This document is a Limited Sources Justification and Approval for a single source award to DynaTouch Corporation. The 49th Contracting Squadron will acquire kiosk licensing, software as a service, and maintenance support from DynaTouch for $5,532. This will renew existing infrastructure and mitigate manpower limitations, as replacement would incur greater costs. Only DynaTouch's solution meets requirements like FedRAMP approval for storing DoD information. Market research found no other compliant alternatives. The award represents best value as changing vendors would require additional training and hardware installation. Future awards will consider any FedRAMP-approved solutions.
The related opportunity is a special notice of intent to make a single source award to DynaTouch Corporation under solicitation number FA480123Q0498. The award is by the Department of the Air Force Air Combat Command to renew existing kiosk capabilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combo.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Limited Sources Justification and Approval (J&A)
April 2021 Page 1 of 3April 2021 Page 1 of 3
Contracting Activity: 49 CONS / PKA
Purchase Request / Local ID Number: F2E0FM3229AW01
Program / Project (and PE, if applicable): CPTS Kiosk Renewal
Program Type (PEO or Other Contracting): Other Contracting
Authority: Multiple Award Schedule Program (FAR 8.405-6)
Estimated Contract Cost (including options): $5,532.00
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No
Description of Limitation:
Kiosk solutions require FedRAMP approval (see Presidential OMB Policy Memo dated 8 Dec 2011) for storage of DOD controlled information. Additionally, this acquisition of licensing and service renewal supports existing infrastructure, and replacement by an alternate company would incur substantially greater costs.
COORDINATION (AFFARS 5306.304(a)) ** To remove a row, click the "X" next to the signature block.
** To restore the row, click the appropriate link to the right: CSO Legal COCO CA SCO PEO AQC AQ Blank-1 Blank-2PM CO
Date
11 Sep 2023
Contracting Officer Mitchell R. Dawson, TSgt, USAF
49 CONS/PKA, 575-572-4867
Signature X
APPROVAL (AFFARS 5306.304(a)) ** To remove a row, click the "X" next to the signature block.
** To restore the row, click the appropriate link to the right: COCO CO CA SPEPEO Blank
April 2021 Page 2 of 3April 2021 Page 2 of 3
Remove guidance pages.
I. Contracting Activity.
49 CONS / PKA
II. Nature and/or description of the action being processed.
Acquisition from single supplier of licensing for existing IT infrastrucure to support recent manpower limitations and shortages.
III. Description of supplies/services required to meet agency needs.
Lease / Software as a Service (SaaS) and software maintenance support for 1 year of kiosk capabilities for Comptroller and Finance customer service support for existing systems and software. Planned to acquire via suppliers' existing GSA Schedule.
IV. Identification of the justification/rationale for limiting sources and demonstration of the contractor's unique qualifications to provide the required supply/service.
Kiosk solutions require FedRAMP approval (see Presidential OMB Policy Memo dated 8 Dec 2011) for storage of DOD controlled information, which DynaTouch has already received approval. Additionally, this license and service renewal supports existing infrastructure, and replacement by an alternate company would incur substantially greater costs.
V. Determination by the ordering activity Contracting Officer that the order represents the best value consistent with FAR 8.404(d).
This order will mitigate the manpower limitations from recent personnel movements, and is substantially less expensive than a manned solution.
VI. Description of the market research conducted and the results, or explain why market research was not conducted.
Efforts to locate another FedRAMP approved kiosk solution have been unsuccessful.
VII. Other facts supporting the justification.
Implementation of another solucion would require further training and familiarization incurring personnel costs. Further, other IT solutions also need 49 CS and/or AETC/A6 approval, and possible installation of additional hardware.
VIII. Actions the agency may take to remove or overcome any barriers that led to the restricted consideration before any subsequent acquisition for the supplies or services.
Any FedRAMP approved kiosk solution will be considered. This is the only solution known to 49 CONS and 49 CPTS at this time.
IX. Certification by the Contracting Officer.
As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.
April 2021 Page 3 of 3April 2021 Page 3 of 3
X. Certification by the technical/requirements personnel.
As evidenced by my signature above, I certify that any supporting data contained herein, which is my responsibility, is both accurate and complete.
April 2021 Page of Authority: Multiple Award Schedule Program (FAR 8.405-6) Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?
COORDINATION (AFFARS 5306.304(a)) ** To remove a row, click the "X" next to the signature block.
** To restore the row, click the appropriate link to the right:
APPROVAL (AFFARS 5306.304(a)) ** To remove a row, click the "X" next to the signature block.
** To restore the row, click the appropriate link to the right:
( See guidance at the end of this document for completing the following sections. ) I. Contracting Activity.
II. Nature and/or description of the action being processed.
III. Description of supplies/services required to meet agency needs.
IV. Identification of the justification/rationale for limiting sources and demonstration of the contractor's unique qualifications to provide the required supply/service.
