calendar days after exercising the option, including Government inspection and delivery to the Government.
0013 1 Lot NSP Technical Data
FFP
The reports shall be competed in accordance with the Statement of Work (SOW) in Section C, as well as the CDRL exhibits.
This CLIN is Not Separately Priced (NSP).
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
Statement of Work (SOW) for Shaft Sleeve Machining Services #4
Naval Foundry and Propeller Center
1.0 INTRODUCTION
1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. The services provided in this contract are for the Naval Foundry and Propeller Center (NFPC) who is responsible for the manufacturing, and repair of propellers for the US Navy and misc. components to support active Navy vessels.
1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied.
1.0.3 Government / Contractor Relationship
(a) The services to be delivered under this contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.
(b) The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence
(c) Contractor personnel under this contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.
(d) Employee Relationship:
1) The services to be performed under this contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.
2) Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation.
This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.
(e) Inapplicability of Employee Benefits: This contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.
(f) Notice. It is the Contractor's, as well as the Government's, responsibility to monitor contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.
1) The Contractor should notify the Contracting Officer in writing within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the estimate in time by which the Government must respond to this notice to minimize cost, delay, or disruption of performance.
2) The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:
(i) Confirm the conduct is in violation and when necessary direct the mode of further performance,
(ii) Countermand any communication regarded as a violation,
(iii) Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or
(iv) In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.
1.1 BACKGROUND
NFPC seeks machining services to perform machining services on 70/30 Copper-Nickel (CuNi) shaft sleeves after they have been cast. The finish, tolerance and final dimensions of machining can be found in the below sections, scope of work and applicable documents, with attachments.
The material covered in this contract will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as Special Emphasis SUBSAFE / LEVEL I material and special control procedures are invoked to ensure receipt of correct material.
1.2 SCOPE OF WORK
This scope of work comprises of the off-site rough machining service of 70/30 CuNi shaft sleeves as per drawing (detail 3A of Attachment 1). When complete, the shaft sleeves must have a minimum surface finish of 250 RMS. Following the completion of the machining process, the shaft sleeves shall be dimensionally inspected and all dimensions shall be recorded on CDRL A001.
The CLIN structure is as follows:
YEAR 1:
CLIN 0001-Shaft Sleeve Machining Services – 1 Each – Firm Fixed Price (FFP) CLIN 0002-Shaft Sleeve Machining Services – 1 Each – Firm Fixed Price (FFP) CLIN 0003-Shaft Sleeve Machining Services – 1 Each – FFP - Option CLIN 0004-Shaft Sleeve Machining Services – 1 Each – FFP - Option CLIN 0005-Shaft Sleeve Machining Services – 1 Each – FFP - Option CLIN 0006-Shaft Sleeve Machining Services – 1 Each – FFP – Option
YEAR 2:
CLIN 0007-Shaft Sleeve Machining Services – 1 Each – FFP - Option CLIN 0008-Shaft Sleeve Machining Services – 1 Each – FFP - Option CLIN 0009-Shaft Sleeve Machining Services – 1 Each – FFP - Option CLIN 0010-Shaft Sleeve Machining Services – 1 Each – FFP - Option CLIN 0011-Shaft Sleeve Machining Services – 1 Each – FFP - Option CLIN 0012-Shaft Sleeve Machining Services – 1 Each – FFP - Option
2.0 APPLICABLE DOCUMENTS
2.1. Rough Machining and Inspection Requirements (Attachment 1)
2.2. Appendix A; “Minimum Standard Quality Contract Requirements for Procurement, Modification, Repair or Overhaul of Non-Nuclear Level I Material SMICs L1, C1, S1 and Level I Support SMIC Q3, VG” (Attachment 2).
3.0. REQUIREMENTS
3.1.1. Contractor personnel should maintain strict adherence to the marking, machining and inspection requirement listed in Attachment 1.
The minimum quality requirements for LEVEL I Material are provided in Appendix A;
“Minimum Standard Quality Contract Requirements for Procurement, Modification, Repair or Overhaul of Non-Nuclear Level I Material SMICs L1, C1, S1 and Level I Support SMIC Q3, VG”. Appendix A is a material part of this contract and the contractor shall comply with all requirements established in Appendix A (Attachment 2).
3.1.2. As a part of the Government’s Quality Assurance Program, the Government reserves the right to witness any of the manufacturing, testing, machining, or inspection operations conducted by the contractor or its subcontractor(s).
