Twin Chimneys

Landfill

Cell 3 Liner

Civil

Project No.

11075 Augusta Road

C o n t r a c t D r a w i n g s F o r

10174879

February 2022

I N D E X O F D R A W I N G S

GENERAL

11G-00 COVER SHEET

11G-01 OVERALL SITE PLAN

CIVIL

11C-01 EXISTING CONDITIONS

11C-02 SUBGRADE

11C-03 SUBGRADE CONTROL

11C-04 TOP OF LINER

11C-05 OPERATIONAL LAYER

11C-06 LINER DETAILS

Issued for Proposal

MSW Unit 4

Greenville County, South Carolina

HDR Engineering, Inc.

of the Carolinas

440 S. Church St., Suite 1200

Charlotte, NC 28202-2075

704.338.6700

2/24/22

C

D

A

C

E

S

R

O

A

D

A

C

C

E

A

D

C S -1

C S -2

OUTPARCEL

OUTPARCEL

OUTPARCEL

0 6

UNIT 2

C&D

CELL 1

CELL 2

FUTURE

UNIT 7

FUTURE

UNIT 5

ACTIVE

UNIT 4 MSW

PROPOSED

CELL 3

UNIT 1 MSW

SEDIMENT

BASIN B

SEDIMENT

BASIN C

E-WASTE

METALS

PAD

YARD

WASTE

PAD

SEDIMENT

BASIN A

ROCK

STOCKPILE

COMPOST AREA

SW-6

SW-2

SW-4

MM-1

MM-2

MM-3

MM-4

MM-5

MM-6

MM-7

MM-28

MM-29

MM-30

MM-31

MM-32

MM-33

MW-4

MW-5

OW-115

MW-72

MW-48

MW-71

MW-47

MW-46

MW-45

MW-70

MW-30

MW-31

MW-32

MW-33

MW-37

MW-38

MW-39

OW-107

OW-108

MW-29

MW-28

MW-27

MW-26

MW-25

MW-66

MW-67

OW-113

OW-114

MW-61

MW-62

MW-24

MW-63

MW-64

MW-65

OW-103

MW-105

MW-13

MW-14

OW-104-R1

MW-17

MW-18

MW-19

OW-104

OW-105

MW-1

MW-2

MW-3

OW-102

OW-110

OW-109

MW-52

MW-6

MW-7

MW-51

MW-41

MW-12

MW-8

MW-50

MW-11

MW-10

MW-9

OW-101

MW-20

SB-85

PZ-13s

PZ-13d

PZ-44

PZ-7s

PZ-50

PZ-2d

PZ-2s

PZ-4a

PZ-76

PZ-6d

PZ-53

PZ-54

PZ-56

PZ-6s

PZ-5da

PZ-5d

SB-69

SB-42

SB-47

SB-18

SB-7d

SB-80

SB-83

SB-82

SB-1

SB-22

SB-3dSB-3s

SB-36

SB-90

SB-97

SB-92

SB-94

SB-10s SB-10r

SB-109

SB-93

SB-112

SB-5s

SB-110

SB-9d

SB-105

SB-108

MW-15

MW-16

PZ-77

PZ-14

PZ-43

PZ-19

PZ-52s

PZ-52d

PZ-7s

PZ-4

PZ-39s

PZ-39d

PZ-26d PZ-26s

PZ-23d

PZ-23s

PZ-75

PZ-51

PZ-10ra

PZ-41

PZ-57s

PZ-57d

PZ-78

PZ-73

PZ-30

PZ-25

PZ-25d

PZ-20

PZ-64

PZ-29

PZ-79

PZ-55

PZ-67

PZ-66s

PZ-66d

PZ-12

PZ-74

PZ-65

PZ-9s

PZ-35d

PZ-35

PZ-62s

PZ-62d

PZ-28

PZ-40

PZ-48

MM-10

MM-12

MM-47

MM-49

MM-51

MM-52

MM-17

MM-19

MM-24

MM-27

MM-53

MM-45

MM-44

MM-10

MM-11

MM-9

MM-8

MM-13

MM-14

MM-15

MM-46

MM-48

MM-50

MM-16

MM-18

MM-34

OW-105-R1

MW-10R

MW-21

MW-23

MW-22

MW-42

MW-43

MW-44

MW-49

OVERALL SITE PLAN

11G-01.dwg

1"=300' 11G-01

J.GAUL

A 02/2022 ISSUED FOR PROPOSAL

GENERAL NOTES:

1. EXISTING TOPOGRAPHY PROVIDED BY FREELAND & ASSOCIATES

AERIAL SURVEY DATED JULY 15, 2021.

