DTMA-91-B-2013-0006

SOLICITATION, OFFER AND AWARD

4. TYPE OF SOLICITATION2. CONTRACT NUMBER 3. SOLICITATION NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)

ORDER UNDER DPAS (15 CFR 700)

6. REQUISITION/PURCHASE NUMBER

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

NEGOTIATED (RFP)

SEALED BID (IFB)

5. DATE ISSUED

1. THIS CONTRACT IS A RATED RATING PAGE OF PAGES

1 100

C. E-MAIL ADDRESS

EXT.NUMBERAREA CODE

B. TELEPHONE (NO COLLECT CALLS)A. NAME

10. FOR

INFORMATION

CALL:

CAUTION: LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the

SOLICITATION

9. Sealed offers in original and

PART IV - REPRESENTATIONS AND INSTRUCTIONS

OTHER STATEMENTS OF OFFERORS

EVALUATION FACTORS FOR AWARD

INSTRS., CONDS., AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND

LIST OF ATTACHMENTS

CONTRACT CLAUSES

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

I

J

K

L

M SPECIAL CONTRACT REQUIREMENTS

CONTRACT ADMINISTRATION DATA

DELIVERIES OR PERFORMANCE

INSPECTION AND ACCEPTANCE

PACKAGING AND MARKING

DESCRIPTION/SPECS./WORK STATEMENT

SUPPLIES OR SERVICES AND PRICES/COSTS

SOLICITATION/CONTRACT FORM

PART II - CONTRACT CLAUSESPART I - THE SCHEDULE

H

G

F

E

D

C

B

A

SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)

11. TABLE OF CONTENTS

18. OFFER DATE17. SIGNATURE

SUCH ADDRESS IN SCHEDULE.

IS DIFFERENT FROM ABOVE - ENTER

15C. CHECK IF REMITTANCE ADDRESS

EXT.NUMBERAREA CODE

15B. TELEPHONE NUMBER

(Type or print)AND

ADDRESS

OF

OFFEROR

CODE FACILITY

16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER15A. NAME

DATEAMENDMENT NO.DATEAMENDMENT NO.

and related documents numbered and dated):

amendments to the SOLICITATION for offerors

(The offeror acknowledges receipt of

14. ACKNOWLEDGEMENT OF AMENDMENTS

CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)

(See Section I, Clause No. 52.232.8)

13. DISCOUNT FOR PROMPT PAYMENT

designated point(s), within the time specified in the schedule.

by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the

12. In compliance with the above, the undersigned agrees, if this offer is accepted within ______________ calendar days (60 calendar days unless a different period is inserted

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

28. AWARD DATE

(Signature of Contracting Officer)

27. UNITED STATES OF AMERICA

25. PAYMENT WILL BE MADE BY

26. NAME OF CONTRACTING OFFICER (Type or print)

CODE 24. ADMINISTERED BY (If other than Item 7)

ITEM

(4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

41 U.S.C. 253 (c) ( 10 U.S.C. 2304 (c) (

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

21. ACCOUNTING AND APPROPRIATION20. AMOUNT19. ACCEPTED AS TO ITEMS NUMBERED

AWARD (To be completed by government)

CODE

10/16/2013X

00091

U.S. DOT/ Maritime Administration Office of Acquisition MAR-380

1200 NEW JERSEY AVENUE SE

MAIL STOP W-28-201

WASHINGTON DC 20590-0001

1400 ET 11/20/2013

Wilbur Turner 202 wilbur.turner@dot.gov

366-0700

X

X

X

X

X

X

X

X

X

X

X

X

X

PAGE(S)

Benedict J. Burnowski

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

STANDARD FORM 33 (Rev. 9-97)

Prescribed by GSA - FAR (48 CFR) 53.214(c)

2-22

23-35 37-39 40-41 42-44 45-50

51-78

79-90

91-94

95-96

97-100

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

Contractor shall provide non personal layberth services for the exclusive long-term safe layberthing for three (3) designated MARAD RRF vessels or other Government Vessels FOB: Destination Period of Performance: 04/16/2014 to 04/15/2024

0001 Bse Year 5yr. Cape Horn (4/16/2014 to 4/15/2015) LO Period of Performance: 04/16/2014 to 04/15/2015

000111 Berthage (4/16/2014 to 4/15/2015) Per diem 365 DA Period of Performance: 04/16/2014 to 04/15/2015

000112 Connect Cycle (4/16/2014 to 4/15/2015) 1 EA Period of Performance: 04/16/2014 to 04/15/2015

000113 Disconnect Cycle (4/16/2014 to 4/15/2015) 1 EA Period of Performance: 04/16/2014 to 04/15/2015

000114 Electrical Service (4/16/2014 to 4/15/2015) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2014 to 04/15/2015

000115 Water and Sewage Services (4/16/2014 to4/15/2015 LO Period of Performance: 04/16/2014 to 04/15/2015

0002 Opt 1 Cape Horn (4/16/2015 to 4/15/2016 LO Period of Performance: 04/16/2015 to 04/15/2016

000211 Berthage (4/16/2015 to 4/15/2016) Per diem 366 DA Period of Performance: 04/16/2015 to 04/15/2016

000212 Connect Cycle (4/16/2015 to 4/15/2016) 1 EA Period of Performance: 04/16/2015 to 04/15/2016

000213 Disconnect Cycle (4/16/2015 to 4/15/2016 1 EA Period of Performance: 04/16/2015 to 04/15/2016

000214 Electrical Service (4/16/2015 to 4/15/2016) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2015 to 04/15/2016

000215 Water and Sewage Services (4/16/2015 to 4/15/2016 LO Period of Performance: 04/16/2015 to 04/15/2016 Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

NSN 7540-01-152-8067 2

3 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

0003 Opt 2 Cape Horn (4/16/2016 to 4/15/2017 LO Period of Performance: 04/16/2016 to 04/15/2017

000311 Berthage (4/16/2016 to 4/15/2017) Per diem 365 DA Period of Performance: 04/16/2016 to 04/15/2017

000312 Connect Cycle (4/16/2016 to 4/15/2017) 1 EA Period of Performance: 04/16/2016 to 04/15/2017

000313 Disconnect Cycle (4/16/2016 to 4/15/2017) 1 EA Period of Performance: 04/16/2016 to 04/15/2017

000314 Electrical Service (4/16/2016 to 4/15/2017) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2016 to 04/15/2017

