DTMB-0415 (Design Build Advertisement R10-17).pdf
PDF 22 KB Posted
- Solicitation number
- RFQ-171-180000000714-2
- Issued by
- Oakland County, Michigan
About this file
This is a Design Build Project Advertisement from the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration for the Department of Corrections. The project involves replacing and repairing the backup fuel system blender at the E.C. Brooks Correctional Facility in Muskegon Heights, MI. The scope includes restoring the existing propane plant to full functionality by installing a new propane blender system capable of supplying 30 MM Btu per hour of mixed gas at 8 pounds pressure, including propane flow pumps, water bath vaporization unit, and associated gas piping and electrical connections. A mandatory walk-through inspection is scheduled for June 28, 2018 at 11:00 am, with bids due July 11, 2018 at 2:00 p.m. local time. Questions will be accepted until July 5, 2018 at noon EDT.
The project requires a 5% bid security and must comply with all applicable federal, state and local codes and regulations, including permits and approvals from the State of Michigan Bureau of Construction Codes and Bureau of Fire Services. Contractors must submit a LEIN check request five business days prior to the pre-bid walk-through. The project will be awarded through the SIGMA procurement system, with Todd Cordill, NCARB serving as the Project Director. The file number assigned is 472/16402.TYC with index number 37180.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LEIN Request 16402.pdf | ||
| EC Br Propane 1.JPG | JPG image | |
| Addendum 1.pdf | ||
| EC Br Propane 3.JPG | JPG image | |
| EC Br Propane 4.JPG | JPG image | |
| Design Build Master (10-27-17).pdf | ||
| EC Br Propane 2.JPG | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0415 (R 10/17)
DESIGN BUILD PROJECT ADVERTISEMENT
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN & CONSTRUCTION DIVISION
This form is required for the advertisement of all construction projects. (1984 PA 431)
TO:
DESIGN & CONSTRUCTION DIVISION
DATE
June 15, 2018
FROM:
Department of Corrections
PROJECT MANAGER
Todd Cordill, NCARB
DTMB FILE NUMBER
472/16402.TYC
INDEX NUMBER
37180
ADVERTISEMENT DATE
June 19, 2018
BID DUE DATE
July 11, 2018 @ 2:00 p.m. local time
PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)
Propane Plant Replacement/ Replace & Repair the back-up fuel system blender E.C. Brooks Correctional Facility, 2500 S. Sheridan Drive, Muskegon Heights, MI 49444
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION
Thursday, June 28, 2018 at 11:00 am at the Maintenance Building of the
E. C. Brooks Correctional Facility, 2500 S. Sheridan Drive, Muskegon Heights, MI 49444
Mandatory Yes No
LEIN CHECK (Dept. of Corrections ONLY) All contractor/vender representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Tracy Falor at email address: FalorT@michigan.gov. The email “Subject” must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting).
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
DESCRIPTION OF WORK:
To restore the existing propane plant to be fully functional, that will include replacement/ installation of one Propane blender system consisting of: new propane air Venturi mixing system supplying 30 MM Btu per hour of mixed gas at 8 pounds of pressure; Propane flow pumps to the existing propane tank (includes bypass valves); Propane water bath vaporization unit at 30MM Btu per hour @-20 deg F and 200 PSIG. This will include all associated gas piping and electrical connections, grounding to be modified or replaced as required for a safe, operational system. All applicable codes shall be complied with including permits and approvals from the State of Michigan, Bureau of Construction Codes, and Bureau of Fire Services. Since this is a design/build project, the submitted proposal shall include design recommendations to restore the existing system to full operation in good repair.
5% Bid Security:
Required
Not Required
NIGP CODES: 90692 92595 91356 91389 90977 90924 91036
ACCEPTING QUESTIONS UNTIL: July 5, 2018 at noon (12:00 pm EDT)
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers’ safety rules that are administered by federal agencies (EPA, OSHA and DOT), state agencies (DCH, DEQ, DNR, and MIOSHA), and any other local regulations and standards that may apply.
Documents & Bid Results may be obtained from:
https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
Project Director: Todd Cordill, NCARB
Address:
Phone: (517) 897-7017 Email: cordillt1@michigan.gov