These documents contain sections of the draft PWS and required response information.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI REAC INSPECTIONS SOURCES SOUGHT AND CAPABILITY STATEMENTS

THIS IS A SOURCES SOUGHT NOTICE ONLY. This is not a request for offers, quotes or proposals. This notice does not represent a commitment by the Government to issue a solicitation or award a contract. This is a market research tool only to determine the capability of potential sources.

The Department of Housing and Urban Development (HUD) is contemplating establishing a multiple award IDIQ contract under NAICS Code(s) 541350 Building Inspection Services, and the Small Business Standard is $7 Million, for Housing Inspection Services and is issuing this Request For Information (RFI) in order to solicit responses from capable sources and capability statements to ensure sufficient competition exists to meet the government’s requirements.

Teaming arrangements and joint ventures will be considered for any subsequent procurement based on the Government's market research.

Please review the performance work statement (PWS) exerts and provide your feedback to Joel Bartholomew at Joel.J.Bartholomew@HUD.Gov .

So, what exactly is HUD contemplating acquiring?

(Insert a General Scope of Work here)

BACKGROUND

A Congressionally mandated HUD audit, issued in 2008, found that HUD lacked adequate controls over the physical condition of its Section 8 housing stock. The remedy provides for REAC to perform quality control inspections of up to 10,000 HQS inspections at 100 of the largest PHAs, collect the inspection data, and provide results to the PHAs, field offices, and program offices.

During FY2011, two overlapping initiatives were launched. HUD’s Secretary launched the Delivering Together effort to identify ways in which HUD could improve its customer service by reducing Public Housing Agency (PHA) burden while improving HUD’s PHA oversight. One of the Delivering Together recommendations was to establish a single standardized inspection protocol for both Public Housing and HCV programs. Under the auspices of the White House Domestic Policy Council’s Rental Policy Working Group, an interagency team of Treasury, HUD, and USDA staff developed a set of recommendations to eliminate duplicative physical inspections for owners of affordable housing subject to inspection from more than one Federal program. REAC would lead both efforts.

REAC’s Physical Assessment Subsystem (PASS) collects data and reports the actual state of repair and habitability of real property. The inspection observations are recorded on a hand-held computer using HUD developed and HUD owned software and sent electronically to REAC for scoring, analysis, and processing. The key business functions currently supported by PASS include: (1) the collection of profile data for all public housing and multifamily (MF) properties for which HUD has a statutory obligation or a financial interest, and (2) the inspection of these properties which provides the capability to assess their physical condition.

The REAC PASS Quality Assurance (QA) Division performs quality assurance reviews and physical inspections of HUD insured and assisted properties and inspector training both in the classroom and in the field. The QA Division also provides Phase II training and certification examinations for new contract inspector candidates that have passed Phase I classroom training. The QA Division’s objective is to ensure that the Uniform Physical Condition Standards (UPCS) certified inspectors conduct accurate, reliable, and repeatable inspections in full compliance with established UPCS inspection protocol.

This objective reflects HUD's commitment that HUD assisted and insured housing is decent, safe, sanitary, and in good repair

GENERAL DESCRIPTION OF WORK

The Contractor shall perform to the standards of this contract. The contractor(s) shall schedule inspections and inspection reviews with property representatives of HUD and other Federal agency funded/assisted housing/properties and confirm resident notification. The contractor(s) shall use a HUD certified inspector trained in the appropriate protocol, software, and/or HUD-distributed inspection tool to conduct physical inspections and/or inspection reviews of a unit/property individually, simultaneously with the property’s staff/contract inspector performing the same inspection, and/or as a follow-on inspection to the property’s inspection.

The contractor(s) shall focus on the accuracy of the inspection and document any discrepancies utilizing the inspection protocol and supported by digital camera images, as required, that are time stamped and embedded in the deliverable. The contractor shall input and submit all required inspection data and photographic images to REAC using either a HUD-distributed REAC Inspection Tool or the secure systems Physical Assessment Sub-system. The contractor(s) shall be required to maintain data storage/warehouse sufficient to house the computerized inspection reports, including photographs and all other required data that is accessible to HUD or its designated agent 24 hours per day, seven days a week, for specific periods of time.

