MTAC_Cost_Proposal_Schedules.docx

DOCX document 142 KB Posted

Attached to
Monitoring and Technical Assistance Contract (MTAC) for the Federal Railroad Administration Grant and Loan Program
Solicitation number
DTRT57-13-R-20012
Issued by

About this file

Word Version of Cost Proposal Schedules

View the file

Other files

File Type Posted
MTAC_Amendment_A0003.pdf PDF
MTAC_Amendment_A0002.pdf PDF
MTAC_RFP_Amendment_A0001.pdf PDF
Solicitation_No._DTRT57-13-R-20012.pdf PDF
DTRT57-13-R-20012_Informational_Draft.docx DOCX document
MTAC_SOW_Final_Draft.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHECKLIST FOR SCHEDULES (CLIN 0001 and CLIN 0002)

Proposal Page Reference

Solicitation Documents

Schedule 1: Proposal Cover Sheet

Schedule 2: Summary of Proposed Costs and Fixed Fee

Schedule 3: Summary of Proposed Costs and Profit

Schedule 4: Establishment of Maximum Factors and Calculation of Proposed Amounts for Fixed Fee and Profit

Schedule 5: Summary of Proposed Labor Cost

Schedule 6: Labor Cost Realism Information

Schedule 7: Allocation of Labor Hours

Schedule 8: Indirect Rates and Factors

Schedule 9: Subcontract Information

Exhibit C: Resume Checklist

Supporting documentation for labor rates including current salary information, escalation to performance period, road-mapping to internal labor categories for resumed key personnel

Supporting documentation for labor rates including current salary information, escalation to performance period, road-mapping to internal labor categories for non-resumed professional labor

Administrative labor hours and description of functions for labor that will be charged directly

Information for Uncompensated Overtime

Professional Compensation Plan

Estimate and rationale for Offeror-estimated Other Direct Costs

Supporting documentation for indirect rates including: basis of proposed, current forecast, historical actuals, and evidence of audit or approval. Government-site rate must be included but not used to price the labor.

Cost of Money supporting documents and calculations if proposed.

Signed letters of intent for planned new hires

Prime’s evaluation of subcontractor proposals

Evidence of Accounting System approval

Cost Control Plan

Subcontracting Plan

Limitation on Pass-Through Charges - Identification of Subcontracted Effort (IAW FAR 52.215-22)

Conflict of Interest Disclosure Statement

NOTE: Offerors may modify the following schedules (font size, portrait or landscape orientation, etc.) provided all of the requested information is included and furnished in similar format. Small business offerors are not required to submit a subcontracting plan.

Schedule 1 – Proposal Cover Sheet

PROPOSAL COVER SHEET
1. SOLICITATION/CONTRACT/MODIFICATION NUMBER
2a. NAME OF OFFEROR
3a. NAME OF OFFEROR’S POINT OF CONTACT
2b. FIRST LINE ADDRESS
3b. TITLE OF OFFEROR’S POINT OF CONTACT

2c. STREET ADDRESS

3c. TELEPHONE
3d. EMAIL
2d. CITY
2e. STATE
2f. ZIP CODE
AREA CODE
NUMBER
4. TYPE OF CONTRACT OR SUBCONTRACT (Check)
5. |_| PRIME OFFEROR

|_| FFP

|_| FPI

|_| CPFF |_| CPIF |_| OTHER

|_| OTHER (Specify)

|_| CPAF
|_| SUBCONTRACTOR __________________________

PRIME OFFEROR’S NAME

6. ESTIMATED COST, FEE AND PROFIT INFORMATION

A. ESTIMATED COST

B. FIXED FEE

C. PROFIT

D.TOTAL PRICE

7. PROVIDE THE FOLLOWING

NAME OF COGNIZANT CONTRACT ADMINISTRATIVE AGENCY
NAME OF COGNIZANT GOVERNMENT AUDIT AGENCY
STREET ADDRESS
STREET ADDRESS
CITY
STATE
ZIP CODE
CITY
STATE
ZIP CODE
TELEPHONE
AREA CODE AND NUMBER
PHONE
AREA CODE AND NUMBER
FACSIMILE
AREA CODE AND NUMBER
FACSIMILE
AREA CODE AND NUMBER

