DTMB Addendum 2.pdf

PDF 2 MB Posted

Attached to
472/22098. HJD; Muskegon CF - Inside Sidewalk Repairs
Solicitation number
RFQ - 171 - 240000000220
Issued by
Kent County, Muskegon City, Michigan

About this file

This document is a construction bid addendum for the Muskegon Correctional Facility - Inside Sidewalk Repairs project, managed by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division. The addendum provides updates to the pre-bid walk-through notes, plan sheets, specifications, and other items. It also includes a location map and details on the project codes, standards, and general notes. The bid opening date is set for 2/28/2024.

The document outlines special working conditions for the contractor, including mandatory background checks, restricted working hours, security protocols, tool control requirements, and other facility-specific rules. It also provides details on the phased construction approach to maintain accessibility during the project. Pricing and funding information are not included, but the document emphasizes the need for the contractor to provide their own measurements and quantities for a complete scope of work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 12/17)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

CONSTRUCTION BID ADDENDUM NO. 2

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

2/16/2024

PROJECT NAME

Muskegon Correctional Facility – Inside Sidewalk Repairs

FILE NUMBER

472/22098.HJD

PROFESSIONAL

Beckett & Raeder, Inc.

PROJECT DIRECTOR

Heather DeKorte, R.A.

BID OPENING DATE:

2/28/2024

ADDENDUM ITEMS:

Pre-Bid Walk-Through Notes:

- All on-site personnel shall attend a 1-hour virtual orientation.

- Concrete forms can be left overnight.

- Metal stakes are acceptable, but quantities must be accounted for in the Contractor’s manifest.

Plan Sheets:

- Concrete pad for a future weight pit (see attached added Sheet C3.1, along with minor revisions to the cover sheet and C1.0).

Specifications:

- Appendix II shall be replaced with an updated version (see attached).

Other Items:

- Pre-Bid Walk-Through Attendance Sheet (see attached).

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Kristofer Enlow, P.E., Beckett & Raeder, Inc. DATE: 2/16/2024

APPROVED BY:

PROJECT DIRECTOR: DATE: 2/16/2024

Heather DeKorte, R.A.

LOCATION MAP

No Scale

MUSKEGON CORRECTIONAL FACILITY - INSIDE SIDEWALK REPAIRS Date Issued: 01/31/2024

Issued for: BIDSMICHIGAN DEPARTMENT OF CORRECTION/ MUSKEGON CORRECTIONAL FACILITY

CODES AND STANDARDS

1.

2.

3.

CONTRACTOR TO COMPLY WITH LATEST CONSTRUCTION CODE.

CONSTRUCTION TO COMPLY WITH NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS

INCLUDING NFPA 20, NFPA 7b, AND NFPA 70e.

CONSTRUCTION TO APPLY TO OSHA AND MIOSHA CODES AND STANDARDS.

GENERAL NOTES

1.

2.

3.

CONTRACTOR EMPLOYEES SHALL HAVE USE OF THE STATE OF MICHIGAN INDOOR

BATHROOM FACILITIES.

DIMENSIONS SHOWN WERE DETERMINED BY FIELD MEASUREMENTS. ALL BIDDERS SHALL

PROVIDE THEIR OWN MEASUREMENTS AND QUANTITIES, FOR ALL REQUIRED WORK AND

SHALL BE RESPONSIBLE FOR THOSE AMOUNTS FOR A COMPLETE JOB WITH NO ADDITIONAL

COSTS TO THE STATE AFTER AWARD OF THE CONTRACT.

DAMAGE TO PAVEMENT, LAWNS, SHRUBS, TREES, FENCING, BUILDINGS, OR OTHER

STRUCTURES OR SITE APPURTENANCES, THAT RESULT FROM THE EXECUTION OF THIS

PROJECT, SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS/HER EXPENSE.

PRE-CONSTRUCTION PHOTO/VIDEO DOCUMENTATION REQUIRED.

OWNER

SHEET INDEX

535 West William, Suite 101

Planning & Engineering Landscape Architecture

Beckett & Raeder, Inc.

Ann Arbor, MI 48103

663.2622 663.6759 ph fx

Beckett&Raeder RB i

Professional Service Contractor

Cover Sheet C1.0 Existing Conditions C2.0 SESC and DEMO C3.0 Layout and Materials Plan C3.1 Concrete Pad for Future Weight Pit C4.0 Grading and Utilities Plan C5.0 Site Details C5.1 Site Details C6.0 Landscape and Restoration Plan E0.0 Electrical - Notes and Legend E1.1 Electrical - Partial Site Plan - Internal Sidewalks - Electrical Demolition & New Work E3.0 Electrical - Details