2. CONTRACTOR'S PRIMARY ACCESS TO THE SITE SHALL BE VIA THE

EXISTING AUGUSTA ROAD (HIGHWAY 25) CONSTRUCTION ENTRANCE

THAT LEADS DIRECTLY INTO UNIT 4. MAINTAIN IN GOOD CONDITION

AT ALL TIMES AND IMPROVE AS NECESSARY TO COMPLETE THE

WORK.

3. ACCESS TO THE BRIDGE ROAD IS RESTRICTED DUE TO LANDFILL

OPERATIONS. COORDINATE WITH OWNER A SCHEDULE FOR

TRAVERSING THE BRIDGE. SUPPLY FLAGGERS DURING LANDFILL

OPERATING HOURS TO COORDINATE CONTRACTORS TRAFFIC AND

LANDFILL TRAFFIC ON BRIDGE ROAD. GARBAGE TRUCKS AND

OTHER COUNTY VEHICLES SHALL ALWAYS HAVE PRIORITY.

4. CONTRACTOR RESPONSIBLE FOR SECURITY OF ALL TOOLS,

MATERIALS AND EQUIPMENT LEFT ON SITE. CONTRACTOR TO

SECURE ACCESS POINTS TO THE WORK SITE AS NECESSARY.

5. THE CONTRACTOR SHALL PROTECT ALL EXISTING WELLS,

STRUCTURES AND UTILITIES. ANY WELLS, STRUCTURES OR

UTILITIES THAT ARE DAMAGED SHALL BE REPLACED OR REPAIRED

(AS DIRECTED BY OWNER).

6. EROSION AND STORMWATER CONTROL MEASURES ARE INSTALLED

AND OPERATIONAL FOR THE DESIGNATED WORK AREAS.

CONTRACTOR TO MAINTAIN AND PROTECT THE MEASURES FROM

DAMAGE.

7. SITE BENCHMARK CONTROL IS LOCATED NEAR THE CELLULAR

TOWER.

SEDIMENT

BASIN #T2

SEDIMENT

BASIN #T5

SEDIMENT

BASIN #T3

SEDIMENT BASIN #9

WETLANDS

SEDIMENT BASIN #10

DI #9

LEACHATE

TANKS

SCALE

HOUSE

ADMINISTRATION

BUILDING

EDUCATION

BUILDING

CELLULAR

TOWER

SEDIMENT

TRAP A

SEDIMENT

BASIN #T4

EXISTING CONSTRUCTION ENTRANCE

A U

G U

S T

A R

D

AUG

USTA R

D

BRIDGE ROAD

SEDIMENT BASIN #11

100 YEAR FLOODPLAIN

LEACHATE

EVAPORATOR

CONCRETE

MONUMENT

N 987685.471

E 1604817.497

EL. 809.25

CONSTRUCTION AREA

BORINGS (SB & B)

METHANE MONITORING (MM)

GROUNDWATER WELLS (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PL

LEGEND

EXISTING 2021 MAJOR CONTOURS

EXISTING 2021 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

MW-A

MM-#

B-#

B-#

GW-#

GW-#

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 3

Greenville County South Carolina

10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200

Charlotte, NC 28202-2075

704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

UNIT 1 MSW

SEDIMENT

BASIN C

C

D

A

C

E

A

D

A

C

C

E

A

D

E-WASTE

METALS

PAD

YARD

WASTE

PAD

CELL 1

CELL 2

C S

-1

C S

-2

COMPOST AREA

ACTIVE

UNIT 4 MSW

PROPOSED

CELL 3

EXISTING CONDITIONS

11C-01.dwg

1"=200' 11C-01

J.GAUL

A 02/2022 ISSUED FOR PROPOSAL

GENERAL NOTES:

1. EXISTING TOPOGRAPHY PROVIDED BY FREELAND & ASSOCIATES

AERIAL SURVEY DATED JULY 15, 2021. THE EXISTING CONDITIONS

SHOWN WITHIN THE CELL 3 CONSTRUCTION AREA DO NOT REFLECT

THE JULY 15, 2021 SURVEY DUE TO CURRENT EXCAVATION

OPERATIONS IN THAT AREA.

