QUALITY ASSURANCE FOR THE CONSTRUCTION OF THE TWIN CHIMNEYS LANDFILL UNIT 4 CELL 4
Solicitation number
RFP #24127
Issued by
Greenville County, South Carolina

About this file

The provided file is a set of contract drawings for the Twin Chimneys Landfill Unit 4 Cell 4 Liner project in Greenville County, South Carolina, prepared by HDR Engineering, Inc. of the Carolinas and dated April 2024. The drawings, labeled as Issued for Proposals, consist of nine sheets covering general site information, existing conditions, subgrade details, top of liner specifications, operational cover, and liner and stormwater details for a 10.3-acre landfill cell. The documents outline the civil engineering plans for constructing a new municipal solid waste (MSW) landfill cell, including detailed specifications for liner systems, leachate collection, and stormwater management.

The project involves precise engineering specifications for the landfill cell, including a complex liner system composed of a 24-inch initial soil barrier, geosynthetic clay liner, HDPE geomembrane, and geocomposite drainage media. The drawings provide extensive technical details on subgrade preparation, slope configurations, leachate pipe installations, and operational cover placement. Key technical elements include specific slope gradients (ranging from 1.4% to 10%), anchor trench designs, and detailed pipe perforation patterns. The project appears to be part of a broader landfill expansion or cell replacement strategy for Greenville County, with careful attention to environmental compliance and engineering precision.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Twin Chimneys Landfill

Cell 4 Liner Civil

Project No.

11075 Augusta Road

C o n t r a c t D r a w i n g s F o r

10174879

April 2024

I N D E X O F D R A W I N G S

GENERAL

13G-00 COVER SHEET

13G-01 OVERALL SITE PLAN

CIVIL

13C-01 EXISTING CONDITIONS

13C-02 UNIT 4 CELL 4 SUBGRADE

13C-03 UNIT 4 CELL 4 SUBGRADE CONTROL

13C-04 UNIT 4 CELL 4 TOP OF LINER

13C-05 UNIT 4 CELL 4 TOP OF LINER CONTROL

13C-06 UNIT 4 CELL 4 OPERATIONAL COVER

13C-07 UNIT 4 CELL 4 OPERATIONAL COVER CONTROL

13C-08 LINER DETAILS

13C-09 STORMWATER DETAILS

Issued for Proposals

MSW Unit 4

Greenville County, South Carolina

HDR Engineering, Inc.

of the Carolinas 440 S. Church St., Suite 1200 Charlotte, NC 28202-2075 704.338.6700