IDENTIFICATION

Heather DeKorte

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE OF MICHIGAN

ADAM P. LACH, RA, DIRECTOR

DESIGN AND CONSTRUCTION DIVISION

LOCATION

2400 S Sheridan Dr, Muskegon, MI 49442

STATE FACILITIES ADMINISTRATION

State of Michigan Project Director

Consultant

FILE NO: 472/22098.HJD

SITE

Location Maps

NOT TO SCALE

MUSKEGON

Bids Due: 02/28/24 kenlow@bria2.com email Kris Enlow

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text B

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text Q

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text

AutoCAD SHX Text

US - 31

AutoCAD SHX Text I-96

AutoCAD SHX Text 31-B

AutoCAD SHX Text

E LAKETON AVE

AutoCAD SHX Text

EVANSTON AVE

AutoCAD SHX Text

QUARTERLINE RD

AutoCAD SHX Text

SHERIDAN DR

AutoCAD SHX Text

S WALKER RD

AutoCAD SHX Text

S MILL IRON RD

AutoCAD SHX Text

SHERIDAN DR

AutoCAD SHX Text

S BROOKS RD

AutoCAD SHX Text

W SHERMAN BLVD

AutoCAD SHX Text

S GETTY ST

AutoCAD SHX Text

TAC ASSOCIATES, LLC

AutoCAD SHX Text 4321 East Camden Road Osseo, MI 49266 Ph. (517) 254-4789 * Fax (517) 254-4886 http://www.tac-associates.com

AutoCAD SHX Text Consulting Engineers

AutoCAD SHX Text

AutoCAD SHX Text

02.15.24 ADDENDUM 2

18"

ME 34.95 ME 34.82

35.42

ME 35.60

35.48

35.73

ME 35.48

ME 35. 44

35.73 35.69

35.73

36.64

36.39

36.60

36.35

36.37

36.12

36.20

35.95

35.96

35.71

ME

ME35.69

35.61

35.85

35.62

35.37

35.80

35.55

36.10

35.85

36.39

36.06

36.06

ME

ME

ME

33.60

34.40

34.27

34.30

RIM 33.00

35.85/ME

34.75

34.50 35.00

34.60/ 35.10

35.12

34.09/ 34.59

35.30

35.04

ME34.78

35.25

34.50

34.50 34.50 34.60/ 35.10

34.50 34.60

34.75

35.70 35.84

34.09/ 34.59

34.75

34.74

34.60

C1 .0

Know what's below.

before you dig.Call

R

50250 15075

1. CONTRACTOR SHALL CALL MISS DIG (811) A MINIMUM OF THREE WORKING DAYS

PRIOR TO START OF CONSTRUCTION.

2. CONTRACTOR SHALL INVESTIGATE EXTENT AND LOCATION OF ALL EXISTING

UTILITIES AND SHALL BE RESPONSIBLE FOR PROTECTION AND RESTORATION OF

SAME IF DAMAGED AS A RESULT OF CONTRACTOR'S OPERATIONS.

3. TREE LOCATIONS ARE APPROXIMATED AND MUST BE CONFIRMED ON SITE.

EXISTING CONDITIONS NOTES

MDM/GPB OF WESTSHORE ENGINEERING & SURVEYING

2534 MUSKEGON, MI 49444

SURVEY PREPARED BY:

BM: FLANGE BOLT UNDER "E" IN EJIW ELEV=635.78

BENCHMARK NOTES

THE NATURAL RESOURCE CONSERVATION SERVICE SOIL SURVEY INDICATES THE SITE IS

COMPRISED OF PlfabB and PpsaaA.

PlfabB - PLAINFIELD SAND, LAKE PLAIN, 0 TO 6 PERCENT SLOPES PpsaaA - PIPESTONE-COVERT-SAUGATUCK SANDS, 0 TO 3 PERCENT SLOPES

SOIL TYPES

S

UN

UM

E

PL

UR

IB

U

I N

E P

SI

R

A U

Q I

S M

A N

E C

M A

M A

L U

S N

La nd sc ap e A rc hi te ct ur e

Pl an ni ng

E ng in ee ri ng

B ec ke tt

R ae d er , I n c.

W es t W ill ia m , S ui te

A nn

A rb or , M

I 4

B ec ke tt R ae d er

3.

fx

B

3.

ph

R i

LEGNED

PARCEL #61-24-135-300-0002-00

CITY OF MUSKEGON

N 1/2 OF SW 1/4 SEC 35 T10N R16W, EX N 66 FT & EX W 66 FT THEREOF

LEGAL DESCRIPTION OF PROPERTY

EXISTING GATE

SALLYPORT

HOUSING UNIT 2

HOUSING UNIT 3

HOUSING UNIT 4

HOUSING UNIT 5

VOCATIONAL

BUILDING

FOOD SERVICES

HOUSING UNIT 1

HEALTH CARE

UTILITY POLE,

TYP.

CONTRACTOR SHALL ACCESS THE SITE THROUGH THE SALLYPORT. ASPHALT

PAVEMENTS THROUGHOUT THE FACILITY ARE NEW. THE CONTRACTOR WILL BE

RESPONSIBLE FOR ANY DAMAGE TO THE NEW ASPHALT PAVEMENT CAUSE BY HIS/HER

OPERATIONS.

CONSTRUCTION ACCESS

CONTRACTOR SHALL ACCESS THE SITE

THROUGH THE SALLYPORT. ASPHALT

PAVEMENTS THROUGHOUT THE FACILITY ARE

NEW. THE CONTRACTOR WILL BE RESPONSIBLE

FOR ANY DAMAGE TO THE NEW ASPHALT

PAVEMENT CAUSE BY HIS/HER OPERATIONS.

