This Construction Addendum No. 1, issued by the Michigan Department of Technology, Management and Budget (DTMB) on August 8, 2026, modifies the bidding documents for the Torch Lake Superfund Site - Scales Creek Culvert Cover Repair project (File No. 761/20188.SAR) located in Houghton County, Michigan. The project addresses severe erosion damage caused by a June 2018 flash flood at a culvert on Scales Creek, where failed riprap and geotextile liners exposed stamp sands and mining tailings. The scope includes excavation and backfilling of approximately 198 cubic yards of material, installation of 113 tons of MDOT riprap, placement of 242 square yards of ADS 0801T geotextile fabric liner, native planting turf establishment on 108 square yards with six-inch topsoil, reinforced concrete placement (129 square yards), aggregate base and surface installation (43 tons of 21AA and 13 tons of 23AA), and comprehensive soil erosion and sediment control (SESC) measures. The project also includes construction of an overflow spillway north of the existing culvert set approximately two feet below roadway elevation to accommodate larger storm events. The bid opening date is August 12, 2026, with construction activities to be completed by Summer 2027 to allow for vegetation establishment verification. AECOM Technical Services serves as the professional, with Sadi Rayyan, P.E., as project director.
The base bid schedule includes twelve pay items covering mobilization, site services and preparation, excavation and backfill (lump sum), riprap placement (per ton), geotextile installation (per square yard), native planting (lump sum), aggregate surfaces (per ton), SESC installation and removal (lump sum), reinforced concrete (per square yard), aggregate base (per ton), demobilization (lump sum), and a $10,000 provisionary allowance for unforeseen conditions. All construction must comply with MDOT 2020 Standard Specifications and Roadway and Bridge Standard Plans, as well as applicable state and local soil erosion control regulations. The contractor must obtain a Soil Erosion and Sedimentation Control Permit from Houghton County and is subject to inspection by the Michigan Department of Environment, Great Lakes, and Energy (EGLE), county, and state inspectors. The contractor is responsible for all traffic control measures, utility location verification through Miss Dig, protection of public and private property, and may be assessed fines for noncompliance with SESC regulations and contract provisions. Construction activities shall be performed during normal working hours with 48-hour advance notice to the engineer, EGLE, and county/state inspectors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 6/25)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design & Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
8/8/2026
PROJECT NAME
Torch Lake Superfund Site – Scales Creek Culvert Cover Repair
FILE NUMBER
761 / 20188.SAR
PROFESSIONAL
AECOM Technical Services
PROJECT DIRECTOR
Sadi Rayyan P.E.
BID OPENING DATE:
8/12/2026
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
Revision (red/bolded) to Project Scope of Work and Section 00010-2, Work Description
In June 2018, a flash flood occurred in Houghton, Michigan, causing severe damage throughout the area, including one of the culverts at Scales Creek. The culvert experienced severe erosion on the western side of the private access road, where riprap and geotextile liner were observed damaged, exposing stamp sands and causing potential airborne and surface water exposures. The failed erosion protection system led to a section (approximately 45 feet wide and 40 feet long), on the west side of the private access road at the Site, to be partially washed out. The washout occurred in an area where the six-inch soil and vegetative cover was installed to cover mining tailings and slag to prevent or reduce airborne nuisance dust and transport into Scales Creek. The washout caused extensive failure to the soil cover and riprap, which exposed the stamp sands and allowed them to become mobile and airborne, ultimately spilling into Scales Creek. The area needs to be restored back to the original condition prior to the 2018 flood. This will prevent, or reduce, the amount of stamp sands transporting into Scales Creek and other connected tributaries.
To accomplish this soil improvement and cover repair the Scales Creek Culvert Cover Repair plan (presented in the attached drawings) has been prepared to address the failed erosion protection system at the site. The construction activities will include, but are not limited to, installation of proper soil erosion and sediment control (SESC) measures required by the State and Local Agencies, the washed-out area will be excavated and backfilled, with the excavated material and fill material to bring the area back up to the original grade to support the existing culvert and existing road. There will be no construction activities related to the culvert itself. In lieu of replacing the existing culvert, an overflow spillway will be constructed to accommodate larger storm events. The spillway will be constructed north of the existing culvert and will be set approximately 2-feet below the existing roadway elevation. The spillway will be armored with rip rap and concrete for the roadway surface. The spillway will be approximately 2-feet deep, 20-feet bottom width, and 10% side slopes. Once the area has been backfilled to its original grade, a geotextile fabric liner will be laid and riprap will be installed. To complete the erosion protective system, all areas affected by erosion will be restored by placing a six-inch layer of soil to reestablish the integrity of the remedy.
The private access road will be repaired by establishing aggregate 23AA. The distributed area will be seeded with native vegetation and a mulch blanket to establish turf to help stabilize soil, reduce runoff and support local biodiversity. If a vegetative cover does not establish, the contractor will be required to reseed during Spring 2027.
Revision to Contract Form, Bid Schedule Revised Bid Schedule included as an attachment.
Table of Contents, Drawings (Additional sheet listed in red/bold) Revised drawings included as an attachment.
SHEET 1 – COVER SHEET
SHEET 2 – GENERAL NOTES
SHEET 3 – TYPICAL SECTION
SHEET 4 – SOIL EROSION AND SEDIMENT CONTROL PLAN
SHEET 5 – REMOVAL PLAN
SHEET 6 – CONSTRUCTION PLAN
SHEET 7 – SITE DETAILS
Revision (red/bolded) to Section 01020 – 4, Specific Pay Items:
(g) Contract Item No. 3 – Excavation, Temporary Staging of Excavated Material and Backfill, Excavated Material to be used as Backfill (Lump Sum)
Payment for this item shall be paid for at the Contract lump sum. The excavated material will be re-purposed as backfill.
This item includes all labor, tools, equipment, and materials necessary for excavating, staging and backfilling the material.