2. THE EXTENT OF THE CLAY STOCKPILE AND MISCELLANEOUS

STOCKPILE IS APPROXIMATE BASED ON ACTIVE LANDFILL

OPERATIONS. CONTRACTOR SHALL OBTAIN CLAY FOR THE CLAY

LINER FROM THE CLAY STOCKPILE. CONTRACTOR TO CONFIRM THE

CLAY MEETS THE CLAY LINER (INITIAL SOIL BARRIER 31 38 10)

SPECIFICATIONS.

3. STOCKPILE ALL EXCAVATED SOIL MATERIALS, NOT USED IN THE

WORK, IN THE DESIGNATED AREA INDICATED ON THE PLAN.

· SOILS WITH HYDRAULIC CONDUCTIVITY OF 1E-5CM/SEC

OR LESS (CLAYEY SOIL): SHALL BE PLACED IN THE CLAY

STOCKPILE.

· ROCK: PLACED IN CELL TOWER STOCKPILE.

· OTHER SOILS: THE MISCELLANEOUS SOIL STOCKPILE.

EXISTING SEDIMENT

BASIN #T2

SEDIMENT

BASIN #T5

SEDIMENT

BASIN #T3

SEDIMENT BASIN #9

WETLANDS

SEDIMENT BASIN #10

DI #9

SEDIMENT

BASIN #T4

EXISTING

CONSTRUCTION

ENTRANCE

A U

G U

S T

A R

D

BRIDGE ROAD

SEDIMENT BASIN #11

BORINGS (SB & B)

METHANE MONITORING (MM)

GROUNDWATER WELLS (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

GW-#

GW-#

B-#

B-#

MM-#

MW-A

PL

LEGEND

EXISTING 2021 MAJOR CONTOURS

EXISTING 2021 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

CURRENT MSW

PERMIT BOUNDARY

PROPOSED MSW

PERMIT BOUNDARY

CONSTRUCTION AREA

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 3

Greenville County South Carolina

10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200

Charlotte, NC 28202-2075

704.338.6700 of the Carolinas

PROJECT ENGINEER

CONSTRUCTION

BASELINE

EXISTING TEMPORARY

STORMWATER PIPE

CELL 1& 2 TIE IN

WITH CELL 3 W/O

PIPE

CELL 1 & 2

TIE IN WITH

CELL 3 W/O

PIPE

11C-06

11C-06

MW-20

SB-85

PZ-4a

PZ-6d

PZ-53

PZ-6s

SB-83

SB-82

SB-36

SB-90

PZ-77

PZ-4

MW-21

MW-22

SUBGRADE

11C-02.dwg

1"=70' 11C-02

J.GAUL

A 02/2022 ISSUED FOR PROPOSAL

NOTES

1. EXISTING CONDITIONS WITHIN THE CELL 3 DO NOT

REPRESENT THE JULY 15, 2021 SURVEY DUE TO

EXCAVATION. CONTRACTOR TO VERIFY CONDITIONS

PRIOR TO INITIATING CONSTRUCTION.

2. PROPOSED CONTOURS WITHIN

CONSTRUCTION BASELINE REPRESENT

SUBGRADE OF MSW CELL 3.

3. AN ACCEPTABLE PROOF ROLL (AS DEFINED

BY THE CQA CONSULTANT) MUST BE

OBSERVED TO DEMONSTRATE A STABLE

SUBGRADE PRIOR TO CONSTRUCTION OF

THE LINER SYSTEM. THE SUBGRADE MAY

BE ACCEPTED IN STAGES TO FACILITATE

CONSTRUCTION. REFER TO TECHNICAL

SPEC SECTION 31 38 10.

4. REFER TO SPECIFICATIONS AND CQA PLAN FOR

SURVEYING REQUIREMENTS TO PRODUCE AS-BUILT

DRAWINGS AND TO PROVIDE BASIS FOR VERIFYING

EXCAVATION QUANTITIES.

5. REMOVE ALL WET AND SOFT SOILS PRIOR TO

BEGINNING STRUCTURAL FILL PLACEMENT. COMPACT

PER SPECIFICATIONS. "BRIDGE LIFTS" REQUIRE

APPROVAL OF ENGINEER AND CQA CONSULTANT.

6. PROTECT EXISTING WELLS, DROP INLETS AND OTHER

STRUCTURES DURING THE WORK.