000315 Water and Sewage Services (4/16/2016 to 4/15/2017 LO Period of Performance: 04/16/2016 to 04/15/2017

0004 Opt 3 Cape Horn (4/16/2017 to 4/15/2018 LO Period of Performance: 04/16/2017 to 04/15/2018

000411 Berthage (4/16/2017 to 4/15/2018) Per diem 365 DA Period of Performance: 04/16/2017 to 04/15/2018

000412 Connect Cycle (4/16/2017 to 4/15/2018) 1 EA Period of Performance: 04/16/2017 to 04/15/2018

000413 Disconnect Cycle (4/16/2017 to 4/15/2018) 1 EA Period of Performance: 04/16/2017 to 04/15/2018

000414 Electrical Service (4/16/2017 to 4/15/2018) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2017 to 04/15/2018

000415 Water and Sewage Services (4/16/2017 to 4/15/2018 LO Period of Performance: 04/16/2017 to 04/15/2018

0005 Opt 4 Cape Horn (4/16/2018 to 4/15/2019 LO Period of Performance: 04/16/2018 to 04/15/2019

000511 Berthage (4/16/2018 to 4/15/2019) Per diem 365 DA Period of Performance: 04/16/2018 to 04/15/2019 Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 3

4 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

000512 Connect Cycle (4/16/2018 to 4/15/2019) 1 EA Period of Performance: 04/16/2018 to 04/15/2019

000513 Disconnect Cycle (4/16/2018 to 4/15/2019) 1 EA Period of Performance: 04/16/2018 to 04/15/2019

000514 Electrical Service (4/16/2018 to 4/15/2019) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2018 to 04/15/2019

000515 Water and Sewage Services (4/16/2018 to 4/15/2019 LO Period of Performance: 04/16/2018 to 04/15/2019

0006 Bse Year 5yr. Cape Hudson (4/16/2014 to 4/15/2015 LO Period of Performance: 04/16/2014 to 04/15/2015

000611 Berthage (4/16/2014 to 4/15/2015) Per diem 365 DA Period of Performance: 04/16/2014 to 04/15/2015

000612 Connect Cycle (4/16/2014 to 4/15/2015) 1 EA Period of Performance: 04/16/2014 to 04/15/2015

000613 Disconnect Cycle (4/16/2014 to 4/15/2015) 1 EA Period of Performance: 04/16/2014 to 04/15/2015

000614 Electrical Service (4/16/2014 to 4/15/2015) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2014 to 04/15/2015

000615 Water and Sewage Services (4/16/2014 to 4/15/2015 LO Period of Performance: 04/16/2014 to 04/15/2015

0007 Opt 1 Cape Hudson (4/16/2015 to 4/15/2016 LO Period of Performance: 04/16/2015 to 04/15/2016

000711 Berthage (4/16/2015 to 4/15/2016) Per diem 366 DA Period of Performance: 04/16/2015 to 04/15/2016

000712 Connect Cycle (4/16/2015 to 4/15/2016) 1 EA Period of Performance: 04/16/2015 to 04/15/2016

000713 Disconnect Cycle (4/16/2015 to 4/15/2016 1 EA Period of Performance: 04/16/2015 to 04/15/2016 Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 4

5 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

000714 Electrical Service (4/16/2015 to 4/15/2016) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2015 to 04/15/2016

000715 Water and Sewage Services (4/16/2015 to 4/15/2016 LO Period of Performance: 04/16/2015 to 04/15/2016

0008 Opt 2 Cape Hudson (4/16/2016 to 4/15/2017 LO Period of Performance: 04/16/2016 to 04/15/2017

000811 Berthage (4/16/2016 to 4/15/2017) Per diem 365 DA Period of Performance: 04/16/2016 to 04/15/2017

000812 Connect Cycle (4/16/2016 to 4/15/2017) 1 EA Period of Performance: 04/16/2016 to 04/15/2017

000813 Disconnect Cycle (4/16/2016 to 4/15/2017) 1 EA Period of Performance: 04/16/2016 to 04/15/2017

000814 Electrical Service (4/16/2016 to 4/15/2017) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2016 to 04/15/2017

000815 Water and Sewage Services (4/16/2016 to 4/15/2017 LO Period of Performance: 04/16/2016 to 04/15/2017

0009 Opt 3 Cape Hudson (4/16/2017 to 4/15/2018 LO Period of Performance: 04/16/2017 to 04/15/2018

000911 Berthage (4/16/2017 to 4/15/2018) Per diem 365 DA Period of Performance: 04/16/2017 to 04/15/2018

000912 Connect Cycle (4/16/2017 to 4/15/2018) 1 EA Period of Performance: 04/16/2017 to 04/15/2018

000913 Disconnect Cycle (4/16/2017 to 4/15/2018) 1 EA Period of Performance: 04/16/2017 to 04/15/2018

000914 Electrical Service (4/16/2017 to 4/15/2018) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 5

6 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

Period of Performance: 04/16/2017 to 04/15/2018

000915 Water and Sewage Services (4/16/2017 to 4/15/2018 LO Period of Performance: 04/16/2017 to 04/15/2018

0010 Opt 4 Cape Hudson (4/16/2018 to 4/15/2019 LO Period of Performance: 04/16/2018 to 04/15/2019

001011 Berthage (4/16/2018 to 4/15/2019) Per diem 365 DA Period of Performance: 04/16/2018 to 04/15/2019

001012 Connect Cycle (4/16/2018 to 4/15/2019) 1 EA Period of Performance: 04/16/2018 to 04/15/2019

001013 Disconnect Cycle (4/16/2018 to 4/15/2019) 1 EA Period of Performance: 04/16/2018 to 04/15/2019

001014 Electrical Service(4/16/2018 to 4/15/2019) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2018 to 04/15/2019

001015 Water and Sewage Services (4/16/2018 to 4/15/2019 LO Period of Performance: 04/16/2018 to 04/15/2019

0011 Bse Year 5yr. SS Petersburg (4/16/2014 to LO 4/15/2015 Period of Performance: 04/16/2014 to 04/15/2015

001111 Berthage (4/16/2014 to 4/15/2015) Per diem 365 DA Period of Performance: 04/16/2014 to 04/15/2015

001112 Connect Cycle (4/16/2014 to 4/15/2015) 1 EA Period of Performance: 04/16/2014 to 04/15/2015

001113 Disconnect Cycle (4/16/2014 to 4/15/2015) 1 EA Period of Performance: 04/16/2014 to 04/15/2015

001114 Electrical Service (4/16/2014 to 4/15/2015) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2014 to 04/15/2015

