DTMA93Q1600006_Surveyor_for_BRF_Lash_Barges.pdf
PDF 158 KB Posted
- Attached to
- Condition and Value Survey on Barges at BRF
- Solicitation number
- DTMA93Q1600006
About this file
BRF LASH BARGE SURVEY
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6 01
5 1 ue 24 y
Fri 7 y
1 June
Beaumont Reserve Fleet Division of Gulf Operations
Conduct a Condition and Valuation Survey on 1 Deck Barge (FB-54), 1 Lash Barge (DSLL-540845) and 1 Patrol Craft (PF-57)
Statement of Work 2/24/16
TABLE OF CONTENTS
1. ABSTRACT Page 2
2. GENERAL SPECIFICATIONS Page 2
3. LOCATION/DESCRIPTION Page 2
4. REFERENCES Page 3
5. GOVERNMENT FURNISHED EMS Page 3
6. STATEMENT OF WORK Page 3
7. PERFORMANCE CRITERIA/DELIVERABLES Page 3
1. ABSTRACT:
The intent is to conduct a Condition and Valuation Survey on 2 barges -1 Deck Spud Barge FB-54, 1 Lash Barge DSLL-540854 and 1 Patrol Craft PF-57.
The fundamental purpose of the inspection is to provide to the Beaumont Reserve Fleet information assessing the condition and current market value of the two barges and one patrol craft, on separate reports for each barge and patrol craft.
The contact for this survey will be Eric Welch Deck Operations Supervisor. (409) 722-3433.
2. GENERAL SPECIFICATIONS:
2.1. Inspection and Reports to include.
2.1.1. List a summary of values, what each barge and patrol craft is worth on the current market.
2.1.2. List the vessels particulars of each barge and patrol craft.
2.1.2.1. Name of Vessel.
2.1.2.2. Owners/Operators.
2.1.2.3. MARAD Hull Numbers/ Vessel ID Numbers.
2.1.2.4. Dimensions.
2.1.2.5. Tonnage.
2.1.2.6. Year Built.
2.1.2.7. Builder Hull Number.
2.1.3. List the construction type of each barge and patrol craft.
2.1.4. List arrangement Main deck/Hull forward to aft of each barge and patrol craft.
2.1.5. List available deck fittings and equipment of each barge and patrol craft.
2.1.6. List physical overall condition of vessel paint, corrosion, damage of each barge and patrol craft.
2.1.7. List a definition of values for each barge and patrol craft.
2.1.8. List the methodology of determining the value of each barge and patrol craft.
2.1.9. List any recommendations of repairs for each barge patrol craft.
2.1.10. List certifications by report preparer for each barge and patrol craft.
2.2. Photos furnished for overall survey, to capture the condition, equipment and the arrangement of each barge and patrol craft.
3. LOCATION/ DESCRIPTION:
3.1. LOCATION – Beaumont Reserve Fleet, 2600 Amoco Road, Beaumont, Texas
77705.
3.2. DESCRIPTION- barges are located in the fleet basin at the Beaumont Reserve
Fleet. The FB-54 barge is on the North bank spudded down and held in position with anchor and chain. The Lash barge is secured to the end of the FB-54 barge with mooring line in the same location. Access to 2 barges will be by fleet service craft. The Patrol Craft PF-57 is located at our access dock on a trailer.
4. REFERENCES
4.1. None
5. GOVERNMENT FURNISHED EQUIPMENT/ MATERIAL/SERVICE
5.1. EQUIPMENT: None
5.2. MATERIAL: None
5.3. SERVICES:
5.3.1. Transportation from the Beaumont Reserve Fleet access dock to the barge location in the fleet basin and back to the (BRF) access dock.
5.4. DOCUMENTS:
5.4.1. Report of Excess Personal property for each barge.
5.4.2. Chemtex Paint Sample Report.
6. STATEMENT OF WORK
6.1. To survey the 2 barges FB-54 barge and the DSLL540845 Lash barge and 1
Patrol Craft PF-57 to make an Identification and description report of all damage, deterioration, layout of equipment that barges is fitted with and overall condition of each barge.
6.2. Inspect all areas of barge that can be accessed without removing any tank top or hatch covers by mechanical means. Inspect top, sided, interior and ends of barges above water line
6.3. Create a detailed report identifying the condition and valuation for each of the barges and patrol craft listed under General Specifications 2.1
7. PREFORMANCE CRATERIA/DELIVERABLES:
7.1. The Survey on the 2 barges FB-54, Lash Barge DSLL540845 and 1 Patrol Craft
PF-57 shall be performed by a qualified marine inspector.
7.2. Any supplies or material needed during the inspection will be supplied by the inspector/survey company preforming the inspection.
7.3. The survey shall be performed in a professional manner, reports and inspection
7.4. The Surveyor shall conduct the survey during normal working hours at the
Beaumont Reserve Fleet from 7am to 4:00pm Monday –Thursday and 7am to 3:00pm Friday.
7.5. The surveys shall commence within ten (10) calendar days of award of purchase order.
7.6. The completed reports shall be submitted within twenty-one (21) calendar days of award of purchase order.
File details come from the government source that posted it. Updated .