The contractor(s) shall have the capacity to complete a minimum of 300 HQS and/or UPCS type inspections across all fifty states and the U.S. territories each week.

Contractor Travel: The Contractor shall be required to perform periodic travel within the Continental United States (CONUS) and/or outside the continental United States (OCONUS) in performance of this contract. Prior to travel (each planned trip) the Contractor shall coordinate with and receive Government authorization from the GTR for all travel. The Contractor shall be responsible for obtaining all passenger transportation, lodging and subsistence. For OCONUS travel, the contractor employees shall possess passports, visas and medical clearances for designated areas. The Government will not reimburse the Contractor for these types of expenses. Reimbursement of CONUS travel costs will be in accordance with the Federal Travel Regulation in accordance with FAR 31.205-46. The Contractor shall travel using the lower cost mode transportation commensurate with the mission requirements. When necessary to use air travel, the Contractor shall use the tourist class, economy class or similar lodging accommodations to the extent they are available and commensurate with the mission requirements. HUD will not reimburse Contractor’s local travel. Local travel is defined as travel within 50 miles of the Public Housing Agency (PHA). The Contractor shall use local travel to the maximum extent possible. Note: The Joint Travel Regulation (JTR) applies to OCONUS travel Equipment: The Contractor shall furnish all necessary inspection equipment required to conduct physical inspection and physical inspection reviews. The Contractor shall furnish all required hardware and data collection devices (DCDs) and the necessary expertise to maintain the technical environment of the DCDs.

APPLICABLE REGULATIONS/MANUALS/DOCUMENTS/PUBLICATIONS:

The Contractor shall abide by all applicable regulations, publications, manuals, and policies and procedures in the performance of this contract including, but not limited to the following:

a.The contractor shall perform Federal HQS physical inspections in conformance with the standards in Federal regulations at 24 CFR 982.401.
b.The contractor shall utilize either the Form HUD-52580 Inspection Checklist Housing Choice Voucher Program (03/2001) or Form HUD-52580-A Inspection Form Housing Choice Voucher Program (09/2000). These forms are available at http://www.hud.gov/offices/adm/hudclips/forms/hud5.cfm.
c.The contractor shall be conversant with the Uniform Physical Condition Standards (UPCS) and able to apply HUD UPCS to existing HCV units integrating HQS and UPCS data. The UPCS standards can be found at http://portal.hud.gov/hudportal/documents/huddoc?id=pass4.0scoringnoticefr.PDF.
d.The contractor shall be conversant with the Uniform Physical Condition Standards (UPCS) and all associated HUD Inspector Notices and Inspector Guides. The contractor shall able to apply HUD UPCS to other Federal assisted housing, as required, integrating UPCS data with standards in Federal regulations and existing Federal agency publications.

Training: The Contractor shall be responsible to train and ensure satisfactory completion of physical inspection training in accordance with HUD standards.

a.The contractor(s) shall ensure completion of any on-line training required for HQS and/or UPCS-type inspections.
b.The contractor(s) shall provide Phase I training, an overview of and detailed information about inspection protocols, standards, defect definitions, use of the appropriate software, and any HUD-distributed business tools
c.The contractor(s) shall facilitate and administer tests that require each inspector to demonstrate competence in the inspection protocols, standards, defect definitions, and use of the appropriate software and/or business tools associated with each type of inspection.
d.The contractor(s) shall maintain a list of inspectors and their qualifications. For the purposes of UPCS-type inspections, the following categories of inspectors shall apply:
•Certified Provisional REAC Contract Inspector (applies to initial 12-month base year of contract only) This Contractor/Inspector has successfully completed both the UPCS-type online and Phase I inspector training, but has not completed the Phase II field training.
•Certified REAC Contract Inspector This Contractor/Inspector has successfully completed the UPCS-type online training, Phase I training, and Phase II field training and certification.
•Certified REAC Contract QA Inspector In addition to successfully completing the requirements to become a Certified REAC Contract Inspector, this Contractor/Inspector has completed additional advanced REAC training. Successful completion of this training allows the contract inspector to conduct quality assurance reviews of property staff using the UPCS type inspection software and/or HUD-distributed inspection tools.
e.The contractor(s) shall provide a report of inspectors and their qualifications that includes as a minimum: Inspector Name, ID Number, type of training completed, and completion date.