NAME OF CONTACT

NAME OF

CONTACT

PROPERTY SYSTEM
|_| Reviewed by cognizant contract administrative

agency and determined acceptable |_| Reviewed by cognizant contract administrative agency and determined not acceptable |_| Never reviewed

APPROX DATE OF LAST AUDIT

PURPOSE OF AUDIT
(e.g. proposal review, establishment of billing rates, finalize indirect rates, etc.)
PURCHASING SYSTEM
|_| Reviewed by cognizant contract administrative agency and determined acceptable;

|_| Reviewed by cognizant contract; administrative agency and determined not acceptable;

|_| Never reviewed

ACCOUNTING SYSTEM
|_| Audited and determined acceptable;

|_| Audited and determined not acceptable;

|_| Never audited

OFFEROR’S FISCAL YEAR

8a. NAME OF OFFEROR (Typed)
9. NAME OF FIRM

8b. TITLE OF OFFEROR (Typed)

10. SIGNATURE
11. DATE OF SUBMISSION

DTRT57-13-R-20012

Amendment A0002 Attachment 2

Schedule 2 - SUMMARY OF PROPOSED COSTS AND FIXED FEE

Offeror or Subcontractor Name:

THIS SCHEDULE IS USED TO SUMMARIZE THE COSTS AND FIXED FEE FOR EITHER CLIN 0001 (F&O) OR CLIN 0002 (SDVOSB)

COST ELEMENT
RATE %
AMOUNT
Direct Labor (from the appropriate part of Schedule 5)
$
Fringe Benefits (if separate from Overhead)
%
$
Overhead
%
$

Subcontracts:

1.
$
2.
$
3.
$
4.
$
Subcontract Burden (if separate)
%
$

Other Direct Costs (ODC):

RFP-Travel

CLIN 0001 insert $288,000

CLIN 0002 insert $24,000

RFP-Equipment

CLIN 0001 insert $32,000

CLIN 0002 insert $40,000

Offeror-Estimated ODC
$
ODC Burden (if separate)
%
$
SUBTOTAL
$
G&A
%
$
Cost of Money (COM)
$
Total Costs and COM
$
Profit (from Schedule 4)
$
TOTAL PROPOSED COST AND FIXED FEE
$

Schedule 3 - SUMMARY OF PROPOSED COSTS AND PROFIT

Offeror Name:

THIS SCHEDULE IS USED TO SUMMARIZE THE COSTS AND PROFIT FOR EITHER CLIN 0001 (F&O) OR CLIN 0002 (SDVOSB)

COST ELEMENT
RATE %
AMOUNT
Direct Labor (from the appropriate part of Schedule 5)
$
Fringe Benefits (if separate from Overhead)
%
$
*Overhead
%
$

Subcontracts:

1.
$
2.
$
3.
$
4.
$
Subcontract Burden (if separate)
%
$

Other Direct Costs (ODC):

Offeror-Estimated ODC
$

RFP-Travel

CLIN 0001 insert $72,000

CLIN 0002 insert $6,000

RFP-Equipment

CLIN 0001 insert $8,000

CLIN 0002 insert $10,000

ODC Burden (if separate)
%
$
SUBTOTAL
$
G&A
%
$
Cost of Money (COM)
$
Total Costs and COM
$
Profit (from Schedule 4)
$
TOTAL PROPOSED COST AND PROFIT
$

Schedule 4 - ESTABLISHMENT OF MAXIMUM FACTORS AND CALCULATION OF PROPOSED AMOUNTS FOR FIXED FEE AND PROFIT

Offeror Name:

CLIN Number: __________________________________________

Fixed Fee

Estimated Cost
Percentage (3)
Fixed Fee Dollars
Subcontracts, Equipment, Travel Cost, Offeror-estimated ODCs, and RFP-stipulated ODCs (1)
$
%
$
All Other Costs from Schedule 2 (2)
$
%
$
TOTAL
$

TOTAL FIXED FEE DOLLARS (4)

Profit

Estimated Cost
Percentage (3)
Profit Dollars
Subcontracts, Equipment, Travel Cost, Offeror-estimated ODCs, and RFP-stipulated ODCs (1)
$
%
$
All Other Costs from Schedule 3 (2)
$
%
$
TOTAL
$

TOTAL PROFIT DOLLARS (4)

(1) "Subcontracts, Equipment, and Travel Cost” should not include any Prime indirect burden.

