DTMA92Q1600002_Maine_Repairs_.pdf
PDF 566 KB Posted
- Attached to
- T/S STATE OF MAINE FY16 REPAIRS
- Solicitation number
- DTMA92Q1600002
About this file
DTMA92Q1600001 RFQ SOLICITATION CLAUSES SOW PRICING SHEET
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DTMA92Q1600002-0002_final_SOW _final_questions_and_answers.pdf | ||
| DTMA92Q1600002-0001_SOM_FY16_Repairs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
00092
Norfolk VA 23505-1204
7737 Hampton Blvd
MAR-380.2
Atlantic Div. Acquisition Office U. S. DOT Maritime Administration
00092-TS STATE OF MA CODE 16. ADMINISTERED BYCODE
X
X
X
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED OR00092
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
12/16/2015 1400 ET
11/16/2015
(757) 322.5814LAUREL BISHOP
(No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
DTMA92Q1600002
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 3 MAPR615160086OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
Building 19 Suite 300
TELEPHONE NO.
17a. CONTRACTOR/
Castine ME 04420 1 Water Street Maine Maritime Academy
TS STATE OF MAINE
15. DELIVER TO
NORFOLK VA 23505-1204
Building 19 Suite 300 7737 Hampton Blvd
MAR-380-2
Atlantic Div. Acquisition Office
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULE
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
U.S.DOT/ Maritime Administration
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Delivery: 01/01/2017
0001 LIFERAFTS
0002 LIFE BOAT DAVITS AND RESCUE BOAT DAVITS
0003 FIRE DETECTION AND EXTINGUISHING SYSTEMS
Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
X
XX
DATED
Melinda Simmons-Healy
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
0004 SCBAS AND BREATHABLE AIR COMPRESSOR
0005 SAFETY RADIO AND SVDR TEST
0006 MACHINERY VIBRATION AND INFRARED SURVEY
0007 SLOP OIL
0008 RELIEF AND SAFETY VALVES
0009 HOT WATER HEATER
0010 MOORING BITTS
0012 AUTOMATION SPARES
0013 LIFEBOAT PLATFORMS
0014 SSDG #1 & 3 INSULATION BLANKETS
Continued ...
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
3 2 of
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DTMA92Q1600002
0015 MAIN ENGINE AUTOMATIC LUBE OIL FILTER
0016 GALLEY AND MESS DECK EQUIPMENT
0017 CHILLERS
0018 CLOTHES DRYER EXHAUST DUCTING
0019 CENTRIFUGAL OILY WATER SEPARATOR
0020 FRESHMAN BERTHING SHOWER AREA 2-100-1
0021 SUPPLEMENTAL LABOR 3000 HR
0022 SUPPLEMENTAL MATERIAL
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
State of Maine RFQ DTMA92Q1600002 WINTER CRUISE REPAIRS
The following FAR provisions apply to this solicitation:
52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address: https://www.acquisition.gov/?q=browsefar
52.204-7 System for Award Management (SAM’s) (Jul 2013) – Potential Offerors must be a registered SAM’s Vendor prior to submitting price quote.
52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) 52.212-1 Instructions to Offerors—Commercial Items (Apr 2014) 52.212-3 Offeror Representations and Certifications—Commercial Items ( Dec 2014) (Quoters are required to include a completed copy of this provision with their quote or a statement stating that it is available via the SAM’s website, https://www.sam.gov/portal/public/SAM/#1)
52.233-2 Service of Protest. (Sep 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer by obtaining written and dated acknowledgment of receipt from Laurel Bishop Contract Specialist US Department of Transportation Maritime Administration Building 19, Suite 300 7737 Hampton Blvd.
Norfolk, VA 23505
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
The following FAR clauses apply to this solicitation:
52.252-2 Clauses Incorporated by Reference (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address: http://www.acquisition.gov/far/ 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.212-4 Contract Terms and Conditions—Commercial Items (DEC 2014)
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Items (May 2015)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Dec 2014)
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77, 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
_X__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
https://www.acquisition.gov/?q=browsefar https://www.sam.gov/portal/public/SAM/#1 http://www.acquisition.gov/far/
___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509).
_X__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub L. 111-5) (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009).
_X__ (4) 52.204-10, Reporting Executive compensation and First-Tier Subcontract Awards (Jul 2013) (Pub. L. 109-282) (31 U.S.C. 6101 note).