4/30/24

581080

072572

790785

745740735

730725

805800

795 79

835 825

860855850 845840

815810

780775770765760755

755750

74073

571070570069569

70571

0725730735740

770 77

0 78

5 79 0 79

805 81 0 81

5 82 0 82

5 83

5 78

0 74

5 70

5 68

755750745

68568

690695700705

730735 740745750755

765770775780785

790795800805810815 820825

725720715710

0 68

0 70

815810805800795790785

770765

5 78

0 77 5 77

755 750

715710

0 78

715 710 71 0 71

715 710 705 700 695 690 68

0 68

5 69 0 69

0 71

770765760755750

68068

750755

735730

690685

0675680685

685690

X

X

X

AUGUSTA ROAD - HWY 2

T R A Y N H A M

R O A D

S C

TR

AY

NH

AM

R

OA

D

SC

TR

AY

NH

AM

R

OA

D

SC

TR

AY

NH

AM

R

OA

D

SC

TR

AY

NH

AM

R

OA

D

SC

TR

AY

NH

AM

R

OA

D

SC

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

BU

IL

DI

NG

BU

IL

DI

NG

SC

AL

E

SC

AL

E

SC

AL

E

C O N C R E T E

P A D

C O N C R E T E

P A D

B U I L D I N G

T A N K

T A N K

B U I L D I N G

C O N C R E T E

P A D

B U I L D I N G

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

DE

NS

E

BR

US

H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

A S P H A L T

D R I V E

A S P H A L T

D R I V E

A S P H A L T

D R I V E

AS

PH

AL

T

DR

IV

E

A S P H A L T

D R I V E

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

D I R T

D R I V E

DI

RT

D

RI

VE

D I R T

D R I V E

DI

RT

D

RI

VE

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

C O N C R E T E

P A D

D I R T

D R I V E

D I R T

D R I V E

DIRT

DRI

VE

DI

RT

D

RI

VE

DIRT

DRI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

D I R T

D R I V E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DIRT DRI

VE

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

DIRT DRIV

E

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

DIR

T D

RIV

E

DI

RT

D

RI

VE

DIR

T D

RIV

E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

D I R T

D R I V E

DIRT DRIV

E

DIRT DRIVE

DIR

T D

RIV

E

DIRT

DRIVE

DIRT DRIVE

DIR

T D

RIV

E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DIRT DRIV

E

DIRT

DRIVE

DIRT

DRI

VE

DIRT DRIVE

DIR

T D

RIV

E

DIR

T D

RIV

E

D I R T

D R I V E

DI

RT

D

RI

VE

DIRT D

RIVE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DI

RT

D

RI

VE

D I R T

D R I V E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DIR

T D

RIV

E

DI

RT

D

RI

VE

D I R T

D R I V E

DIR

T D

RIV

E

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

BRIDGE

C E L L

P H O N E

T O W E R

DI

RT

D

RI

VE

DI

RT

D

RI

VE

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

DE

NS

E

TR

EE

S

DE

NS

E

TR

EE

S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

DE

NS

E

TR

EE

S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G B U I L D I N G

B U I L D I N G

B U R N

S T A T I O N

B U R N

S T A T I O N

P O N D

P O N D

DI

RT

D

RI

VE

DIR

T D

RIV

E

DIRT DR

IVE

D I R T

D R I V E

DIRT DR

IVE

D I R T

D R I V E

DIRT DR

IVE

DIRT

DRIVE

DI

RT

D

RI

VE

D E N S E

T R E E S

R I P

R A P

DIRT

DRIVE

08308

80080 0 77

800 80

81081

78078

770770

780780

79079

700700700 70

700 70

75075

75075

770 770

07007

071071

740750

720730

78078 0780780

770770770770

770770770

770770

9079079

0800 80

780780 780780

780 78

78078

078078

78078

790800

080080 0 76076

76076076

80080

08008

0750 75

760770

800 770

0 75

0 72

0790790

820820

77078

780780

68069

710 7

0 780

71071

740750

770770 77

072072

770 770

770 77

84084

074075

790790

750750750

0830830

680680

82082

720720

670670

700710

680690700710720

680690

71071

710720

700710720

67067

720720720

66066

700 700

700700710720

700700

700700

690700

0 71

700710

730730

740 670680

700710

700710720

720730

740740

C S -1

C S -2

OUTPARCEL

OUTPARCEL

OUTPARCEL

UNIT 2

C&D

CELL 1

CELL 2

FUTURE

UNIT 7

FUTURE

UNIT 5

ACTIVE

UNIT 4 MSW

CELL 3

PROPOSED

CELL 4

CLAY

STOCKPILE

UNIT 1 MSW

SEDIMENT

BASIN B

SEDIMENT

BASIN C

E-WASTE

METALS

PAD

YARD

WASTE

PAD

SEDIMENT

BASIN A

ROCK

STOCKPILE

COMPOST AREA

C&D A

CCES

S

ROAD

AC

CE

SS

R

OA

D

OVERALL SITE PLAN

13G-01.dwg

1"=300' 13G-01

J.GAUL

A 04/2024 ISSUED FOR PROPOSALS

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS,

FREELAND & ASSOCIATES AERIAL SURVEYDATED JULY 15, 2021 AND

DRONE SURVEY IN UNIT 1, 2, & 4 AREA BY RP & ASSOCIATES DATED

JULY 06, 2023.

2. CONTRACTOR'S PRIMARY ACCESS TO THE SITE SHALL BE VIA THE

EXISTING AUGUSTA ROAD (HIGHWAY 25) CONSTRUCTION ENTRANCE

THAT LEADS DIRECTLY INTO UNIT 4. MAINTAIN BOTH IN GOOD

CONDITION AT ALL TIMES AND IMPROVE AS NECESSARY TO

COMPLETE THE WORK.

4. ACCESS TO THE BRIDGE ROAD IS RESTRICTED DUE TO LANDFILL

OPERATIONS. COORDINATE WITH OWNER A SCHEDULE FOR

TRAVERSING THE BRIDGE. SUPPLY FLAGGERS DURING LANDFILL

OPERATING HOURS TO COORDINATE CONTRACTORS TRAFFIC AND

LANDFILL TRAFFIC ON BRIDGE ROAD. GARBAGE TRUCKS AND

OTHER COUNTY VEHICLES SHALL ALWAYS HAVE PRIORITY.

5. CONTRACTOR RESPONSIBLE FOR SECURITY OF ALL TOOLS,

MATERIALS AND EQUIPMENT LEFT ON SITE. CONTRACTOR TO

SECURE ACCESS POINTS TO THE WORK SITE AS NECESSARY.

6. THE CONTRACTOR SHALL PROTECT ALL EXISTING WELLS,

STRUCTURES AND UTILITIES. ANY WELLS, STRUCTURES OR

UTILITIES THAT ARE DAMAGED SHALL BE REPLACED OR REPAIRED

(AS DIRECTED BY OWNER).

7. EROSION AND STORMWATER CONTROL MEASURES ARE INSTALLED

AND OPERATIONAL FOR THE DESIGNATED WORK AREAS.

CONTRACTOR TO MAINTAIN AND PROTECT THE STRUCTURES FROM

DAMAGE.

8. CONTRACTOR TO ANTICIPATE CLEANING OUT SEDIMENT BASINS A,

10 & 11 AT LEAST TWICE DURING THE CONTRACT PERIOD (PRIOR TO

BEGINNING OF CONSTRUCTION AND AT THE END).

9. SITE BENCHMARK CONTROL IS LOCATED NEAR THE CELLULAR

TOWER.

SEDIMENT

BASIN #T2

SEDIMENT

BASIN #T5

SEDIMENT

BASIN #T3

SEDIMENT BASIN #9

WETLANDS

SEDIMENT BASIN #10

DI #9

LEACHATE

TANKS

SCALE

HOUSE

ADMINISTRATION

BUILDING

EDUCATION

BUILDING

CELLULAR

TOWER

SEDIMENT

TRAP A

SEDIMENT

BASIN #T4

EXISTING CONSTRUCTION ENTRANCE

AUGUSTA RD

AUGUSTA RD

BRIDGE ROAD

SEDIMENT BASIN #11

100 YEAR FLOODPLAIN

LEACHATE

EVAPORATOR

CONCRETE

MONUMENT

N 987685.471 E 1604817.497

EL. 809.25

CONSTRUCTION AREA

BORINGS (SB & B)