001115 Water and Sewage Services (4/16/2014 to 4/15/2015 LO Period of Performance: 04/16/2014 to 04/15/2015

Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 6

7 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

0012 Opt 1 SS Petersburg (4/16/2015 to 4/15/2016 LO Period of Performance: 04/16/2015 to 04/15/2016

001211 Berthage (4/16/2015 to 4/15/2016) Per diem 366 DA Period of Performance: 04/16/2015 to 04/15/2016

001212 Connect Cycle (4/16/2015 to 4/15/2016) 1 EA Period of Performance: 04/16/2015 to 04/15/2016

001213 Disconnect Cycle (4/16/2015 to 4/15/2016 1 EA Period of Performance: 04/16/2015 to 04/15/2016

001214 Electrical Service (4/16/2015 to 4/15/2016) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2015 to 04/15/2016

001215 Water and Sewage Services (4/16/2015 to 4/15/2016 LO Period of Performance: 04/16/2015 to 04/15/2016

0013 Opt 2 SS Petersburg (4/16/2016 to 4/15/2017 LO Period of Performance: 04/16/2016 to 04/15/2017

001311 Berthage (4/16/2016 to 4/15/2017) Per diem 365 DA Period of Performance: 04/16/2016 to 04/15/2017

001312 Connect Cycle (4/16/2016 to 4/15/2017) 1 EA Period of Performance: 04/16/2016 to 04/15/2017

001313 Disconnect Cycle (4/16/2016 to 4/15/2017) 1 EA Period of Performance: 04/16/2016 to 04/15/2017

001314 Electrical Service (4/16/2016 to 4/15/2017) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2016 to 04/15/2017

001315 Water and Sewage Services (4/16/2016 to 4/15/2017 LO Period of Performance: 04/16/2016 to 04/15/2017

0014 Opt 3 SS Petersburg (4/16/2017 to 4/15/2018 LO Period of Performance: 04/16/2017 to 04/15/2018

001411 Berthage (4/16/2017 to 4/15/2018) Per diem 365 DA Period of Performance: 04/16/2017 to 04/15/2018

Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 7

8 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

001412 Connect Cycle (4/16/2017 to 4/15/2018) 1 EA Period of Performance: 04/16/2017 to 04/15/2018

001413 Disconnect Cycle (4/16/2017 to 4/15/2018) 1 EA Period of Performance: 04/16/2017 to 04/15/2018

001414 Electrical Service (4/16/2017 to 4/15/2018) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2017 to 04/15/2018

001415 Water and Sewage Services (4/16/2017 to 4/15/2018 LO Period of Performance: 04/16/2017 to 04/15/2018

0015 Opt 4 SS Petersburg (4/16/2018 to 4/15/2019 LO Period of Performance: 04/16/2018 to 04/15/2019

001511 Berthage (4/16/2018 to 4/15/2019) Per diem 365 DA Period of Performance: 04/16/2018 to 04/15/2019

001512 Connect Cycle (4/16/2018 to 4/15/2019) 1 EA Period of Performance: 04/16/2018 to 04/15/2019

001513 Disconnect Cycle (4/16/2018 to 4/15/2019) 1 EA Period of Performance: 04/16/2018 to 04/15/2019

001514 Electrical Service (4/16/2018 to 4/15/2019) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2018 to 04/15/2019

001515 Water and Sewage Services (4/16/2018 to 4/15/2019 LO Period of Performance: 04/16/2018 to 04/15/2019

0016 Bse Year 10yr.Cape Horn (4/16/2014 to 4/15/2015 LO Period of Performance: 04/16/2014 to 04/15/2015

001611 Berthage (4/16/2014 to 4/15/2015) Per diem 365 DA Period of Performance: 04/16/2014 to 04/15/2015

001612 Connect Cycle (4/16/2014 to 4/15/2015) 1 EA Period of Performance: 04/16/2014 to 04/15/2015

001613 Disconnect Cycle (4/16/2014 to 4/15/2015) 1 EA Period of Performance: 04/16/2014 to 04/15/2015

Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 8

9 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

001614 Electrical Service (4/16/2014 to 4/15/2015) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2014 to 04/15/2015

001615 Water and Sewage Services (4/16/2014 to 4/15/2015 LO Period of Performance: 04/16/2015 to 04/15/2016

0017 Opt 1 Cape Horn (4/16/2015 to 4/15/2016 LO Period of Performance: 04/16/2015 to 04/15/2016

001711 Berthage (4/16/2015 to 4/15/2016) Per diem 366 DA Period of Performance: 04/16/2015 to 04/15/2016

001712 Connect Cycle (4/16/2015 to 4/15/2016) 1 EA Period of Performance: 04/16/2015 to 04/15/2016

001713 Disconnect Cycle (4/16/2015 to 4/15/2016 1 EA Period of Performance: 04/16/2015 to 04/15/2016

001714 Electrical Service (4/16/2015 to 4/15/2016) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2015 to 04/15/2016