V. Determination by the ordering activity Contracting Officer that the order represents the best value consistent with FAR 8.404(d).
VI. Description of the market research conducted and the results, or explain why market research was not conducted.
VII. Other facts supporting the justification.
VIII. Actions the agency may take to remove or overcome any barriers that led to the restricted consideration before any subsequent acquisition for the supplies or services.
IX. Certification by the Contracting Officer.
X. Certification by the technical/requirements personnel.
GUIDANCE
I. Contracting Activity.
Fully identify the contracting activity responsible for the proposed contracting action. Include the name/phone number of the Contracting Officer. Specifically identify as a “Limited Sources” Justification. Identify purchase request number, if applicable.
II. Nature and/or description of the action being processed.
State whether the action is a new order or by modification to an existing order. Identify the GSA schedule number, the Blanket Purchase Agreement (BPA) number, the order number for the current action, and the Contactor(s). Indicate the Period of Performance (PoP). Also identify the type of the order/line items on the order (e.g. Firm Fixed Price, Labor Hour, etc).
III. Description of the supplies/services required to meet agency needs.
Specifically describe the supplies and/or services to be acquired including the price and quantity of each item in the order and state the total estimated value of the order. For services, state whether the services are performance-based and, if not, provide rationale for not being performance based. Also state the delivery/performance schedule/period for the items under the order.
IV. Identification of the justification/rationale for limiting sources and demonstration of the contractor's unique qualifications to provide the required supply/service.
This section is normally the most detailed part of the justification. To assist you in preparing this justification, an introductory sentence and the four circumstances of FAR 8.405-6 that justify restricting the number of schedule holders are provided below. Select the appropriate cite, then provide, in narrative form, a detailed explanation supporting the specific circumstance cited for limiting the number of schedule holders.
(Introductory sentence) FAR 8.405-6 requires an ordering activity to justify its actions when restricting consideration of schedule contractors to fewer than required in FAR 8.405-1 or 8.405-2.
After selecting the appropriate cite, next select one of the four sentences below and provide a detailed explanation supporting the specific circumstance cited.
FAR 8.405-6(a)(1)(i)(B), “Only one source is capable of responding due to the unique or specialized nature of the work”. (Provide a detailed justification with supporting documentation, as evidence of the “unique or highly specialized” nature of the procurement. The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements are not acceptable.)
FAR 8.405-6(a)(1)(i)(C), “The new work is a logical follow-on to an original Federal Supply Schedule order provided that the original order was placed in accordance with the applicable Federal Supply Schedule ordering procedures.” The original order was not issued under sole source or limited source procedures. (Provide details on the previously competed order and explain how this order is a logical follow-on to that order. Explain fully the connection between the previous work/order and the current one. The user/customer typically provides this supporting information. General statements are not acceptable.)
FAR 8.405-6(a)(1)(i)(A), “An urgent and compelling need exists, and following the ordering procedures would result in unacceptable delays.” (Provide a detailed justification with supporting documentation that explains the exact urgency of the requirement and the schedule impact if time were to be taken to follow FSS ordering procedures. The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements of urgency are not acceptable.)
FAR 8.405-6(b)(1), “The item is peculiar to one manufacturer. A brand name item, whether available on one or more schedule contracts, is an item peculiar to one manufacturer.” (Brand name specifications should not be used unless the particular brand name, product or feature is essential to the Government's requirements. Therefore, explain why the particular brand item is essential to the Government's requirements, and why other companies' similar items, or products lacking the particular feature, do not meet, or cannot meet, or cannot be modified to meet, the agency's need. The user/customer typically provides this supporting information. General statements are not acceptable.)
V. Determination by the ordering activity Contracting Officer that the order represents the best value consistent with FAR 8.404(d).
This section needs to be tailored based upon whether the order is for supplies/services not requiring a statement of work (FAR 8.405-1) or if the order is for services requiring a statement of work (FAR 8.405-2).
For FAR 8.405-1 orders the best value determination needs to be based upon the supply or service offered under MAS contracts by surveying at least three schedule contractors through the GSA Advantage! on-line shopping service, or by reviewing the catalogs or price lists of at least three schedule contractors. The ordering Contracting Officer's review of the Contractor's price list(s) and any price reductions sought is also required. (Contracting Officer should seek additional price discounts/concessions based on the specific order requirements on all orders over the micro-purchase threshold.) In addition to price, when determining best value, the ordering activity may consider, among other factors, past performance, special features of the supply or service required for effective program performance, trade-in considerations, probable life of the item selected as compared with that of a comparable item, warranty considerations, maintenance availability, environmental and energy efficiency considerations, and delivery terms.
When an order contains brand name specifications, the Contracting Officer shall post the Request for Quote (RFQ) along with the basis of the justification as required by FAR 8.405-6(b)(3).