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PL

LEGEND

EXISTING 2021 & 2023 MAJOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

MW-A

MM-#

B-# B-#

PZ-#PZ-#

STOCKPILE ACCESS ROAD

TEMPORARY

SEDIMENT BASIN A

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 4 LANDFILL

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

DE

NS

E

BR

US

H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DIRT DRIV

E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

DIRT DRIV

E

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

DIR

T D

RIV

E

DI

RT

D

RI

VE

DIR

T D

RIV

E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

D I R T

D R I V E

DIRT DRIVE

DIRT DRIVE

DIR

T D

RIV

E

DIRT

DRIVE

DIRT DRIVE

DIR

T D

RIV

E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DIRT D

RIVE

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

BRIDGE

D E N S E

B R U S H

D E N S E

B R U S H

B U I L D I N G

B U R N

S T A T I O N

B U R N

S T A T I O N

DIR

T D

RIV

E

DIRT DR

IVE

D I R T

D R I V E

DIRT DRI

VE

D I R T

D R I V E

DIRT DR

IVE

DI

RT

D

RI

VE

700700700

700 70

0 79

770 770

79080

07007

071071

78078 0780780

770770770770

770770

07907

0800 80

780780 780780

780 78

78078

078078

78078

790800

080080 0 76076

76076076

80080

08008

0750 75

760770

0 780

71071

770770 77

072072

720720

670670

680690700

680690700710720

680690

67067

67066

66066

690700

790785

745740735

730725

5 70

5 68

0 68

0 70

815810805800795790785

770765

5 78

0 77 5 77

755750

715710 705700

0 78

715 710 71 0 71

715 710 705 700 695 690 68

0 68

5 69 0 69

0 71

770765760755750

680685

750755

735730

690685

685690

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

DE

NS

E

BR

US

H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

BRIDGE

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

B U I L D I N G

B U R N

S T A T I O N

B U R N

S T A T I O N

D E N S E

T R E E S

700700700

700 70

760760

0 79

770 770

79080

07007

071071

78078 0780780

770770

770770

07907

0 770780

780780 780780

780 78

78078

078078

78078

790800

080080 0 76076

76076076

780780

760770

71071

770770 77

072072

720720

670670

680690700

680690700710720

680690

67067

67066

66066

690700

740750

CELL 1

CELL 2

FUTURE

UNIT 7

ACTIVE

UNIT 4 MSW

CELL 3

PROPOSED

CELL 4

C S -1

C S -2

OUTPARCEL

OUTPARCEL

MINIMIZE TREE

DISTURBANCE IN THIS AREA

EXISTING CONDITIONS

13C-01.dwg

1"=200 13C-01

J.GAUL

A 04/2024 ISSUED FOR PROPOSALS

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS,

FREELAND & ASSOCIATES AERIAL SURVEY DATED JULY 15, 2021 AND

DRONE SURVEY IN UNIT 1, 2, & 4 AREA BY RP & ASSOCIATES DATED

JULY 06, 2023.

2. THE COUNTY IS CURRENTLY EXCAVATING CELL 4 THROUGH A

SEPARATE CONTRACT. THE GRADES WITHIN CELL 4, THE CLAY

STOCKPILE AND UNIT 7 REPRESENT ANTICIPATED CONDITIONS AT

THE BEGINNING OF THIS CONTRACT. THESE GRADES ARE 2-FEET

ABOVE THE PROPOSED SUBGRADE SHOWN ON SHEET 13C-02. AS AS

BUILT SURVEY AT THE CONCLUSION FROM THAT CONSTRUCTION

WILL BE USED AS THE BASIS FOR THIS CONTRACT.

3. STOCKPILE ALL EXCAVATED SOIL MATERIALS, NOT USED IN THE

WORK, IN THE DESIGNATED AREA INDICATED ON THE PLAN.

· SOILS WITH HYDRAULIC CONDUCTIVITY OF 1E-5CM/SEC

OR LESS (CLAYEY SOIL): SHALL BE PLACED IN THE CLAY

STOCKPILE WEST OF CELL 4.

· ROCK: PLACED IN CELL TOWER STOCKPILE.

· OTHER SOILS: UNIT 7 STOCKPILE.

SEDIMENT

BASIN #T5

SEDIMENT

BASIN #T3

SEDIMENT BASIN #9

WETLANDS

SEDIMENT BASIN #10

DI #9

SEDIMENT

BASIN #T4

EXISTING

CONSTRUCTION

ENTRANCE

AUGUSTA RD

BRIDGE ROAD

SEDIMENT BASIN #11

BORINGS (SB & B)

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PZ-# PZ-#

B-#B-#

MM-#

MW-A

PL

LEGEND

EXISTING 2021 & 2023 MAJOR CONTOURS

EXISTING 2021 & 2023 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

CURRENT MSW

PERMIT BOUNDARY

PROPOSED MSW

PERMIT BOUNDARY

CONSTRUCTION AREA

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 4 LANDFILL

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

SOIL STOCKPILE

CONSTRUCTION SEQUENCE:

1. ESTABLISH LIMITS OF CONSTRUCTION.

2. REVIEW FIELD CONDITIONS AND THE AS-BUILT SURVEY FROM THE

PREVIOUS CONSTRUCTION PROJECT WITH ENGINEER PRIOR TO

INITIATING CONSTRUCTION.

3. PERFORM EXCAVATION AND FINE GRADING TO ACHIEVE SUBGRADE.

4. BEGIN CLAY LINER INSTALLATION. PROVIDE TEST DATA AND

PERIODIC CLAY THICKNESS SURVEY TO ENGINEER FOR REVIEW.

5. UPON RECEIPT OF PASSING CLAY TEST RESULTS AND SURVEY

THICKNESS VERIFICATION, BEGIN GEOSYNTHETICS INSTALLATION.

6. UPON RECEIPT OF PASSING GEOSYNTHETICS TEST RESULTS, BEGIN

OPERATIONAL COVER AND LEACHATE PIPE INSTALLATION.

7. SUBMIT SURVEY OF OPERATIONAL COVER THICKNESS

VERIFICATION TO ENGINEER FOR REVIEW.

8. SEED DISTURBED AREAS AND STOCKPILES.

9. PERFORM LEACHATE PIPE VIDEO INSPECTION AND CLEANING.

10. SUBMIT OVERALL SURVEY OF DISTURBED AREAS.

OVERALL PROJECT SCOPE:

THE COUNTY IS CURRENTLY EXCAVATING THE CELL 4 AREA TO THE

SUBGRADE SHOWN ON SHEET 13C-02. THIS PROJECT MAY REQUIRE

ADDTIONAL EXCAVATION TO ACHIEVE THE SUBGRADE. FOLLOWING

SUBGRADE EXCAVATION, CONTRACTOR TO INSTALL THE LINER SECTION

SHOWN ON SHEET 13C-08 DETAIL 1.