This will prevent the need for hauling the material from the Site to the off-site disposal area, such as a landfill. The excavated material is estimated to be approximately 198 cubic yards. The estimated backfill quantities and extents are detailed on drawings. This item includes all labor, tools, equipment, and materials necessary for placing, grading, and leveling backfill in designated areas. The backfill quantities and extents are detailed in Sheet 5, Removal Plan of the drawings.
(h) Contract Item No. 4 – MDOT Riprap, Heavy (Ton)
Payment for this item shall be paid for at the Contract unit price per ton. This item includes all labor, tools, equipment, and materials necessary for placing, grading, and leveling of riprap in designated areas. The riprap required for the project is estimated at approximately 113 tons. The Contractor shall provide weight tickets from a certified scale to verify the quantity of riprap placed on Site. The Riprap, Heavy, construction and installation are detailed on Sheet 6, Construction Plan of the drawings. Riprap will be salvaged and reused, provided it is in acceptable condition.
(i) Contract Item No. 5 – Purchase and Install ADS 0801T Geotextile Fabric Liner (Square Yard)
Payment for this item shall be paid for at the Contract unit price per square yard. This item includes all labor, tools, equipment, and materials necessary for installing the geotextile liner in the designated areas as detailed on Sheet 6, Construction Plan of drawings. The geotextile fabric liner required for the project is estimated at approximately 242 square yards. The Contractor shall provide receipt to verify square yards of liner placed on Site.
(j) Contract Item No. 6 – Native Planting Turf Establishment (includes 6-inch topsoil) (Lump Sum)
Payment for this item shall be paid for at the Contract lump sum price. This item includes all labor, tools, equipment, and materials necessary for placing, grading, and leveling of imported screened topsoil in designated areas. The imported screened topsoil extents are estimated to be 108 square yards.
The Professional will provide a list of the native species to be seeded. This item includes all labor, tools, equipment, and materials necessary for native seed planting in the designated areas as shown on Sheet 6, Construction Plan of the drawings. Confirmation that vegetation has established will be completed during the Substantial Completion Inspection in Summer of 2027.
(k) Contract Item No. 7 – Aggregate Surface, 6-inch 32AA (Ton)
Payment for this item shall be paid for at the Contract unit price per ton. This item includes all labor, tools, equipment, and materials necessary for placing, grading, and leveling of stone in designated areas. The 6-inch 32AA aggregate surface material required for the project is estimated at approximately 13 tons. The Contractor shall provide weight tickets from a certified scale to verify the quantity of stone placed on Site. The aggregate surface details including quantities and extents are shown on Sheet 6, Construction Plan of the drawings.
(l) Contract Item No. 8 – SESC Installation and Removal (Shallow Turbidity Curtain, Silt Fence) (Lump Sum)
Payment for this item shall be paid for at the Contract lump sum price. This item includes all labor, tools, equipment, and materials required for surface water controls, soil erosion and sedimentation controls, protection of all surface water bodies and storm drains, and removal of all controls upon completion of Work (or as required). This item includes all labor, tools, equipment, and materials necessary to fully remove used silt fence, exposed geotextile underlayment, and any remnants or debris that may exist. This item includes all labor, tools, equipment, and materials necessary to install new SESC measures where required upon completion of Work.
All Work under this Contract must meet the storm water management requirements of the Project and comply with the applicable SESC rules and regulations and specific provisions for same within the Contract Documents. SESC measures will be monitored and enforced by the State Facilities Administration, or another authorized enforcing agency if so delegated, through the review of the Contractor ’s implementation plans and Site inspections. State Facilities Administration or the Professional will notify the Contractor in writing of any violation(s) of the applicable SESC statutes and/or the corrective action(s) undertaken by the Owner and may issue stop Work orders. State Facilities Administration has the right to assess a fine to the Contractor for noncompliance with the provisions of the Contract Documents and/or SESC regulations applicable to this Work and fines must be in addition to any other remediation costs or liquidated damages applicable to the Project and may exceed the value of the Contract.
Contractor shall obtain Soil Erosion and Sedimentation Control Permit from Houghton County.
Please review additional SESC Notes on Sheet 4 of the drawings.
(m) Contract Item No. 9 – Reinforced Concrete, 6-inch (Square yard)
Payment for this item shall be paid for at the Contract unit price per square yard. This item includes all labor, tools, equipment, and materials necessary for laying, grading, and leveling off the reinforced concrete in the designated areas as detailed on Sheet 6, Construction Plan and 7, Site Details of drawings. The reinforced concrete required for the project is estimated at approximately 129 square yards. The Contractor shall provide receipt to verify square yards of reinforced concreate placed on Site and verify the required thickness.
(n) Contract Item No. 10 – Aggregate Surface, 21AA (Ton)
Payment for this item shall be paid for at the Contract unit price per ton. This item includes all labor, tools, equipment, and materials necessary for placing, grading, and leveling of stone in designated areas. The 21AA aggregate surface material required for the project is estimated at approximately 129 tons. The Contractor shall provide weight tickets from a certified scale to verify the quantity of stone placed on Site. The aggregate surface details including quantities and extents are shown on Sheet 6, Construction Plan of the drawings and Sheet 2, Site Details.
(o) Contract Item No. 11 – Demobilization (Lump Sum)
Payment for Demobilization shall be paid at the Contract lump sum price. This item shall include all necessary labor, tools, materials, and equipment for the removal of Contractor’s facilities, equipment, personnel, security, supplies, and incidentals to perform the Work at the Scales Creek Site.
(p) Contract Item No. 12 – Provisionary Allowance (Allowance Amount)
A provisionary allowance of $10,000.00 shall be included to cover additional backfill, Site restoration, dewatering, and/or other unforeseen conditions, as identified by the Professional requiring Work not identified in the Project Manual and Specifications as a result of the activities at the Site. This allowance may only be used upon approval by the Professional and Owner. Payment shall be in accordance with the conditions of the Contract Documents. The Contractor shall provide appropriate backup documentation with payment request.