___ (5) [Reserved] ___ (6) 52.204-14, Service Contract Reporting Requirements (Jan 2014) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Jan 2014) (Pub. L. 111-117, section 743 of Div. C).
_X__ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Aug 2013) (31 U.S.C. 6101 note).
___ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).
___ (10) [Reserved] ___ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).
___ (ii) Alternate I (Nov 2011) of 52.219-3.
___ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).
___ (ii) Alternate I (Jan 2011) of 52.219-4.
___ (13) [Reserved] ___ (14) (i) 52.219-6, Notice of Total Small Business Aside (Nov 2011) (15 U.S.C. 644).
___ (ii) Alternate I (Nov 2011).
___ (iii) Alternate II (Nov 2011).
___ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
___ (ii) Alternate I (Oct 1995) of 52.219-7.
___ (iii) Alternate II (Mar 2004) of 52.219-7.
_X__ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d)(2) and (3)).
___ (17) (i) 52.219-9, Small Business Subcontracting Plan (Oct 2014) (15 U.S.C. 637 (d)(4)).
___ (ii) Alternate I (Oct 2001) of 52.219-9.
___ (iii) Alternate II (Oct 2001) of 52.219-9.
___ (iv) Alternate III (Oct 2014) of 52.219-9.
___ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).
___ (19) 52.219-14, Limitations on Subcontracting (Nov 2011) (15 U.S.C. 637(a)(14)).
___ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
___ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657f).
_X__ (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C. 632(a)(2)).
___ (23) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (Jul 2013) (15 U.S.C. 637(m)).
___ (24) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (Jul 2013) (15 U.S.C. 637(m)).
_X__ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
_X__ (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2014) (E.O. 13126).
_X__ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
_X__ (28) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).
_X__ (29) 52.222-35, Equal Opportunity for Veterans (Jul 2014) (38 U.S.C. 4212).
_X__ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
___ (31) 52.222-37, Employment Reports on Veterans (Jul 2014) (38 U.S.C. 4212).
___ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
_X__ (33) (i) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O. 13627).
___ (ii) Alternate I (Mar 2015) of 52.222-50, (22 U.S.C. chapter 78 and E.O. 13627).
___ (34) 52.222-54, Employment Eligibility Verification (Aug 2013). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
___ (35) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
___ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
___ (36) (i) 52.223-13, Acquisition of EPEAT® -Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514 ___ (ii) Alternate I (Jun 2014) of 52.223-13.
___ (37) (i) 52.223-14, Acquisition of EPEAT® -Registered Television (Jun 2014) (E.O.s 13423 and 13514).
___ (ii) Alternate I (Jun 2014) of 52.223-14.
___ (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
___ (39) (i) 52.223-16, Acquisition of EPEAT® -Registered Personal Computer Products (Jun 2014) (E.O.s 13423 and 13514).
___ (ii) Alternate I (Jun 2014) of 52.223-16.
_X__ (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging while Driving (Aug 2011) (E.O. 13513).
_X__ (41) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).
___ (42) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C.
3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108- 302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43).
___ (ii) Alternate I (May 2014) of 52.225-3.
___ (iii) Alternate II (May 2014) of 52.225-3.
___ (iv) Alternate III (May 2014) of 52.225-3.
___ (43) 52.225-5, Trade Agreements (Nov 2013) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
___ (44) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
___ (45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
___ (46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
___ (47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
___ (48) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505), 10 U.S.C. 2307(f)).
___ (49) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
_X__ (50) 52.232-33, Payment by Electronic Funds Transfer— System for Award Management (Jul 2013) (31 U.S.C. 3332).
___ (51) 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management (Jul 2013) (31 U.S.C. 3332).
___ (52) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
___ (53) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
___ (54) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631).
___ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or executive orders applicable to acquisitions of commercial items:
___ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495) _X__ (2) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67.).
_X__ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_X__ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (Multiple Year and Option Contracts) (May 2014) (29 U.S.C.206 and 41 U.S.C. chapter 67).
___ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (May 2014) (29 U.S.C.
206 and 41 U.S.C. chapter 67).
___ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67).
___ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-- Requirements (May 2014) (41 U.S.C. chapter 67).
___ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2014) (E.O. 13658).
___ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792).
___ (10) 52.237-11, Accepting and Dispensing of $1 Coin (Sep 2008) (31 U.S.C. 5112(p)(1)).
(d) Comptroller General Examination of Record The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records -- Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement.
Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)
(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509).
(ii) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (1) of FAR clause 52.222-17.