3.1.3. Prior to machining, the contractor shall record the casting heat number located on the Government furnished casting and affix the casting number to lathe in any method suitable to ensure number documentation and traceability. Upon job completion, the number recorded shall be vibro-etched as per requirement in Attachment 1. Failure to properly mark will result in the casting being rejected.
3.1.4. The contractor is to identify “Pour End” or “PE” and transfer the same text to rough machined shaft sleeve with a non-destructive marking method. The use of a black permanent marking pen or similar is an acceptable method to transfer the text.
3.1.5. The contractor shall machine the Inside Diameter (ID), Outside Diameter (OD) and Length
(L) of the stock as shown in Attachment 1.
3.1.6. The contractor shall ensure Concentricity, Straightness and Surface Finish is achieved as stated in Attachment 1.
3.1.7. After rough machining, the contractor is to vibro-etch near each end and at mid length on the OD the following:
ASTM B369
ALLOY C96400
SSN 688 CL-203-4457003Z
“Casting Heat Number”
NFPC
3.1.7.1 The “Casting Heat Number” recorded must match the number previously recorded in step
3.1.3 to ensure traceability.
3.1.8. The contractor shall measure and record the requested dimensions at locations as listed in Attachment 1. The contractor shall record the measurements in accordance with CDRL A001 (Attachment 3).
3.1.9. The contractor shall record the tool control number and calibration due dates on all equipment used to take quantitative measurements listed in Attachment 1. The contractor shall record this data on a calibration record sheet.
3.1.10. The contractor shall coordinate with their local DCMA representative for inspection and acceptance prior to shipment to NFPC. The DCMA representative shall produce a nominal inspection report and send to NFPC. Contractor shall not package unit and close shipping crate until contacted by either DCMA or NFPC representative to ensure all inspections and sign offs are complete.
3.2. Material Handling
3.2.1 The Contractor is responsible for removal, custody/storage, reinstallation, and documentation of all Level I work incidental to the Contract. The Contractor shall have a process for removal, custody/storage, reinstallation, and documentation of all controlled work in support of work awarded under a Task Order. NSWCPD reserves the right to conduct audits of process.
Material handling procedures shall provide methods for controlling Level I material from receipt through installation.
3.2.2 Level I material that is awaiting or undergoing receipt inspection or is in storage shall be physically segregated from non-Level I material as soon as practical to prevent commingling and unauthorized use. Segregation may be accomplished by use of separate cages, racks, bins, shelves, boxes or roped-off areas. Storage areas for Level I material shall be distinctly identified and marked. Segregation shall be maintained until the material is installed aboard ship or identified to a specific end-use.
3.2.3 Material control tags shall be used to positively identify Level I material in transit to avoid unauthorized movement, commingling and improper use.
3.2.4 Level I material may be issued for non-Level applications without segregation or removal of MIC markings provided the material is identified to its end use application.
3.2.5 Staging of Level I material with other material is acceptable for a specific job or fabrication process, provided the Level I material is clearly marked as required and the material for the specific job or fabrication process is grouped together, identified by the job or process number, and segregated from material grouped for other processes or jobs.
3.2.6 When material is actually being worked or being stored temporarily pending work adequate segregation between specific generic material types and from non-Level I material, as well as adequate physical controls, shall be instituted to prevent material mix-up.
3.2.7 Level I materials of different material types, grades or condition shall be segregated through physical separation unless readily differentiated by other attributes, such as size or physical appearance (i.e., material that is not subject to mix-up).
3.2.8 When physical segregation cannot be practically accomplished an alternate positive system of control shall be used. The method used shall ensure that different materials that appear to be similar are not mixed (unless such materials are approved alternates for each other as indicated by stock or part number).
3.2.9 Upon successful receipt inspection verification and application of appropriate Level I acceptance marking, the segregation and physical control requirements of paragraphs 6.2.1 and
7.3 above do not apply to assemblies and finished components which are not subject to mix-up.
3.2.10 Material awaiting disposition of an unsatisfactory or questionable condition shall be identified, such as by the use of tags to indicate the status of the material, and shall be segregated from accepted material. If such material awaiting disposition is already part of an assembly or installed aboard ship, its status shall be clearly identified, such as by tags.
3.2.11 If the disposition action for material rejects the material for Level I use, the material shall be promptly moved from any area in which Level I material is stored, worked on, or staged, and the Level I identification on the material shall be removed as soon as practical.