CLAY STOCKPILE

UGE

GR

GR

x 7

.4 9 T

P

EB

8.5 ACRES

10.3 ACRES

2.0

MW-24

MW-13

MW-14

PZ-4

PZ-25

MM-9

MM-8

MM-15

MW-23

MW-22

2.0

5.0

5.0

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

0 720

730 74 0 75

07007

770770

0 76

0 770780

0 79

780780

78078

078078

78078

080080

76076076

780780

71071

770770 77

710 7

072072

10.0%

738742744746748752754756758762

ACTIVE

CELL 2

8.6 ACRES

ACTIVE

CELL 1

17.0 ACRES

UNIT 4 CELL 4 SUBGRADE

13C-02.dwg

1"=100' 13C-02

J.GAUL

A 04/2024 ISSUED FOR PROPOSALS

PL

LEGEND

EXISTING 2023 MAJOR CONTOURS

GENERAL NOTES:

1. CONTRACTOR SHALL PROVIDE AN AS-BUILT SURVEY OF THE SUBGRADE SIGNED

AND SEALED BY A LAND SURVEYOR, FOR ENGINEERS ACCEPTANCE PRIOR TO

INITIATING CLAY LINER INSTALLATION.

2. THE GRADES OF THE CLAY STOCKPILE REPRESENT ANTICIPATED CONDITIONS.

CONTRACTOR TO FIELD VERIFY PRIOR TO CONSTRUCTION.

3. EXISTING CONDITIONS WITHIN THE CELL 4 DO NOT REPRESENT THE JULY 6, 2023

SURVEY DUE TO CURRENT EXCAVATION. CONTRACTOR TO VERIFY CONDITIONS

PRIOR TO INITIATING CONSTRUCTION.

4. PROPOSED CONTOURS WITHIN CONSTRUCTION BASELINE REPRESENT

SUBGRADE OF CELL 4.

5. AN ACCEPTABLE PROOF ROLL (AS DEFINED BY THE CQA CONSULTANT) MUST BE

OBSERVED TO DEMONSTRATE A STABLE SUBGRADE PRIOR TO CONSTRUCTION

OF THE LINER SYSTEM. THE SUBGRADE MAY BE ACCEPTED IN STAGES TO

FACILITATE CONSTRUCTION. REFER TO TECHNICAL SPEC SECTION 31 38 10.

6. REFER TO SPECIFICATIONS AND CQA PLAN FOR SURVEYING REQUIREMENTS TO

PRODUCE AS-BUILT DRAWINGS AND TO PROVIDE BASIS FOR VERIFYING

EXCAVATION QUANTITIES.

7. REMOVE ALL WET AND SOFT SOILS PRIOR TO BEGINNING STRUCTURAL FILL

PLACEMENT. COMPACT PER SPECIFICATIONS. "BRIDGE LIFTS" REQUIRE

APPROVAL OF ENGINEER AND CQA CONSULTANT.

8. PROTECT EXISTING WELLS, DROP INLETS AND OTHER STRUCTURES DURING THE

WORK.

9. IF CONTRACTOR ENCOUNTERS GROUNDWATER DURING EXCAVATION,

IMMEDIATELY STOP WORKING IN THAT AREA AND NOTIFY ENGINEER. EXISTENCE

OF WATER MAY REQUIRE REVISION TO GRADING. THE CONTRACTOR SHALL

IMPLEMENT ALL CHANGES BASED ON EXISTENCE OF GROUNDWATER IN THE

EXCAVATION.

EXISTING 2023 MINOR CONTOURS

WETLANDS

BRIDGE ROAD

UNIT AND CELL BASELINES

PROPERTY LINE

GRADING LIMITS

ACTIVE CELL 3

SEDIMENT BASIN #9

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

SEDIMENT BASIN #12

EXISTING STORMWATER

PIPE TO REMAIN

EXISTING TREELINE

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

MW-A

MM-#

PZ-#PZ-#

PROPOSED CELL 4

CELL 4 ACCESS ROAD

PROPOSED

CONSTRUCTION

BASELINE

TEMPORARY

SEDIMENT BASIN A

A 13C

-09

B13C-09

C

C -0

SEDIMENT BASIN TB-B

SF

SILT FENCE

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 4 LANDFILL

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

CLAY STOCKPILE

GEOSYNTHETIC CLAY LINER

(WITHIN CBL)

LOCATION THIS SHEET

2' OPERATIONAL COVER

SUBGRADE

2' SOIL LINER

60 MIL HDPE GEOMEMBRANE

GEOCOMPOSITE DRAINAGE MEDIA

KEY MAP

RAINCOVER

NTS

D 13C-09

LIMITS OF

GRADING

POINT TABLE

POINT NO.

NORTHING

983468.88

983503.03

983657.57

983663.83

984478.07

984486.51

984329.47

984133.15

983705.44

983455.93

983491.11

983645.23

983647.00

983651.32

983652.09

984221.60

984227.46

984487.46

984495.83

984203.09

984117.66

EASTING

1605806.30

1605568.76

1605314.79

1605185.30

1605167.22

1605547.44

1605588.77

1605638.95

1605749.72

1605809.39

1605565.06

1605311.80

1605275.15

1605189.69

1605173.84

1605160.84

1605161.47

1605155.70

1605532.48

1605620.88

1605642.96

ELEVATION

701.59

712.00

726.76

730.23

761.12

748.00

732.06

728.36

711.10

701.07

711.78

726.50

728.00

730.00

730.37

737.48

738.00

762.41

749.41

730.00

728.00

DESCRIPTION

CBL

CBL

CBL

CBL

CBL

CBL

CBL

CBL

CBL

TOE

TOE

TOE

TOE

TOE

TOE

TOE

TOE

TOE

TOE

CELL 4-3

CELL 4-3

2.0

736738

742744746748

752754756758

104105

10.0%

3.0

5.0

5.0

UNIT 4 CELL 4 SUBGRADE CONTROL

13C-03.dwg

1"=60' 13C-03

J.GAUL

A 04/2024 ISSUED FOR PROPOSALS

LEGEND

CONTROL LINE

ACTIVE CELL 3

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 4 LANDFILL

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

PROPOSED CELL 4

10.3 ACRES

NOTES

1. CONSTRUCT THE CELL FLOOR AND DITCHES TO THE GRADES SHOWN ON

THIS DRAWING. UTILIZE GPS EQUIPMENT FOR FINE GRADING SUBGRADE AND

THE CLAY LINER.

2. CONTOURS INSIDE THE CONSTRUCTION BASELINE REPRESENT PROPOSED

SUBGRADE AS SHOWN ON SHEET 13C-02.