Additional Division – Division 03
SECTION 033000 CAST-IN-PLACE
PART 1 GENERAL
1.1 DESCRIPTION
A. This consists of constructing and installing a cast-in-place structural concrete for the overfill spillway, including spillway slab/apron, training walls, sidewalls, cutoff/key elements, toe/terminal structures, and associated cast-in-place appurtenances as shown on the Drawings.
1.2 WORK DESCRIPTION
A. Concrete materials, proportioning, mixing, delivery, and placement per referenced standards.
B. Coordination and installation of embedded items and inserts (as indicated), including ensuring they remain fixed during placement
C. Finishing of formed and unformed surfaces per specified finish class (e.g., trowel/float/broom where designated).
D. Curing and protection for a minimum curing period, including hot/cold weather measures when required.
E. Field quality control sampling/testing, batch tickets, and acceptance per specified criteria.
F. Concrete is proportioned and delivered per ASTM C94 with mix selection per ACI 350 where applicable to environmental/exposure conditions. Typical criteria used in our cast-in-place requirements include compressive strength, slump control, air content, maximum water–cementitious ratio, and placement temperature limits as specified.
END OF SECTION 033000
Attachments Revised Project Scope of Work and Bid Schedule Revised Project Drawings Figure 1. Lake Linden Shoreline Restoration Construction Plan
END
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Clara Foutch, AECOM Technical Services DATE: 8/8/2026
APPROVED BY:
PROJECT DIRECTOR: Sadi Rayyan P.E., Project Director DATE: Click to enter date
Bidding and Contract Document (R 03/25)
Project Name: Torch Lake Superfund Site – Scales Creek Culvert Cover Repair
File No. 761/20188.SAR
The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.
Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated:
BID SCHEDULE
Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:
Refer to the attached revised Section 01020-4 Specific Pay Items for payment description.
Base Bid Item No.
Bid Quantity
Description Unit Price
Item Bid Price
1 Lump Sum Mobilization
2 Lump Sum Site Services and Preparation
3 Lump Sum Excavation, Temporary Staging of Excavated
Material and Backfill, Excavated Material to be used as Backfill
4 113 tons MDOT Rip rap, Heavy
5 242 syd Purchase and Install ADS 0801T Geotextile Fabric
Liner
6 108 syd Native Planting Turf Establishment (Includes 6-inch topsoil)
7 13 tons Aggregate Surface, 6-inch 23AA
8 Lump Sum SESC Installation and Removal (Shallow Turbidity
Curtain, Silt Fence)
9 129 syd Reinforced Concrete, 6-inch
10 43 tons Aggregate Base, 21AA
11 Lump Sum Demobilization
12 1 ALLOWANCE AMOUNT $10,000
TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $
Base Bid (Sum of Item Bid Prices for all Base Bid Items):
__________________________________________________________________ Dollars $__________________________ (use words) (in figures)
PROJECT
AREA
STATE LOCATION MAP
HOUGHTON COUNTY
TORCH LAKE SUPERFUND SITE - SCALES
CREEK CULVERT REPAIR
NORTH
00 1000' 2000'
SHEET INDEX
SHEET
NUMBER SHEET TITLE
1 COVER SHEET
2 GENERAL NOTES
3 TYPICAL SECTION
4 SOIL EROSION AND SEDIMENT CONTROL PLAN
5 REMOVAL PLAN
6 CONSTRUCTION PLAN
7 SITE DETAILS
COVER SHEET
VALLEY ROAD
AR
C
H D
4" x
6"
REGISTRATION
CONSULTANT
AECOM
3950 SPARKS DRIVE SE
GRAND RAPIDS, MI 49546
616.574.8500 TEL
www.aecom.com
CLIENT
WALELIGN WAGAW
SENIOR PROJECT MANAGER
MICHIGAN
DEPARTMENT OF
ENVIRONMENT, GREAT
LAKES, AND ENERGY
(EGLE) - SUPERFUND
SECTION
525 WEST ALLEGAN STREET
LANSING, MI 48933
PROJECT
TORCH LAKE
SUPERFUND SITE -
SCALES CREEK
CULVERT REPAIR
47.269118102900364, -88.38488671459874
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
I/R DATE DESCRIPTION
ISSUE/REVISION
1 05/29/2026 100% DESIGN
2 08/07/2026 ADDENDUM 1
La st s av ed b y:
K
AU
R
N 1(
-0 8-
La st P lo tte d:
6-
-0
Fi le na m e:
L :\D
C S\
PR
O
JE
C
TS
\E
N V\
TO
R C
H L
AK
E
U P\
0_
D
EL
IV
ER
AB
LE
S\
S
C
AL
ES
C
R
EE
K C
U
LV
ER
T\
- C
AD
\9
_C
AD
\S H
EE
TS
\1 C
O
VE
R S
H
EE
T.
D
W G
60627460
Know what's below.
before you dig.Call
R
HALTUNEN ROAD
AR
C
H D
4" x
6"
REGISTRATION
CONSULTANT
AECOM
3950 SPARKS DRIVE SE
GRAND RAPIDS, MI 49546
616.574.8500 TEL
www.aecom.com
CLIENT
WALELIGN WAGAW
SENIOR PROJECT MANAGER
MICHIGAN
DEPARTMENT OF
ENVIRONMENT, GREAT
LAKES, AND ENERGY
(EGLE) - SUPERFUND
SECTION
525 WEST ALLEGAN STREET
LANSING, MI 48933
PROJECT
TORCH LAKE
SUPERFUND SITE -
SCALES CREEK
CULVERT REPAIR
47.269118102900364, -88.38488671459874
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
I/R DATE DESCRIPTION
ISSUE/REVISION
1 05/29/2026 100% DESIGN
2 08/07/2026 ADDENDUM 1
La st s av ed b y:
K
AU
R
N 1(
-0 8-
P lo tte d:
6-
-0
Fi le na m e:
L :\D
C S\
PR
O
JE
C
TS
\E
N V\
TO
R C
H L
AK
E
U P\
0_
D
EL
IV
ER
AB
LE
S\
S
C
AL
ES
C
R
EE
K C
U
LV
ER
T\
- C
AD
\9
_C
AD
\S H
EE
TS
\2 G
EN
ER
AL
N
O
TE
S.
