DU100H-14-R-0006.Attach002.doc

DOC document 96 KB Posted

Attached to
Single Family Transaction Services
Solicitation number
DU100H-14-R-0006
Issued by

About this file

Attachment 002

View the file

Other files

File Type Posted
DU100H-14-R-0006.0714.rtf RTF text file
DU100H-14-R-0006.Attach001.xlsx XLSX spreadsheet
DU100H-14-R-0006.Attach003.xlsx XLSX spreadsheet
DU100H-14-R-0006.SF1449.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DU100H-14-R-0006

Attachment 002

PAGE

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

The Department of Housing and Urban Development (HUD), under the auspices of the Federal Housing Administration (FHA) Single Family Loan Sales Program (SFLS or Program), sells certain of its single family HUD-held notes that are assigned to HUD after default by a borrower. The Asset Sales Office (ASO), an organizational unit within HUD’s Office of Finance and Budget, was established in Fiscal Year 2001 to administer the Asset Sales Program. The primary objective of the ASO is to maximize the recoveries to the Federal Housing Administration (FHA) insurance funds. The ASO will engage a Transaction Specialist (TS) meet the objectives of the program.

Issued July, 2014

TABLE OF CONTENTS

INTRODUCTION

11.1 Purpose

11.2 Performance Management Approach

11.3 Performance Management Strategy

ROLES AND RESPONSIBILITIES

22.1 The Contracting Officer

22.2 The Government’s Technical Representative

IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

METHODOLOGIES TO MONITOR PERFORMANCE

24.1 Surveillance Techniques

34.2 Customer Feedback

34.3 Acceptable Quality Levels

QUALITY ASSURANCE DOCUMENTATION

35.1 The Performance Management Feedback Loop

35.2 Monitoring Forms

ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

46.1 Determining Performance

46.2 Reporting

46.3 Reviews and Resolution

5ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

6ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

1 INTRODUCTION

This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled: Transaction Specialist Single Family Loan Sale Program. This plan sets forth the procedures and guidelines that the Asset Sales Office (ASO) will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.

1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

1.2 Performance Management Approach

1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the ASO to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

1.3 Performance Management Strategy

1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

2 ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the government technical representative (GTR) and the contractor. The CO will designate one full-time GTR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.

2.2 The Government Technical Representative

The government technical representative is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. GTR limitations are contained in the written appointment letter. The GTR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The GTR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The GTR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. I

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are as follows:

· 100% Inspection. One hundred percent inspection shall be used for those products and services, which are considered critical tasks. All tasks that utilize this method of surveillance shall be reviewed by the GTM and certified for its completeness, accuracy, and conformance to HUD’s standard.

· Validated User Complaints. User complaints will be received through various means of communications, telephone calls/surveys, email, forum entries, etc. User complaints will be recorded and maintained by the GTM.

4.2 Customer Feedback

The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the CO and/or GTR, as opposed to the contractor.

Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the GTR. The GTR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified in Attachment 3.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

4.3 Acceptable Quality Levels

The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed. For certain critical activities such as those involving loan due diligence data the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at the ASO.

5 QUALITY ASSURANCE DOCUMENTATION

5.1 The Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.

5.2 Monitoring Forms

The government’s QA surveillance, accomplished by the GTR will be reported using the monitoring forms in Attachments 2 and 3. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results are being achieved.

5.2.1 The GTR will retain a copy of all completed QA surveillance forms.

6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

6.1 Determining Performance

6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

6.2 Reporting

6.2.1 At the end of each month, the GTM will prepare a written report for the GTR summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

6.3 Reviews and Resolution

6.3.1 The GTR may require the contractor’s project manager, or a designated alternate, to meet with the CO and / or GTM and other government IPT personnel as deemed necessary to discuss performance evaluation. The GTR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the GTR as often as required or per the contractor’s request. The agenda of the reviews may include:

· Monthly performance assessment data and trend analysis

· Issues and concerns of both parties

· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

· Recommendations for improved efficiency and/or effectiveness

· Issues arising from the performance monitoring processes

6.3.2 The CO and GTR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

6.3.3 The GTR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the CO.

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

Performance Measure
Performance Objective
Performance Standard
Minimum Acceptable Quality Level
Surveillance Method
Incentive/

Disincentive

5.3.1 Asset Sales Project Plan
For each sale the Contractor shall develop a comprehensive Asset Sales Project Plan that incorporates all requirements of the sale
Each plan is complete in that it addresses all aspects of the sale from Kick-off to settlements and is written in a clear and concise manner.
The plan is submitted on time with minimum errors (grammar, spelling) and is substantive relative to the goals of the plan and asset sales program
100% Inspection by GTM
Failure to meet the required service or performance level will result in a requirement to redo and resubmit deliverable and a negative performance documented in the monthly GTR reports and past performance reports (CPARS).
5.3.2 Asset Portfolio Analytics
The Contractor shall conduct portfolio analytics to ensure the that assets are properly valued, priced and pooled
Analytics are based on methodology supported by accepted valuation practices and pertinent market data for the asset type and delivered in a format that that allows for ease of review and assessment.
Analytics are supported by accepted practices and pertinent market data for single family defaulted mortgage notes
100% inspection by the GTM
Failure to meet the required service or performance level will result in a requirement to redo and resubmit deliverable and a negative performance documented in the monthly GTR reports and past performance reports (CPARS).).
5.3.4 Marketing Plan
For each sale the Contractor shall develop a comprehensive Marketing Plan that incorporates all requirements of the sale
Sale and marketing strategy must reflect HUD’s goals of maximizing sales proceeds
The plan is submitted on time with minimum errors (grammar, spelling) and is substantive relative to the goals of the plan and asset sales program
100% Inspection by GTM
Failure to meet the required service or performance level will result in a requirement to redo and resubmit deliverable and a negative performance documented in the monthly GTR reports and past performance reports (CPARS).
5.3.6 Loan Due Diligence Services
For each sale , the Contractor shall provide loan due diligence services to include information collection, aggregation, and review
Due diligence online platform is state-of-the art and innovative; due diligence materials are thorough, complete and is relevant to the sale
Due diligence data is relevant to the sale, is legible, posted timely, and allows for each of access by users
100% inspection by GTM and validated by bidder feed back
Failure to meet the required service level will result in a requirement to redo and resubmit deliverable and a negative performance documented in the monthly GTR reports and past performance reports (CPARS).
5.4 Bid Day Execution
Bid Day is executed smoothly and effectively
Bid Day Procedures are followed , contractor has adequate staff on site, bid model works efficient; all issues are addressed and resolved timely
Contractor meets or exceeds HUD’s established reserve price per pool of loans sold
100% inspection by GTM and validated by bids received
Failure to meet the required service level will result in a requirement to redo and resubmit deliverable and a negative performance documented in the monthly GTR reports and past performance reports (CPARS).

ATTACHMENT 2: SAMPLE QUALITY ASSURANCE

MONITORING FORM

SERVICE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check):

Random Sampling 100% Inspection Periodic Inspection Customer Complaint

LEVEL OF SURVEILLANCE (Check):

Monthly Quarterly As needed

PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______%

Service Provider’s Performance (Check):

Meets Standards

Does Not Meet Standards

Narrative of Performance During Survey Period:

PREPARED BY: ___________________________________

DATE: _________________

PAGE

i

File details come from the government source that posted it. Updated .