3. EACH PANEL (PLANE) DEPICTS AN AREA OF CONSTANT GRADE. REFER TO

THE DETAILS FOR BASEGRADE GEOMETRY AROUND THE PIPING.

4. THE CONTROL POINTS DEFINE THE LOCATION OF THE CONSTRUCTION

BASELINE AND THE PANELS THAT MAKEUP THE CELL.

5. IF THERE ARE ANY CONFLICTS BETWEEN INFORMATION ON THIS SHEET AND

OTHER REPRESENTATIONS OF THE WORK, NOTIFY THE ENGINEER. THE

ENGINEER WILL DETERMINE PRECEDENCE OF CONFLICTS.

2.9

5.0

5.0

2.0

2.9 % 5.0

8.5 ACRES

PZ-4

PZ-25

MW-23

MW-22

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

B R U S H

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

0 720

730 74 0 75

07007

770770

0 76

0 770780

0 79

780780

78078

078078

78078

080080

76076076

780780

71071

770770 77

710 7

072072

2.0

10.0%

LF

4.

0%

LF

4.

0%16

LF

4.

0%

L F@

2.

0%

L F@

2.

0%

LF

2.

5%

LF

2.

5%

LF

1.

4%

LF

2.

0%

LF

1.

4%

LF

4.

0%

LF

1.

4%

LF

2.

0%

LF

4.

0%

LF

4.

0%

L F@

2.

0%

L F@

2.

0%

ACTIVE

CELL 2

8.6 ACRES

ACTIVE

CELL 1

17.0 ACRES

10.3 ACRES

10.0%

UGE

GR

GR

x 7

.4 9 T

P

EB

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 4 LANDFILL

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

UNIT 4 CELL 4 TOP OF LINER

13C-04.dwg

1"=60 13C-04

J.GAUL

A 04/2024 ISSUED FOR PROPOSALS

2' OPERATIONAL COVER

SUBGRADE

2' SOIL LINER

KEY MAP

NTS

GEOSYNTHETIC CLAY LINER

(WITHIN CBL)

LOCATION THIS SHEET

60 MIL HDPE GEOMEMBRANE

GEOCOMPOSITE DRAINAGE MEDIA

RAINCOVER

LEGEND

UNIT AND CELL BASELINES

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

1. CLAY FOR THE SOIL LINER SHALL BE OBTAINED

FROM THE CLAY STOCKPILE .

2. BACKFILL THE ANCHOR TRENCH WITH THE SAME

MATERIAL AS USED FOR SOIL LINER

COMPONENT.

3. THE CONSTRUCTION BASELINE GENERALLY

REPRESENTS THE HORIZONTAL EXTENT OF THE

LINER SYSTEM. SEE LINER DETAILS.

4. THESE CONTOURS REPRESENT THE TOP OF

SOIL LINER GRADES.

5. REFER TO SPECIFICATIONS AND CQA PLAN FOR

SURVEYING REQUIREMENTS TO PRODUCE

AS-BUILT DRAWINGS AND TO PROVIDE BASIS

FOR VERIFYING EXCAVATION QUANTITIES AND

REQUIRED LINER THICKNESS.

6. RECORD ALL PERMEABILITY TEST LOCATIONS BY

GPS, OR CONVENTIONAL SURVEY. DOCUMENT

LOCATION OF ALL OTHER TESTS BY METHOD

APPROVED BY CQA CONSULTANT.

7. CERTIFY IN WRITING TO THE CQA ENGINEER

THAT THE CLAY LINER MEETS SPECIFICATIONS

INCLUDING THICKNESS VERIFICATION PRIOR TO

INSTALLING HDPE LINER.

8. SUBMIT A HDPE LINER PANEL LAYOUT TO THE

ENGINEER FOR APPROVAL PRIOR TO

INSTALLATION. THE PANELS SHALL BE SEAMED

PARALLEL TO LINE OF MAXIMUM SLOPE. FLOOR

PANELS SHALL GENERALLY BE LAPPED ON THE

DOWNHILL SIDE. REFER TO SPECIFICATIONS AND

CQA PLAN.

9. USE TEXTURED 60 MIL HDPE GEOMEMBRANE

FOR ALL AREAS.

10. ALL LEACHATE PIPES TO BE PERFORATED. ALL

CONNECTIONS TO BE FUSED.

11. JOIN INTERSECTING PIPES WITH

APPROPRIATELY SIZED FITTINGS AND BUTT

FUSION WELDS.

12. PIPES SHOULD BE LAID STRAIGHT BETWEEN

CONTROL POINTS. ALL CLEANOUTS SHALL RUN

PERPENDICULAR TO SLOPE.

NOTES

ACTIVE CELL 3

CLAY STOCKPILE

BRIDGE ROAD

ACTIVE CELL 3

SEDIMENT BASIN #9

SEDIMENT BASIN #12

EXISTING STORMWATER

PIPE TO REMAIN

PROPOSED CELL 4

CELL 4 ACCESS ROAD

PROPOSED

CONSTRUCTION

BASELINE

TEMPORARY

SEDIMENT BASIN A

A 13C

-09

B13C-09

C

C -0

SEDIMENT BASIN TB-B

OUTLET APRON

CELL 5 FUTURE

TIE-IN W/O PIPE

13C-08

CELL 4 TIE-IN

WITH CELL 3

W/O PIPE

13C-08

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PZ-# PZ-#

MM-#

MW-A

CELL 5 FUTURE

TIE-IN W/ PIPE

13C-08

CELL 4 TIE-IN WITH

CELL 3 W/ PIPE

13C-08

D 13C-09

LEACHATE

COLUMN

13C-08

LEACHATE COLLECTION PIPE

(SIZE VARIES)

EXISTING MAJOR CONTOURS780

EXISTING MINOR CONTOURS

PIPE PERFORATION

(TYP)

13C-08

10.0%

10.0% 2.0

2.0

3.0

5.0

5.0

205206207

210 211 212

220221

LF

4.

0%

LF

4.

0%16

LF

4.

0%

L F@

2.

0%

L F@

2.

0%

LF

2.

5%

LF

2.

5%

LF

1.

4%

LF

2.

0%

LF

1.

4%

LF

4.

0%

LF

1.

4%

LF

2.

0%

LF

4.