D
W G
60627460
SITE GRADING NOTES
1. ALL SOIL EROSION AND SILT MUST BE CONTROLLED AND CONTAINED ON SITE AND DURING
ALL PHASES OF CONSTRUCTION.
2. ALL EARTHWORK AND PAVING OPERATIONS SHALL COMPLY WITH CURRENT MDOT
STANDARDS AND PROJECT SPECIFICATIONS FOR CONSTRUCTION.
3. FROZEN MATERIAL SHALL NOT BE USED AS FILL. FILL SHALL NOT BE PLACED ON FROZEN
GROUND.
CONSTRUCTION NOTES
1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH THE MDOT STANDARD SPECIFICATIONS
FOR CONSTRUCTION, 2020 EDITION.
2. ALL CONSTRUCTION TO BE IN ADDORANCE WITH THE MDOT ROADWAY AND BRIDGE
STANDARD PLANS, 2020 EDITION.
3. ALL MDOT REFERENCES ARE TO THE 2020 EDITION.
3.1. HTTPS://MDOTJBOSS.STATE.MI.US/SPECPROV/SPECBOOKHOME.HTM
3.2. HTTPS://MDOTJBOSS.STATE.MI.US/STDPLAN/STANDARDPLANSINDEX.HTM
SITE REMOVAL NOTES
1. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION. ANY
DISCREPANCIES FOUND ARE TO BE BROUGHT TO THE ENGINEER'S ATTENTION PRIOR TO
COMMENCEMENT OR CONTINUATION OF CONSTRUCTION ACTIVITIES.
2. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE DIVISION OF INDUSTRIAL
REGULATIONS (OSHA) SAFETY STANDARDS. IF REQUESTED BY THE INSPECTOR, THE
CONTRACTOR SHALL PROVIDE PROOF OF A PERMIT FROM SAID DIVISION.
3. CONTRACTOR SHALL NOTIFY THE ENGINEER, EGLE, AND COUNTY AND/OR STATE
INSPECTOR 48 HOURS PRIOR TO COMMENCING CONSTRUCTION AND 24 HOURS IN
ADVANCE OF SPECIFIC INSPECTION NEEDS DURING THE COURSE OF THE WORK. ALL
WORK SHALL BE PERFORMED DURING NORMAL WORKING HOURS AND SUBJECT TO
INSPECTION BY THE EGLE, COUNTY, AND/OR STATE. WHERE OVERTIME INSPECTION IS
NEEDED, SUBJECT TO THE AVAILABILITY OF AN INSPECTOR, AND APPROVED BY THE
ENGINEER, THE CONTRACTOR WILL BE BILLED FOR SAID INSPECTION SERVICES AS
PROVIDED IN THE MOST RECENTLY ADOPTED RESOLUTION WHICH ESTABLISHES THE FEES
FOR SUCH SERVICES.
4. NO KNOWN UTILITIES ARE IN THE PROJECT AREA. ANY DISCREPANCIES DISCOVERED IN
THE FIELD DURING CONSTRUCTION THAT HAVE AN IMPACT ON THE DESIGN INTENT ARE TO
BE BROUGHT TO THE ATTENTION OF THE ENGINEER.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL PUBLIC AND PRIVATE
PROPERTY INSOFAR AS IT MAY BE AFFECTED BY THESE OPERATIONS. ALL COSTS FOR
PROTECTING, REMOVING, AND RESTORING EXISTING IMPROVEMENTS SHALL BE BORNE,
SOLELY, BY THE CONTRACTOR.
6. CONSTRUCTION WORK ZONE TRAFFIC SIGNS SHALL BE FURNISHED, INSTALLED, AND
MAINTAINED IN ACCORDANCE WITH APPLICABLE REGULATORY AGENCIES HAVING
JURISDICTION. A TRAFFIC CONTROL PLAN, PREPARED BY THE CONTRACTOR, MAY BE
REQUIRED BY THE COUNTY OR STATE. "CONSTRUCTION AHEAD" WARNING SIGNS ARE TO
BE INSTALLED ALONG ADJACENT DRIVEWAYS OR ROADS. FLASHERS WITH CAUTION TAPE
ARE TO BE INSTALLED WHERE ANY CONSTRUCTION ACTIVITY CROSSES A SIDEWALK OR
PEDESTRIANS PATH IN ACCORDANCE WITH THE SPECIFICATIONS AND ANY/ALL LOCAL
REGULATIONS.
7. NO STOPPING, PARKING, OR STORING OF CONSTRUCTION MATERIALS IN THE PUBLIC
STREETS OR ANY DRIVEWAY.
8. CONTRACTOR SHALL CONTACT "MISS DIG" AT 1-800-482-7171, AT LEAST 3 WORKING DAYS
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO SCHEDULE THE
MARKING OF EXISTING UTILITY LOCATIONS.
9. EXISTING SITE FEATURES ABOVE THE GROUND SURFACE, INCLUDING BUT NOT LIMITED TO
PAVEMENT, SIGNAGE, LANDSCAPING, AND FENCING WITHIN THE REMOVAL BOUNDARY ARE
TO BE REMOVED ENTIRELY AND DISPOSED OF UNLESS OTHERWISE NOTED ON THE PLANS
OR AS DIRECTED BY THE OWNER.
10. EXISTING SITE FEATURES BELOW THE GROUND SURFACE, INCLUDING BUT NOT LIMITED
TO, FOUNDATIONS, UTILITIES, AND UTILITY STRUCTURES, WITHIN THE REMOVAL
BOUNDARY SHALL BE REMOVED UNLESS OTHERWISE NOTED ON THE PLANS OR AS
DIRECTED BY THE OWNER.
11. GRAVEL SURFACE AREAS SHOWN TO BE REMOVED SHALL BE DONE SO TO FULL DEPTH
ALONG THE REMOVAL BOUNDARY UNLESS OTHERWISE NOTED.
12. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED DEMOLITION PERMITS
INCLUDING ALL INSPECTIONS BEFORE, DURING, AND AFTER DEMOLITION.
13. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL MEASURES.
SOIL EROSION & SEDIMENT CONTROL (SESC) NOTES
1. THE CONTRACTOR SHALL COMPLY WITH MUNICIPALITY RULES & REGULATIONS FOR SOIL
EROSION CONTROL & SUBMIT A SCHEDULE OF SOIL EROSION ACTIVITIES TO THE LOCAL
ENFORCING AGENCY PRIOR TO ANY EARTH CHANGE.
2. THE CONTRACTOR SHALL INSPECT ALL TEMPORARY & PERMANENT EROSION CONTROL
MEASURES DAILY & IMMEDIATELY (WITHIN 24 HOURS) AFTER A SIGNIFICANT RAINFALL
EVENT. ALL MEASURES REQUIRING MAINTENANCE REPAIR, OR REPLACEMENT SHALL BE
CORRECTED IMMEDIATELY AT NO ADDITIONAL COST TO THE OWNER.
3. PERMANENT SOIL EROSION CONTROL MEASURES, PLANTINGS & MULCHING FOR ALL
SLOPES, CHANNELS, DITCHES, OR DISTURBED LAND AREA SHALL BE COMPLETED WITHIN
FIVE (5) CALENDAR DAYS AFTER FINAL GRADING OR FINAL EARTH CHANGE HAS BEEN
COMPLETED.
4. PROVIDE TEMPORARY MULCH BLANKETS ON ALL DISTURBED AREAS THAT ARE NOT
STABILIZED WITH PERMANENT MEASURES WITHIN 5 DAYS OF GRADING.
5. ALL SLOPES SHALL BE TRACKED PERPENDICULAR TO THE SLOPE TO AID IN EROSION
CONTROL OF SLOPED AREAS.
6. WHERE SEASONAL LIMITATIONS OR CONSTRUCTION DELAYS PREVENT SCHEDULED
INSTALLATION OF PERMANENT CONTROL FACILITIES, APPROVED TEMPORARY MEASURES
SHALL BE INSTALLED WITHIN FIVE (5) CALENDAR DAYS & MAINTAINED UNTIL REPLACED BY
PERMANENT FACILITY.
7. THE LOCATION OF ANY TOPSOIL STOCKPILE SHALL BE DESIGNATED BY THE OWNER PRIOR
TO CONSTRUCTION. THIS AREA SHALL BE ENCLOSED BY SILT FENCE A REASONABLE
DISTANCE FROM THE TOE OF SLOPE UNTIL SUCH TIME IT IS USED TO TOPSOIL THE SITE.
8. AT COMPLETION OF CONSTRUCTION ACTIVITIES, REMOVE SEDIMENT ACCUMULATED
DURING CONSTRUCTION FROM SEDIMENT BASIN AND SUBMIT INSPECTION LOG BOOK TO
THE MUNICIPALITY & THE ENGINEER.
9. APPROXIMATE TOTAL AREA DISTURBED BY CONSTRUCTION IS 0.02 ACRES.
CONSTRUCTION STAGING NOTES
SUGGESTED CONSTRUCTION SEQUENCE
· EXCAVATE AND OFF SITE DISPOSE OF THE SOIL MATERIAL FOR RIP-RAP PLACEMENT.
· INSTALL CONCRETE EMERGENCY SPILLWAY.
· INSTALL RIP-RAP.
· INSTALL REMAINDER OF RIP-RAP, AS NEEDED.
· RESTORE/CONSTRUCT SITE TO FINAL CONDITIONS.
GENERAL NOTES
CULVERT ENLARGED
LOCATION
WETLAND
BOUNDARY
AREA DISTURBED = 0.06 ACRES
24FT +/- EXISTING GRAVEL ROAD
AGGREGATE SURFACE CSE, 6 INCH
23AA
1V:3H
1V:2.5H MAX
MATCH EXISTING ℄
2%4%
EXISTING STREAMBED ELEV = 719.02 EXISTING STREAMBED ELEV = 719.94
EX CULVERT, ALUM BOX, 15FT X 8FT +/-
PROPOSED GRADE
EXISTING GRADE
MDOT RIPRAP, HEAVY
SEE LIMITS ON CONSTRUCTION PLAN
RIPRAP, PLAIN
GEOTEXTILE FABRIC GEOTEXTILE FABRIC
2 F T
VARIES 12FT-13FT
EX SUBGRADE
2 F T
10FTVARIES
SURVEYED WATER ELEV = 721.12
100 YR FLOOD PLAIN = 722.42 (5.4 FT ABOVE STREAMBED)
OHWM= 722.62
12 FT
1V:2.5H MAX
EXISTING STREAMBED ELEV = 719.02 EXISTING STREAMBED ELEV = 719.94
EX CULVERT, ALUM BOX, 15FT X 8FT +/-
EXISTING GRADE
RIPRAP, PLAIN
GEOTEXTILE FABRIC
EX SUBGRADE
2 F T
SURVEYED WATER ELEV = 721.12
100 YR FLOOD PLAIN = 722.42 (5.4 FT ABOVE STREAMBED)
OHWM= 722.62
19 FT
2FT DEPTH ON SIDE
SLOPES OUTSIDE OF
STREAM
F
T
LE
NG
TH
1V:2.5H MAX
EXISTING STREAMBED ELEV = 719.02 EXISTING STREAMBED ELEV = 719.94
EX CULVERT, ALUM BOX, 15FT X 8FT +/-
EXISTING GRADE
RIPRAP, PLAIN
GEOTEXTILE FABRIC
EX SUBGRADE
2 F T
SURVEYED WATER ELEV = 721.12
100 YR FLOOD PLAIN = 722.42 (5.4 FT ABOVE STREAMBED)
OHWM= 722.62
6 FT 22
F
T
LE
NG
TH
AR
C
H D
4" x
6"
REGISTRATION
CONSULTANT
AECOM
3950 SPARKS DRIVE SE
GRAND RAPIDS, MI 49546
616.574.8500 TEL
www.aecom.com
CLIENT
WALELIGN WAGAW
SENIOR PROJECT MANAGER
MICHIGAN
DEPARTMENT OF
ENVIRONMENT, GREAT
LAKES, AND ENERGY
(EGLE) - SUPERFUND
SECTION
525 WEST ALLEGAN STREET
LANSING, MI 48933
PROJECT
TORCH LAKE
SUPERFUND SITE -
SCALES CREEK
CULVERT REPAIR
47.269118102900364, -88.38488671459874
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
I/R DATE DESCRIPTION
ISSUE/REVISION
1 05/29/2026 100% DESIGN
2 08/07/2026 ADDENDUM 1
La st s av ed b y:
K
AU
R
N 1(
-0 8-
P lo tte d:
6-
-0
Fi le na m e:
L :\D
C S\
PR
O
JE
C
TS
\E
N V\
TO
R C
H L
AK
E
U P\
0_
D
EL
IV
ER
AB
LE
S\
S
C
AL
ES
C
R
EE
K C
U
LV
ER
T\
- C
AD
\9
_C
AD
\S H
EE
TS
\3 T
YP
IC
AL
S
EC
TI
O N
S.