001715 Water and Sewage Services (4/16/2015 to 4/15/2016 LO Period of Performance: 04/16/2015 to 04/15/2016

0018 Opt 2 Cape Horn (4/16/2016 to 4/15/2017 LO Period of Performance: 04/16/2016 to 04/15/2017

001811 Berthage (4/16/2016 to 4/15/2017) Per diem 365 DA Period of Performance: 04/16/2016 to 04/15/2017

001812 Connect Cycle (4/16/2016 to 4/15/2017) 1 EA Period of Performance: 04/16/2016 to 04/15/2017

001813 Disconnect Cycle (4/16/2016 to 4/15/2017) 1 EA Period of Performance: 04/16/2016 to 04/15/2017

001814 Electrical Service (4/16/2016 to 4/15/2017) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2016 to 04/15/2017 Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 9

10 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

001815 Water and Sewage Services (4/16/2016 to 4/15/2017 LO Period of Performance: 04/16/2016 to 04/15/2017

0019 Opt 3 Cape Horn (4/16/2017 to 4/15/2018 LO Period of Performance: 04/16/2017 to 04/15/2018

001911 Berthage (4/16/2017 to 4/15/2018) Per diem 365 DA Period of Performance: 04/16/2017 to 04/15/2018

001912 Connect Cycle(4/16/2017 to 4/15/2018) 1 EA Period of Performance: 04/16/2017 to 04/15/2018

001913 Disconnect Cycle (4/16/2017 to 4/15/2018) 1 EA Period of Performance: 04/16/2017 to 04/15/2018

001914 Electrical Service (4/16/2017 to 4/15/2018) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2017 to 04/15/2018

001915 Water and Sewage Services (4/16/2017 to 4/15/2018 LO Period of Performance: 04/16/2017 to 04/15/2018

0020 Opt 4 Cape Horn (4/16/2018 to 4/15/2019 LO Period of Performance: 04/16/2018 to 04/15/2019

002011 Berthage (4/16/2018 to 4/15/2019) Per diem 365 DA Period of Performance: 04/16/2018 to 04/15/2019

002012 Connect Cycle (4/16/2018 to 4/15/2019) 1 EA Period of Performance: 04/16/2018 to 04/15/2019

002013 Disconnect Cycle (4/16/2018 to 4/15/2019) 1 EA Period of Performance: 04/16/2018 to 04/15/2019

002014 Electrical Service (4/16/2018 to 4/15/2019) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2018 to 04/15/2019

002015 Water and Sewage Services (4/16/2018 to 4/15/2019 LO Period of Performance: 04/16/2018 to 04/15/2019

0021 Opt 5 Cape Horn (4/16/2019 to 4/15/2020 LO Period of Performance: 04/16/2019 to 04/15/2020 Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 10

11 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

002111 Berthage(4/16/2019 to 4/15/2020)Per diem 366 DA Period of Performance: 04/16/2019 to 04/15/2020

002112 Connect Cycle (4/16/2019 to 4/15/2020) 1 EA Period of Performance: 04/16/2019 to 04/15/2020

002113 Disconnect Cycle (4/16/2019 to 4/15/2020 1 EA Period of Performance: 04/16/2019 to 04/15/2020

002114 Electrical Service (4/16/2019 to 4/15/2020) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2019 to 04/15/2020

002115 Water and Sewage Services (4/16/2019 to 4/15/2020 LO Period of Performance: 04/16/2019 to 04/15/2020

0022 Opt 6 Cape Horn (4/16/2020 to 4/15/2021) LO Period of Performance: 04/16/2020 to 04/15/2021

002211 Berthage(4/16/2020 to 4/15/2021)Perdiem 365 DA Period of Performance: 04/16/2020 to 04/15/2021

002212 Connect Cycle (4/16/2020 to 4/15/2021) 1 EA Period of Performance: 04/16/2020 to 04/15/2021

002213 Disconnect Cycle (4/16/2020 to 4/15/2021) 1 EA Period of Performance: 04/16/2020 to 04/15/2021

002214 Electrical Service (4/16/2020 to 4/15/2021) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2020 to 04/15/2021

002215 Water and Sewage Services (4/16/2020 to 4/15/2021 LO Period of Performance: 04/16/2020 to 04/15/2021

0023 Opt 7 Cape Horn (4/16/2021 to 4/15/2022 LO Period of Performance: 04/16/2021 to 04/15/2022

002311 Berthage(4/16/2020 to 4/15/2021)Perdiem 365 DA Period of Performance: 04/16/2021 to 04/15/2022

002312 Connect Cycle (4/16/2021 to 4/15/2022) 1 EA Period of Performance: 04/16/2021 to 04/15/2022 Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 11

12 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

002313 Disconnect Cycle (4/16/2021 to 4/15/2022 1 EA Period of Performance: 04/16/2021 to 04/15/2022

002314 Electrical Service (4/16/2021 to 4/15/2022) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2021 to 04/15/2022

002315 Water and Sewage Services (4/16/2021 to 4/15/2022 LO Period of Performance: 04/16/2021 to 04/15/2022

0024 Opt 8 Cape Horn (4/16/2022 to 4/15/2023 LO Period of Performance: 04/16/2022 to 04/15/2023

002411 Berthage(4/16/2022 to 4/15/2023)Per diem 365 DA Period of Performance: 04/16/2022 to 04/15/2023

002412 Connect Cycle (4/16/2022 to 4/15/2023) 1 EA Period of Performance: 04/16/2022 to 04/15/2023

002413 Disconnect Cycle(4/16/2022 to 4/15/2023) 1 EA Period of Performance: 04/16/2022 to 04/15/2023

002414 Electrical Service(4/16/2022 to 4/15/2023) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2022 to 04/15/2023

002415 Water and Sewage Services (4/16/2022 to 4/15/2023 LO Period of Performance: 04/16/2022 to 04/15/2023

0025 Opt 9 Cape Horn (4/16/2023 to 4/15/2024) LO Period of Performance: 04/16/2023 to 04/15/2024

002511 Berthage(4/16/2023 to 4/15/2024)Perdiem 366 DA Period of Performance: 04/16/2023 to 04/15/2024

002512 Connect Cycle (4/16/2023 to 4/15/2024) 1 EA Period of Performance: 04/16/2023 to 04/15/2024

002513 Disconnect Cycle (4/16/2023 to 4/15/2024 1 EA Period of Performance: 04/16/2023 to 04/15/2024

002514 Electrical Service(4/16/2023 to 4/15/2024) DA Reimbursable electrical power usage Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 12