0%

LF

4.

0%

L F@

2.

0%

L F@

2.

0%

234235236237238239

5.0

SITE LAYOUT COORDINATE POINTS TABLE

POINT NO.

NORTHING

983455.93

983491.11

983645.23

983652.09

984221.60

984227.46

984487.46

984495.93

984491.39

984482.96

984229.73

984223.41

983659.06

983652.64

983498.22

EASTING

1605809.39

1605565.06

1605311.80

1605173.84

1605160.84

1605161.47

1605155.70

1605536.87

1605541.96

1605162.11

1605167.73

1605167.87

1605180.41

1605313.28

1605567.04

ELEVATION

701.07

711.78

726.50

730.37

737.48

738.00

762.41

749.26

748.65

761.76

737.98

737.39

730.24

726.67

711.92

DESCRIPTION

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

TOE-LINER

TOE-LINER

TOE-LINER

TOE-LINER

TOE-LINER

TOE-LINER

SITE LAYOUT COORDINATE POINTS TABLE

POINT NO.

NORTHING

983463.65

983466.69

983500.14

983654.61

983660.97

984223.80

984230.59

984481.00

984489.44

984331.56

984203.06

984117.64

983656.14

983660.28

EASTING

1605807.55

1605800.41

1605567.73

1605313.88

1605182.37

1605169.86

1605169.71

1605164.15

1605544.15

1605588.16

1605620.89

1605642.97

1605282.32

1605196.71

ELEVATION

701.38

703.76

713.95

728.71

732.23

739.36

740.00

763.51

748.39

734.10

732.00

730.00

730.00

732.00

DESCRIPTION

TOE-LINER

TOP-LINER

TOP-LINER

TOP-LINER

TOP-LINER

TOP-LINER

TOP-LINER

TOP-LINER

TOP-LINER

SLOPE CONTROL

SLOPE CONTROL

SLOPE CONTROL

SLOPE CONTROL

SLOPE CONTROL

LEACHATE PIPING POINT TABLE

POINT NO.

NORTHING

983471.83

983546.36

983655.97

983699.27

983791.84

983884.41

983976.98

984069.55

984162.05

984228.18

EASTING

1605771.69

1605493.71

1605306.55

1605182.51

1605180.46

1605178.40

1605176.35

1605174.29

1605172.24

1605170.77

ELEVATION

705.05

718.29

729.04

732.70

733.88

735.05

736.22

737.39

738.57

739.74

DESCRIPTION

10" LEACH

10" LEACH

8" LEACH

8" LEACH

8" LEACH

8" LEACH

8" LEACH

8" LEACH

8" LEACH

16" LEACH

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 4 LANDFILL

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

UNIT 4 CELL 4 TOP OF LINER CONTROL

13C-05.dwg

1"=60 13C-05

J.GAUL

A 04/2024 ISSUED FOR PROPOSALS

LEGEND

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

CONTROL LINE

LEACHATE PIPING

0 720

730 74 0 75

07007

770770

0 76

0 770780

0 79

780780

78078

078078

78078

080080

76076076

780780

71071

770770 77

710 7

072072

3.0

5.0

5.0

MW-23

MW-22

742744746748752754756758762

10.0%

10.0%

2.0

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 4 LANDFILL

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

UNIT 4 CELL 4 OPERATIONAL COVER

13C-06.dwg

1"=60 13C-06

J.GAUL

A 04/2024 ISSUED FOR PROPOSALS

KEY MAP

2' SOIL LINER

SUBGRADE

2' OPERATIONAL COVER

GEOSYNTHETIC CLAY LINER

(WITHIN CBL)

LOCATION THIS SHEET

60 MIL HDPE GEOMEMBRANE

GEOCOMPOSITE DRAINAGE MEDIA

RAINCOVER

PL

LEGEND

UNIT AND CELL BASELINES

PROPERTY LINE

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

1. THE GRADES WITHIN CELL 4 GENERALLY REPRESENT THE

TOP OF OPERATIONAL COVER.

2. CERTIFY IN WRITING TO THE CQA ENGINEER THAT THE

OPERATIONAL COVER MEETS SPECIFICATIONS INCLUDING

THICKNESS VERIFICATION.

3. PLACE RAINCOVER OVER CELL 4. BALLAST RAINCOVER.

NOTES

BRIDGE ROAD

ACTIVE CELL 3

SEDIMENT BASIN #9

SEDIMENT BASIN #12

EXISTING STORMWATER

PIPE TO REMAIN

PROPOSED CELL 4

10.3 ACRES

CELL 4 ACCESS ROAD

PROPOSED

CONSTRUCTION

BASELINE

TEMPORARY

SEDIMENT BASIN A

A 13C

-09

B13C-09

C

C -0

CLAY STOCKPILE

120,00 cy

SEDIMENT BASIN TB-B

OUTLET APRON

BAFFLES

CLAY STOCKPILE

CELL 5 FUTURE

TIE-IN W/O PIPE

13C-08

CELL 4 TIE-IN

WITH CELL 3

W/O PIPE

13C-08

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

MW-A

MM-#

PZ-#PZ-#

CELL 5 FUTURE

TIE-IN WITH PIPE

13C-08

CELL 4 TIE-IN

WITH CELL 3

WITH PIPE

13C-08

D 13C-09

PIPE & CELL

TERMINATION

13C-08

LEACHATE

COLUMN

13C-08

EXISTING MAJOR CONTOURS780

EXISTING MINOR CONTOURS

104105

220221222

310 311 312

742744746748

752754756758

2.0

2.0

3.0

5.0

5.0

10.0%

POINT TABLE

POINT NO.

NORTHING

983468.88

983503.03

983657.57

983663.83

984478.07

984486.51

984329.47

984133.15

983705.44

983455.93

983491.11

983647.00

983652.09

984221.60

984227.46

984487.46

984495.83

984491.39

984482.96

984229.73

EASTING

1605806.30

1605568.76

1605314.79

1605185.30

1605167.22

1605547.44

1605588.77

1605638.95

1605749.72

1605809.39

1605565.06

1605275.15

1605173.84

1605160.84

1605161.47

1605155.70

1605532.48

1605541.96

1605162.11

1605167.73

ELEVATION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

701.07

711.78

728.00

730.37

737.48

738.00

762.41

749.41

748.65

761.76

737.98

DESCRIPTION

CBL

CBL

CBL

CBL

CBL

CBL

CBL

CBL

CBL

TOE

TOE

TOE

TOE

TOE

TOE

TOE

TOE

MAINT-AREA

TOE-LINER

TOE-LINER

POINT TABLE

POINT NO.