3.3. Quality System Requirements
3.3.1 The Contractor furnishing items under this contract/purchase order shall provide and maintain a quality system in accordance with ivfIL-I-45208 or ISO9001 :2008 ( except as amplified or modified herein) with the calibration system requirements of MIL-STD-45662 or ISO10012 or ANSI-Z540.1. Quality systems in accordance with ISO9001:2000, ISO9001: 1994, or ISO9002: 1994 are acceptable alternates.
3.3.2 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/non-acceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order.
3.3.3 The Contractor's quality system shall be documented and shall be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor shall, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative.
3.3.4 Inspection System Procedures (CDRL per DI-QCIC-81110) - All suppliers of Level I/SUB SAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement.
3.3.5 This contract provides for the performance of Government Quality Assurance at Source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately.
3.3.6 Any changes made by the Contractor to a qualified quality system will require resubmittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption.
3.4. Contractor Inspection Requirements
3.4.1 The Contractor shall maintain adequate records of all inspections and tests. The records shall indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records shall be traceable to the material inspected.
3.4.2 The supplier's gages, measuring and test equipment shall be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel shall be made available for operations of such devices and for verification of their accuracy and condition.
3.4.3 All documents and reference data applicable to this contract shall be available for review by the Government representative. Copies of documents required for Government inspection purposes shall be furnished in accordance with the instructions provided by the Government representative.
3.5 Subcontractor Inspection Requirements
3.5.1 The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents shall be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately."
3.5.2 The prime contractor's program shall include procedures to assess the capability of The prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document.
3.5.3 Each sub-tier supplier of material or services for items in Section 3 of this contract Shall be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract.
3.5.4 The prime contractor shall ensure that the purchased product conforms to specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product shall be dependent upon the effect of the purchased product on the end item represented by this contract.
3.5.5 The prime contractor shall evaluate the requirements of the contract and select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation shall be established. Records of this effort shall be available for review by the government.
3.5.6 The prime contractor's supplier quality assurance program shall provide for a review of purchase documents to assure applicable quality requirements
4.0 DATA REQUIREMENTS
4.1. Certificate of Conformance Report (CDRL A001)
4.2. Government Property Inventory Report (CDRL A002)
5.0 SECURITY REQUIREMENTS
5.1. The contractor shall be escorted onto the site, observed while they perform the work, and escorted off the site.
5.2. Escorted visit. Escorted visits are required for any person who is not assigned to NNSY/NFPC and/or does not have a valid security clearance. Visitors will be escorted at all time by an NFPC employee and no exposure to any classified open storage areas or material.
Requests for escorted access must be submitted 5 working days prior to arrival. If it is service or maintenance that needs to be done or an emergency the request needs to be submitted immediately in order to allow for ample time for proper vetting of individual/individuals requesting access.
The requesting NFPC code/shop will coordinate the visit and security code 1123 will verify two forms of Government issued identification. The responsible code shall provide escort during the contractor’s visit.
Acceptable documents include:
US Birth Certificate (original) US Voters registration US Passport (Home Land security), Transportation Workers Identification Credential (TWIC) Naturalization paperwork Driver’s License Social Security Card
Installation Access for Visitors/Contractors
All visitors/contractors having a valid purpose for access shall submit a completed and signed Form 5512/1 to their identified Government sponsor 14 working days prior to the date of their required visit.
The entire document shall be completed and form dated/signed by the visitor/contractor.
Visitor/Contractor shall retain a copy of the form 5512/1 to present on the first day at the installation.
The visitor/contractor shall communicate all on-site day to day schedules and schedule changes to the NFPC base sponsor to be submitted to code 1123 in a detailed security plan.
Note: It is critical that start/end dates/work hours are identified, accurate, and short term visitors/contractors are not granted extended or after-hours access if not required Reporting to PNY-A for the first time.
Visitor/Contractor Responsibility
Visitor/Contractor shall report to the location designated by their sponsor (Security Office or other designated location, Pass and ID office) or if operating a Commercial Vehicle requiring inspection; to the Vehicle Inspection Station.
Visitor/Contractor shall present their completed and signed 5512/1.
The Sentry or Security Assistant shall verify vetting is cleared and issue the appropriate passes. If visitor/contractor has not completed the 5512/1 their access will be delayed until they correct the form.
Code 1123 will review request and when acceptable notify requesting NFPC code/shop to arrange visit.