7. IF CONTRACTOR ENCOUNTERS GROUNDWATER

DURING EXCAVATION, IMMEDIATELY STOP WORKING IN

THAT AREA AND NOTIFY ENGINEER. EXISTENCE OF

WATER MAY REQUIRE REVISION TO GRADING. THE

CONTRACTOR SHALL IMPLEMENT ALL CHANGES BASED

ON EXISTENCE OF GROUNDWATER IN THE

EXCAVATION.

GEOSYNTHETIC CLAY LINER

(WITHIN CBL)

LOCATION THIS SHEET

2' OPERATIONAL COVER

SUBGRADE

2' SOIL LINER

60 MIL HDPE GEOMEMBRANE

GEOCOMPOSITE DRAINAGE MEDIA

KEY MAP

RAINCOVER

NTS

LEGEND

CONSTRUCTION BASELINE

EXISTING CONTOURS

PROPOSED CONTOURS

CELL 3

(8.5 ACRES)

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 3

Greenville County South Carolina

10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200

Charlotte, NC 28202-2075

704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

EXISTING

CELL 1

EXISTING

CELL 2

T

E

F

L

O

P

E

C

C

O

N

S

T

R

U

C

T

I

O

N

B

A

S

E

L

I

N

E

CONSTRUCTION BASELINE

POINT NO.

NORTHING

983468.88

984133.15

984194.11

984329.47

984486.10

984623.04

984707.29

984756.28

984876.17

984937.99

984906.72

984785.15

984678.22

984673.36

984551.34

984516.88

984478.22

EASTING

1605806.30

1605638.95

1605623.16

1605588.77

1605547.55

1605555.44

1605584.28

1605577.90

1605540.32

1605576.01

1605603.26

1605636.87

1605699.68

1605702.53

1605768.63

1605787.30

1605832.14

ELEVATION

701.59

728.55

729.85

732.23

747.96

737.56

723.37

722.93

721.32

718.00

720.29

721.28

720.03

720.97

734.00

737.80

732.92

DESCRIPTION

CBL

CBL

CBL

CBL

CBL

CBL

CBL

CBL

CBL

CBL

CBL

CBL

CBL

CBL

CBL

CBL

CBL

CONSTRUCTION BASELINE

POINT NO.

NORTHING

984457.89

984445.39

984432.77

984308.51

984294.89

983580.64

983540.40

983464.33

EASTING

1605856.10

1605870.64

1605888.56

1606065.04

1606055.45

1605954.70

1605983.38

1605795.04

ELEVATION

730.32

729.94

728.05

715.96

716.50

699.18

697.45

701.89

DESCRIPTION

CBL

CBL

CBL

CBL

CBL

CBL

CBL

SG

SUBGRADE CONTROL

POINT NO.

NORTHING

984396.76

984269.09

EASTING

1605939.71

1606051.81

ELEVATION

724.90

716.55

DESCRIPTION

SG

SG

SUBGRADE CONTROL

POINT NO.

NORTHING

983464.33

984130.14

984328.58

984340.73

984486.24

984625.38

984708.52

984753.69

984839.74

984781.53

984491.09

984516.44

984432.28

984429.90

984439.69

984393.99

984374.64

EASTING

1605795.04

1605627.33

1605576.53

1605572.80

1605535.11

1605543.56

1605572.02

1605566.14

1605621.78

1605557.41

1605753.34

1605785.23

1605830.35

1605836.21

1605878.74

1605858.91

1605754.95

ELEVATION

701.89

729.00

732.06

733.50

748.43

738.00

724.00

723.41

721.59

722.87

740.90

738.00

732.61

732.00

729.25

728.00

730.00

DESCRIPTION

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SUBGRADE CONTROL

11C-03.dwg

1"=70' 11C-03

J.GAUL

A 02/2022 ISSUED FOR PROPOSAL

LEGEND

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 3

Greenville County South Carolina

10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200

Charlotte, NC 28202-2075

704.338.6700 of the Carolinas

PROJECT ENGINEER

CONSTRUCTION

BASELINE

CELL 1 & 2

TIE-IN WITH

CELL 3 W/ PIPE

TEMPORARY

STORMWATER PIPE

PIPE

PERFORATION

11C-06

11C-06

EXISTING LEACHATE

PIPING (TYP.)