(iv) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(v) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).
(vi) 52.222-35, Equal Opportunity for Veterans (Jul 2014) (38 U.S.C. 4212).
(vii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(viii) 52.222-37, Employment Reports on Veterans (Jul 2014) (38 U.S.C. 4212).
(ix) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(x) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67).
(xi) ____ (A) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O. 13627).
___ (B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 E.O. 13627).
(xii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)
(xiii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-- Requirements (May 2014) (41 U.S.C. chapter 67)
(xiv) 52.222-54, Employment Eligibility Verification (Aug 2013).
(xv) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2014) (E.O. 13658).
(xvi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xvii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xviii) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
APPLICABLE WAGE DETERMINATION:
The following Department of Labor Service Contract Act Wage Determination is applicable to performance of work under this contract and may be viewed on-line at:
http://www.wdol.gov/wdol/scafiles/std/05-2259.txt?v=15 Revision No: 17. Date of Revision: 8 July 2015
The following TAR clauses apply to this requirement
1252.223-73 Seat Belt Use Policies and Programs 1252.242-73 Contracting Officer’s Technical Representative
The following Maritime Administration (MCL) apply to this requirement
MCL.E.-1 Delegation of Inspection and Acceptance (Aug 2005) MCL.G-2 Schedules and Schedule Updates for Ship Repair (Aug 2005) MCL.H-2 Supplemental Work Requests (Subparagraph (d)(10) is $5,000.00) (Aug 2005) MCL.H-3 Indemnity and Insurance (Aug 2005) MCL.H.4 Indemnity and Insurance (Additional) (All limits up to $5,000,000.00 are revised to $1,000,000.00 for this solicitation) (Aug 2005) MCL.H-6 Standards of Employee Conduct (Aug 2005) MCL.H-7 Environmental Concerns/Asbestos Related/Hazardous Materials/Petroleum and Petroleum Products:
Environmental Compliance (Aug 2005) MCL.H-10 Supplemental Growth Requirements (Aug 2005) MCL.H-11 Disposition of Removed Equipment and Scrap (Aug 2005) MCL.H-12 Maritime Liens, No Authority to Incur (Aug 2005) MCL.L-2 Agency Protests (Aug 2005)
Full text of the above solicitation provision and clauses can be found at: https://voa.marad.dot.gov/Solicitation_Awards/docs/mar-380/MARAD%20Clauses%20MCL%20for%20HTML.htm
QUOTATION SUBMISSION INSTRUCTIONS: In addition to the referenced provision 52.212-1, Instructions to Offeror – Commercial Items, quoters shall provide the following information.
1. Past Performance A. Provide a listing of work completed within the past 3 years involving vessels of similar characteristics to those of the T.S. STATE OF MAINE or larger (e.g., commercial , Navy, Coast Guard and MARAD Ready Reserve Force Vessels).
B. Include with the listing contact information for the owner/operator of the vessel and/or the Contracting
Officer for Public Vessels.
C. Provide contract total value and contract type
2. Price – Complete Quote Pricing Sheet (Attachment #2)
3. Signed SF-1449 and/or Amendments (if applicable)
4. Payment terms (i.e. Net 30)
5. Remittance address, Tax Identification Number, Dunn and Bradstreet number and Cage Code
6. Validity of quote (Please specify if the quote is valid for 60 days from solicitation response date)
BASIS FOR AWARD – The Government plans to evaluate quotes and make award without conducting discussions. Quoters may be given the opportunity to clarify certain aspects of their quote or resolve minor or clerical errors. Award will be made to the responsible quoter whose offer is found to be technically acceptable in accordance with their relevant satisfactory past performance and offers the lowest reasonable price.
http://www.wdol.gov/wdol/scafiles/std/05-2259.txt?v=15 https://voa.marad.dot.gov/Solicitation_Awards/docs/mar-380/MARAD%20Clauses%20MCL%20for%20HTML.htm
Responses to this solicitation are due Wednesday, 16 December 2015 at 2:00 pm Eastern Standard Time. Quotes may be emailed to laurel.bishop@dot.gov. No faxed quotes will be accepted. Please reference the solicitation number DTMA92Q1600002 on your quote.
INVOICE SUBMISSION INSTRUCTIONS – MARAD
The Contractor may submit invoices in either electronic or paper format. Electronic submission is preferred.