Scheduling:

Uniform Physical Condition Standards (UPCS): The following shall be used for all UPCS type inspections/inspection reviews:

a.Negotiating a mutually agreeable date and time for the inspections with the property. owner/agent (POA). All inspections must occur in the presence of the property representative.
b.Using Secure Systems PASS, the contractor shall input information to include property inspection time and date and the Inspector’s ID number.
c.Monitor scheduled inspections and update the schedule as necessary
d.Generate the confirmation letter regarding time, date and other details concerning the inspection and email letter to the POA’s contact/representative.
e.Prior to arriving for the review inspection, the contractor shall call the property to confirm the time and date of inspection and verify the property has completed resident notification for the scheduled unit(s)/properties.
f.Once the inspection/inspection review is scheduled, the contractor shall make every effort to arrive on time for the inspection. If the inspector anticipates any delay, the contractor shall notify the POA’s designated representative as soon as possible.

Housing Quality Standards (HQS): The following scheduling process for HQS inspection reviews/inspections and QA inspections shall be used:

a.The contractor shall contact each PHA property representative to obtain a list of scheduled inspections.
b.The contractor shall use a random sampling technique to ensure a mix of housing types and PHA inspectors and randomly select scheduled inspections to conduct simultaneously or as a follow-on inspection.
c.The contractor shall contact the PHA property representative and obtain the time and date for each review inspection. It is necessary for either the resident or the landlord to be present during the inspection. Additionally, the PHA’s inspector must accompany the contractor at all times while on site.
d.The contractor shall provide the PHA property representative with a letter confirming one or more scheduled inspections.
e.The contractor shall report the following schedule information: Contractor’s first and last name, ID number (as available), and contact information; PHA city and state, property contact with contact information, and property representative with contact information; Property address including city, state, and zip code; Date and time of each scheduled inspection; and PHA Inspector’s first and last name, Contractor or Employee, and contact information.

Inspections

HQS:

a.The contractor shall be responsible for bringing the necessary equipment/tools to perform the inspection including a digital camera with date/time stamp technology.
b.The contractor shall perform Federal HQS physical inspections in compliance with the standards in Federal regulations at 24 CFR 982.401.
c.The contractor shall utilize either the Form HUD-52580 Inspection Checklist Housing Choice Voucher Program (03/2001) or Form HUD-52580-A Inspection Form Housing Choice Voucher Program (09/2000). These forms are available at http://www.hud.gov/offices/adm/hudclips/forms/hud5.cfm.
d.The contractor shall perform a Federal HQS inspection of an HCV unit simultaneously with the PHA’s staff/contract inspector performing an HQS inspection or as a follow-on inspection to the PHA’s HQS inspection.
e.The contractor shall observe and record conditions that fail to meet the Federal Housing Quality Standards, without exception for local code differences or local PHA requirements.
f.The contractor shall compare and document any differences between the Federal HQS and the local HQS inspection results as recorded by the PHA’s contractor/employee inspector.
g.Using either the electronic format of the HUD-distributed REAC HQS Inspection Tool or a compatible means of recording inspection data, the contractor shall annotate all differences by category as missed, incorrectly categorized, local code exception, or PHA requirement with a clear, concise description of the disparity.
h.The contractor shall support each disparity with one or more clear, time/date stamped digital camera images and take as many pictures as necessary to support the HQS inspection and for each defect with a determination of missed, incorrectly categorized, local code exception, or PHA requirement.
i.The contractor shall record any exigent health and safety hazards identified during the inspection, provide the PHA representative with a written notice of all such defects, and ask the PHA representative to sign acknowledging receipt of the notice before departing the property.
j.The contractor shall obtain a copy of the original HQS inspection report performed by the PHA’s employee/contract inspector immediately after the PHA’s inspection.