CELL 1& 2 TIE IN

WITH CELL 3 W/O

PIPE

CELL 1 & 2

TIE IN WITH

CELL 3 W/O

PIPE

11C-06

11C-06

CELL 3 FUTURE

TIE-IN W/ PIPE

11C-06

TERMINATION

11C-06

CELL 3 FUTURE

TIE-IN W/O PIPE

11C-06

TERMINATION

11C-06

L

F

L

F

L

F

L

F

L

F

L

F

L

F

L

F

L F

L

F

L

F

L

F

LEACHATE PIPE POINT TABLE

POINT NO.

NORTHING

983484.32

983654.66

983822.70

983907.25

983991.81

984076.36

984160.92

984245.56

984342.77

984486.52

984492.09

984699.69

984532.31

984810.44

984800.96

984855.82

EASTING

1605802.60

1605761.86

1605719.35

1605697.46

1605675.56

1605653.66

1605631.76

1605610.09

1605584.87

1605547.57

1605798.36

1605581.68

1605767.72

1605560.92

1605614.79

1605546.70

ELEVATION

704.21

711.06

717.91

721.38

724.84

728.31

731.19

732.72

735.27

749.92

738.44

726.68

738.85

724.29

723.72

723.29

DESCRIPTION

10" LEACHATE PIPE

10" LEACHATE PIPE

8" LEACHATE PIPE

8" LEACHATE PIPE

8" LEACHATE PIPE

8" LEACHATE PIPE

8" LEACHATE PIPE

8" LEACHATE PIPE

16" LEACHATE PIPE

36" LEACHATE PIPE

20" LEACHATE PIPE

8" LEACHATE PIPE

8" LEACHATE PIPE

16" LEACHATE PIPE

8" LEACHATE PIPE

8" LEACHATE PIPE

TOP OF LINER

11C-04.dwg

1"=70' 11C-04

J.GAUL

A 02/2022 ISSUED FOR PROPOSAL

2' OPERATIONAL COVER

SUBGRADE

2' SOIL LINER

1. BACKFILL THE ANCHOR TRENCH WITH THE SAME MATERIAL

AS USED FOR SOIL LINER COMPONENT.

2. THE CONSTRUCTION BASELINE GENERALLY REPRESENTS

THE HORIZONTAL EXTENT OF THE LINER SYSTEM. SEE LINER

DETAILS.

3. THESE CONTOURS REPRESENT THE TOP OF SOIL LINER

GRADES.

4. REFER TO SPECIFICATIONS AND CQA PLAN FOR SURVEYING

REQUIREMENTS TO PRODUCE AS-BUILT DRAWINGS AND TO

PROVIDE BASIS FOR VERIFYING EXCAVATION QUANTITIES

AND REQUIRED LINER THICKNESS.

5. RECORD ALL PERMEABILITY TEST LOCATIONS BY GPS, OR

CONVENTIONAL SURVEY. DOCUMENT LOCATION OF ALL

OTHER TESTS BY METHOD APPROVED BY CQA CONSULTANT.

6. CERTIFY IN WRITING TO THE CQA ENGINEER THAT THE CLAY

LINER MEETS SPECIFICATIONS INCLUDING THICKNESS

VERIFICATION PRIOR TO INSTALLING HDPE LINER.

7. SUBMIT A HDPE LINER PANEL LAYOUT TO THE ENGINEER

FOR APPROVAL PRIOR TO INSTALLATION. THE PANELS SHALL

BE SEAMED PARALLEL TO LINE OF MAXIMUM SLOPE. FLOOR

PANELS SHALL GENERALLY BE LAPPED ON THE DOWNHILL

SIDE. REFER TO SPECIFICATIONS AND CQA PLAN.

8. USE TEXTURED 60 MIL HDPE GEOMEMBRANE FOR ALL

AREAS.

9. ALL LEACHATE PIPES TO BE PERFORATED. ALL

CONNECTIONS TO BE FUSED.

10. JOIN INTERSECTING PIPES WITH APPROPRIATELY SIZED

FITTINGS AND BUTT FUSION WELDS.

11. PIPES SHOULD BE LAID STRAIGHT BETWEEN CONTROL

POINTS. ALL CLEANOUTS SHALL RUN PERPENDICULAR TO

SLOPE.

12. CLAY FOR THE SOIL LINER SHALL BE OBTAINED FROM THE

CLAY STOCKPILE .