(1) Electronic invoices shall be addressed to MARADInvoices@faa.gov, with copy to MARADSARInvoices@dot.gov
Electronic invoices shall conform to the following criteria, or be subject to rejection:
a. Invoice and supporting documentation shall be in Adobe Acrobat (pdf) format.
b. The e-mail subject shall include the contract/purchase order number and invoice number.
c. The transmitting e-mail shall include the following information: Name of the Contractor; Invoice date and number; Invoice amount; Contract number and, if applicable, the order or modification number; Terms of any discount for prompt payment offered;
Payment instructions (i.e., financial institution, ABA routing #, account #)
(2) Paper invoices shall be submitted to one of the following addresses. Multiple copies are not required.
MARAD A/P SAR Invoices Branch
AMZ-160
PO Box 25710 Oklahoma City, OK 73125
If a street address is required for delivery (i.e., Federal Express), the following address may be used in lieu of the post office box:
MARAD A/P SAR Invoices Branch
AMZ-160
6500 S MacArthur Blvd.
Oklahoma City, OK 73169
LIST OF ATTACHMENTS:
1. Statement of Work (Attachment 1)
2. Vendor Pricing Quote Sheet (Attachment 2) mailto:laurel.bishop@dot.gov mailto:MARADInvoices@faa.gov mailto:MARADSARInvoices@dot.gov
STATEMENT OF WORK (SOW)
TRAINING SHIP “STATE OF MAINE”
FY 2016 REPAIR PACKAGE
U.S. DEPARTMENT OF TRANSPORTATION
MARITIME ADMINISTRATION
T/S STATE OF MAINE 2015 MAINTENANCE AND REPAIR PACKAGE
TABLE OF CONTENTS
BACKGROUND:
LOCATION:
PERIOD OF PERFORMANCE:
GENERAL REQUIREMENTS:
ITEM 1: LIFERAFTS
ITEM 2: LIFE BOAT & RESCUE BOAT DAVITS
ITEM 3: FIRE DETECTION AND EXTINGUISHING SYSTEMS
ITEM 4: SCBAs AND BREATHABLE AIR COMPRESSOR
ITEM 5: SAFETY RADIO AND SVDR
ITEM 6: MACHINERY VIBRATION AND INFRARED SURVEY
ITEM 7: SLOP OIL
ITEM 8: RELIEF AND SAFETY VALVES
ITEM 9: HOT WATER HEATER
ITEM 10: MOORING BITTS
ITEM 11: AUTOMATION SPARES
ITEM 12: LIFEBOAT PLATFORMS
ITEM 13: SSDG #1 & 3 INSULATION BLANKETS
ITEM 14: MAIN ENGINE AUTOMATIC LUBE OIL FILTER
ITEM 15: GALLEY AND MESS DECK EQUIPMENT
ITEM 16: CHILLERS
ITEM 17: CLOTHES DRYER EXHAUST DUCTING
ITEM 18: CENTRIFUGAL OILY WATER SEPARATOR
ITEM 19: FRESHMAN BERTHING SHOWER AREA 2-100-1
ITEM 20: SUPPLEMENTAL LABOR
ITEM 21: SUPPLEMENTAL MATERIAL (and Subcontracted Labor/Services)
BACKGROUND:
The T/S STATE OF MAINE is a U.S. Government owned training ship provided to Maine Maritime Academy for the purpose of training young men and women for a career in the U.S. Maritime Industry.
The ship is part of the USDOT-Maritime Administration’s National
Defense Reserve Fleet (NDRF) and maintains a U.S. Coast Guard
Certificate of Inspection (COI) and American Bureau of Shipping
(ABS) Classification with the following designations and notations:
USCG Service / ABS Description: Public Nautical Schoolship.
SOLAS Category: Cargo Ship.
MARPOL Category: Not an Oil Tanker.
ABS Class Notations:
The ship is enrolled in a Continuous Hull and Continuous
Machinery Survey with ABS.
As a Public Nautical School Ship and Cargo Ship (non-tanker), the regulations of 46 CFR 167, in addition to ABS Rules and
SOLAS Regulations for a Cargo Ship (non-tanker), govern all work performed aboard.
The Contractor shall ensure that all work performed in the execution of this Statement of Work (SOW) be in conformance with the requirements of 46 CFR 167 and all applicable ABS Rules and
SOLAS Regulations and shall not knowingly perform any action which may compromise the ship’s Certificate of Inspection (COI) and/or ABS Classification. If the Contractor is aware of anything, within this SOW or missing from this SOW, that might compromise that compliance, they shall make it known immediately, and in writing, to the Contracting Officer’s
Representative (COR). If there exists apparent differences between the requirements of the CFRs, ABS Rules and SOLAS
Regulations as they relate to the work being performed, the more stringent requirement shall apply.