NORTHING

984223.41

983652.64

983498.22

983463.65

983466.69

983500.14

983654.61

983660.97

984223.80

984230.59

984481.00

984489.44

983656.14

983660.28

983473.06

983506.87

983661.52

983667.65

984223.96

984230.74

EASTING

1605167.87

1605313.28

1605567.04

1605807.55

1605800.41

1605567.73

1605313.88

1605182.37

1605169.86

1605169.71

1605164.15

1605544.15

1605282.32

1605196.71

1605805.30

1605570.14

1605316.00

1605189.22

1605176.86

1605176.71

ELEVATION

737.39

726.67

711.92

701.38

703.76

713.95

728.71

732.23

739.36

740.00

763.51

748.39

730.00

732.00

707.59

717.95

732.71

736.23

743.36

744.00

DESCRIPTION

TOE-LINER

TOE-LINER

TOE-LINER

TOE-LINER

TOP-LINER

TOP-LINER

TOP-LINER

TOP-LINER

TOP-LINER

TOP-LINER

TOP-LINER

TOP-LINER

SLOPE CONTROL

SLOPE CONTROL

BERM

BERM

BERM

BERM

BERM

BERM

POINT TABLE

POINT NO.

NORTHING

984474.16

984482.54

984480.55

984472.20

984230.79

984224.00

983669.56

983663.49

983508.79

983475.15

983476.97

983510.54

983665.27

983666.47

983670.72

983671.28

984226.50

984234.92

984468.68

984477.44

EASTING

1605171.30

1605548.48

1605549.01

1605173.35

1605178.71

1605178.86

1605191.18

1605316.60

1605570.83

1605804.80

1605804.36

1605571.46

1605317.15

1605290.42

1605204.89

1605193.18

1605180.81

1605181.02

1605177.04

1605549.82

ELEVATION

767.51

754.26

754.24

767.51

744.00

743.36

736.23

732.71

717.95

707.62

705.92

716.13

730.91

732.00

734.00

734.19

741.22

742.00

763.90

751.09

DESCRIPTION

BERM

BERM

BERM

BERM

BERM

BERM

BERM

BERM

BERM

BERM

BERM TOE

BERM TOE

BERM TOE

BERM TOE

BERM TOE

BERM TOE

BERM TOE

BERM TOE

BERM TOE

BERM TOE

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 4 LANDFILL

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

UNIT 4 CELL 4 OPERATIONAL COVER CONTROL

13C-07.dwg

1"=60 13C-07

J.GAUL

A 04/2024 ISSUED FOR PROPOSALS

LEGEND

CONTROL LINE

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

24" INITIAL SOIL BARRIER

GEOSYNTHETIC CLAY LINER (GCL)

HDPE GEOMEMBRANE

GEOCOMPOSITE DRAINAGE MEDIA

24" OPERATIONAL LAYER

SUBGRADE

NOTES:

1. GCL AND GEOCOMPOSITE DRAINAGE NET ARE PRESENT

IN ALL LOCATIONS WHERE HDPE IS DETAILED.

2. THE REQUIRED THICKNESS OF LAYERS IS MEASURED

PERPENDICULAR TO THE SURFACE. THE HORIZONTAL

LOCATION OF THE SLOPE TOES WILL VARY BASED ON

INTERSECTING SLOPES.

3. GEOSYNTHETIC MATERIAL THICKNESS ARE

EXAGGERATED FOR ILLUSTRATION PURPOSES WHERE

SHOWN AND OMITTED FOR DETAIL CLARITY WHERE NOT

SHOWN.

24" INITIAL SOIL BARRIER

GEOSYNTHETIC CLAY LINER (GCL)

HDPE GEOMEMBRANE

GEOCOMPOSITE DRAINAGE MEDIA

24" OPERATIONAL LAYER

SUBGRADE

NOTES:

1. GCL AND GEOCOMPOSITE DRAINAGE NET ARE PRESENT

IN ALL LOCATIONS WHERE HDPE IS DETAILED.

2. THE REQUIRED THICKNESS OF LAYERS IS MEASURED

PERPENDICULAR TO THE SURFACE. THE HORIZONTAL

LOCATION OF THE SLOPE TOES WILL VARY BASED ON

INTERSECTING SLOPES.

3. GEOSYNTHETIC MATERIAL THICKNESS ARE

EXAGGERATED FOR ILLUSTRATION PURPOSES WHERE

SHOWN AND OMITTED FOR DETAIL CLARITY WHERE NOT

SHOWN.

SLOPESLOPE

B

SEPARATOR

GEOTEXTILE

2' M

IN

PERFORATED PIPE (A)

PIPE

DIA (A)

WIDTH

(B)

LENGTH

(C)

AREA

(D)

(IN) (FT) (FT) (SF)

8 2 16.0 17.4

10 2.5 16.3 18.0 16 4.0 19.3 24.0 20 5.0 21.3 28.0 36 9.0 29.3 44.0

SEPARATOR GEOTEXTILE

(EXPOSED GEOTEXTILE TO BE

REMOVED BY THE OWNER

PRIOR TO WASTE PLACEMENT)

NOTES:

1. GEOSYNTHETIC MATERIAL THICKNESS ARE

EXAGGERATED FOR ILLUSTRATION PURPOSES WHERE

SHOWN AND OMITTED FOR DETAIL CLARITY WHERE NOT

SHOWN.