(2) “All Other Costs” should include all remaining costs from Schedule 2 or 3 except cost of money if proposed.

(3) “Percentage” is the fee or profit percentage the Offeror uses to develop fixed fee and profit. The percentages will be incorporated into Paragraph H.9 of a resultant contract and will be used to calculate maximum fixed fee and profit that an Offeror may propose at the task order level. Offerors may always bid less than the calculated maximum.

(4) Fixed fee and profit on Schedules 2 and 3 should be calculated on the tables above.

Schedule 5 - SUMMARY OF PROPOSED LABOR COST AND DISTRIBUTION OF LABOR COST BETWEEN COST PLUS FIXED FEE AND FIRM FIXED PRICE (CLIN 0001 - F&O)

Offeror or Subcontractor Name: _________________________________________

Category
Hours Proposed
Unburdened Hourly Rate
Labor Cost

Key Personnel

Program Manager

$
$

Task Order Manager

$
$

Lead Engineer

$
$

Lead Environmental Specialist

$
$

Lead Professional Planner

$
$

Lead Railroad Safety Specialist

$
$

Professional Labor

Mid Archeologist

$
$

Sr. Architect/Engineer/Scientist

$
$

Mid Architect/Engineer/Scientist

$
$

Jr. Architect/Engineer/Scientist

$
$

Budget Analyst/Economics Manager

$
$

CAD/GIS Operator

$
$

Certified Safety Professional

$
$

Construction Inspector

$
$

Construction Manager

$
$

Cost Estimator/Cost Analyst

$
$

Engineering Technician

$
$

Mid-level IT/Database Specialist

$
$

Senior NEPA/Environmental Specialist

$
$

Mid-level NEPA/Environmental Specialist

$
$

Junior NEPA/Environmental Specialist

$
$

Project Scheduler

$
$

QA/QC Manager/Specialist

$
$

Real Estate Manager

$
$

Regulatory Specialist

$
$

Risk Assessor/Manager

$
$

System Security Expert

$
$

Total Technical Hours Proposed (NTE 76,000)

Administrative #1(specify)

$
$

Administrative #2 (specify)

Administrative #3 (specify)

Administrative #4(specify)

$
$

Total Direct Labor*

Cost Plus Fixed Fee Labor
To Schedule 2
80% of Total Direct Labor
$
Firm Fixed Price Labor
To Schedule 3
20% of Total Direct Labor
$

*Prime Offerors continue down to apportion direct labor cost to Cost Plus Fixed Fee and Firm Fixed Price Schedules 2 and 3 respectively. Subcontractors go directly to Schedule 2 with Total Direct Labor.

Prime Offerors and their Subcontractor must provide supporting documentation for labor rates including current salary information, escalation to performance period, road-mapping to internal labor categories for non-resumed professional labor.

Schedule 5 - SUMMARY OF PROPOSED LABOR COST AND DISTRIBUTION OF LABOR COST BETWEEN COST PLUS FIXED FEE AND FIRM FIXED PRICE (CLIN 0002 – SDVOSB SET-ASIDE)

Offeror or Subcontractor Name: _____________________________________

Category
Hours Proposed
Unburdened Hourly Rate
Labor Cost

Key Personnel

$
$

Program Manager

Senior Trainer or Curriculum Development Specialist

$
$

Logistics Coordinator for Conferences

$
$

Web Design Project Manager

$
$

Professional Labor

Graphics Support

$
$

Logistics Support

$
$

Web Designer

$
$

Documentation Specialist

$
$

Total Technical Hours Proposed (NTE 3,640)