D
W G
60627460
PROPOSED ROAD TYPICAL SECTION
TYPICAL SECTION
SCALE: NTS
CUT/FILL BELOW 100 YR FLOOD PLAIN CROSS SECTION
SCALE: NTS
CUT/FILL BELOW STREAM CROSS SECTION
SCALE: NTS
719.02
STREAMBED
719.94
STREAMBED
CP 100
CP 101
731.10
730.82
730.60
731.40
730.56
730.46
729.71
729.75
729.88
730.88
730.64
729.68
728.10
726.53
723.13
725.40
RIPRAP
RIPRAPRIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
726.64
729.30
726.18
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
SIDE" CULVERT
INV. 720.49
TOP" CULVERT
INV. 727.00
SIDE" CULVERT
INV. 722.37
730.48
730.54
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
730.97
728.11
726.46
725.66
726.87
727.71
729.61
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
722.25
722.29
722.91
722.81
722.18 722.10
722.26
722.20
723.22SIDE" CULVERT
INV. 720.84
726.33 728.34
730.46
730.14
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
727.15
724.65
723.99
722.32
722.33
RIPRAP
RIPRAP
722.27
722.24
722.22
722.12
722.85
RIPRAP
TOP" CULVERT
INV. 726.76
SIDE" CULVERT
INV. 719.63
.11
F T
B
AN
KF
UL
L W
ID
TH
.21
F T
B
AN
KF
UL
L W
ID
TH
730.00
729.00
8.0
7.0
728.00
727.00
731.00
CONTROL POINTS:
CP 100:
N - 909545.045 E - 25902954.6
ELEVATION: 729.721 (NAVD88)
CP 101:
N - 909446.294 E - 25902879.14
ELEVATION: 730.808 (NAVD88)
COORDINATE SYSTEM:
COORDINATES & BEARINGS ARE BASED ON NAD83 MICHIGAN STATE PLANES, NORTH ZONE, INTERNATIONAL FOOT
AR
C
H D
4" x
6"
REGISTRATION
CONSULTANT
AECOM
3950 SPARKS DRIVE SE
GRAND RAPIDS, MI 49546
616.574.8500 TEL
www.aecom.com
CLIENT
WALELIGN WAGAW
SENIOR PROJECT MANAGER
MICHIGAN
DEPARTMENT OF
ENVIRONMENT, GREAT
LAKES, AND ENERGY
(EGLE) - SUPERFUND
SECTION
525 WEST ALLEGAN STREET
LANSING, MI 48933
PROJECT
TORCH LAKE
SUPERFUND SITE -
SCALES CREEK
CULVERT REPAIR
47.269118102900364, -88.38488671459874
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
I/R DATE DESCRIPTION
ISSUE/REVISION
1 05/29/2026 100% DESIGN
2 08/07/2026 ADDENDUM 1
La st s av ed b y:
K
AU
R
N 1(
-0 8-
P lo tte d:
6-
-0
Fi le na m e:
L :\D
C S\
PR
O
JE
C
TS
\E
N V\
TO
R C
H L
AK
E
U P\
0_
D
EL
IV
ER
AB
LE
S\
S
C
AL
ES
C
R
EE
K C
U
LV
ER
T\
- C
AD
\9
_C
AD
\S H
EE
TS
\4 S
ES
C
.D W
G
60627460
SOIL EROSION AND SEDIMENT
CONTROL PLAN
Know what's below.
before you dig.Call
R
Know what's below.
before you dig.Call
R
Know what's below.
