E QA_plan.pdf

PDF 133 KB Posted

Attached to
Lolo, Bitterroot and Flathead National Forest Roadside Brushing Federal contract opportunity
Solicitation number
1284LM22R0001
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Lolo, Bitterroot and Flathead National Forest Roadside Brushing, newest first.
File Type Posted
Amendment 1.pdf PDF
C Bitterroot Map.pdf PDF
A Experience Qustioniarre.pdf PDF
D Flathead Map.pdf PDF
G WD Flathead 15-5401.pdf PDF
H WD Missoula 15-5393.pdf PDF
1284LM22R0001.pdf PDF
B Lolo Map.pdf PDF
F Typical Brushing Details.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Road Maintenance

ROADSIDE BRUSHING

QUALITY ASSURANCE PLAN

Contractor Performance Checklist

Tasks and Critical

Subtasks Quality Standards Acceptable Quality Level Method of Inspection Penalties Incentives

Clearing and Brushing

• Brush road using the Horizontal and vertical dimension shown on the Typical Drawing in the exhibits.

• This includes all turnouts and additional lane width

• All trees and brush 6 in. or less shall be cut and completely severed with no stumps higher than 6 in.

above the ground or any obstruction such rocks

• Tree diameter shall be measured 12 in.

above the Ground

• Trees and brush protruding into the Clear Limits shall be trimmed as near to flush as practicable

• Windfalls shall be cut where they enter the Clearing Limit

• Accepted industry quality workmanship.

• The quality standards shall be met consistently

• Visual verification

• Random samples

• Contractor may be required to re-work, at their expense, the unacceptable section

• Government may withhold compensation for that section

• Contractor may receive poor performance rating

• Contractor would receive a superior

Level Method of Inspection Penalties Incentives

Slash disposal

• Slash shall be scattered outside the Clearing Limit without damaging trees

• Slash shall be defined as any cut material, except for windfalls

• Trees 2 inches and larger in dia. shall be lopped and scattered

• A length great than 36 inches with a dia. less than 2 inches

• A length great than 24 inches with a dia. greater than 2 inches.

• No material shall be deposited in stream, drainage ways, and pipe inlets.

• The depth shall not be great than 18 inches above the ground

• All cut material shall be disposed of outside the Clearing Limits

• Accepted industry quality workmanship

• The quality standards shall be met consistently

• Visual verification.

• Random samples

• Will inspect completed sections of road within two working days following contractor’s notification of completed work

• Contractor may be required to re-work, at their expense, the unacceptable portions of work

• Contractor may receive poor performance rating

• Contract may be terminated with repeated deficiencies.

Level Method of Inspection Penalties Incentives

Traffic Control

• The contractor shall exercise caution when operating, to prevent undue conflicts with public user of the roads.

• A “slow moving” emblem shall be attached to brush equipment

• Work site shall be posted with warning signs

• Shall meet the requirements of 2001 Manual of Uniform Traffic Control Devices

• Each sign shall have 2- 12”x12” flags on both ends of section being worked

• Signs shall be moved as needed and shall not precede the machinery by more than 1 mile

• Accepted industry quality workmanship.

• Insuring for public safety

• Visual verification if signs are in place and moved with the equipment

• Random sample

• Stop Work Order may be issued until signing is correct for operation

• Contractor may receive poor performance rating

• Contract may be terminated with repeated deficiencies.

• Contractor would

Level Method of Inspection Penalties Incentives

Existing Facilities

• Existing Facilities such as signs, cattleguards, culverts, riprap protecting culverts, etc.

No Damage No Damage • Visual verification

• Random samples

• Contractor may receive poor performance rating

• Contract may be terminated with repeated deficiencies

• Repair damage at contractors’ expense

ROADSIDE BRUSHING
QUALITY ASSURANCE PLAN
Traffic Control

File details come from the government source that posted it. Updated .