13 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2023 to 04/15/2024

002515 Water and Sewage Services (4/16/2023 to 4/15/2024 LO Period of Performance: 04/16/2023 to 04/15/2024

0026 Bse Year 10yr.Cape Hudson (4/16/2014 to 4/15/2015 LO Period of Performance: 04/16/2014 to 04/15/2015

002611 Berthage (4/16/2014 to 4/15/2015) Per diem 365 DA Period of Performance: 04/16/2014 to 04/15/2015

002612 Connect Cycle (4/16/2014 to 4/15/2015) 1 EA Period of Performance: 04/16/2014 to 04/15/2015

002613 Disconnect Cycle (4/16/2014 to 4/15/2015) 1 EA Period of Performance: 04/16/2014 to 04/15/2015

002614 Electrical Service (4/16/2014 to 4/15/2015) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2014 to 04/15/2015

002615 Water and Sewage Services (4/16/2014 to 4/15/2015 LO Period of Performance: 04/16/2014 to 04/15/2015

0027 Opt 1 Cape Hudson (4/16/2015 to 4/15/2016 LO Period of Performance: 04/16/2015 to 04/15/2016

002711 Berthage (4/16/2015 to 4/15/2016) Per diem 366 DA Period of Performance: 04/16/2015 to 04/15/2016

002712 Connect Cycle (4/16/2015 to 4/15/2016) 1 EA Period of Performance: 04/16/2015 to 04/15/2016

002713 Disconnect Cycle (4/16/2015 to 4/15/2016 1 EA Period of Performance: 04/16/2015 to 04/15/2016

002714 Electrical Service (4/16/2015 to 4/15/2016) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2015 to 04/15/2016

002715 Water and Sewage Services (4/16/2015 to 4/15/2016 LO Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 13

14 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

Period of Performance: 04/16/2015 to 04/15/2016

0028 Opt 2 Cape Hudson (4/16/2016 to 4/15/2017 LO Period of Performance: 04/16/2016 to 04/15/2017

002811 Berthage (4/16/2016 to 4/15/2017) Per diem 365 DA Period of Performance: 04/16/2016 to 04/15/2017

002812 Connect Cycle (4/16/2016 to 4/15/2017) 1 EA Period of Performance: 04/16/2016 to 04/15/2017

002813 Disconnect Cycle (4/16/2016 to 4/15/2017) 1 EA Period of Performance: 04/16/2016 to 04/15/2017

002814 Electrical Service (4/16/2016 to 4/15/2017) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2016 to 04/15/2017

002815 Water and Sewage Services (4/16/2016 to 4/15/2017 LO Period of Performance: 04/16/2016 to 04/15/2017

0029 Opt 3 Cape Hudson (4/16/2017 to 4/15/2018 LO Period of Performance: 04/16/2017 to 04/15/2018

002911 Berthage (4/16/2017 to 4/15/2018) Per diem 365 DA Period of Performance: 04/16/2017 to 04/15/2018

002912 Connect Cycle (4/16/2017 to 4/15/2018) 1 EA Period of Performance: 04/16/2017 to 04/15/2018

002913 Disconnect Cycle (4/16/2017 to 4/15/2018) 1 EA Period of Performance: 04/16/2017 to 04/15/2018

002914 Electrical Service (4/16/2017 to 4/15/2018) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2017 to 04/15/2018

002915 Water and Sewage Services (4/16/2017 to 4/15/2018 LO Period of Performance: 04/16/2017 to 04/15/2018

0030 Opt 4 Cape Hudson (4/16/2018 to 4/15/2019 LO Period of Performance: 04/16/2018 to 04/15/2019

003011 Berthage (4/16/2018 to 4/15/2019) Per diem 365 DA Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 14

15 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

Period of Performance: 04/16/2018 to 04/15/2019

003012 Connect Cycle (4/16/2018 to 4/15/2019) 1 EA Period of Performance: 04/16/2018 to 04/15/2019

003013 Disconnect Cycle (4/16/2018 to 4/15/2019) 1 EA Period of Performance: 04/16/2018 to 04/15/2019

003014 Electrical Service (4/16/2018 to 4/15/2019) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2018 to 04/15/2019

003015 Water and Sewage Services (4/16/2018 to 4/15/2019 LO Period of Performance: 04/16/2018 to 04/15/2019

0031 Opt 5 Cape Hudson (4/16/2019 to 4/15/2020 LO Period of Performance: 04/16/2019 to 04/15/2020

003111 Berthage (4/16/2019 to 4/15/2020) Per diem 366 DA Period of Performance: 04/16/2019 to 04/15/2020

003112 Connect Cycle (4/16/2019 to 4/15/2020) 1 EA Period of Performance: 04/16/2019 to 04/15/2020

003113 Disconnect Cycle (4/16/2019 to 4/15/2020 1 EA Period of Performance: 04/16/2019 to 04/15/2020

003114 Electrical Service (4/16/2019 to 4/15/2020) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2019 to 04/15/2020

003115 Water and Sewage Services (4/16/2019 to 4/15/2020 LO Period of Performance: 04/16/2019 to 04/15/2020

0032 Opt 6 Cape Hudson (4/16/2020 to 4/15/2021 LO Period of Performance: 04/16/2020 to 04/15/2021

003211 Berthage (4/16/2020 to 4/15/2021) Per diem 365 DA Period of Performance: 04/16/2020 to 04/15/2021

003212 Connect Cycle (4/16/2020 to 4/15/2021) 1 EA Period of Performance: 04/16/2020 to 04/15/2021

003213 Disconnect Cycle (4/16/2020 to 4/15/2021) 1 EA Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 15

16 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

Period of Performance: 04/16/2020 to 04/15/2021

003214 Electrical Service (4/16/2020 to 4/15/2021) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2020 to 04/15/2021