before you dig.Call
R
TURBIDITY CURTAIN
EDGE OF EX GRAVEL ROAD
EDGE OF EX GRAVEL ROAD
EDGE OF WATER
EDGE OF WATER
LIMITS OF DISTURBANCE
TURBIDITY CURTAIN
QUANTITIES
PAY ITEM QTY UNIT
SESC INSTALLATION AND REMOVAL (SHALLOW TURBIDITY
CURTAIN, SILT FENCE) 1 LUMP SUM
LIMITS OF DISTURBANCE
SILT FENCE
TOP OF EX BANK
SILT FENCE
719.94
STREAMBED
CP 100
CP 101
731.10
730.82
730.60
731.40
730.56
730.46
729.71
729.75
729.88
730.64
729.68
728.10
723.13
725.40
RIPRAP
RIPRAPRIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
726.64
729.30
726.18
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
SIDE" CULVERT
INV. 720.49
TOP" CULVERT
INV. 727.00
SIDE" CULVERT
INV. 722.37
730.48
730.54
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
730.97
728.11
726.46
725.66
726.87
727.71
729.61
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
722.25
722.29
722.91
722.81
722.18 722.10
722.26
722.20
723.22SIDE" CULVERT
INV. 720.84
726.33 728.34
730.46
730.14
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
727.15
724.65
723.99
722.32
722.33
RIPRAP
RIPRAP
722.27
722.24
722.22
722.12
722.85
RIPRAP
TOP" CULVERT
INV. 726.76
SIDE" CULVERT
INV. 719.63
.11
F T
BA
NK
FU
LL
W
ID
TH
.21
F T
BA
NK
FU
LL
W
ID
TH
AR
C
H D
4" x
6"
REGISTRATION
CONSULTANT
AECOM
3950 SPARKS DRIVE SE
GRAND RAPIDS, MI 49546
616.574.8500 TEL
www.aecom.com
CLIENT
WALELIGN WAGAW
SENIOR PROJECT MANAGER
MICHIGAN
DEPARTMENT OF
ENVIRONMENT, GREAT
LAKES, AND ENERGY
(EGLE) - SUPERFUND
SECTION
525 WEST ALLEGAN STREET
LANSING, MI 48933
PROJECT
TORCH LAKE
SUPERFUND SITE -
SCALES CREEK
CULVERT REPAIR
47.269118102900364, -88.38488671459874
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
I/R DATE DESCRIPTION
ISSUE/REVISION
1 05/29/2026 100% DESIGN
2 08/07/2026 ADDENDUM 1
La st s av ed b y:
K
AU
R
N 1(
-0 8-
P lo tte d:
6-
-0
Fi le na m e:
L :\D
C S\
PR
O
JE
C
TS
\E
N V\
TO
R C
H L
AK
E
U P\
0_
D
EL
IV
ER
AB
LE
S\
S
C
AL
ES
C
R
EE
K C
U
LV
ER
T\
- C
AD
\9
_C
AD
\S H
EE
TS
\5 R
EM
O
VA
L
PL
AN
.D W
G
60627460
REMOVAL PLAN
EDGE OF EX GRAVEL ROAD
EDGE OF EX GRAVEL ROAD
Know what's below.
before you dig.Call
R
Know what's below.
before you dig.Call
R
Know what's below.
before you dig.Call
R
EDGE OF WATER
EDGE OF WATER
LIMITS OF DISTURBANCE
EARTH EXCAVATION
CONTROL POINTS:
CP 100:
N - 909545.045 E - 25902954.6
ELEVATION: 729.721 (NAVD88)
CP 101:
N - 909446.294 E - 25902879.14
ELEVATION: 730.808 (NAVD88)
COORDINATE SYSTEM:
COORDINATES & BEARINGS ARE BASED ON NAD83 MICHIGAN STATE PLANES, NORTH ZONE, INTERNATIONAL FOOT
QUANTITIES
PAY ITEM QTY UNIT
MOBILIZATION, MAX. 1 LUMP SUM
EXCAVATION, EARTH 198 CYD
TEMPORARY STAGING OF EXCAVATED MATERIAL TO BE USED
AS BACKFILL 1 LUMP SUM
LIMITS OF DISTURBANCE
TOP OF EX BANK
REMOVE,
SALVAGE &
RE-SPREAD
RIP-RAP AS
NECESSARY
REMOVE,
SALVAGE &
RE-SPREAD
RIP-RAP AS
NECESSARY
EDGE OF EX GRAVEL ROAD
719.94
STREAMBED
CP 100
CP 101
731.10
730.82
730.60
731.40
730.56
730.46
729.71
729.75
729.88
730.64
729.68
728.10
723.13
725.40
RIPRAP
RIPRAPRIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
726.64
729.30
726.18
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
SIDE" CULVERT
INV. 720.49
TOP" CULVERT
INV. 727.00
SIDE" CULVERT
INV. 722.37
730.48
730.54
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
730.97
728.11
726.46
725.66
726.87
727.71
729.61
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
722.25
722.29
722.91
722.81
722.18 722.10
722.26
722.20
723.22SIDE" CULVERT
INV. 720.84
726.33 728.34
730.46
730.14
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
RIPRAP
727.15
724.65
723.99
722.32
722.33
RIPRAP
RIPRAP
722.27
722.24
722.22
722.12
722.85
RIPRAP
TOP" CULVERT
INV. 726.76
SIDE" CULVERT
INV. 719.63
730.00
729.00
8.0
7.0
728.00
727.00
731.00
728.50 728.50
726.50
726.50
728.50 728.50
726.50
726.50
730.50
730.50
730.50 730.50
11.18FT
19.60FT
19.00FT AVG WIDTH22
.00
FT
6.00'
.00 F
T A
VG
LE
NG
TH
.11
FT
B
AN
KF
UL
L W
ID
TH
.21
FT
B
AN
KF
UL
L W
ID
TH
16.00FT
.00
FT
.00
FT
.00
FT
28.00FT
AR
C
H D
4" x
6"
REGISTRATION
CONSULTANT
AECOM
3950 SPARKS DRIVE SE
GRAND RAPIDS, MI 49546
616.574.8500 TEL
www.aecom.com
CLIENT
WALELIGN WAGAW
SENIOR PROJECT MANAGER
MICHIGAN
DEPARTMENT OF
ENVIRONMENT, GREAT
LAKES, AND ENERGY
(EGLE) - SUPERFUND
SECTION
525 WEST ALLEGAN STREET
LANSING, MI 48933
PROJECT
TORCH LAKE
SUPERFUND SITE -
SCALES CREEK
CULVERT REPAIR
47.269118102900364, -88.38488671459874
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
I/R DATE DESCRIPTION
ISSUE/REVISION
1 05/29/2026 100% DESIGN
2 08/07/2026 ADDENDUM 1
La st s av ed b y:
K
AU
R
N 1(
-0 8-
P lo tte d:
6-
-0
Fi le na m e:
L :\D
C S\
PR
O
JE
C
TS
\E
N V\
TO
R C
H L
AK
E
U P\
0_
D
EL
IV
ER
AB
LE
S\
S
C
AL
ES
C
R
EE
K C
U
LV
ER
T\
- C
AD
\9
_C
AD
\S H
EE
TS
\6 C
O N
ST
R
U C
TI
O
N P
LA
N
.D W
G
60627460
CONSTRUCTION PLAN
Know what's below.