5.3. Contractor Vehicle Parking: (OPNAV 5530.14E) All contractor commercial vehicles must be visually inspected at Lot 753 prior to entry into any NFPC buildings and are subject to random inspections anywhere on the compound. Vehicles must clearly display an authorized company sign or logo including a company phone number. Vehicles must only be allowed in the compound for transportation of contractors' tools, parts, and materials to and from the work site with the exception of MILCON scope projects. Vehicles must be registered to the company and not to an individual. Parking of POV's is available at Lot 753, which is approximately one mile from the work site. Contractor shall ensure that their vehicles, including delivery trucks, have valid and current vehicle registration and insurance upon arrival to NFPC. Non-valid and outdated or missing vehicle registration and insurance shall result in denied facility access requiring the Contractor to reschedule delivery Immediately at the contractor’s expense. Delivery drivers must present two forms of Government issued identification.
5.4. PEDs (Portable Electronic Devices) are not allowed in areas where work is being performed.
Should the Contractor require a laptop, tablet or other similar device on-site to fulfill the Scope of Work, the Contractor must complete an asset authorization form for each device and submit the devices to code 109 for inspection and approval prior to site access. The laptops cannot have camera capabilities. Procedures regarding laptop access are subject to change.
PEDs (Portable Electronic Devices) are PROHIBITED:
In Restricted Areas (Open Storage Confidential Areas, Secure Rooms, Vaults, etc.) and any location (office, trailer, shop, work area, etc.) where NAVSEA business is conducted.
PEDs are permitted in Personally Owned Vehicles parked outside of the Controlled Access Area. (General parking lots across the street.)
Cell Phones/Smart Watches/Fitness Bands/ Wireless Headsets and Speakers are permitted in outside areas of the CAA and where Naval Sea Systems Command (NAVSEA) business of a sensitive nature is NOT conducted. Cell Phones, Smart Watches, Fitness Bands or Wireless Headsets and Speakers are prohibited in the OSC Areas.
PEDs are PROHIBITED in Secure Rooms (regardless of where any of these areas are located), and in any meeting, discussion or forum where NAVSEA business of a sensitive nature is carried on.
Cellphone lockers/boxes will be placed at the entrance to facilities, or as close to the entrance as possible in order to facilitate this policy.
********CAA-Controlled Access Area is anywhere within the fence line********
5.5.0 The contractor shall adhere to the base access guidance per the following website:
https://www.cnic.navy.mil/regions/cnrma/om/contractor_verification_system/faqs.html
5.6.0 The contractor shall ensure that only contractor employees who meet the security requirements stated below perform under this contract at the Government site (e.g. delivery drivers and passengers, etc.). The contractor shall propose and maintain a list of employees whom meet these requirements and be willing to submit this list to the Government, along with the necessary documentation to prove they meet them (e.g. the results of a contractor conducted background check, etc.), for the Government’s security vetting, to include any Government background check, and approval. Once vetted and approved, a list of approved contractor employees must be maintained for the entire period of performance of the contract (i.e. propose new employees, replace existing employees or provide updates to existing employees’ records, as necessary). A minimum of two employees, primary and backup, should be cleared by the Government to perform the necessary functions under this contract (e.g. proposed drivers of a delivery vehicle) throughout the entire period of performance of the contract. Contractors must have the ability to be granted access by ensuring current documentation is available at the submission of their proposal to allow background checks for any proposed driver and passenger under the following criteria:
Felony conviction of any type within 10 years, or felony arrest that has not been adjudicated yet (includes "deferred findings").
Misdemeanor conviction or on-base arrest within 5 years, for any of the following types of crimes (includes "deferred findings"): Crimes of violence, sexual assault, larceny, drugs, or a habitual offender.
On the Sex Offender Registry.
Is barred from any Navy installation.
If a contractor’s employee is denied entry at delivery due to inaccurate or outdated personal and/or vehicle documentation, the Government is absolved of any costs accrued as a result of the denial and the contractor is still pledged to fulfill the contract requirements. Failure to fulfill the contract requirement may result in a termination for default pursuant to FAR 49.4.
5.7.0 OPERATIONS SECURITY (OPSEC)
The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure. NFPC’s Critical Information List, (CIL) will be provided on site, if warranted. Performance under this contract requires the contractor to adhere to OPSEC requirements. The Contractor may not impose OPSEC requirements on its subcontractors unless NFPC approves the OPSEC requirements. During the period of this contract, the Contractor may be exposed to, use, or produce, NFPC Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NFPC CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence (FOCI) ) unless such FOCI has been appropriately mitigated through measures approved by the Defense Counterintelligence and Security Agency.
CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations.
Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer. Component/System outside storage, staging, and test areas shall be shielded/obscured from public view wherever physically possible.
NFPC’s CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public facing websites. Media requests related to this project shall be directed to the PCO, and the COR who will forward the required to the NFPC Public Release Authority for review.
Any attempt by unauthorized third parties to solicit, obtain, photograph, or record, or; incidents of loss/compromise of government Classified or CI, Business Sensitive, Company Proprietary information related to this or other program must be immediately reported to the contractor's Facility Security Officer and Cognizant Security Office and/or the Naval Criminal
Investigative Service, and the NFPC Security Division (Code 1123). Questions concerning these requirements shall be directed to the PCO, and the COR who will forward the request to the NFPC Security Division (Code 1123).
5.8.0 RECEIPT, STORAGE, AND GENERATION OF CONTROLLED UNCLASSIFIED
INFORMATION (CUI)
All Controlled Unclassified Information (CUI) associated with this contract must follow the minimum marking requirements of DoDI 5200.48, Section 3, paragraph 3.4.a, and include the acronym "CUI" in the banner and footer of the document. In accordance with DoDI 5200.48, CUI must be safeguarded to prevent Unauthorized Disclosure (UD). CUI export controlled technical information or other scientific, technical, and engineering information must be marked with an export control warning as directed in DoDI 5230.24, DoDD 5230.25, and Part 250 of Title 32, CFR. Nonfederal information systems storing and processing CUI shall be protected per NIST SP-800-171, or subsequent revisions. All transmissions to personal email accounts (AOL, Yahoo, Hotmail, Comcast, etc.) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.) are prohibited. Destroy CUI associated with this contract by any of the following approved methods: A cross-cut shredder; a certified commercial destruction vendor; a central destruction facility; incineration; chemical decomposition; pulverizing, disintegration; or methods approved for classified destruction.
6.0 DELIVERY
6.1 The contractor shall receive the sleeves in a Government provided shipping crate. The contractor shall provide information to the Government related to their ability to receive the crated sleeves: location, if they have a loading dock, days/times available, equipment they have to help unload, etc. Upon receipt the contractor will inspect the shipping container and inform the Government if it is damaged in such a manner they believe it will not be safe to reuse.
6.1.1 The contractor is responsible for storing the shipping crate until that sleeve’s contract requirements are complete, where they will properly re-crate with the paperwork as required by NFPC and DCMA in this contract. Once all the paperwork is complete, the contractor will seal the crate and facilitate pickup of the crate with the shipping carrier, which arranged and paid for by the Government. The contractor may need to use a forklift or other equipment to load the crate unto the carrier’s vehicle or bring it to a position the carrier can move it into their vehicle, details will depend on the carrier and the dock type the contractor has.
6.1.2 The contractor is responsible for providing miscellaneous hardware and shipping supplies needed to properly re-crate the sleeve. Possible examples are nails, plastic sheeting, Styrofoam, tape, etc. The contractor may use whatever came with the sleeve, provided it is in a usable condition, but may need to supplant with their own supplies.
6.1.3 Should the contractor lose or damage the crate they will be responsible for repairing, replacing or the costs of replacing. The Government may be able to provide a replacement, but the cost of such will be borne by the contractor to include shipping it to them.
7.0 TRAVEL
Not applicable.
8.0 GOVERNMENT FURNISHED PROPERTY
Shaft Sleeve with S/N TBD.
Shipping Crate
Upon receipt of GFP, Contractor shall notify a Government Representative prior to opening the packaging.
8.1 Government Furnished Material and/or Equipment (GFM/GFE)
8.1.1 When material or equipment is furnished by the Government, the Contractor shall develop documented control procedures that require at least the following:
8.1.2 Visual examination upon receipt to detect damage during transit.
8.1.3 Inspection for completeness and proper type.
8.1.4 Verification of material quality received.
8.1.5 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage
8.1.6 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation.
8.1.7 Identification and protection from improper use or disposition.
8.1.8 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier shall determine and record probable cause and necessity for withholding the material from use.
8.1.9 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed
Government material. Records of all inspection and maintenance performed on bailed property shall be maintained.
8.1.10 Material returned to the contractor shall be handled as GFM.
9.0 GOVERNMENT FURNISHED INFORMATION
Not applicable.
10. PURCHASES
Not applicable.
11. COUNTERFEIT MATERIAL PREVENTION
Not applicable.