SLOPESLOPE

B

SEPARATOR

GEOTEXTILE

2' M

IN

PERFORATED PIPE (A)

PIPE

DIA (A)

WIDTH

(B)

LENGTH

(C)

AREA

(D)

(IN) (FT) (FT) (SF)

8 2 16.0 17.4

10 2.5 16.3 18.0 16 4.0 19.3 24.0 20 5.0 21.3 28.0 36 9.0 29.3 44.0

SEPARATOR GEOTEXTILE

(EXPOSED GEOTEXTILE TO BE

REMOVED BY THE OWNER

PRIOR TO WASTE PLACEMENT)

NOTES:

1. GEOSYNTHETIC MATERIAL THICKNESS ARE

EXAGGERATED FOR ILLUSTRATION PURPOSES WHERE

SHOWN AND OMITTED FOR DETAIL CLARITY WHERE NOT

SHOWN.

CONSTRUCTION

BASELINE

WELDED CAP

1.00'

LINER ANCHOR TRENCH

LEACHATE

PIPE

2.00'

12'

CONSTRUCTION

BASELINE

WELDED CAP

1.00'

LINER ANCHOR TRENCH

LEACHATE

PIPE

2.00'

12'

CONSTRUCTION

BASELINE

1.0'

LINER AND RAINCOVER

ANCHOR TRENCH

2.0'

2.0'

2.

0'

12'

CONSTRUCTION

BASELINE

1.0'

LINER AND RAINCOVER

ANCHOR TRENCH

2.0'

2.0'

2.

0'

12'

GEOCOMPOSITE DRAINAGE MEDIA

HDPE GEOMEMBRANE

GEOSYNTHETIC CLAY LINER

2'

1'

CONSTRUCTION

BASELINE

6.0'

LINER ANCHOR TRENCH

2.0'

2.0'

2.

0'

EXISTING

CELL 3

CELL 4

CONSTRUCTION

BASELINE

6.0'

LINER ANCHOR TRENCH

2.0'

2.0'

2.

0'

EXISTING

CELL 3

CELL 4

CONSTRUCTION

BASELINE

WELDED CAP TO BE

REMOVED AND NEW PIPE

WELDED TO EXISTING PIPE

6'

LINER ANCHOR TRENCH

LEACHATE

PIPE

2.00'

LEACHATE

PIPE

EXISTING

CELL 3CONSTRUCTION

BASELINE

WELDED CAP TO BE

REMOVED AND NEW PIPE

WELDED TO EXISTING PIPE

6'

LINER ANCHOR TRENCH

LEACHATE

PIPE

2.00'

LEACHATE

PIPE

EXISTING

CELL 3

SLOPE

SLOPE

2.0'

SEPARATOR

GEOTEXTILE

2' M

IN

4'

CONSTRUCTION

BASELINE

FLAP (60-mil)

PERFORATED PIPE

WELD FLAP TO

BASE LINER

6'

15.7'

SEPARATOR GEOTEXTILE

(EXPOSED GEOTEXTILE TO BE

REMOVED BY THE OWNER

PRIOR TO WASTE PLACEMENT)

NOTES:

1. SEE DETAIL 3 FOR DIMENSIONS OF THE STONE COLUMN.

2. GEOSYNTHETIC MATERIAL THICKNESS ARE EXAGGERATED

FOR ILLUSTRATION PURPOSES WHERE SHOWN AND

OMITTED FOR DETAIL CLARITY WHERE NOT SHOWN.

SLOPE

SLOPE

2.0'

SEPARATOR

GEOTEXTILE

2' M

IN

4'

CONSTRUCTION

BASELINE

FLAP (60-mil)

PERFORATED PIPE

WELD FLAP TO

BASE LINER

6'

15.7'

SEPARATOR GEOTEXTILE

(EXPOSED GEOTEXTILE TO BE

REMOVED BY THE OWNER

PRIOR TO WASTE PLACEMENT)

NOTES:

1. SEE DETAIL 3 FOR DIMENSIONS OF THE STONE COLUMN.

2. GEOSYNTHETIC MATERIAL THICKNESS ARE EXAGGERATED

FOR ILLUSTRATION PURPOSES WHERE SHOWN AND

OMITTED FOR DETAIL CLARITY WHERE NOT SHOWN.

SPACING

4" CENTER

HOLE/PATTERN: 6/STAGGERED

3/8"Ø STAGGERED

PERFORATIONS

6" TO 14"

6" CENTER SPACING

1/2"Ø STAGGERED

PERFORATIONS

HOLE/PATTERN: 16/STAGGERED

16"- 36"

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 4 LANDFILL

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

LINER DETAILS

13C-08.dwg

1"=60 13C-08

J.GAUL

A 04/2024 ISSUED FOR PROPOSALS

LINER SECTION

1"=5'

LEACHATE COLUMN

1"=5'

13C-06

CELL 5 FUTURE TIE IN W/PIPE

1"=5'

13C-04

PIPE PERFORATION

NOT TO SCALE

13C-04

CELL 5 FUTURE TIE-IN W/O PIPE

1"=5'

ANCHOR TRENCH

1"=1'

CELL 4 TIE-IN

WITH CELL 3 W/PIPE

1"=5'

13C-04

CELL 4 TIE-IN

WITH CELL 3 W/O PIPE

1"=5'

13C-02

PIPE AND CELL TERMINATION

1"=5'

13C-06

13C-04

0+00 0+50 1+00 1+50

EXISTING GRADE PERMITTED SUBGRADE

CONSTRUCTION BASELINE

EXISTING CELL 3 FUTURE CELL 4

CELL 3 OPERATIONAL COVER

13C-08

13C-08

0+00 0+50 1+00

EXISTING GRADE

CONSTRUCTION

BASELINE

PERMITTED SUBGRADE

13C-08

13C-08

0+00 0+50 1+00

CONSTRUCTION

BASELINEEXISTING GRADE

13C-08

13C-08

0+00 0+50 1+00

CONSTRUCTION

BASELINE

EXISTING GRADE

13C-08

13C-08

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 4 LANDFILL

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

STORMWATER DETAILS

13C-09.dwg

1"=60 13C-09

J.GAUL

A 04/2024 ISSUED FOR PROPOSALS

SECTION - "A"

NTS

A 13C-02

SECTION - "B"

NTS

B 13C-02

SECTION - "C"

NTS

C 13C-02

SECTION - "D"

NTS

D 13C-02

File details come from the government source that posted it. Updated .