UPCS-V Inspections: Services shall include:

a.The contractor shall be responsible for bringing the necessary equipment/tools to perform the inspection including a digital camera with date/time stamp technology.
b.The contractor shall meet with the property representative.
c.The contractor shall download the appropriate UPCS-V inspection.
d.The contractor shall verify/update the one building/one unit property profile and building information using the HUD-distributed software.
e.The contractor shall conduct inspections using the HUD-distributed UPCS-V software and in compliance with the UPCS protocol. The current UPCS standards can be found at http://portal.hud.gov/hudportal/documents/huddoc?id=pass4.0scoringnoticefr.PDF.
f.The contractor shall document and support each defect with a digital/time-stamped camera image.
g.The contractor shall record any exigent health and safety hazards identified during the inspection, provide the PHA representative with a written notice of all such defects, and ask the PHA representative to sign acknowledging receipt of the notice before departing the property.

UPCS/UPCS-type/Other Federal Agency Inspections: Services shall include:

a.The contractor shall be responsible for bringing the necessary equipment/tools to perform the inspection including a digital camera with date/time stamp technology.
b.The contractor shall meet with the property representative.
c.The contractor shall download the appropriate UPCS-type inspection.
d.The contractor shall verify/update the property profile and building information using the HUD-distributed software.
e.The contractor shall conduct inspections using the HUD-distributed UPCS-type software and in compliance with the UPCS protocol. The current UPCS standards can be found at http://portal.hud.gov/hudportal/documents/huddoc?id=pass4.0scoringnoticefr.PDF.
f.The contractor shall document and support each defect with a digital/time-stamped camera image.
g.The contractor shall record any exigent health and safety hazards identified during the inspection, provide the property representative with a written notice of all such defects, and ask the PHA representative to sign acknowledging receipt of the notice before departing the property.

HQS Quality Assurance (QA) Inspections: Services shall include:

a.The contractor shall be responsible for bringing the necessary equipment/tools to perform the inspection including a digital camera with date/time stamp technology.
b.The contractor shall perform Federal HQS physical inspections in compliance with the standards in Federal regulations at 24 CFR 982.401.
c.The contractor shall utilize either the Form HUD-52580 Inspection Checklist Housing Choice Voucher Program (03/2001) or Form HUD-52580-A Inspection Form Housing Choice Voucher Program (09/2000). These forms are available at http://www.hud.gov/offices/adm/hudclips/forms/hud5.cfm.
d.The contractor shall perform a Federal HQS inspection of an HCV unit simultaneously with the PHA’s staff/contract inspector performing an HQS inspection or as a follow-on inspection to the PHA’s HQS inspection.
e.The contractor shall observe and record conditions that fail to meet the Federal Housing Quality Standards, without exception for local code differences or local PHA requirements.
f.The contractor shall compare and document any differences between the Federal HQS and the local HQS inspection results as recorded by the PHA’s contractor/employee inspector.
g.Using either the electronic format of the HUD-distributed REAC HQS Inspection Tool or a compatible means of recording inspection data, the contractor shall annotate all differences by category as missed, incorrectly categorized, local code exception, or PHA requirement with a clear, concise description of the disparity.
h.The contractor shall support each disparity with one or more clear, time/date stamped digital camera images and take as many pictures as necessary to support the HQS inspection and for each defect with a determination of missed, incorrectly categorized, local code exception, or PHA requirement.
i.The contractor shall record any exigent health and safety hazards identified during the inspection, provide the PHA representative with a written notice of all such defects, and ask the PHA representative to sign acknowledging receipt of the notice before departing the property.
j.The contractor shall obtain a copy of the original HQS inspection report performed by the PHA’s employee/contract inspector immediately after the PHA’s inspection.

Data Storage and Reporting:

HQS Inspections/Inspection Reviews and QA Inspections Data Storage:

The contractor(s) shall be required to maintain data storage/warehouse sufficient to house the computerized inspection reports, including photographs and all other required data that is accessible to HUD or its designated agent 24 hours per day, seven days a week, for specific periods of time.

Quality Control: The Contractor shall establish and maintain a complete Quality Control Program that shall ensure services are performed in accordance with this contract. The Contractor shall develop and implement procedures to identify, prevent, and ensure non reoccurrence of defective services. The Contractor’s quality control program is the means by which he assures himself that his work complies with the requirements of the contract. The Contractor shall provide the associated Quality Control Plan.