12. PERSONNEL
Not applicable.
13.0 NSWCPD ELECTRONIC COST REPORTING AND FINANCIAL TRACKING
(ECRAFT) SYSTEM
Not applicable.
14.0 SPECIAL REQUIREMENTS
Not applicable.
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.
None
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal N6449824Q4020 dated 12 March 2024 in response to Solicitation No. N6449824Q4020.
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019)
(a) Definitions. As used in this text:
Article means a manufactured item other than a fluid or particle: (i) which is formed to a specific shape or design during manufacture; (ii) which has end use function(s) dependent in whole or in part upon its shape or design during end use; and (iii) which under normal conditions of use does not release more than very small quantities, e.g., minute or trace amounts of a hazardous chemical, and does not pose a physical hazard or health risk to employees.
Boundary of containment means a continuous tight seal (barrier) to prevent the release of functional mercury during normal operation and maintenance. Examples include the exterior of a fluorescent lamp, glass capsule of a mercury switch, and container for mercury reagents. A double boundary of containment consists of two independent seals.
Functional mercury means mercury or mercury compound(s) contained in equipment that is required for the equipment to operate properly, such as that found in mercury switches, fluorescent lamps, flat-panel monitors, thermostats, thermostat probes, small coin type batteries, barometers, and dental amalgams.
Hardware means any article, container, piece of material, individual part, subassembly, assembly, component, or system to which mercury control requirements apply.
Mercury-free means hardware that does not contain functional mercury and is not contaminated by mercury or mercury compounds.
Portable means items that are frequently transported during normal operation. Desk lamps, shop lights, and hand-held instruments are considered portable, while bulbs in stationary light fixtures are not. In general, items that require transport only during maintenance, installation, and removal of the items are not considered portable.
(b) The Contractor, and all subcontractors and vendors, shall ensure that mercury or mercury containing compounds are not intentionally added to, or come in direct contact with, hardware or supplies furnished under this contract.
(1) The Contractor shall ensure that mercury and mercury compounds are not taken onboard naval vessels by Contractor, subcontractor, or vendor personnel except for functional mercury used in batteries, dental amalgams, fluorescent lamps, flat-panel monitors, required instruments, sensors or controls, weapon systems, and chemical analysis reagents specified by the Naval Sea Systems Command (NAVSEA).
(2) Portable fluorescent lamps and portable instruments containing elemental mercury must be shock-proof in accordance with MIL-DTL-901E entitled Requirements for Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and Systems and have mercury enclosed by a double boundary of containment. Some devices with liquid crystal display (LCD) screens utilize a fluorescent bulb backlight to illuminate the LCD screen.
No additional restrictions or controls apply to devices with LCD screens; however, the Contractor shall remove the LCD screen and seal it in plastic following any evidence that the backlight failed.
(3) For Submarines, any use of mercury containing items must be approved as required by the Nuclear Powered Submarine Atmosphere Control Manual (S9510-AB-ATM-010/U) Volume 1.
(4) The Contractor shall ensure that mercury and mercury compounds do not contact hardware surfaces in systems covered by NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear
Propulsion Plant Maintenance and Construction, submarine air systems, level I systems per NAVSEA Publication 0948-LP-045-7010, NAVSEA Material Control Standard, or the submarine safety program (SUBSAFE) surfaces during maintenance or repair. Such hardware is designated as mercury-free. The Contractor shall ensure that all other hardware that could be structurally degraded by contamination with elemental mercury or reactive mercury compounds is separated from it by sufficient distance, or boundaries of containment that effectively prevents contact in all but the most extreme circumstances.
(5) The Contractor shall check any hardware surfaces in the above systems which are known or suspected to have come in contact with mercury or mercury compounds for evidence of structural degradation and external mercury contamination. The existence of external mercury contamination can be determined following MIL-STD- 2041D entitled Control of Detrimental Materials.
(6) The presence of mercury in a product may be determined by checking product labeling on material safety data sheets or safety data sheets. Chemical analysis is not required.
(7) The Contractor shall dispose of any mercury and mercury compounds in accordance with OPNAV Manual (OPNAV M-5090.1) entitled Environmental Readiness Program Manual of 10 January 2014.
(8) If the use of mercury or mercury compounds cannot be avoided, a risk assessment and waiver request, if required, must be performed and submitted per the NAVSEA Hazardous Material Avoidance Process (T9070-AL- DPC-020/077-2).
This is the start of the file's text. The full file is on GovTribe.