DWSD Addendum No. 1.pdf

PDF 9 KB Posted

Attached to
2018 Water Meter Replacement
Solicitation number
BD-18-1983-DWSD1-DWSD1-23184
Issued by
Middlesex County, Massachusetts

About this file

This document is an Addendum No. 1 issued by the Dracut Water Supply District (DWSD) for their 2018 Water Meter Replacement Project. The addendum provides revisions to the Advertisement for Bids and the Instructions to Bidders sections, including changing the bid submission deadline to 11:00 AM on February 15, 2018. The addendum also addresses questions received, indicating that "or equal" status of specific equipment would be evaluated during the shop drawing submittal phase, and that plumbers licensed in Massachusetts may be required for certain non-standard installations.

The 2018 Water Meter Replacement Project is a state and local contract opportunity located in Middlesex County, Massachusetts. Sealed bids for the project are due by 11:00 AM on February 15, 2018, at which time they will be publicly opened and read aloud. The contract scope involves the replacement of water meters for the DWSD.

View the file

Other files

File Type Posted
00100 - Ad for Bid UPDATED.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 1 February 5, 2018

DRACUT WATER SUPPLY DISTRICT

2018 WATER METER REPLACEMENT PROJECT

ADDENDUM NO. 1

To be considered as part of the contract drawings and specifications for the Dracut Water Supply District 2018 Water Meter Replacement Project:

SPECIFICATIONS EDITS

SECTION 00100 – ADVERTISEMENT FOR BIDS

1. Page 00100-1, DELETE the first paragraph and replace with the following paragraph:

“Sealed bids for the 2018 Water Meter Replacement Project for the Dracut Water Supply District (DWSD), will be received at the Superintendent’s Office, 59 Hopkins Street, Dracut, MA 01826 until 11:00 a.m. prevailing time, on February 15, 2018 at which time and place said bids will be publicly opened and read aloud.”

SECTION 00200 – INSTRUCTIONS TO BIDDERS

1. Page 00200-1, 1. Receipt and Opening of Bids, DELETE the second paragraph and replace with the following paragraph:

“Such bids addressed to the Dracut Water Supply District and endorsed “2018 Water Meter Replacement Project”, will be received at the Superintendent’s Office at 59 Hopkins Street, Dracut, MA 01826 until 11:00 a.m., February 15, 2018 at which time and place said bids will be publicly opened and read aloud.”

QUESTIONS AND ANSWERS

1. QUESTION: Will you be willing to accept Kamstrup as an alternate meter selection?

ANSWER: Or equal status of specific equipment would be evaluated during the shop drawing submittal phase of the construction project.

2. QUESTION: I do not see anywhere in the RFP where a license in Massachusetts is required to perform the work. Can that be?

ANSWER: Plumbers licensed in Massachusetts may be required for Non-Standard installations requiring modifications to existing plumbing and/or installing valves and installing meters that are cut in with meter setting equipment. Reference Section 15120, paragraph 3.02.A.12.

END OF ADDENDUM