003215 Water and Sewage Services (4/16/2020 to 4/15/2021 LO Period of Performance: 04/16/2020 to 04/15/2021

0033 Opt 7 Cape Hudson (4/16/2021 to 4/15/2022 LO Period of Performance: 04/16/2021 to 04/15/2022

003311 Berthage (4/16/2021 to 4/15/2022) Per diem 365 DA Period of Performance: 04/16/2021 to 04/15/2022

003312 Connect Cycle (4/16/2021 to 4/15/2022) 1 EA Period of Performance: 04/16/2021 to 04/15/2022

003313 Disconnect Cycle (4/16/2021 to 4/15/2022) 1 EA Period of Performance: 04/16/2021 to 04/15/2022

003314 Electrical Service (4/16/2021 to 4/15/2022) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2021 to 04/15/2022

003315 Water and Sewage Services (4/16/2021 to 4/15/2022 LO Period of Performance: 04/16/2021 to 04/15/2022

0034 Opt 8 Cape Hudson (4/16/2022 to 4/15/2023 LO Period of Performance: 04/16/2022 to 04/15/2023

003411 Berthage (4/16/2022 to 4/15/2023) Per diem 365 DA Period of Performance: 04/16/2022 to 04/15/2023

003412 Connect Cycle (4/16/2022 to 4/15/2023) 1 EA Period of Performance: 04/16/2022 to 04/15/2023

003413 Disconnect Cycle (4/16/2022 to 4/15/2023) 1 EA Period of Performance: 04/16/2022 to 04/15/2023

003414 Electrical Service (4/16/2022 to 4/15/2023) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 16

17 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F) one) Period of Performance: 04/16/2022 to 04/15/2023

003415 Water and Sewage Services (4/16/2022 to 4/15/2023 LO Period of Performance: 04/16/2022 to 04/15/2023

0035 Opt 9 Cape Hudson (4/16/2023 to 4/15/2024 LO Period of Performance: 04/16/2023 to 04/15/2024

003511 Berthage(4/16/2023 to 4/15/2024)Per diem 366 DA Period of Performance: 04/16/2023 to 04/15/2024

003512 Connect Cycle (4/16/2023 to 4/15/2024) 1 EA Period of Performance: 04/16/2023 to 04/15/2024

003513 Disconnect Cycle (4/16/2023 to 4/15/2024) 1 EA Period of Performance: 04/16/2023 to 04/15/2024

003514 Electrical Service(4/16/2023 to 4/15/2024) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2023 to 04/15/2024

003515 Water and Sewage Services (4/16/2023 to 4/15/2024 LO Period of Performance: 04/16/2023 to 04/15/2024

0036 Bse Year 10yr. SS Petersburg (4/16/2014 to LO 4/15/2015 Period of Performance: 04/16/2014 to 04/15/2015

003611 Berthage (4/16/2014 to 4/15/2015) Per diem 365 DA Period of Performance: 04/16/2014 to 04/15/2015

003612 Connect Cycle (4/16/2014 to 4/15/2015) 1 EA Period of Performance: 04/16/2014 to 04/15/2015

003613 Disconnect Cycle (4/16/2014 to 4/15/2015) 1 EA Period of Performance: 04/16/2014 to 04/15/2015

003614 Electrical Service (4/16/2014 to 4/15/2015) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2014 to 04/15/2015

003615 Water and Sewage Services (4/16/2014 to 4/15/2015 LO Period of Performance: 04/16/2014 to 04/15/2015 Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 17

18 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

0037 Opt 1 SS Petersburg (4/16/2015 to 4/15/2016 LO Period of Performance: 04/16/2015 to 04/15/2016

003711 Berthage (4/16/2015 to 4/15/2016) Per diem 366 DA Period of Performance: 04/16/2015 to 04/15/2016

003712 Connect Cycle (4/16/2015 to 4/15/2016) 1 EA Period of Performance: 04/16/2015 to 04/15/2016

003713 Disconnect Cycle (4/16/2015 to 4/15/2016 1 EA Period of Performance: 04/16/2015 to 04/15/2016

003714 Electrical Service(4/16/2015 to 4/15/2016) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2015 to 04/15/2016

003715 Water and Sewage Services (4/16/2015 to 4/15/2016 LO Period of Performance: 04/16/2015 to 04/15/2016

0038 Opt 2 SS Petersburg (4/16/2016 to 4/15/2017 LO Period of Performance: 04/16/2016 to 04/15/2017

003811 Berthage (4/16/2016 to 4/15/2017) Per diem 365 DA Period of Performance: 04/16/2016 to 04/15/2017

003812 Connect Cycle (4/16/2016 to 4/15/2017) 1 EA Period of Performance: 04/16/2016 to 04/15/2017

003813 Disconnect Cycle (4/16/2016 to 4/15/2017) 1 EA Period of Performance: 04/16/2016 to 04/15/2017

003814 Electrical Service (4/16/2016 to 4/15/2017) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2016 to 04/15/2017

003815 Water and Sewage Services (4/16/2016 to 4/15/2017 LO Period of Performance: 04/16/2016 to 04/15/2017

0039 Opt 3 SS Petersburg (4/16/2017 to 4/15/2018 LO Period of Performance: 04/16/2017 to 04/15/2018

003911 Berthage (4/16/2017 to 4/15/2018) Per diem 365 DA Period of Performance: 04/16/2017 to 04/15/2018 Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 18

19 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

003912 Connect Cycle (4/16/2017 to 4/15/2018) 1 EA Period of Performance: 04/16/2017 to 04/15/2018

003913 Disconnect Cycle (4/16/2017 to 4/15/2018) 1 EA Period of Performance: 04/16/2017 to 04/15/2018

003914 Electrical Service (4/16/2017 to 4/15/2018) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2017 to 04/15/2018

003915 Water and Sewage Services (4/16/2017 to 4/15/2018 LO Period of Performance: 04/16/2017 to 04/15/2018

0040 Opt 4 SS Petersburg (4/16/2018 to 4/15/2019 LO Period of Performance: 04/16/2017 to 04/15/2018

004011 Berthage (4/16/2018 to 4/15/2019) Per diem 365 DA Period of Performance: 04/16/2018 to 04/15/2019

004012 Connect Cycle (4/16/2018 to 4/15/2019) 1 EA Period of Performance: 04/16/2018 to 04/15/2019

004013 Disconnect Cycle (4/16/2018 to 4/15/2019) 1 EA Period of Performance: 04/16/2018 to 04/15/2019

004014 Electrical Service (4/16/2018 to 4/15/2019) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2018 to 04/15/2019