EXISTING

BASKETBALL

COURT

EXISTING

SIDEWALK

EXISTING

BASKETBALL

COURT

EXISTING TENNIS

COURT

CONCRETE PAD FOR FUTURE

WEIGHT PIT SEE SHEET C3.1

AutoCAD SHX Text 633.861

AutoCAD SHX Text 633.386

AutoCAD SHX Text 634.217

AutoCAD SHX Text 633.333

AutoCAD SHX Text E

AutoCAD SHX Text 633.331

AutoCAD SHX Text 633.434

AutoCAD SHX Text 634.491

AutoCAD SHX Text 633.979

AutoCAD SHX Text 634.370

AutoCAD SHX Text 633.628

AutoCAD SHX Text 633.628

AutoCAD SHX Text

WV

AutoCAD SHX Text 633.397

AutoCAD SHX Text 634.005

AutoCAD SHX Text 634.409

AutoCAD SHX Text 634.669

AutoCAD SHX Text 634.373

AutoCAD SHX Text

WV

AutoCAD SHX Text C O

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text 634.984

AutoCAD SHX Text 634.275

AutoCAD SHX Text 633.946

AutoCAD SHX Text 633.985

AutoCAD SHX Text 633.823

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

WV

AutoCAD SHX Text 634.299

AutoCAD SHX Text 634.502

AutoCAD SHX Text 634.718

AutoCAD SHX Text 633.971

AutoCAD SHX Text 634.154

AutoCAD SHX Text 634.226

AutoCAD SHX Text 634.328

AutoCAD SHX Text 634.237

AutoCAD SHX Text 634.158

AutoCAD SHX Text 634.213

AutoCAD SHX Text 634.268

AutoCAD SHX Text 633.734

AutoCAD SHX Text 634.406

AutoCAD SHX Text 634.302

AutoCAD SHX Text 633.707

AutoCAD SHX Text 634.161

AutoCAD SHX Text C O

AutoCAD SHX Text 633.637

AutoCAD SHX Text 633.685

AutoCAD SHX Text 634.351

AutoCAD SHX Text 634.542

AutoCAD SHX Text 635.134

AutoCAD SHX Text 635.035

AutoCAD SHX Text 635.284

AutoCAD SHX Text 635.472

AutoCAD SHX Text 635.752

AutoCAD SHX Text 636.223

AutoCAD SHX Text 636.204

AutoCAD SHX Text 634.723

AutoCAD SHX Text 634.830

AutoCAD SHX Text 635.278

AutoCAD SHX Text 635.990

AutoCAD SHX Text 635.191

AutoCAD SHX Text C O

AutoCAD SHX Text C O

AutoCAD SHX Text 636.147

AutoCAD SHX Text 633.993

AutoCAD SHX Text 633.974

AutoCAD SHX Text

WV

AutoCAD SHX Text 634.053

AutoCAD SHX Text 633.439

AutoCAD SHX Text 633.329

AutoCAD SHX Text C O

AutoCAD SHX Text

WV

AutoCAD SHX Text 635.577

AutoCAD SHX Text 640.234

AutoCAD SHX Text 643.168

AutoCAD SHX Text 633.987

AutoCAD SHX Text 633.337

AutoCAD SHX Text 647.170

AutoCAD SHX Text 634.575

AutoCAD SHX Text 634.246

AutoCAD SHX Text 635.053

AutoCAD SHX Text 634.837

AutoCAD SHX Text 648.052

AutoCAD SHX Text C O

AutoCAD SHX Text C O

AutoCAD SHX Text 635.963

AutoCAD SHX Text

WV

AutoCAD SHX Text 634.884

AutoCAD SHX Text 634.572

AutoCAD SHX Text 634.620

AutoCAD SHX Text 634.600

AutoCAD SHX Text 634.616

AutoCAD SHX Text 634.246

AutoCAD SHX Text 634.148

AutoCAD SHX Text 634.29

AutoCAD SHX Text 634.110

AutoCAD SHX Text 635.640

AutoCAD SHX Text 635.876

AutoCAD SHX Text 633.812

AutoCAD SHX Text 633.090

AutoCAD SHX Text 633.208

AutoCAD SHX Text 639.388

AutoCAD SHX Text 639.300

AutoCAD SHX Text 638.870

AutoCAD SHX Text 638.653

AutoCAD SHX Text 633.236

AutoCAD SHX Text 633.075

AutoCAD SHX Text 635.318

AutoCAD SHX Text 633.000

AutoCAD SHX Text 633.027

AutoCAD SHX Text 633.136

AutoCAD SHX Text 636.437

AutoCAD SHX Text 636.975

AutoCAD SHX Text 637.455

AutoCAD SHX Text 634.412

AutoCAD SHX Text C O

AutoCAD SHX Text C O

AutoCAD SHX Text 637.174

AutoCAD SHX Text 634.430

AutoCAD SHX Text 632.821

AutoCAD SHX Text 632.918

AutoCAD SHX Text 634.110

AutoCAD SHX Text 640.290

AutoCAD SHX Text 633.924

AutoCAD SHX Text 634.719

AutoCAD SHX Text 635.339

AutoCAD SHX Text 635.279

AutoCAD SHX Text 635.214

AutoCAD SHX Text 633.842

AutoCAD SHX Text 633.635

AutoCAD SHX Text 634.113

AutoCAD SHX Text 634.743

AutoCAD SHX Text 635.022

AutoCAD SHX Text 633.979

AutoCAD SHX Text 635.874

AutoCAD SHX Text 635.74

AutoCAD SHX Text 635.620

AutoCAD SHX Text 634.876

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text 633.651

AutoCAD SHX Text 633.639