Quality Control Plan: The Contractor shall develop, maintain, enforce and document a Quality Control Plan (QCP). The QCP shall ensure the Government receives the level of quality that is consistent with the requirements specified in this contract. The QCP shall be sufficiently detailed to provide the Contractor’s methodology for identifying and recruiting qualified personnel. The QCP shall also provide the Contractor’s methodology for resolving problems identified by the Government during reviews conducted in accordance with its Quality Assurance Surveillance Plan (QSAP). The QCP shall also provide the Contractor’s methodology for establishing an internal feedback system for support personnel, and for resolving problems identified by that feedback system. The QCP shall demonstrate and validate that the services or deliverables to be provided under the contract are completed with a level of quality that meets the minimum performance threshold established in the Government’s QASP. The QCP shall address Quality Management Approach, Quality Assurance, Quality Control and Quality Standards. This will also include conducting follow-up quality control inspections to verify completion of repairs of deficiencies identified during original inspection of up to 10% at HUDs request.

The tasks require a set of skill categories based on the following approximate breakdown:

Special Qualifications: The Contractor(s) shall ensure all contractor(s) (including any subcontractor) personnel that will be conducting inspections, shall meet the special qualification requirements as follows:

a.High school education or equivalent.
b.Specific technical knowledge in major building trades used in residential construction including foundations, structures, framing, roofing, plumbing, heating and air conditioning, and electrical.
c.General computer skills including familiarity with Windows software and ability to use an appropriate data collection device.
d.Completion of a minimum of 50 licensed/certified physical inspections of public housing properties, Housing Choice Voucher properties, single family or multifamily real estate properties, commercial and/or medical care facilities to determine compliance with physical housing infrastructure, systems, and construction standards.
e.Ability to read, understand, and interpret (based on personal experience) Federal Housing Quality Standard (HQS) and Uniform Physical Condition Standards (UPCS).
f.Some agencies employ and/or contract for HQS and UPCS inspections. The Contractor(s) (including any subcontractor) assigned to perform an inspection shall not be the same person as the agency had previously employed and/or contracted to inspect the same unit/property.

HUD is interested in the capabilities of perspective contractors in the following areas:

•Scheduling and inspection of state and or federally subsidized or regulated housing
•Performing HQS, UPCS or similar inspection protocol inspections
•Training of inspectors
•Development & implementation of quality control programs for a property inspection process
•The use of computer based system(s) to perform onsite inspections
•Ability to electronically warehouse data base of inspections performed
•Ability to download, upload inspections electronically per HUDs guidelines
•Ability to make inspection data accessible to HUD or HUD authorized entities at any

CONTEMPLATED PERFORMANCE METRICS

Performance Measure
Performance Objective
Performance Standard
Minimum Acceptable Quality Level
Surveillance Method
Incentive/