LOCATION:
The TS State of Maine is moored alongside her pier at the Maine
Maritime Academy, Castine, Maine 04421.
PERIOD OF PERFORMANCE:
The period of performance for this SOW shall be from the date of contract award (anticipated in late 2015) through January 1, 2017, however, individual work ITEMs may require earlier completion dates (as stated within the Period of Performance within each ITEM). In addition, the ship shall be making a winter cruise from December 29, 2015 thru January 20, 2016. For this reason, no dis-assemblies or other work which might render an equipment or system inoperable for that period shall begin until after February 1, 2016. There may be Supplemental Labor and/or Supplemental Material requirements that may be ordered by the government immediately following contract award.
GENERAL REQUIREMENTS:
The following general requirements apply to ALL work performed in the execution of this SOW including all Supplemental Labor and Supplemental Material ITEMS. Additional requirements are stated within each ITEM.
1. General: The Contractor shall provide all labor, materials and services (except where noted as being government furnished) to accomplish the ITEMS in this SOW in accordance with all applicable ABS Rules, USCG Regulations and original equipment manufacturers’ (OEM) instructions. This work includes all removals and re-installations of interferences and the proper disposal of all wastes generated from the execution of this
SOW. Any equipment or materials damaged during removals and/or re-installations shall be replaced at the Contractor’s expense.
2. Supervision: The Contractor shall employ a Manager/Supervisor to oversee all work aboard the ship and ashore. This
Manager/Supervisor shall be available by phone 24/7. In addition, this Manager/Supervisor shall be available to meet with the COR aboard the ship within two hours after a request is made by the COR. This requirement shall help to ensure that an efficient and timely response is made by the
Contractor concerning any emergent requirements or problems.
This Manager/Supervisor shall have full authority to negotiate pricing with the COR and to sign Delivery Orders on behalf of the Contractor.
3. Government Furnished: Any materials, equipment, labor and/or services provided by the Government shall be listed in the
Government Furnished section of an ITEM. The Contractor shall be responsible for providing all other materials, equipment, labor or services necessary to accomplish each ITEM.
4. Use of Government Materials and/or Equipment: Unless specifically stated in this SOW, the Contractor shall not use any of the ship’s spare parts, equipment, material, etc., unless authorized in writing by the COR. Any spare parts, material, etc., consumed by the Contractor shall be replaced at the Contractor’s expense.
5. Welders Certifications & Approved Welding Procedures: All welding shall be performed by welders possessing ABS certification for the welds they perform. Copies of each welder’s ABS stamped Welder Performance Qualification Records
(WPQ), their company’s Welding Procedure Specifications (WPS) and their Procedure Qualification Records (PQR) shall be submitted with their offer.
6. Electrical Certifications: All electrical work shall be performed by a licensed commercial electrician or an individual with extensive marine electrical experience. The
Contractor shall provide documentation of either when submitting their offer.
7. Piping System Material and Design Specifications: Unless specifically stated otherwise in an ITEM, all piping system materials provided by the Contractor (to include piping, valves, fittings, take down joints, valves, fasteners etc.)
shall, at a minimum, meet the material and design specifications of ASTM F1155-10 “Standard Practice for
Selection and Application of Piping System Materials” for the service they are employed. This publication specifies the minimum piping system material, design and testing requirements of the USCG and ABS. It is available at:
http://www.astm.org/Standards/F1155.htm for approximately
$60.00. All piping materials provided by the Contractor shall be equal to or better than the original material and of similar form, fit and function.
8. Penetrations: All hull, deck, bulkhead, beam or structural penetrations made by the Contractor shall be in accordance http://www.astm.org/Standards/F1155.htm with the requirements of the National Shipbuilding Research
Program, “Industry Standards for Hull Structural Penetration
Design Criteria and Details”. It is available free of charge at: http://www.dtic.mil/dtic/tr/fulltext/u2/a445982.pdf. All deck and bulkhead penetrations made by the Contractor shall be in a manner which retains the structural fire protection rating of the deck or bulkhead as identified by the ship’s structural fire protection drawing. If the Contractor must run wiring as part of this SOW and desires to use an existing penetration, (such as a multiple cable transit), they must first determine that the existing penetration meets the required structural fire protection requirements. If it does not, they shall either create a new and separate penetration
(which does meet code) or modify the entire existing penetration so that it meets code. If piping and/or electrical penetrations need to be re-routed from the routes indicated in the drawings in order to comply with these guidelines, it shall be accomplished via a change order and at the
Contractor’s expense.