004015 Water and Sewage Services (4/16/2018 to 4/15/2019 LO Period of Performance: 04/16/2018 to 04/15/2019

0041 Opt 5 SS Petersburg (4/16/2019 to 4/15/2020 LO Period of Performance: 04/16/2019 to 04/15/2020

004111 Berthage (4/16/2019 to 4/15/2020) Per diem 366 DA Period of Performance: 04/16/2019 to 04/15/2020

004112 Connect Cycle(4/16/2019 to 4/15/2020) 1 EA Period of Performance: 04/16/2019 to 04/15/2020

004113 Disconnect Cycle(4/16/2019 to 4/15/2020 1 EA Period of Performance: 04/16/2019 to 04/15/2020 Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 19

20 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

004114 Electrical Service (4/16/2019 to 4/15/2020) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2019 to 04/15/2020

004115 Water and Sewage Services (4/16/2019 to 4/15/2020 LO Period of Performance: 04/16/2019 to 04/15/2020

0042 Opt 6 SS Petersburg (4/16/2020 to 4/15/2021 LO Period of Performance: 04/16/2020 to 04/15/2021

004211 Berthage (4/16/2020 to 4/15/2021) Per diem 365 DA Period of Performance: 04/16/2020 to 04/15/2021

004212 Connect Cycle (4/16/2020 to 4/15/2021) 1 EA Period of Performance: 04/16/2020 to 04/15/2021

004213 Disconnect Cycle (4/16/2020 to 4/15/2021) 1 EA Period of Performance: 04/16/2020 to 04/15/2021

004214 Electrical Service (4/16/2020 to 4/15/2021) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2020 to 04/15/2021

004215 Water and Sewage Services (4/16/2020 to 4/15/2021 LO Period of Performance: 04/16/2020 to 04/15/2021

0043 Opt 7 Cape SS Petersburg (4/16/2021 to 4/15/2022 LO Period of Performance: 04/16/2021 to 04/15/2022

004311 Berthage(4/16/2021 to 4/15/2022) Per diem 365 DA Period of Performance: 04/16/2021 to 04/15/2022

004312 Connect Cycle (4/16/2021 to 4/15/2022) 1 EA Period of Performance: 04/16/2021 to 04/15/2022

004313 Disconnect Cycle (4/16/2021 to 4/15/2022) 1 EA Period of Performance: 04/16/2021 to 04/15/2022

004314 Electrical Service (4/16/2021 to 4/15/2022) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 20

21 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

Period of Performance: 04/16/2021 to 04/15/2022

004315 Water and Sewage Services (4/16/2021 to 4/15/2022 LO Period of Performance: 04/16/2021 to 04/15/2022

0044 Opt 8 SS Petersburg (4/16/2022 to 4/15/2023 LO Period of Performance: 04/16/2022 to 04/15/2023

004411 Berthage (4/16/2022 to 4/15/2023) Per diem 365 DA Period of Performance: 04/16/2022 to 04/15/2023

004412 Connect Cycle (4/16/2022 to 4/15/2023) 1 EA Period of Performance: 04/16/2022 to 04/15/2023

004413 Disconnect Cycle (4/16/2022 to 4/15/2023) 1 EA Period of Performance: 04/16/2022 to 04/15/2023

004414 Electrical Service (4/16/2022 to 4/15/2023) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2022 to 04/15/2023

004415 Water and Sewage Services (4/16/2022 to 4/15/2023 LO Period of Performance: 04/16/2022 to 04/15/2023

0045 Opt 9 SS Petersburg (4/16/2023 to 4/15/2024 LO Period of Performance: 04/16/2023 to 04/15/2024

004511 Berthage(4/16/2023 to 4/15/2024)Per diem 366 DA Period of Performance: 04/16/2023 to 04/15/2024

004512 Connect Cycle (4/16/2023 to 4/15/2024) 1 EA Period of Performance: 04/16/2023 to 04/15/2024

004513 Disconnect Cycle (4/16/2023 to 4/15/2024 1 EA Period of Performance: 04/16/2023 to 04/15/2024

004514 Electrical Service(4/16/2023 to 4/15/2024) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Period of Performance: 04/16/2023 to 04/15/2024

004515 Water and Sewage Services (4/16/2023 to 4/15/2024 LO Period of Performance: 04/16/2023 to 04/15/2024

0046 Cumulative total for SS Petersburg 5yr alt Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 21

22 100

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0006

(A) (B) (C) (D) (E) (F)

(4/16/2014 to 4/15/2019) Period of Performance: 04/16/2014 to 04/15/2019

0047 Cumulative total for Cape Horn & Hudson 5yr alt (4/16/2014 to 4/15/2019) Period of Performance: 04/16/2014 to 04/15/2019

0048 Cumulative total all three (3) vessels to include Cape Horn & Hudson and SS Petersburg 5yr alternate (4/16/2014 to 4/15/2019) Period of Performance: 04/16/2014 to 04/15/2019

0049 Offeror proposed cumulative electric alternate EA service charges amount (5Yr.alt) (3 vessel daily KWH usage X 1826 days X documented actual deliverable KWH cost) (4/16/2014 to 4/15/2019)

Period of Performance: 04/16/2014 to 04/15/2019

0050 Cumulative total for SS Petersburg 10yr alt (4/16/2014 to 4/15/2024)

0051 Cumulative total for Cape Horn & Hudson 10yr alt (4/16/2014 to 4/15/2024)

0052 Cumulative total for all three (3) vessels to include Cape Horn & Hudson and SS Petersburg 10yr alt (4/16/2014 to 4/15/2024)

0053 Offeror proposed cumulative electric alternate EA service charges amount (10Yr.alt) (3 vessel daily KWH usage X 3654 days X documented actual deliverable KWH cost) (4/16/2014 to 4/15/2024) Quantities for SubCLINS 00XX11 through 00XX13 are estimates only. Questions are due no later than Wednesday October 30th by 5:00 PM.

