Attachment_1_-_Instructions_Conditions_and_Notices_to_Offerors.pdf
PDF 19 KB Posted
- Solicitation number
- DTRT5715Q80095
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_2_-_FAR_52_212-3.pdf | ||
| Attachment_3_-_Wage_Determination_2005-2255_Revision_18.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Quotation (RFQ) No. DTRT5715Q80095 Attachment 1
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
I. PROPOSAL FORMAT
The Offeror’s written proposal must include the following:
PRICE QUOTATION
The Offeror shall complete CLINs 0100 through 0200 as reflected in the CLIN structure of the Solicitation and provide a total proposed price of all CLINs 0100-0200. The offeror’s quoted price will be evaluated based on the total firm fixed price proposed for CLINs 0100-0200.
For CLIN 0001, the Contractor shall propose a not-to-exceed (NTE) price with the requirements listed in the Statement of Work. The Contractor shall construct its proposal using 240 hours (80 hours per chiller) of emergency on call support.
For CLIN 0002, The Contractor shall propose the necessary firm-fixed price in accordance with the requirements listed in the statement of Work.
TECHNICAL PROPOSAL
The Offeror’s technical proposal shall include the following:
1) A written description of the Offeror’s technical approach for successfully achieving the requirements identified in the Statement of Work
FAR 52.212-3, OFFEROR REPRESENTATIONS AND CERTIFICATIONS –
COMMERCIAL ITEMS
The Offeror must include a completed copy of the provision at FAR 52.212-3, Offeror Representations and Certifications-Commercial Items (see Attachment 2). An Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certifications electronically using the System for Award Management (SAM) accessible via http://www.acquisition.gov. If the Offeror has not completed the annual representations and certifications electronically in SAM, the Offeror shall complete only paragraphs (c) through (o) of this provision. The Offeror is reminded that if it completes its annual representations and certifications electronically in SAM it must update its representations and certifications as necessary, but at least annually, to ensure they are kept current, accurate, and complete. All Contractors must be registered in SAM in order to receive an award from a DOT Agency.
Any proposal that does not include the components specified above will be considered non-responsive.
II. EVALUATION FACTORS FOR AWARD
http://www.acquisition.gov/
Request for Quotation (RFQ) No. DTRT5715Q80095 Attachment 1
Award Criteria
Overall best value to the Government with regards to lowest price technically acceptable.
Basis for Award
An award will be made to the contractor that best conforms to the technical requirements in the Statement of Work and is the lowest price.
Order of Importance
The technical approach is considered equal to price in the selection of the contractor for award.
When the Technical Proposals are evaluated as essentially equal, the quoted price may become the determining factor in making an award.
Price
The Offeror’s quoted price will be evaluated based on the total firm fixed price proposed for CLINs 0100 – 0200.
File details come from the government source that posted it. Updated .