before you dig.Call
R
Know what's below.
before you dig.Call
R
Know what's below.
before you dig.Call
R
EDGE OF EX GRAVEL ROAD
EDGE OF WATER
EDGE OF WATER
LIMITS OF DISTURBANCE
FILL/DREDGE
BELOW
STREAM
PROPOSED GRAVEL ROAD, 23AA
CONTROL POINTS:
CP 100:
N - 909545.045 E - 25902954.6
ELEVATION: 729.721 (NAVD88)
CP 101:
N - 909446.294 E - 25902879.14
ELEVATION: 730.808 (NAVD88)
COORDINATE SYSTEM:
COORDINATES & BEARINGS ARE BASED ON NAD83 MICHIGAN STATE PLANES, NORTH ZONE, INTERNATIONAL FOOT
QUANTITIES
PAY ITEM QTY UNIT
AGGREGATE SURFACE, 6 INCH 23AA 13 TON
MDOT RIP RAP, HEAVY 113 TON
ADS 0801T GEOTEXTILE FABRIC LINER 242 SYD
NATIVE PLANTING TURF ESTABLISHMENT
(INCLUDES 6" TOPSOIL) 108 SYD
REINFORCED CONCRETE, 6 INCH 129 SYD
AGGEREGATE BASE, 21AA 43 TON
TOP OF EX BANK
EDGE OF EX GRAVEL ROAD
LIMITS OF DISTURBANCE
FIELD VERIFY EX EROSION LOCATION
FIELD
VERIFY EX
EROSION
LOCATION
SUITABLE EXCAVATED
MATERIAL TO BE USED
TO FILL EROSION
AREAS
NATIVE PLANTING TURF ESTABLISHMENT
QUANTITIES FOR EGLE PERMIT (NOT CONSTRUCTION QUANITIES)
DREDGE VOLUME BELOW STREAM
6 FT x 22 FT x 2 FT = 10 CYD
FILL VOLUME BELOW STREAM
6 FT x 22 FT x 2 FT = 10 CYD
100 YR FLOODPLAIN CUT VOLUME (ELEV 722.42)
19 FT x 30 FT x 2 FT = 43 CYD
100 YR FLOODPLAIN FILL VOLUME (ELEV 722.42)
19 FT x 30 FT x 2 FT = 43 CYD
PROPOSED MDOT RIPRAP, HEAVY
CUT/ FILL BELOW
100 YR FLOOD
PLAIN
PROPOSED MDOT RIPRAP, HEAVY
A
B B
A
10 FT 20 FT20 FT
6 F T
F
T 6 F
T
1:3
1:3
10.0%10.0%
2.0%
0.0%
X X
X X
X X X
X X
X
COMPACTED
SUB-GRADE
10 FT
TYP.
2 FT
NON-WOVEN
GEOTEXTILE
FILTER FABRIC
20 FT 20FT
1V:10H
REINFORCED CONCRETE
6 INCH
W2.9 WIRE MESH
LONGITUDINAL AND TRANSVERSE
WIRE SPACING
4" CENTER TO CENTER SPACING
16 FT
AGGREGATE BASE
6 INCH, 21AA
COMPACTED
SUB-GRADE
6 FT6 FT
REINFORCED CONCRETE
6 INCHW2.9 WIRE MESH
NON-WOVEN
GEOTEXTILE
FILTER FABRIC
X
X X X X
MDOT RIP RAP, HEAVY
AGGREGATE BASE
6 INCH, 21AA
1V:10H
1 FT
2 F T
1 FT
2 F T
AR
C
H D
4" x
6"
REGISTRATION
CONSULTANT
AECOM
3950 SPARKS DRIVE SE
GRAND RAPIDS, MI 49546
616.574.8500 TEL
www.aecom.com
CLIENT
WALELIGN WAGAW
SENIOR PROJECT MANAGER
MICHIGAN
DEPARTMENT OF
ENVIRONMENT, GREAT
LAKES, AND ENERGY
(EGLE) - SUPERFUND
SECTION
525 WEST ALLEGAN STREET
LANSING, MI 48933
PROJECT
TORCH LAKE
SUPERFUND SITE -
SCALES CREEK
CULVERT REPAIR
47.269118102900364, -88.38488671459874
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
I/R DATE DESCRIPTION
ISSUE/REVISION
1 05/29/2026 100% DESIGN
2 08/07/2026 ADDENDUM 1
La st s av ed b y:
K
AU
R
N 1(
-0 8-
P lo tte d:
6-
-0
Fi le na m e:
L :\D
C S\
PR
O
JE
C
TS
\E
N V\
TO
R C
H L
AK
E
U P\
0_
D
EL
IV
ER
AB
LE
S\
S
C
AL
ES
C
R
EE
K C
U
LV
ER
T\
- C
AD
\9
_C
AD
\S H
EE
TS
\3 T
YP
IC
AL
S
EC
TI
O N
S.
D
W G
60627460
SITE DETAILS
PROPOSED SPILLWAY PLAN VIEW
SCALE: NTS
SECTION A-A
SCALE: NTS
SECTION B-B
SCALE: NTS
| DTMB0414 Construction Addendum_Scales Creek 761_20188SAR.pdf |
| 60627460_260804_Scales-Creek-DCSpec - Revised Bid Schedule.pdf |
| 60627460 SCALES CREEK CULVERT FINAL _SNS.pdf |
| COVER SHEET |
| 1 COVER SHEET |
| GENERAL NOTES |
| 2 GENERAL NOTES |
| TYPICAL SECTIONS |
| 3 TYPICAL SECTIONS |
| SESC SHEET |
| 4 SESC |
| REMOVAL SHEET |
| 5 REMOVAL PLAN |
| CONSTRUCTION SHEET |
| 6 CONSTRUCTION PLAN |
| site details |
| DETAIL |
File details come from the government source that posted it. Updated .