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

FENCE

AutoCAD SHX Text 652.327

AutoCAD SHX Text 651.611

AutoCAD SHX Text 639.687

AutoCAD SHX Text 646.915

AutoCAD SHX Text 634.327

AutoCAD SHX Text 633.788

AutoCAD SHX Text 636.732

AutoCAD SHX Text 639.580

AutoCAD SHX Text 639.601

AutoCAD SHX Text 639.607

AutoCAD SHX Text 635.313

AutoCAD SHX Text C O

AutoCAD SHX Text C O

AutoCAD SHX Text 636.232

AutoCAD SHX Text 635.590

AutoCAD SHX Text 635.709

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text 635.908

AutoCAD SHX Text 635.252

AutoCAD SHX Text 634.899

AutoCAD SHX Text 635.217

AutoCAD SHX Text 635.210

AutoCAD SHX Text 635.085

AutoCAD SHX Text 635.906

AutoCAD SHX Text 635.106

AutoCAD SHX Text 635.283

AutoCAD SHX Text 635.258

AutoCAD SHX Text 635.712

AutoCAD SHX Text 635.403

AutoCAD SHX Text 635.510

AutoCAD SHX Text

WV

AutoCAD SHX Text 634.731

AutoCAD SHX Text 634.684

AutoCAD SHX Text 634.653

AutoCAD SHX Text 634.398

AutoCAD SHX Text 634.458

AutoCAD SHX Text 633.999

AutoCAD SHX Text 633.900

AutoCAD SHX Text 633.935

AutoCAD SHX Text 635.077

AutoCAD SHX Text 634.249

AutoCAD SHX Text 634.205

AutoCAD SHX Text 633.349

AutoCAD SHX Text 638.734

AutoCAD SHX Text 638.085

AutoCAD SHX Text 638.294

AutoCAD SHX Text 638.248

AutoCAD SHX Text 633.764

AutoCAD SHX Text 638.283

AutoCAD SHX Text 638.400

AutoCAD SHX Text 645.758

AutoCAD SHX Text 635.669

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

WV

AutoCAD SHX Text 635.423

AutoCAD SHX Text 635.322

AutoCAD SHX Text 635.437

AutoCAD SHX Text 635.522

AutoCAD SHX Text 635.724

AutoCAD SHX Text 635.385

AutoCAD SHX Text 635.462

AutoCAD SHX Text 634.862

AutoCAD SHX Text 634.628

AutoCAD SHX Text 635.340

AutoCAD SHX Text 635.615

AutoCAD SHX Text 631.915

AutoCAD SHX Text 631.884

AutoCAD SHX Text

WV

AutoCAD SHX Text 632.064

AutoCAD SHX Text 631.842

AutoCAD SHX Text

WV

AutoCAD SHX Text 636.878

AutoCAD SHX Text 636.690

AutoCAD SHX Text 634.779

AutoCAD SHX Text 634.651

AutoCAD SHX Text 634.119

AutoCAD SHX Text 633.832

AutoCAD SHX Text 636.125

AutoCAD SHX Text 638.371

AutoCAD SHX Text 633.665

AutoCAD SHX Text 633.303

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text 632.727

AutoCAD SHX Text 631.759

AutoCAD SHX Text 632.442

AutoCAD SHX Text 631.612

AutoCAD SHX Text 634.256

AutoCAD SHX Text 634.16

AutoCAD SHX Text 637.061

AutoCAD SHX Text 635.256

AutoCAD SHX Text 635.403

AutoCAD SHX Text 632.788

AutoCAD SHX Text 632.875

AutoCAD SHX Text C O

AutoCAD SHX Text C O

AutoCAD SHX Text 628.832

AutoCAD SHX Text 628.792

AutoCAD SHX Text 628.800

AutoCAD SHX Text 629.012

AutoCAD SHX Text 628.896

AutoCAD SHX Text 629.514

AutoCAD SHX Text 629.310

AutoCAD SHX Text 631.834

AutoCAD SHX Text 633.230

AutoCAD SHX Text 632.866

AutoCAD SHX Text 632.869

AutoCAD SHX Text C O

AutoCAD SHX Text 634.394

AutoCAD SHX Text 634.366

AutoCAD SHX Text 634.151

AutoCAD SHX Text 634.130

AutoCAD SHX Text 634.412

AutoCAD SHX Text 634.431

AutoCAD SHX Text 637.597

AutoCAD SHX Text 637.581

AutoCAD SHX Text 634.442

AutoCAD SHX Text 637.981

AutoCAD SHX Text 633.900

AutoCAD SHX Text 638.340

AutoCAD SHX Text 633.828

AutoCAD SHX Text 633.898

AutoCAD SHX Text 639.356

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text 633.156

AutoCAD SHX Text 633.379

AutoCAD SHX Text 633.622

AutoCAD SHX Text 634.383

AutoCAD SHX Text 634.113

AutoCAD SHX Text C O

AutoCAD SHX Text C O

AutoCAD SHX Text 634.162

AutoCAD SHX Text 635.840

AutoCAD SHX Text 633.792

AutoCAD SHX Text 633.066

AutoCAD SHX Text 632.847

AutoCAD SHX Text 633.112

AutoCAD SHX Text 633.199

AutoCAD SHX Text 632.797

AutoCAD SHX Text 633.079

AutoCAD SHX Text 632.926

AutoCAD SHX Text 632.646

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text 632.630

AutoCAD SHX Text 632.634