Administrative #1(specify)

$
$

Administrative #2 (specify)

Administrative #3 (specify)

Administrative #4(specify)

$
$

Total Direct Labor*

Cost Plus Fixed Fee Labor
To Schedule 2
80% of Total Direct Labor
$
Firm Fixed Price Labor
To Schedule 3
20% of Total Direct Labor
$

*Prime Offerors continue down to apportion direct labor cost to Cost Plus Fixed Fee and Firm Fixed Price Schedules 2 and 3 respectively. Subcontractors go directly to Schedule 2 with Total Direct Labor.

Prime Offerors and their Subcontractor must provide supporting documentation for labor rates including current salary information, escalation to performance period, road-mapping to internal labor categories for non-resumed professional labor.

Schedule 6 - LABOR COST REALISM INFORMATION (Fill out as applicable)

Prime or Subcontractor Name: _______________________________

Labor Category
Resumed Employee Name
Current Employee Hourly Rate
Category Rate from Schedule 5

CLIN 0001 (F&O)

Program Manager

Task Order Manager

Lead Engineer

Lead Environmental Specialist

Lead Professional Planner

Lead Railroad Safety Specialist

CLIN 0002 (SDVOSB)

Program Manager

Senior Trainer or Curriculum Development Specialist

Logistics Coordinator for Conferences

Web Design Project Manager

Schedule 7 - ALLOCATION OF LABOR HOURS

CLIN 0001 (F&O)

Prime Name: ____________________________

Category
Prime
Subcontractor A
Subcontractor B
Subcontractor C
Total Hours

Program Manager

1,500

Task Order Manager

3,000

Lead Engineer

1,500

Lead Environmental Specialist

1,500

Lead Professional Planner

1,500

Lead Railroad Safety Specialist

1,500

Mid-level Archeologist

2,000

Senior Architect/Engineer/ Scientist

4,000

Mid-level Architect/Engineer/

8,000

Junior Architect/Engineer/

10,000

Budget Analyst/Economics Manager

2,000

CAD/GIS Operator

4,000

Certified Safety Professional

3,000

Construction Inspector

3,000

Construction Manager

3,000

Cost Estimator/Cost Analyst

3,000

Engineering Technician

4,000

Mid-level IT/Database Specialist

3,000

Senior NEPA/Environmental Specialist

1,200

Mid-level NEPA/Environmental Specialist

3,000

Junior NEPA/Environmental Specialist

4,000

Project Scheduler

1,200

QA/QC Manager/Specialist

1,200

Real Estate Manager

1,600

Regulatory Specialist

1,600

Risk Assessor/Manager

1,500

System Security Expert

1,200

TOTALS

76,000

Schedule 7 - ALLOCATION OF LABOR HOURS

CLIN 0002 (SDVOSB SET-ASIDE)

Prime Name: ____________________________

Category
Prime
Subcontractor A
Subcontractor B
Subcontractor C
Total Hours

Program Manager

Senior Trainer or Curriculum Development Specialist

Logistics Coordinator for Conferences

Web Design Project Manager

Graphics Support

Logistics Support

Web Designer

Documentation Specialist

TOTALS

3,640

Schedule 8 - INDIRECT RATES AND FACTORS (Fill out as applicable)

Prime or Subcontractor Name: ______________________________________________

CLIN Number :_____________________________

Cost Element
Proposed Rate/Factor
Allocation Base

Labor Escalation

Not applicable

Fringe Benefits (if separate from overhead)

Contractor Site Overhead

Subcontract Burden (if separate)

ODC Burden (if separate)

Other (specify)

G & A

Cost of Money

Offeror or Subcontractor Fiscal Year Ends: __________________________

Schedule 9 - SUBCONTRACT INFORMATION (Either CLIN as applicable)

Offeror Name: ___________________________________________

CLIN Number: ___________________________________________

Subcontractor Name

Subcontract Type

Subcontract Value

Total Technical Hours

Total $

File details come from the government source that posted it. Updated .