Disincentive

Inspections: Complete HQS and UPCS type Inspections IAW PWS section 5.3
Inspections are conducted completed in a timely and accurate manner.
Inspectors follow applicable standards for all types of inspections.
100% of inspections are conducting using the required protocols and standards
Random Sampling- On a monthly basis, 5% of inspectors receive CQA Reviews
Inspectors found outside standards to be decertified for a period of one year
Inspections: Complete HQS type Inspections IAW PWS section 5.2
Resident and landlord notification is conducted IAW the PWS and documented
Landlord or the tenant is properly notified of and present for the inspection.
Less than 3% of monthly inspections are cancelled due to landlord or tenant no-show. All required notification documents demonstrate the landlord/tenant were notified and received the notification
100% Inspection-100% Contractor performance metrics and documentation will be reviewed for cancelations
A 40 percent reduction will apply for each inspection cancelled due to resident and/or landlord nonappearance over the 3% no-show variance
Inspections: Complete UPCS type Inspection IAW PWS section 5.3,5.4.2
UPCS inspection uploaded to the PASS system within 24 hours
Inspectors are uploading successful inspections in a timely manner
95% of UPCS inspection are uploaded within 24 hours, 98% of inspections are designated successful
Automated review performed by system tools
Inspections: Complete UPCS type Inspection IAW PWS section 5.3,5.4.2
Questions pertaining to an uploaded inspection that have been placed on hold or rejected, to be answered within one business day
Rejected and on hold inspections are successfully completed in a timely manner
90% of inspections placed on hold or rejected reflect a documented outcome within one business day, 98% of inspections are designated successful
Automated review performed by system tools
Inspectors: Inspector Training IAW PWS paragraph 5.1
All inspectors are trained and/or certified
The contractor shall ensure 100% of people conducting inspection reviews/ inspections are trained and/or certified
100% of people trained and/or certified
100% inspection by GTR
Any untrained and/or uncertified inspector conducting an inspection to be suspended from inspecting for a one year period
Inspectors: Inspector Training IAW PWS paragraph 5.1
All trained and/or certified inspectors are within standards
100% of trained and/certified inspectors are able to complete inspections within standards
100% of trained and/or certified inspectors meet physical inspection standards
100% inspection by GTR
Any trained and/or certified inspector found to be outside standards during a CQA will be decertified for a period of one year/suspended from performing inspections for a period of one year
Project Management: Monthly Performance Report IAW PWS paragraph 5.4.4.2
To be delivered within the first five days of the following month.
The Contractor shall provide a monthly report that is complete, timely, and written in a clear and concise manner
Report is submitted on time with minimum errors (grammar and spelling) and reflects the full substance of the requirements
100% inspection by GTR
Full payment will be made for 100% compliance
Scheduling: Report of Weekly Schedule of HQS Reviews/ Inspections IAW PWS paragraph 5.4.1.3
To be initially delivered three weeks prior to the first scheduled review/inspection and submitted on a weekly basis thereafter. Any changes to a weekly schedule must be submitted within 24 hours of the change.
The Contractor shall provide a weekly report that is complete and timely
95% of reports are submitted on time with less than 3% missing variables
100% inspection by GTR
Full payment will be made for 100% compliance
Planning: Project Plan IAW PWS paragraph 5.4.3
To be delivered within the first 30 days from the date of each Task Order award
The Contractor shall provide task order project plan that is complete, timely, and written in a clear and concise manner
Project plan is submitted on time and reflects the full substance of the requirements
100% inspection by GTR
A $500 reduction will apply for each business day the project plan is overdue
Quality Control: Quality Control Plan IAW PWS paragraph 4.7.1/6.2
To be delivered within 90 calendar days after contract award
The Contractor shall provide a report that is complete, timely, and written in a clear and concise manner
Report is submitted on time with minimum errors (grammar and spelling) and reflects the substance of the requirements
100% inspection by GTR
Full payment will be made for 100% compliance

CONTEMPLATED REPORT REQUIREMENTS

Inspection Reporting: The contractor shall provide the PHA’s original HQS report and the comparison Federal HQS report, with embedded photos, in the HUD-distributed REAC HQS Inspection Tool (database) for each HQS inspection to REAC for all HQS type inspections on a weekly basis.

Weekly Scheduling Report: The contractor shall provide an Excel spreadsheet that provides for each Task Order: Contractor(s) Inspector’s first and last name, ID number, and contact information; PHA city and state with property contact/representative with contact information; property address including city, state, and zip code; and date and time of each scheduled review.

UPCS: The contractor shall verify and upload inspection data for each inspection, within 24 hours of completion of the inspection, to REAC using the Secure Systems PASS. The contractor shall provide a satisfactory answer to any questions about inspection details resulting in the inspection being placed on hold or rejected in PASS secure systems.

Project Plan: The contractor shall provide a project plan for each Task Order that describes all planning, scheduling and inspection review/inspection activities; personnel positions and staff skills and abilities, standards, and training; inspection schedule; equipment resources; training and facilities; and functional responsibility and authority within a structured project organization. The Project Plan will also detail the random sampling technique to be used to select inspections for HQS, UPCS-V, and QA type inspections to ensure a mix of housing types, property inspectors, and overall inspection results.

Monthly Performance Report Performance Metrics: The contractor shall develop performance metrics that allow tracking of project completion against the milestones set by REAC for each Task Order.

