E - 106800AS - 12529763.doc
DOC document 38 KB Posted
- Attached to
- SET SCREW PER DRAWING Federal contract opportunity
- Solicitation number
- W911PT21Q0095
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A -106800AS - 12529763.doc | DOC document | |
| W911PT21Q0095.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOC #
| 106800AS |
| WBS Element # |
| EH20UFM410EHM7 |
| DWG # |
| 12529763 |
INSPECTION AND ACCEPTANCE/FIRST ARTICLE CLAUSE REQUIREMENTS
PLACE OF INSPECTION AND ACCEPTANCE
Government inspection/acceptance will be made by the authorized Government Representative located at:
Inspection
Acceptance
[X] Watervliet Arsenal
[X] Watervliet Arsenal
[ ] Contractor’s Plant
[ ] Contractor’s Plant
GENERAL QUALITY ASSURANCE PROVISIONS (Jun 1996) (ACC-WRN(WVA))
Contractor requirements and inspection provisions are required in accordance with QAP-APPENDIX-WVA and the item QAP(s) (if applicable).
(END OF CLAUSE)
52.0246-0015 CERTIFICATE OF CONFORMANCE (Apr 1984) (REF)
52.209-4 Alt I FIRST ARTICLE APPROVAL – GOVERNMENT TESTING (Sep 1989) – ALTERNATE I (Jan 1997)
(a) The contractor shall deliver One SCREW, 7239763, shall be furnished, without protective finish and one One SCREW, 7239763, shall be provided with protective finish for 100% inspection of all applicable requirements, to assure compliance with QAP(s), specification(s) and drawing(s) unit(s) of Lot/Item _____________ within _____ calendar days from the date of this contract to the Government at:
WATERVLIET ARSENAL
VENDOR QUALITY & GAGE CALIBRATION WORK GROUP
BLDG #35-E, ATTN: TAWV-ODQ-M
WATERVLIET, NY 12189-4050
for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
(b) Within 30 calendar days after the government receives the first article, the contracting officer shall notify the contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, the Contractor—
(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and
(2) Shall remove and dispose of any first article from the Government test facility at the Contractor’s expense.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
(j) The Contractor shall produce both the first article and the production quantity at the same facility.
(End of clause)
EVALUATION OF NECESSITY FOR FIRST ARTICLE AND COST RELATED THERETO (Feb 1992) (ACC-WRN(WVA))
a. The requirement entitled First Article Inspection as provided in Section E of this solicitation may be waived by the government under the following conditions, all inclusive:
(1) The offeror has had a First Article approved by the government and/or has produced the same or similar item within the past 12 months from the date set for submission of offers. (In case of forging performs, tube forgings and breech ring forgings, the 12 month figure is changed to 36 months), and
(2) There have been no significant changes in processes or applicable specifications and/or drawings, concerning the item being solicited, and
(3) Production deliveries on the offeror’s most recent contract for the same or a similar item did not include non-conforming material delivered to Watervliet Arsenal, or destination. (If the non-reported discrepant condition(s) are considered minor by Watervliet Arsenal, this condition may be waived.)
NOTE: The determination as to significant changes, similar items, and minor condition(s) will be at the sole election of the Watervliet Arsenal.
If the offeror wants to be considered for waiver, the offeror shall furnish in the space provided below information relative to the prior approval:
CONTRACT NUMBER: _________________
DATE OF APPROVAL: __________________
b. In evaluating offers herein, the sum of $ 1,200.00, which represents the cost to the government for performing First Article testing, will be added to the total price of those offers for which such testing cannot be waived in accordance with the criteria set forth above.
c. Where alternate offers are permitted in Section B, for First Article required and First Article waived, award may be made, in the government’s best interest, for EITHER item after application of the evaluation factors set forth herein. Offeror’s are cautioned that failure to provide a price for the line item which includes the First Article Test may result in the loss of an award if the government is unable to waive the First Article Requirement. (END OF PROVISION).
File details come from the government source that posted it. Updated .