NTS

GEOSYNTHETIC CLAY LINER

(WITHIN CBL)

LOCATION THIS SHEET

60 MIL HDPE GEOMEMBRANE

GEOCOMPOSITE DRAINAGE MEDIA

RAINCOVER

PERFORATED PIPE

LEGEND

CONSTRUCTION BASELINE

EXISTING CONTOURS

PROPOSED CONTOURS

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 3

Greenville County South Carolina

10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200

Charlotte, NC 28202-2075

704.338.6700 of the Carolinas

PROJECT ENGINEER

CONSTRUCTION

BASELINE

CELL 1& 2 TIE IN

WITH CELL 3 W/O

PIPE

CELL 1 & 2

TIE IN WITH

CELL 3 W/O

PIPE

11C-06

11C-06

LEACHATE

COLUMN

11C-06

TERMINATION

11C-06

TERMINATION

11C-06

OPERATIONAL COVER

11C-05.dwg

1"=70' 11C-05

J.GAUL

A 01/2022 ISSUED FOR PROPOSAL

LEGEND

(WITHIN CBL)

LOCATION THIS SHEET

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 3

Greenville County South Carolina

10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200

Charlotte, NC 28202-2075

704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

C p w w o r k i n g e a s t d

C d w g

P l o t

A

M

J G

A U

24" INITIAL SOIL BARRIER

GEOSYNTHETIC CLAY LINER (GCL)

HDPE GEOMEMBRANE

GEOCOMPOSITE DRAINAGE MEDIA

24" OPERATIONAL LAYER

SUBGRADE

NOTES:

1. GCL AND GEOCOMPOSITE DRAINAGE NET ARE PRESENT

IN ALL LOCATIONS WHERE HDPE IS DETAILED.

2. THE REQUIRED THICKNESS OF LAYERS IS MEASURED

PERPENDICULAR TO THE SURFACE. THE HORIZONTAL

LOCATION OF THE SLOPE TOES WILL VARY BASED ON

INTERSECTING SLOPES.

3. GEOSYNTHETIC MATERIAL THICKNESS ARE

EXAGGERATED FOR ILLUSTRATION PURPOSES WHERE

SHOWN AND OMITTED FOR DETAIL CLARITY WHERE NOT

SHOWN.

RAINCOVER

SLOPE

S L O

P E

2.0'

SEPARATOR

GEOTEXTILE

M

I N

RAINCOVER

PERFORATED PIPE

RAINCOVER

CONSTRUCTION

BASELINE

WELDED CAP

1.00'

LINER AND RAINCOVER

ANCHOR TRENCH

LEACHATE

PIPE

2.00'

12'

RAINCOVER

CONSTRUCTION

BASELINE

1.0'

LINER AND RAINCOVER

ANCHOR TRENCH

2.0'

2.0'

12'

RAINCOVER

CONSTRUCTION

BASELINE

6.0'

LINER AND RAINCOVER

ANCHOR TRENCH

2.0'

2.0'

EXISTING

CELL 1 OR 2

CELL 3

RAINCOVER

CONSTRUCTION

BASELINE

WELDED CAP TO BE

REMOVED AND NEW PIPE

WELDED TO EXISTING PIPE

6'

LINER AND RAINCOVER

ANCHOR TRENCH

LEACHATE

PIPE

2.00'

LEACHATE

PIPE

EXISTING

CELL 1 OR 2

SLOPE

S L O

P E

2.0'

SEPARATOR

GEOTEXTILE

M

I N

RAINCOVER

4'

CONSTRUCTION

BASELINE

FLAP (60-mil)

PERFORATED PIPE

WELD FLAP TO

BASE LINER

15.7'

LINER DETAILS

11C-06.dwg

AS NOTED 11C-06

J.GAUL

A 02/2022 ISSUED FOR PROPOSAL

LINER SECTION

1"=5'

LEACHATE COLUMN

1"=5'

11C-05

CELL 3 FUTURE TIE IN W/PIPE

1"=5'

11C-04

PIPE PERFORATION

NOT TO SCALE

11C-04

CELL 3 FUTURE TIE-IN W/O PIPE

1"=5'

ANCHOR TRENCH

1"=1'

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 3

Greenville County South Carolina

10174879

P. WESTMORELAND, P.E.

HDR Engineering Inc.

440 S. Church St. Suite 1200

Charlotte, NC 28202-2075

704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

CELL 1 & 2 TIE-IN

WITH CELL 3 W/PIPE

1"=5'

11C-04

CELL 1 & 2 TIE-IN

WITH CELL 3 W/O PIPE

1"=5'

11C-02

TERMINATION

1"=5'

11C-04

11C-04