BRF LIGHTING UPGRADE AMENDMENT

View the file

Other files

File Type Posted
DTMA93Q140018_BRF_LIGHTING_UPGRADE.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. ABSTRACT: This outlines general requirements to furnish and install new

Energy Star or Design Light Consortium (DLC) rated lighting fixtures and bulbs for the Maritime Administration, Beaumont Reserve Fleet (BRF), 2600 Amoco Road, Beaumont, Texas 77705. All name brand fixtures can be and/or equal

2. GENERAL SPECIFICATIONS:

2.1 Deliveries are to be made between 0800 and 1500 Monday – Friday.

2.2 Normal operating hours are Mon.-Thurs. between 0700 and 1630, Friday 0700-

1530.

3. LOCATION/ DESCRIPTION:

3.1 LOCATION – Beaumont Reserve Fleet, 2600 Amoco Road, Beaumont, Texas

77705.

4. REFERENCES:

5. Disconnect & remove the 9 existing 2x4 lay-in fixtures in the Leader-man building.

6. Install 9 new LED CREE 2x4 fixtures.

7. Disconnect & remove the 8 existing 2-light strip fixtures in the Stationing building.

8. Install new 2-light T8 strip fixtures.

9. Disconnect & remove the 4 existing 2-light strip fixtures in the welding shop.

10. Install 2 new 6-light T5 F-bay fluorescent fixtures.

11. Disconnect & remove the 9 existing 400watt MH low bay style fixtures in the machine shop.

12. Install 6 new 6-light T5 F-bay fluorescent fixtures.

13. Disconnect & remove the 3 existing 2-light T12 strips upstairs in the machine shop.

14. Install 3 new 2-light T8 fluorescent strip fixtures.

15. Disconnect & remove the 4 existing 2x4 4-light T12 troffers in the office of the machine shop.

16. Install 4 new LED CREE 2x2 fixtures.

17. Disconnect & remove the 2 existing 150 watt HPS wall packs on outside of machine shop.

18. Install 2 new 32 watt LED wall packs

19. Disconnect & remove the 21 existing 4-light T12 strip fixtures in warehouse #2

20. Install 21 new 2-light T8 strip fixtures.

21. Disconnect & remove the 16 existing 4-light T12 strip fixtures in warehouse #1

22. Install 16 new 2-light T8 strip fixtures.

23. Disconnect & remove the 2 existing 150watt HPS wall packs on warehouse 1.

24. Install 2 new 32watt LED wall packs

25. .Disconnect & remove the 1 existing 100watt incandescent ceiling fixtures in laundry room

26. Install 1 new 2-light T8 strip fixtures.

27. Disconnect & remove the 2 existing 150watt HPS wall packs on the bathhouse.

28. Install 2 new 32watt LED wall packs.

29. Disconnect & remove the 13 existing 100watt incandescent ceiling fixtures in the bathhouse.

30. Install 13 new 26watt CFL ceiling mount fixtures.

31. Disconnect & remove the 1 existing 4-light T12 fluorescent fixture in the Union office.

32. Install 1 new 2-light T8 strip fixtures.

33. Disconnect & remove the 2 existing 150watt HPS wall packs on the library.

34. Install 2 new 32watt LED wall packs.

35. Disconnect & remove the 10 existing 4-light T12 wraps in the library building.

36. Install 10 new 2-light T8 wraps.

37. Disconnect & remove the 27 existing 4-light T12 wraps, and 3-2-light T12 wraps in the Admin building.

38. Install 27 new 4-light T8 wraps, and 3-2-light T8 wraps.

39. Disconnect & remove the 2 existing 4-light T12 strip.

40. Install 2 new 2-light T8 wrap

41. .Disconnect & remove the 1 existing 150watt HPS wall packs on the outside guard shack.

42. Install 2 new 32watt LED wall packs, 1- replace the existing and the 2nd on the side facing the drive. Provide the conduit & wiring to connect.

43. Disconnect & remove the 1 existing 4-light wrap in the outside guard shack.

44. Install 1 new 2-light T8 wrap.

45. Disconnect & remove the 1 existing 2-light T12 c8' strip in the inside guard shack.

46. Install 2 new 2-light T8 wrap.

47. Disconnect & remove the 1 existing 100 watt incandescent outside fixture on inside guard shack.

48. Install 1 new 32 watt LED wall pack.

49. Include all conduit, wiring, connectors, and hardware to install the above.

50. Disconnect & remove the 12 existing 2-light wrap in the keystone trailer

51. Install 12 new 2-light T8 wrap.

52. Connect the new fixtures to existing wiring

53. Provide all hardware needed.

54. Disconnect & remove the 9 existing 1000watt MH floodlights.

55. Install 9 new 210watt LED floodlights.

56. Connect the new fixtures to existing wiring.

57. Provide man lift for installation.

58. Provide all hardware needed.

59. GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

59.1 EQUIPMENT: None

59.2 MATERIALS: None

59.3 SERVICES: None

60. STATEMENT OF WORK:

60.1 Contractor shall remove existing fixtures and install new Energy Star rated fixtures and bulbs to existing wiring.

60.2 Contractor shall provide all hardware needed.

60.3 Contractor will operate during normal Beaumont Reserve Fleet hours.

60.4 Contractor shall dispose of removed lamps according to all Federal and State laws.

60.5 Contractor shall dispose of existing fixtures.

60.6 Contractor shall coordinate with Entergy Representative for enrollment in

Entergy’s Rebate Program.

60.7 Entergy Rebate check to be deducted from contractor’s overall bid.

61. PERFORMANCE CRITERIA/DELIVERABLES:

61.1 New fixtures shall be installed within 45 days after contract award.

61.2 All lighting tested with Beaumont Reserve Fleet representative at end of project for operating verification.