This document is a Statement of Work (SOW) for an electrical upgrade project at Duke Field Air Force Base in Florida, specifically for Building 3144, Room 239. The project involves reconfiguring the electrical infrastructure to support a new furniture layout, increasing workstations from 45 to 54 and upgrading electrical capacity to support three computers and peripherals per workstation. Key requirements include relocating and reusing existing CFRB4 floor boxes, installing new drop boxes, and ensuring all electrical components are pretested and post-tested. The contractor must provide final cabling and outlet location drawings, submit a list of products with part numbers for technical approval, and adhere to multiple standards including the National Electrical Code (NEC), NEMA standards, and Unified Facilities Criteria. The government reserves the right to refuse final acceptance until all discrepancies are resolved to their satisfaction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BLDG 3144 Electircal Posting Questions.docx | DOCX document | |
| ATTCH 1.pdf | ||
| Combo Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Duke Field AFB, Florida B3144 Electrical Upgrade
Scope:
• Provide an electrical technical solution for Building 3144, Room 239 at Duke Field, FL.
• The installation and/or relocation of electrical cabling, outlets, and raised floor tiles for furniture upgrade.
Electrical Deliverables: Contractor/Installer shall provide for review final cabling and outlet locations and as-built/as-installed drawings prior to scheduling a final quality assurance inspection.
Specific Task Objectives:
• Contractor is obligated to undertake the design and engineering process in compliance with all relevant and applicable standards.
• Contractor is required to include in their response to the request for quote, a list of the products they plan to provide, along with corresponding part numbers and quantities for technical approval.
• Customer is replacing all of the modular furniture in room 239A. The new furniture will be set up in a different configuration (See Attachment 1). Currently, there are 45 workstations with two duplex style outlets in the existing CFRB4 electrical box outlets each that support two computers and associated peripherals. The existing layout will be reconfigured and increased to 54 workstations with the capacity to support three computers and associated peripherals. The number of power receptacles should be sufficient to support three computers and peripherals per workstation
• The existing layout, proposed layout, as-built single line diagram, panel schedule and electrical outlet layout are provided in Attachment 1. The existing cables and outlet boxes will need to be moved around to support the new furniture configuration, utilizing as much existing cable and outlet boxes as possible. All cabling and outlets to be relocated shall be pretested and post tested and results provided with the final documentation.
• Per Attachment 1, the supporting power panel may have room for expansion if more circuit breakers are required.
• The current CFRB4 floor boxes contain four (4) receptacles each and six (6) fiber connections. Fiber connections can be unplugged to allow movement of the CFRB4 boxes.
• Existing CFRB4 floor boxes will need to be moved, reinstalled, and shall be reused to max extend possible. New CFRB4 floor boxes may need to be purchased to accommodate new work locations new drop locations.
• Floor tiles and carpet tiles need to be pulled up, reused, and reconfigured to new workstation layout.
• Install CFBR4 drop boxes to ensure every workstation has one drop box with electrical.
• All electrical CFBR4 drop boxes should be tested and inspected and verified by the government.
The government reserves the right to refuse final acceptance until all discrepancies have been resolved to the satisfaction of the government.
APPLICABLE STANDARDS CONTRACTORS & INSTALLERS SHALL ADHEAR TO:
Standards shall be used as a baseline of quality and craftmanship for installing electrical products.
National Electrical Code (NEC) and National Electrical Manufacturers Association (NEMA) Standards: NFPA 70
Unified Facilities Criteria: (UFC) 3-520-1, 3-580-1, 4-010-06 dated most recent.
National Electrical Contractors Association/Fiber Optic Association: (NECA/FOA) 301-2016 Installing and Testing Fiber Optics
All DoD and Industry standards/guidelines shall be used to provide a complete system, from end to end. Note: Since Standards are continually being revised, contractors and installers should refer to the latest version of any relevant standard for compliance.
| Scope: |
| Specific Task Objectives: |