9. Hydrostatic Tests: Upon completion of any piping modifications and/or installations, and in the presence of the USCG, ABS and the COR, the Contractor shall perform a hydrostatic test of that installation in accordance with the requirements of 46CFR
56.97-30 (which is a test pressure equal to 1.5 x MAWP for a period of at least 10 minutes, not to exceed 90% of the yield strength of the material).
10. Operational Tests: The Contractor’s work shall also be tested via operational tests performed by the ship’s crew.
The Contractor shall be required to correct any deficiencies in their work or the materials they supplied. Deficiencies in http://www.dtic.mil/dtic/tr/fulltext/u2/a445982.pdf existing or supplied GFM material shall not be the responsibility of the Contractor.
11. Electric Motor Overhauls: All electric motor overhauls shall be performed in accordance with ANSI/EASA Standard
AR100-2010. All electric motor bearings shall be replaced with sealed bearings, the grease fittings removed and a plug put in its place.
12. Machinery Shaft Alignment: All machinery shaft alignments shall correct for short, soft or angled foot conditions and shall, at a minimum, meet or exceed the “Acceptable” criteria below.
Angular Misalignment mils/inch
Offset Misalignment mils
Rpm Excellent Acceptable Excellent Acceptable
3600 0.3 0.5 1 2
1800 0.5 0.7 2 4
1200 0.7 1 3 6
900 1 1.5 4 8
13. Rotor Balancing: All rotor balancing of rigid shafts
(shafts which operate below their first critical speed), shall meet or exceed the requirements of ISO 1940/1.
14. Disturbed Areas: All areas which are disturbed as a result of the execution of this SOW shall be returned to a condition equal to or better than originally found. All new and disturbed areas (to include all piping, plate, foundations, brackets, etc.) shall be prepared and coated in accordance with the MARAD Standard Coatings Guidelines. Final top coat colors shall match the surrounding areas. These guidelines shall be provided upon request to interested bidders.
15. Regulatory Attendance Charges: All ABS Surveyor attendance charges related to the work in this SOW shall be to the
Government’s account. Since TS State of Maine is a Public
Nautical Schoolship, there will be no charge for USCG
Inspector attendance. Repeated ABS Surveyor attendance fees resulting from mistakes and/or failures of the Contractor shall be the Contractor’s responsibility to pay.
16. Personnel Safety: The Contractor shall adhere to all safety procedures employed aboard the ship by the Maine
Maritime Academy. All persons working aboard the ship shall employ proper personnel protective equipment (PPE) for the work being accomplished. At a minimum, hard hats, safety glasses and work shoes are required.
17. Maintain Fire Boundaries: The Contractor shall not compromise fire boundaries (fire screen doors, remote-acting watertight doors, etc.) by blocking doors open or removing doors for any extended or unattended periods.
18. Maintain Unobstructed Escape Routes: The Contractor shall not obstruct egress routes (doors, hatches, scuttles, passageways, etc.) in a manner which endangers the safe entry or evacuation of personnel.
19. Slips, Trips and Fall Hazards: The Contractor shall take all necessary precautions to ensure that:
a. Areas being worked on are well lit.
b. Ladders, rails and deck plating are not removed without sufficiently encircling the openings with sturdy line and yellow caution tape.
c. Decks are kept free of oils and greases.
d. Welding leads, oxy-acetylene hoses, extension cords, etc., are not strung across ladders, egress paths, etc., in a manner which creates a tripping hazard.
20. Safe for Entry: All tanks and spaces which constitute a confined space shall first be certified “safe for entry” by a
Contractor provided Marine Chemist. These areas shall be maintained as such by a Contractor provided, “Competent
Person” using a certified gas monitor so long as work is continuing in the space.