AutoCAD SHX Text 632.586

AutoCAD SHX Text 632.644

AutoCAD SHX Text 632.804

AutoCAD SHX Text 632.643

AutoCAD SHX Text 632.876

AutoCAD SHX Text 633.261

AutoCAD SHX Text 633.370

AutoCAD SHX Text 633.496

AutoCAD SHX Text 633.528

AutoCAD SHX Text 633.442

AutoCAD SHX Text 633.579

AutoCAD SHX Text 633.920

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text 633.984

AutoCAD SHX Text 634.163

AutoCAD SHX Text 634.474

AutoCAD SHX Text 634.503

AutoCAD SHX Text 634.551

AutoCAD SHX Text 634.331

AutoCAD SHX Text 633.907

AutoCAD SHX Text 634.243

AutoCAD SHX Text 634.056

AutoCAD SHX Text 633.896

AutoCAD SHX Text 633.910

AutoCAD SHX Text 633.777

AutoCAD SHX Text 633.735

AutoCAD SHX Text 633.737

AutoCAD SHX Text 633.988

AutoCAD SHX Text 634.186

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text 634.173

AutoCAD SHX Text 634.310

AutoCAD SHX Text 634.250

AutoCAD SHX Text 633.564

AutoCAD SHX Text 633.995

AutoCAD SHX Text 634.276

AutoCAD SHX Text 633.995

AutoCAD SHX Text 634.276

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

LIGHT POLE TOWER

AutoCAD SHX Text 634.510

AutoCAD SHX Text 634.550

AutoCAD SHX Text 633.311

AutoCAD SHX Text 633.796

AutoCAD SHX Text 634.023

AutoCAD SHX Text 633.825

AutoCAD SHX Text 633.389

AutoCAD SHX Text 633.714

AutoCAD SHX Text 633.328

AutoCAD SHX Text 633.342

AutoCAD SHX Text 633.112

AutoCAD SHX Text 632.565

AutoCAD SHX Text 633.401

AutoCAD SHX Text 634.139

AutoCAD SHX Text 633.965

AutoCAD SHX Text 634.364

AutoCAD SHX Text 634.666

AutoCAD SHX Text 635.012

AutoCAD SHX Text 635.336

AutoCAD SHX Text 635.671

AutoCAD SHX Text 635.925

AutoCAD SHX Text 635.90

AutoCAD SHX Text 634.143

AutoCAD SHX Text 640.694

AutoCAD SHX Text 636.028

AutoCAD SHX Text 635.793

AutoCAD SHX Text 635.829

AutoCAD SHX Text 632.491

AutoCAD SHX Text 633.367

AutoCAD SHX Text 634.163

AutoCAD SHX Text 634.384

AutoCAD SHX Text 633.955

AutoCAD SHX Text 633.719

AutoCAD SHX Text 635.157

AutoCAD SHX Text 635.532

AutoCAD SHX Text 635.211

AutoCAD SHX Text 635.631

AutoCAD SHX Text 635.867

AutoCAD SHX Text 636.040

AutoCAD SHX Text 636.265

AutoCAD SHX Text 636.310

AutoCAD SHX Text

ELEC PANEL

AutoCAD SHX Text

FENCE

AutoCAD SHX Text 632.911

AutoCAD SHX Text 632.838

AutoCAD SHX Text 633.000

AutoCAD SHX Text 635.346

AutoCAD SHX Text 635.673

AutoCAD SHX Text 633.759

AutoCAD SHX Text 632.980

AutoCAD SHX Text 632.873

AutoCAD SHX Text 635.076

AutoCAD SHX Text 635.148

AutoCAD SHX Text 635.436

AutoCAD SHX Text 635.398

AutoCAD SHX Text 635.416

AutoCAD SHX Text 635.486

AutoCAD SHX Text 635.351

AutoCAD SHX Text 635.260

AutoCAD SHX Text 635.786

AutoCAD SHX Text 640.042

AutoCAD SHX Text 635.820

AutoCAD SHX Text 635.950

AutoCAD SHX Text 636.235

AutoCAD SHX Text 635.963

AutoCAD SHX Text 642.545

AutoCAD SHX Text 640.326

AutoCAD SHX Text 639.658

AutoCAD SHX Text 640.006

AutoCAD SHX Text 641.602

AutoCAD SHX Text 641.356

AutoCAD SHX Text 641.293

AutoCAD SHX Text 635.698

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text 634.844

AutoCAD SHX Text 635.357

AutoCAD SHX Text 634.860

AutoCAD SHX Text 635.458

AutoCAD SHX Text 640.316

AutoCAD SHX Text 640.207

AutoCAD SHX Text 635.792

AutoCAD SHX Text 635.654

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text 635.940

AutoCAD SHX Text 635.074

AutoCAD SHX Text 635.220

AutoCAD SHX Text 634.296

AutoCAD SHX Text 634.389

AutoCAD SHX Text 634.321

AutoCAD SHX Text 635.291

AutoCAD SHX Text 635.465

AutoCAD SHX Text 635.790

AutoCAD SHX Text 636.057

AutoCAD SHX Text 637.084

AutoCAD SHX Text 643.942

AutoCAD SHX Text 641.314

AutoCAD SHX Text 643.298

AutoCAD SHX Text 636.02

AutoCAD SHX Text 640.136

AutoCAD SHX Text

ANTENNA TOWER

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

ELEC VAULT

AutoCAD SHX Text

WELL CAPS(2)