For FAR 8.405-2 orders for services requiring a statement of work, FAR 8.405-2(d) requires that an evaluation be performed based on the criteria provided to the schedule contractors. Therefore, the justification must address how the FAR 8.404(d) requirement for an evaluation of the proposed level of effort and mix of labor will be conducted and include a statement that the Contracting Officer will perform a price reasonableness determination as part of the best value determination.
VI. Description of the market research conducted and the results, or explain why market research was not conducted.
Discuss market research that was conducted among schedule holders and the market research results that led to the conclusion to go sole source or to limit the number of schedule holders to be solicited. The narrative in this section should provide a high level of confidence that the requirements of 8.405-1 and 8.405-2 could not be met. If no market research was conducted, state so and provide the rationale.
VII. Other facts supporting the justification.
When FAR 8.405-6(a)(1)(i)(C) is cited for an follow-on acquisition as the basis for the justification, include an estimate of the cost that would be duplicated and the basis and derivation of the estimate, or provide details on why a delay to solicit additional schedule holders would be unacceptable.
Provide any other facts supporting the Limited Sources Justification.
VIII. Actions the agency may take to remove or overcome any barriers that led to the restricted consideration before any subsequent acquisition for the supplies or services.
Describe all efforts to be taken to remove or overcome any barriers that preclude the agency from meeting the requirements of FAR 8.405-1and FAR 8.405-2 before any subsequent acquisition for the supplies or services is made. If no actions are planned, so state and provide reasons.
IX. Certification by the Contracting Officer.
The contracting officer's signature on the signature page evidences that he/she has determined this document to be both accurate and complete to the best of his/her knowledge and belief.
X. Certification by the technical/requirements personnel
As evidenced by their signatures on the signature page, the technical/requirements personnel have certified that any supporting data contained herein which is their responsibility is both accurate and complete.
9.0.0.2.20120627.2.874785
| Security_Markings: |
| CurrentPage: |
| PageCount: |
| Contracting-Activity: 49 CONS / PKA |
| PR-ID-Number: F2E0FM3229AW01 |
| Program-Project: CPTS Kiosk Renewal |
| Program-Type: Other Contracting |
| Estimated-Contract-Cost: $5,532.00 |
| Yes: |
| No: |
| Description-of-Limitation: |
| Restore-CSO-Coord: |
| Restore-Legal-Coord: |
| Restore-COCO-Coord: |
| Restore-CA-Coord: |
| Restore-SCO-Coord: |
| Restore-PEO-Coord: |
| Restore-AQC-Coord: |
| Restore-AQ-Coord: |
| Restore-Blank-1-Coord: |
| Restore-Blank-2-Coord: |
| Restore-PM-Coord: |
| Restore-CO-Coord: |
| Date: 11 Sep 2023 |
| Name: [ Name ] |
[ Office Symbol / Phone Number ] Name: Mitchell R. Dawson, TSgt, USAF
49 CONS/PKA, 575-572-4867
Name: [ Name ] [ Office Symbol / Phone Number ] Name: [ Name ] [ Office Symbol / Phone Number ] Name: [ Name ] [ Office Symbol / Phone Number ] Name: [ Name ] [ Office Symbol / Phone Number ] Name: [ Name ] [ Office Symbol / Phone Number ] Name: [ Name ] [ Office Symbol / Phone Number ] Name: [ Name ] [ Office Symbol / Phone Number ] Name: [ Name ] [ Office Symbol / Phone Number ] Name: [ Name ] [ Office Symbol / Phone Number ] Name: [ Name ] [ Office Symbol / Phone Number ] Name: [ Name ] [ Office Symbol / Phone Number ] Name: [ Name ] [ Office Symbol / Phone Number ] Name: [ Name ] [ Office Symbol / Phone Number ]
| Signature: |
| Hide-PM-Coord: |
| Hide-CO-Coord: |
| Hide-CSO-Coord: |
| Hide-Legal-Coord: |
| Hide-COCO-Coord: |
| Hide-CA-Coord: |
| Hide-SCO-Coord: |
| Hide-PEO-Coord: |
| Hide-AQC-Coord: |
| Hide-AQ-Coord: |
| Hide-Blank-1-Coord: |
| Hide-Blank-2-Coord: |
| Restore-COCO-Approval: |
| Restore-CO-Approval: |
| Restore-CA-Approval: |
| Restore-SPE-Approval: |
| Restore-PEO-Approval: |
| Restore-Blank-Approval: |
| Hide-COCO-Approval: |
| Hide-CO-Approval: |
| Hide-CA-Approval: |
| Hide-PEO-Approval: |
| Hide-SPE-Approval: |
| Hide-Blank-Approval: |
| RemoveGuidance: 1 |
| Section-I-Text: |
| Section-II-Text: |
| Section-III-Text: |
| Section-IV-Text: |
| Section-V-Text: |
| Section-VI-Text: |
| Section-VII-Text: |
| Section-VIII-Text: |
| Section-IX-Text: |
| Section-X-Text: |
File details come from the government source that posted it. Updated .