21. Safe for Hot Work: All areas requiring hot work shall first be certified “safe for hot work” by a Contractor provided
Marine Chemist. These areas shall be maintained as such by a
Contractor provided, “Competent Person” using a certified gas monitor. The Competent Person shall hold certification for satisfactory completion of an NFPA approved course for shipyard competent persons. A copy of this certification shall be provided to the COR upon contract award. All hot work shall require that the Contractor fill out one of the ship’s hot work permits and obtain the signature/acknowledgement of one of the ship’s officers each day that hot work is being performed. This permit is used to inform the ship’s crew of the specific hot work being done each day. Precautions shall be taken to ensure that overheads, bulkheads, decks, wiring, piping, insulation, etc.
are properly protected from burning, welding, cutting or similar activities by covering them with fire retardant board or cloth as appropriate. A Contractor supplied fire watch shall be employed on each side of a bulkhead or deck where hot work is taking place. Use of the ship’s portable extinguishers is not permitted. The Contractor’s extinguishers shall be kept full and in good working condition. The fire watch must remain in place for at least ½ hour after any hot work is performed to include standing by during break and lunch periods if hot work was performed within ½ hour prior to the start of the break/lunch. All hot work must cease at least ½ hour prior to the end of the work day in order to provide the Contractor’s fire watch ample time to ensure that the area is safe before departing the ship.
22. Oxygen and Acetylene: All oxygen and acetylene bottles shall be kept ashore and tied off along the dock. All oxygen and acetylene hoses shall be disconnected at their bottles at the end of each work day. Hoses used within the ship shall be coiled up such that no hoses are left passing through any doors at the end of the work day. Hoses shall be kept in good condition at all times. Hoses deemed in need of replacement by the COR shall be replaced by the Contractor at the COR’s direction.
23. Welding Leads: All welding leads shall be kept in good condition. All leads shall be disconnected from their welding machines at the end of each work day. Leads used within the ship shall be coiled up such that no leads are left passing through any doors at the end of each work day. Leads deemed in need of replacement or repair by the COR shall be replaced or repaired by the Contractor at the COR’s direction.
24. Internal Combustion Engines: All Contractor provided internal combustion engines driving welding machines, air compressors or similar equipment, shall be kept on the pier and placed in a berm large enough to contain any oils or fuels that could potentially leak from that equipment. These berms shall be kept free of rain water in as much as is practical.
25. Energy Control Plan (Lock Out/Tag Out): Any work which involves stored energy (such as electrical work, fluids under pressure, etc.), shall first be isolated and locked out/tagged out in accordance with the TS State of Maine’s lock out/tag out procedures. This permission shall be accomplished by way of an entry in the ship’s lock out/tag out record book by one of the engineering officers. Requests for lock out/tag out shall be made not less than 1 hour before requiring them. The
Contractor shall provide their own locks and tags.
26. Working Aloft: All persons working aloft shall do so in accordance with the ship’s working aloft procedures.
Permission to go aloft shall be obtained from the Chief Mate by way of a signed working aloft permit. The Contractor shall provide their own safety harnesses.
27. Smoking: Smoking is not permitted aboard the ship. There is a designated area on the pier where smoking is permitted.
28. Security: All persons working aboard the ship shall be in possession of a Transportation Worker’s Identification Card
(TWIC). All persons with a TWIC shall be provided a temporary access card which shall be scanned by the cadet watch at each boarding and disembarking of the ship. Quick trips to the pier for tools or the like shall not require scanning in/out providing the cadet watch is informed and the
Contractor’s employee or subcontractor remains within sight of the watch. A list of all Contractors employees and subcontractors involved in the execution of this SOW shall be provided to the Chief Mate prior to the start of work.
29. Work Hours: Work hours shall be Monday thru Friday, 0700 to
1600 hrs. not including those Holidays observed by the Maine
Maritime Academy. See also the working day restrictions stipulated above under “PERIOD OF PERFORMANCE”.
30. Loading/unloading of Tools, Equipment and Materials:
Contractors shall be permitted to load/unload personnel, tools and materials at the Academy pier alongside the ship. The ship’s crew shall provide an operator for the ship’s cranes to hoist/lower tools, equipment and materials up to 4,000 lbs.
Request for this service shall be made to the Chief Mate at least one day prior to needing the crane. Availability of the ship’s cranes is not guaranteed. The Contractor shall be responsible for providing straps, shackles, etc. required for the safe hoisting of equipment and materials. In addition, the Contractor shall provide the personnel required to safely direct the crane operator and to guide the hoisted tools/equipment/materials.