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 22

SECTION C – DESCRIPTIONS AND SPECIFICATIONS

C.1 INTRODUCTION AND BACKGROUND

The Maritime Administration (MARAD) requires services for the exclusive long-term safe layberthing for three (3) Government owned RRF vessels, CAPE HORN, CAPE HUDSON, and OPDS vessel PETERSBURG. The vessels are to be berthed on the U.S. West Coast between California to Washington inclusive of all navigable waterways that can support the safe berthing and navigation of the size vessel identified. Although the layberths are intended for the vessels identified in this contract, the Government may substitute vessels of a similar size or smaller. A Memorandum of Agreement (MOA) between the Department of the Defense (DoD) and the Department of Transportation (DOT) establishes that, in consideration of the National Defense and the American Merchant Marine, a mutual interest and responsibility exists for the joint establishment, maintenance and control of a Ready Reserve Force (RRF), which is an element of the National Defense Reserve Fleet (NDRF). The ships of the RRF are maintained by MARAD in various states of readiness to meet common user lift requirements of the armed services in a contingency. The RRF consists of 46 vessels as of July 28, 2012.

C.2 DEFINITIONS

Alternative Mooring Arrangement: A mooring plan that uses a combination of fixed berthing structures and anchors to moor vessels to meet the heavy weather mooring standard.

Apron: An area adjacent to and extending the length of the berth used for vehicle passage, material staging, parking of vehicles engaged in maintenance, repair, delivery of parts, etc.

Berth: Any designated place where a vessel is secured including the dock and slip, usually indicated by a code or name.

Contract Award Date: Designated in accordance with the contract provision "Period of Performance" found in Section F.

Contract Start Date: The date the berth must meet the contract's requirement. It is 120 days after the Contract Award Date unless the parties agree to an earlier date.

Dock: The structure located within the layberth facility having the mooring hardware for vessels, synonymous with pier and wharf.

Full service port complex: A Port area with maritime services available, including but not limited to ship repair facilities, availability of around the clock pilotage, bunker supply and delivery services, and ship assist tugs as specified in section C.4.(C).

Heavy Weather Mooring Plan: An analysis consisting of drawings and mooring calculations that combines vessel characteristics, existing or additional mooring points, effects of wind direction, wind speed, tides and currents proving that the vessel(s) can be safely moored permanently at the proposed layberth up to the maximum weather and wind conditions specified for the layberth geographical area.

Layberth: A berth used by a vessel for an extended period of time.

Non-resilient fenders: Structures with an outer layer of High Impact Ultra High Molecular Weight (UHMW) instead of elastic material (rubber or plastics) placed along the pier face to cushion the vessel and prevent hull-plating damage.

Ramp: The primary vehicular access way onto a RO/RO vessel that is characterized by the location of entry (stern ramp/side-port ramp).

Resilient fenders: Structures with an outer layer of elastic material (rubber or plastics) placed along the pier face to cushion the vessel and prevent hull-plating damage.

Slip: The water area of the layberth adjacent to the dock where the vessel is maneuvered during arrivals and departures.

Ship Manager/General Agent: The MARAD contractor for a designated group of MARAD vessels that is responsible for ship operation, maintenance, and activation readiness.

Vertical live loads: These are items moving or being caused to move over the dock.

Water level: The height of water above or below the datum reference point as predicted by local tide tables and affected by seasonal flooding or drought.

Working Area: The area of a dock adjacent to vessel to be used for deliveries, staging gear, and vehicle access.

C.3 STATUS OF VESSELS

(A) RRF vessels will normally be maintained in an idle status and will remain at the layberth site in all weather conditions, except to participate in a military exercise/operation, to conduct some repairs, or comply with periodic regulatory requirements. Ship activations and dock trials are expected to be conducted at the layberth.

(B) RRF vessels may have a reduced operating status crew onboard.

(C) The shipboard firefighting system may be inoperable.

(D) The cathodic protection systems will be energized.

(E) Interior house and engineering spaces may be dehumidified with ship's equipment.

(F) The mooring equipment will remain in operating condition. Mooring lines and wires will be provided by the Government or the Government's Ship Manager/General Agent for each vessel.

(G) The vessels may be used for cargo handling training and for other training purposes.

(H) The CAPE H vessels will be moored starboard side to the layberth because most mooring bitts, chocks and mooring winches are located on the starboard side and to accommodate placement of the stern ramp on the dock the stern ramp on the dock. The OPDS vessel may be moored either side to the layberth

(I) Ships shall be boomed or have booms available for deployment at all times. In circumstances where prevailing currents, tides, or vessel traffic preclude having booms continuously in place, the containment booms should be kept in readily deployable locations such as onboard or adjacent to the vessel. Booms are Government Furnished Equipment (GFE) provided to Ship Managers of outported ships. SOMO’s shall ensure services to deploy, maintain, adjust and replace booms as necessary and take appropriate actions to ensure funding is provided. Booms shall be deployed during fuel oil transfer and during ro/ro ramp operation and testing when there is the danger of a hydraulic oil leak. Area division business plans shall address funding for oil boom replacement as necessary.

C.4 BERTH REQUIREMENTS AND THE CONTRACTORS OBLIGATIONS

(A) The layberth Contractor shall bear all costs associated with obtaining and maintaining an acceptable safe layberth except as specifically identified. Some items are identified for emphasis only. An acceptable safe layberth shall meet the following minimum criteria and technical features:

1. The water depth, based on the National Oceanic and Atmospheric Administration (NOAA) chart datum for soundings, shall be at least four (4) feet greater than the estimated deep draft of the type of vessel to be located at the layberth (See Section J for ship dimensions). This depth shall be maintained the length and breadth of the proposed layberth, including the area needed to pull the vessel(s) away from the layberth with tugs, plus the access route from the layberth to the navigational channel, extending outward to the sea buoy, or pilot station, whichever is farther.