Performance Report: The contractor shall submit a monthly Performance Report that reflects project progress, resources, budget, schedules, work flow, quality control, and reporting for each Task Order. The contractor(s) shall evaluate the use of their random sampling technique for any PHA HQS, UPCS-V, and QA type inspections for a mix of housing types, PHA inspectors, and overall inspection results. The contractor(s) shall perform a detailed review of project deliverables for accuracy, completeness, and adherence to contractual and functional requirements and report the results of their

CONTEMPLATED MAGNITUDE OF THE PROJECT

HUD is contemplating a multiple award IDIQ with a minimum of Three (3) firms and a maximum of Seven (7) firms. HUD anticipates utilizing these contracts for a minimum of 9,000 inspections and maximum of 50,000 inspections annually.

CONTEMPLATED PLACE OF PERFORMANCE

Place of Performance: The physical inspection and inspection review services to be performed during this contract shall be performed at a select number of HUD and other Federal agency funded/ assisted housing/properties located in the United States (U.S.) and U.S. Territories to include the Virgin Islands, the Commonwealth of Puerto Rico, and Guam.

The Contractor(s) shall maintain a database sufficient to house the computerized inspection reports, including photographs and all other required data that is accessible to HUD or its designated agent 24 hours per day, seven days a week, for the entire period of the contract.

The Contractor(s) must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within the Contract when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.

RESPONSE REQUESTED

Small Businesses are encouraged to respond.

This synopsis is a market research tool being used to determine the availability and capability of potential sources prior to determining the method of acquisition and whether the government will proceed with this acquisition. The Government will not pay for any information solicited. If a contract is ultimately pursued, responses to this RFI will be used to aid in determining whether the acquisition is set-aside for small business or in establishing small business subcontracting goals. All qualified firms are encouraged to respond.

The capability statement shall address, at a minimum, the following for the past three years:

1. Name and address of company and or companies (if there is a teaming arrangement or joint venture);

2. Technical expertise relevant to the requirement;

3. Technical approach relevant of the requirement;

4. Management approach relevant to the requirement;

5. Corporate experience relevant to the requirement;

6. Indicate if you are a small business or any other socio-economic categories that apply to your firm under the designated NAICS code;

7. Relevant past performance. Your capability statement needs to include a list of three customers (Government/non-Government) within the past three (3) years highlighting similar work in nature, scope, complexity, and difficulty and a brief description of the scope of work. Your submission for relevant past performance must include for each customer:

· Contract name;

· Contracting Agency or Department, POC and contact information;

· Yearly contract value (in $$);

· Whether your firm was the prime or a subcontractor;

· Period of performance;

· Description of work and how it relates to the requirements.

Submission requirements:

1. Page limit - eight (8) 8 ½ x 11 pages

2. 1 inch margins (top, bottom and sides)

3. Times New Roman font - 12 point

4. Page limitation does not include (1 cover page or 1 letter of introduction page)

5. Do not include promotional materials Interested firms responding to this market survey must provide a capability statement demonstrating their experience, skills and capability to fulfill the Governments requirements for the above. The capability statement shall be in sufficient enough detail, but not exceed eight (8) pages TOTAL, so that the Government can determine the experience and capability of your firm to provide the requirements above. The Government technical team will then assess the experience & capabilities based on: 1) technical expertise relevant to the requirement; 2) technical approach relevant to the requirement, 3) management approach relevant to the requirement, 4) corporate experience relevant to the requirement, and 5) relevant past performance. Please specify one primary and one alternate Point of Contact (POC) within your firm, including telephone numbers and email addresses.

Only electronic copies of capability statements will be accepted and should be emailed to: Joel.J.Bartholomew@Hud.Gov. The e-mail shall contain the following subject line: Response to Sources Sought Notice – REAC Inspections Requirement. The Government may use the responses received to determine whether to proceed with the acquisition as a set-aside, or in the absence of a least two small business responses to this notice, may determine to proceed with a full and open competition. This decision and whether to proceed with the acquisition is at the sole discretion of the Government.

All interested contractors should submit their capability statements by TIME 3:00 PM EST on 12/06/2013 attention Joel Bartholomew. Late responses will not be considered.

File details come from the government source that posted it. Updated .