AutoCAD SHX Text

ICV(3)

AutoCAD SHX Text

WV

AutoCAD SHX Text

ELEC PANEL

AutoCAD SHX Text

ELEC PANEL

AutoCAD SHX Text

EX CATCH BASIN RIM=632.44 SE INV=627.34 SW INV=627.34

AutoCAD SHX Text

EX CATCH BASIN

AutoCAD SHX Text

RIM=632.57

AutoCAD SHX Text

NE INV=627.17

AutoCAD SHX Text

W INV=627.12

AutoCAD SHX Text PlfabA

AutoCAD SHX Text PlfabB

AutoCAD SHX Text PlfabB

AutoCAD SHX Text PlfabA

AutoCAD SHX Text PlfabA

AutoCAD SHX Text PlfabB

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Existing Condtions

AutoCAD SHX Text

ISSUED FOR

AutoCAD SHX Text

FINAL RECORD

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

472/22098.HJD

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

IDENTIFICATION NO.

AutoCAD SHX Text

FILE NO.

AutoCAD SHX Text

PRELIMINARY

AutoCAD SHX Text

CHECKED: JB

AutoCAD SHX Text

DRAWN: MK

AutoCAD SHX Text

DESIGNED: KE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED: JB

AutoCAD SHX Text

TUEBOR

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text Created by Robert W. Loftis

AutoCAD SHX Text

JAN 31, 2024

AutoCAD SHX Text Client Muskegon Correctional Facility - Inside Sidewalk Repairs

AutoCAD SHX Text

STATE OF MICHIGAN

AutoCAD SHX Text

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

AutoCAD SHX Text

DESIGN AND CONSTRUCTION DIVISION

AutoCAD SHX Text

ADAM LACH, PROJECT MANAGER

AutoCAD SHX Text

STATE FACILITIES ADMINISTRATION

AutoCAD SHX Text

TELEPHONE RISER

AutoCAD SHX Text

LIGHT POLE

AutoCAD SHX Text

UTILITY POLE

AutoCAD SHX Text

CATCH BASIN

AutoCAD SHX Text

WELL CAP/WATER WELL

AutoCAD SHX Text

FIRE HYDRANT

AutoCAD SHX Text

GAS VALVE

AutoCAD SHX Text

WATER VALVE

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

WV

AutoCAD SHX Text

GV

AutoCAD SHX Text W

AutoCAD SHX Text

SANITARY CLEAN-OUT

AutoCAD SHX Text C O

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

FENCE

AutoCAD SHX Text X

AutoCAD SHX Text

MISC MANHOLE

AutoCAD SHX Text

GATE SENSOR

AutoCAD SHX Text

GS

AutoCAD SHX Text

SATELLITE DISH

AutoCAD SHX Text S

AutoCAD SHX Text

ICV(1)

AutoCAD SHX Text

WV

AutoCAD SHX Text

IRRIGATION CONTROL VALVE

AutoCAD SHX Text

(X) INDICATES THE NUMBER OF VALVES IN THAT PARTICULAR AREA

AutoCAD SHX Text

MICROWAVE BEAM

AutoCAD SHX Text

MWV

AutoCAD SHX Text

MONITOR WELL

AutoCAD SHX Text

EXISTING IRRIGATION LINE

AutoCAD SHX Text

SOIL TYPE DELINEATION

AutoCAD SHX Text Ga

AutoCAD SHX Text Ku

AutoCAD SHX Text

EXISTING ELECTRICAL LINE

AutoCAD SHX Text

94.00'

.0

0'

36.54

36.75

36.75

36.75

36.75

ME 34.82

ME 34.824.0%

36.40

N 8444.6759

N 8543.3012 E 40851.80

N 8501.4990 E 40838.10

N 8513.1378 E 40940.83

N 8471.3261 E 40927.13

LAYOUT & MATERIALS NOTES

1. ALL WORK SHALL BE COMPLETED IN CONFORMANCE WITH CURRENT ADA

STANDARDS.

2. ALL DIMENSIONS ARE TO BACK OF CURB, FACE OF BUILDING OR EDGE OF

MATERIAL UNLESS OTHERWISE NOTED.

3. ALL LINES ARE PARALLEL OR PERPENDICULAR TO THE CURB/ PAVEMENT/ BUILDING

LINE FROM WHICH THEY ARE DIMENSIONED UNLESS OTHERWISE NOTED.

4. FOLLOWING LAYOUT OF ALL MATERIALS, CONTRACTOR SHALL REVIEW WITH

OWNER'S REPRESENTATIVE.

5. ANY DISCREPANCIES IN THE LAYOUT PLAN SHOULD BE IMMEDIATELY REPORTED

TO OWNER'S REPRESENTATIVE.

6. NORTHINGS AND EASTINGS ON THE PLAN HAVE BEEN TRUNCATED BY THE

FOLLOWING: NORTHINGS: 620,000; EASTINGS: 12,600,000

PROPOSED STANDARD DUTY

CONCRETE PAVEMENT

LAYOUT & MATERIALS LEGEND

EXPANSION JOINT

CONTROL JOINT

C3 .1

S

UN

UM

E

PL

UR

IB

U

I N

E P

SI

R

A U

Q I

S M

A N

E C

M A

M A

L U

S N

La nd sc ap e A rc hi te ct ur e

Pl an ni ng

E ng in ee ri ng

B ec ke tt

R ae d er , I n c.

W es t W ill ia m , S ui te

A nn

A rb or , M

I 4

B ec ke tt R ae d er

3.

fx

B

3.

ph

R iC5.0

1 CONCRETE PAVEMENT

REL RELOCATED LIGHT POLE

LIMIT OF DISTURBANCE

PHASE BOUNDARY

0 105 3015

INTERNAL WALK CONSTRUCTION SHALL BE COMPLETED IN 3 PHASES,

CONTRACTOR IS RESPONSIBLE FOR MAINTAINING AN ADA ROUTE FROM

SERVICE UNIT 1 TO FOOD SERVICE.

PHASE 1 TO BE COMPLETED BEFORE PHASE 2. PHASE 2 TO BE COMPLETED

BEFORE PHASE 3.

PHASING NOTE

Know what's below.

before you dig.Call

R

NEW CONSTRUCTION: STANDARD DUTY ASPHALT

CRACK FILL AND SEAL ASPHALT

EXISTING WEIGHT PIT

AutoCAD SHX Text 635.47

AutoCAD SHX Text 634.91

AutoCAD SHX Text 635.71

AutoCAD SHX Text 634.89

AutoCAD SHX Text 633.69

AutoCAD SHX Text 634.69

AutoCAD SHX Text 635.26

AutoCAD SHX Text 635.36

AutoCAD SHX Text 635.81

AutoCAD SHX Text 635.70

AutoCAD SHX Text 635.26

AutoCAD SHX Text 634.62

AutoCAD SHX Text 634.67

AutoCAD SHX Text 635.40

AutoCAD SHX Text 635.38

AutoCAD SHX Text 635.66

AutoCAD SHX Text 636.28

AutoCAD SHX Text 637.28

AutoCAD SHX Text 636.94

AutoCAD SHX Text 636.48

AutoCAD SHX Text 635.70

AutoCAD SHX Text 636.53

AutoCAD SHX Text 635.50

AutoCAD SHX Text 635.20

AutoCAD SHX Text 634.86

AutoCAD SHX Text 634.88

AutoCAD SHX Text 634.91

AutoCAD SHX Text 634.82

AutoCAD SHX Text 634.77

AutoCAD SHX Text 634.70

AutoCAD SHX Text Concrete Pad for Future Weight Pit

AutoCAD SHX Text

ISSUED FOR

AutoCAD SHX Text

FINAL RECORD

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

472/22098.HJD

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

IDENTIFICATION NO.

AutoCAD SHX Text

FILE NO.

AutoCAD SHX Text

PRELIMINARY

AutoCAD SHX Text

CHECKED: JB

AutoCAD SHX Text

DRAWN: MK

AutoCAD SHX Text

DESIGNED: KE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED: JB

AutoCAD SHX Text

TUEBOR

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text Created by Robert W. Loftis

AutoCAD SHX Text

JAN 31, 2024

AutoCAD SHX Text Client Muskegon Correctional Facility - Inside Sidewalk Repairs

AutoCAD SHX Text

STATE OF MICHIGAN

AutoCAD SHX Text

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

AutoCAD SHX Text

DESIGN AND CONSTRUCTION DIVISION

AutoCAD SHX Text

ADAM LACH, PROJECT MANAGER

AutoCAD SHX Text

STATE FACILITIES ADMINISTRATION

Bidding and Contract Document (R 07/23)

Project Name: Muskegon Correctional Facility – Inside Sidewalk Repairs

File No. 472/22098.HJD

APPENDIX II

SPECIAL WORKING CONDITIONS

(Michigan Department of Corrections)

DEPARTMENT OF CORRECTIONS

The Work comprising this Project will be performed at a State of Michigan Correctional Facility and the Contractor/Professional must comply with the following special working rules.

1. Contractor/Professional must submit a LEIN request consisting of name, driver’s license number, social security number, birth date, and additional information when requested, on all persons to be employed on the Project site. Such form (Vendor/Contractor LEIN Request, CAJ-1037) must be submitted directly to the Department of Corrections Designee for approval before any person's appearance at the site for Work assignments. These employees will be required to attend Contractor/Professional orientation prior to any on site activity.

2. Contractor/Professional will be allowed to work within or on Correctional Facility confines for an eight (8) hour shift as designated by the facility. Four (4) ten (10) hour shifts will be considered. No Work is allowed to be performed on Saturdays, Sundays, or State holidays without written permission from the State Agency.

The State Agency may set other time schedules as discussed during the pre-construction meeting.

Consideration will be given to using alternate shifts to minimize the length of time an area is out of service.

3. All employees of the Contractor/Professional may be subject to individual body search each time they enter the Correctional Facility. Packages or containers of any kind may be opened for inspection. Lunch boxes are not permitted inside the security perimeter. All employees of the Contractor/Professional will be required to have legal picture identification card.

4. All trucks and other mobile equipment may be subject to inspection both on arrival and upon departure from the Correctional Facility. Absolutely no fraternization between inmates and Contractor/Professional's employees will be tolerated. Any attempts at same by prisoners are to be reported immediately to the escorting officer or MDOC employee.