31. Parking: Vehicle parking is permitted at the Castine town parking lot upon approval from the Town Selectman. This approval shall be requested by submitting to the COR, a list of all Contractor and subcontractor vehicle models, license plate numbers, and driver’s license numbers prior to the start of the contract. The town parking lot is approximately 1,000 ft from the ship. Overnight parking at the town lot is not permitted. If a Contractor desires to leave a work trailer on the pier or Academy grounds, it shall be in a location agreed to by the Chief Mate and the Maine Maritime Academy Police
Department. Work trailers and other vehicles must never obstruct emergency (fire and ambulance) vehicle access to the ship.
32. Toilets: The Contractor shall provide portable toilet facilities for their employees and subcontractors. The Chief
Mate shall designate a space on the dock for them to be placed. The Contractor shall maintain them clean and shall empty them as required.
33. Availability of Drawings and Technical Manuals: The COR shall assist, in as much as possible, by providing access to any requested drawings or manuals. These drawings and manuals shall not leave the ship but may be copied on board with the written approval of the Chief Engineer. Most all of the ship’s drawings have been electronically copied to a pdf format. CD copies of available drawings shall be provided to the Contractor upon request.
34. Hazmat Handling and Documentation: The Contractor must recognize that ships may contain hazardous materials which require special handling. These materials may include, but are not limited to; asbestos (used in heat and electrical insulation, brake linings, deck coverings, boiler refractory, joiner work and other areas), mercury, oils, bilge water and slops containing fuel, grease and lubricating oils, lead, lead-based anti-foulants, etc. This SOW attempts to make the
Contractor aware of any known HAZMAT materials and substances that may be encountered in the execution of this SOW, however, the responsibility for identifying, handling and disposing of these materials shall be the Contractors. Removal and disposal of all hazardous material or waste shall be in accordance with all applicable Federal, State, and local rules and regulations. The Contractor shall submit documented evidence of that compliance, if applicable, within five working days after the end of the contract. These documents shall include the types and quantities of hazardous waste generated, the procedures followed for custody and disposal, and copies of receipts for same. Additional charges required for handling and disposing of hazardous materials after contract award shall not be permitted unless it is related to work authorized under the Supplemental Labor and Supplemental
Material ITEMs of these SOW.
35. Credit For Scrap: Unless stated otherwise in this SOW, all scrap material generated as a result of this SOW shall be removed from the ship, become the property of the Contractor, and be disposed of in accordance with all Federal, State and local requirements. A credit to the Maritime Administration for the value of any scrap material removed shall be included in the Contractor’s pricing for each ITEM in this SOW which generates any scrap material and/or salvaged equipment.
36. Trash Removal and Clean-up: The Contractor shall remove ALL trash generated each day and sweep down each area worked on at the end of each day. Upon completion of all work in an ITEM, all affected areas shall be thoroughly cleaned to a condition equal to or better than originally found. The ship is used by the faculty and cadets of the Maine Maritime Academy and is open to the public and prospective students for tours. For this reason, it is important that all public areas remain clean and orderly. If the Contractor soils or dirties any public areas or areas of the ship outside of the areas being worked on, they shall clean them immediately.
37. The ship shall provide the Contractor with one UHF radio and charger for the purpose of contacting the COR (or his designated representative). The radio and charger shall be signed for by the Contractor and returned at the end of the contract period.
38. Equipment Information: The Contractor shall provide the COR with an electronic copy (in pdf format) of all drawings, operating manuals, repair manuals, parts manuals, cut sheets etc., for any equipment that the Contractor provides to the ship as part of this SOW. In addition, any drawings required as a deliverable in this SOW shall also be provided in AutoCad format.
39. Accuracy of Information: Dimensions and measurements in this SOW (or referenced in this SOW) are provided in good faith, however, their accuracy is not guaranteed. The
Contractor is responsible for verifying the accuracy of dimensions, measurements, sizes, etc., provided in any sketches, drawings, plans and specifications, within this SOW prior to quoting, fabricating, ordering, etc., anything required in this SOW. All drawings provided or referenced in this SOW, whether they are considered “as builts” or not, are not guaranteed to be accurate. Furthermore, these drawings should not be scaled in an attempt to determine the actual location of existing piping/wiring runs, etc. in hidden areas such as bulkheads and/or joinery. The Contractor shall be aware that numerous drawings and manuals represent the ship’s configuration prior to the conversion in 1997 and as such, may no longer accurately represent the ship’s current configuration. For this reason, it is important to determine whether a drawing or manual being reviewed represents the pre or post conversion configuration.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .