QUOTE_SHEET__Assist_ABS_Tank_Void_Inspection.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
TS GOLDEN BEAR Ballast Tank/Void Inspection Assistance
Solicitation number
DTMA9417Q00020
Issued by

About this file

Amendment 3 Quote Sheet

View the file

Other files

File Type Posted
Amendment_3_SF30.pdf PDF
Assist_ABS_Tank_Inspection_-Quote_Sheet.xlsx XLSX spreadsheet
SR_No_5189799_Ballast_Tank_and_Void_Inspections_1-13-17.docx DOCX document
Amendment_2.pdf PDF
GENARRMT-S4-REV.pdf PDF
Amendment_1.pdf PDF
GENARRT-S1-REV.pdf PDF
GENARRMT-S3-REV.pdf PDF
SR_No_5189799_Ballast_Tank_and_Void_Inspections.pdf PDF
SF1449.pdf PDF
Tank_Arrangement_and_Capacity.pdf PDF
Tank_and_Void_Inspection_Assistance_T&C.pdf PDF
wage_determination_Solono_Co_2005_rev_17.pdf PDF
TSBG_Ballast_Tanks.pdf PDF
ATTCH_CLAUSES.pdf PDF
Cofferdams__Voids_2017.pdf PDF
Assist_ABS_Tank_Inspection_-Quote_Sheet.xlsx XLSX spreadsheet
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

GOLDEN BEAR - TANK AND VOID INSPECTION ASSISTANCE - QUOTE SHEET
TANKACCESS / COMMENTASSISTANCE REQUIREDEST COST
Forepeak 6-E-0Requires opening 5-15-0 SWB & Chain lockers for boundary insp.Ventilation, Chemist for 5-15-0 and chain lockers
Perm Ballast 6-15-0Requires opening 5-15-0 SWB for accessVentilation, Chemist for 5-15-0 & Opening / Closing, chemist for 6-15-0
Perm Ballast 6-35-1Requires emptying 5-35-01 fuel tank for accessRemove last of fuel, Ventilation, Chemist for 5-35-01 (fuel tank) & Opening / Closing, chemist for 6-35-1
Perm Ballast 6-35-2Requires emptying 5-35-01 fuel tank for accessRemove last of fuel, Ventilation, Chemist for 5-35-01 (fuel tank) & Opening / Closing, chemist for 6-35-2
Perm Ballast 6-75-1Requires emptying 5-77-1, 5-101-1 SWB for accessRemove last of water, Ventilation, Chemist for 5-77-1, 5-101-1 & Opening / Closing, chemist for 6-75-1
Perm Ballast 6-75-2Requires emptying 5-77-2, 5-101-2 SWB for accessRemove last of water, Ventilation, Chemist for 5-77-2, 5-101-2 & Opening / Closing, chemist for 6-75-2
ESTIMATED TOTAL FOR TANKS
Access/CommentAssistance Required
Cofferdams and VoidsEst Cost
Cofferdam 1-144-0Cosal Storeroom FWD PassagewayOpen / Close, Ventilation, Chemist
Cofferdam 2-104-0HALON Room FWD InboardOpen / Close, Ventilation, Chemist
Cofferdam 2-143-1Cosal Storeroom STBF FWD Comp.Open / Close, Ventilation, Chemist
Rudder Trunk 3-195-0Located in After SteeringOpen / Close, Ventilation, Chemist
Void 2-15-1Located Starboard outboard of Chain LockerOpen / Close, Ventilation, Chemist
Void 2-15-2Located Port Outboard of Chain LockerOpen / Close, Ventilation, Chemist
Void 5-35-0Main Deck, Located Starboard Outboard of Fuel Tank 5-35-01Ventilation, Chemist
Void 5-75-1Located in Furniture room STBDVentilation, Chemist
Void 5-75-2Located in Furniture Room PortVentilation, Chemist
Void 6-100-1Bottom of Aft Transducer TrunkVentilation, Chemist
Void 6-170-0Aft in Shaft Alley, Starboard of ShaftOpen / Close, Ventilation, Chemist
Void 6-35-0Bottom of FWD Transducer TrunkVentilation, Chemist
Void 6-47-0Bottom of FWD Sonar Trunk, aftVentilation, Chemist
Void 6-50-0Bottom of FWD Sonar Trunk Lower LevelVentilation, Chemist
Void 6-75-05-75-1 Crawl Space and 5-75-2 Crawl SpaceOpen / Close, Ventilation, Chemist
Void 6-77-0In 5-75-0 Wire-way CenterVentilation, Chemist
Void 6-96-0In 5-75-0 Wire-way AftOpen / Close, Ventilation, Chemist
Void 6-98-14th deck Inboard side of Eng. labVentilation, Chemist
ESTIMATED TOTAL FOR VOIDS AND COFFERDAMS$ - 0
Supplementary Labor -- 20hrs @ $____________/hr
Supplementary Material$ 5,000.00

TOTAL ESTIMATED COST

Sheet2

Sheet3

File details come from the government source that posted it. Updated .