5. No requests for visits with inmates will be granted to Contractor/Professional's employees except where such visiting originated prior to award of the Contract.

6. Contractor/Professional must follow rules pertaining to foot and vehicle traffic as established by the Correctional Facility. Contractor/Professional must observe all off-limit restricted areas beyond which no unauthorized personnel may trespass. The Contractor/Professional and their workers may not leave the assigned Work areas.

7. Heavy equipment, power tools and machinery must be removed from the inside of the security perimeter through the assigned gate at times specified by each facility. Such heavy equipment including but not limited to power shovels, compressors, welding machines, air hammers, welding equipment, etc., must be immobilized in an acceptable manner and may not remain inside unless specifically approved by the Warden. Cutting torches and cutting tools in general must be securely locked as directed by the Agency and checked out as needed. No tools, small pipe, copper, or wire will remain on the site overnight unless acceptably secured as approved by the facility. Any gas powered equipment entering the secured perimeter must be equipped with locking gas caps at all times.

8. MDOC physical plant standards require Contractors/Professionals to provide a properly sized emergency generator(s) to be onsite with all associated equipment to ensure a quick install in an event where power may be disrupted to any part of the facility. Use of the MDOC regional emergency generator may be utilized when applicable and available. See contract documents for any specific generator requirements.

9. In the event of underground excavation work of any kind, ground penetrating radar must be used to document underground utilities, wires, cables, fiber optic, tunnels, structures etc. prior to any work being performed. When the ground must be disturbed within 6’ an underground obstacle as mentioned above, hydro-excavation must take place.

a. Any damage to an underground utility, wire, cable, fiber optic, or underground structure of any kind must be reported immediately to facility staff and a plan of action made to repair the damage immediately. Any wire, cable, or fiberoptic line that has been damaged by the Contractor/Professional, must be replaced in whole.

A splice is not an acceptable means for repair.

10. There will be no exchange, loaning or borrowing of tools, equipment, or manpower between Correctional

Facility personnel and the Contractor/Professional.

11. Specific Facility and MDOC requirements regarding tools & equipment will be covered during the Contractor/Professional orientation process prior to any on site activity. Topics covered include but are not limited to:

a. All tools and equipment within a work area which is not enclosed and secure must be disabled, secured, or removed from the facility if the entire construction crew leaves the work area/facility.

b. Clean up of the site shall be continuously maintained and at the end of each work shift all debris shall be removed from the site or placed into a dumpster as approved by the facility. All building and grounds shall be cleaned using a magnet or metal detector to ensure no debris remains. Demolition work above occupied building requires spotter below area being disturbed to collect potential falling debris.

c. Dumpsters for debris collection/recycle/removal are not allowed to be left inside the security perimeter unless approved by the Warden. In such cases the dumpster location and security will be specified by the Warden and may be required to be secured within a temporary fenced area or provided with a lockable cover. Removal of dumpsters is subject to coordination with the facility.

d. Tools, tool boxes, and equipment of contractors and/or workers performing services inside an institution shall be manifested, inventoried and inspected prior to entry into and exit from the institution. Staff designated to escort workers within the facility shall ensure tools are controlled with proper security and safety procedures and work activities are confined to authorized areas.

e. A list of Dangerous and Critical Tools will be provided to the Contractor as well as all policies and procedures dictating the security, control, and use of these of tools. Tool Control will be thoroughly covered during Contractor/Professional orientation prior to any on site activity.

f. Explosively Driven Tools and Ammunition will not be allowed.

g. Smoking, and the use and possession of tobacco products, is strictly prohibited.

h. It is a felony to bring any of the following items into a correctional facility or onto facility property where prisoners may have access to them without prior written permission of the Warden:

1. Any weapon, including a pocketknife, or other implement which may be used to injure another person, or which may be used in aiding a prisoner to escape.

2. Any alcoholic beverage or poison.

3. Any prescription drug or controlled substance without written certification of need from a licensed physician.

4. Personal cellular telephones and pagers are not permitted on facility grounds except in a locked motor vehicle in designated parking areas.

5. Audio or visual recording devices, including cameras.

12. The assigned gate through which materials, equipment and vehicles must be transported will be opened upon request between the hours as determined by agreement with facility operations.

13. Sanitary facilities will be assigned by the Correctional Facility authorities for the use of the employees of all Contractors. The MDOC or facility may require placement of portable facilities as outlined in the specifications. If used and authorized, portable sanitary facilities shall be locked at all times as when not in use.

14. Guards may be assigned to the working areas. They may inspect and search areas under construction at any time, including the Contractor/Professional's equipment.

15. Areas for employee parking, tool boxes, etc., must be assigned only by Correctional Facility authorities on the site. Remove all firearms, weapons, alcoholic beverages, drugs, medicines, or explosives from vehicles before entering Facility property. Lock vehicles when not attended.

16. Accidents - The Correctional Facility infirmary is not available to Contractor/Professional's employees.

17. The Warden of this Correctional Facility retains the right to revise these "Special Working Conditions" as required to meet facility needs.

18. Unless noted otherwise in the project documents, roofing work is not to occur between November 15th and April 1st each year, unless written authorization is provided to the Contractor.

19. The MDOC will not be responsible for receiving, storing, and handling materials or equipment for a construction contractor.