Cape_T's_Solicit_Doc_Final_.pdf

PDF 1 MB Posted

Attached to
long-term safe layberthing of three (3) Cape T class vessels in the U. S. Gulf Coast area
Solicitation number
DTMA-91-B-2013-0002
Issued by

About this file

DTMA-91-B-2013-0002 Cape Taylor Cape Texas and Cape Trinity Long-term Layberthing services solicitation document

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMA-91-B-2013-0002

SOLICITATION, OFFER AND AWARD

4. TYPE OF SOLICITATION2. CONTRACT NUMBER 3. SOLICITATION NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)

ORDER UNDER DPAS (15 CFR 700)

6. REQUISITION/PURCHASE NUMBER

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

NEGOTIATED (RFP)

SEALED BID (IFB)

5. DATE ISSUED

1. THIS CONTRACT IS A RATED RATING PAGE OF PAGES

1 98

C. E-MAIL ADDRESS

EXT.NUMBERAREA CODE

B. TELEPHONE (NO COLLECT CALLS)A. NAME

10. FOR

INFORMATION

CALL:

CAUTION: LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the

SOLICITATION

9. Sealed offers in original and

PART IV - REPRESENTATIONS AND INSTRUCTIONS

OTHER STATEMENTS OF OFFERORS

EVALUATION FACTORS FOR AWARD

INSTRS., CONDS., AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND

LIST OF ATTACHMENTS

CONTRACT CLAUSES

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

I

J

K

L

M SPECIAL CONTRACT REQUIREMENTS

CONTRACT ADMINISTRATION DATA

DELIVERIES OR PERFORMANCE

INSPECTION AND ACCEPTANCE

PACKAGING AND MARKING

DESCRIPTION/SPECS./WORK STATEMENT

SUPPLIES OR SERVICES AND PRICES/COSTS

SOLICITATION/CONTRACT FORM

PART II - CONTRACT CLAUSESPART I - THE SCHEDULE

H

G

F

E

D

C

B

A

SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)

11. TABLE OF CONTENTS

18. OFFER DATE17. SIGNATURE

SUCH ADDRESS IN SCHEDULE.

IS DIFFERENT FROM ABOVE - ENTER

15C. CHECK IF REMITTANCE ADDRESS

EXT.NUMBERAREA CODE

15B. TELEPHONE NUMBER

(Type or print)AND

ADDRESS

OF

OFFEROR

CODE FACILITY

16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER15A. NAME

DATEAMENDMENT NO.DATEAMENDMENT NO.

and related documents numbered and dated):

amendments to the SOLICITATION for offerors

(The offeror acknowledges receipt of

14. ACKNOWLEDGEMENT OF AMENDMENTS

CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)

(See Section I, Clause No. 52.232.8)

13. DISCOUNT FOR PROMPT PAYMENT

designated point(s), within the time specified in the schedule.

by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the

12. In compliance with the above, the undersigned agrees, if this offer is accepted within ______________ calendar days (60 calendar days unless a different period is inserted

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

28. AWARD DATE

(Signature of Contracting Officer)

27. UNITED STATES OF AMERICA

25. PAYMENT WILL BE MADE BY

26. NAME OF CONTRACTING OFFICER (Type or print)

CODE 24. ADMINISTERED BY (If other than Item 7)

ITEM

(4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

41 U.S.C. 253 (c) ( 10 U.S.C. 2304 (c) (

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

21. ACCOUNTING AND APPROPRIATION20. AMOUNT19. ACCEPTED AS TO ITEMS NUMBERED

AWARD (To be completed by government)

CODE

06/07/2013X

00091

U.S. DOT/ Maritime Administration Office of Acquisition MAR-380

1200 NEW JERSEY AVENUE SE

MAIL STOP W-28-201

WASHINGTON DC 20590-0001

1400 ET 07/16/2013

Wilbur Turner 202 wilbur.turner@dot.gov

366-0700

X

X

X

X

X

X

X

X

X

X

X

X

X

PAGE(S)

Benedict J. Burnowski

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

STANDARD FORM 33 (Rev. 9-97)

Prescribed by GSA - FAR (48 CFR) 53.214(c)

2-29

30-42 44-46 47-48 49-51 52-57

58-80

81-90

91-92

93-94

95-98

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

FOB: Destination Period of Performance: 03/21/2014 to 03/20/2024

0001 Vessel Cape Taylor Base Year 5yr. Alt. (3/21/2014 LO to 3/20/2015) This vessel has the characteristics of a Cape T vessel

0001AA Berthage (3/21/2014 to 3/20/2015) Per diem DA charges for layberthing services as set forth in the statement of work

0001AB Connect Cycle (3/21/2014 to 3/20/2015) A complete EA connect cycle for ship to shore Electric Power, Potable Water and telephones. Additional cycles may be ordered at price given for this subline item.

0001AC Disconnect Cycle (3/21/2014 to 3/20/2015) A EA complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0001AD Electrical Service (3/21/2014 to 3/20/2015) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0001AE Water and Sewage Services (3/21/2014 to 3/20/2015) LO Reimbursable water and sewage usage

0002 Vessel Cape Taylor Option Year 1 (3/21/2015 to LO 3/20/2016) This vessel has the characteristics of a Cape T vessel

0002AA Berthage (3/21/2015 to 3/20/2016) Per diem DA charges for layberthing services as set forth in the statement of work

0002AB Connect Cycle (3/21/2015 to 3/20/2016) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0002AC Disconnect Cycle (3/21/2015 to 3/20/2016) EA A complete disconnect cycle for ship to shore Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

NSN 7540-01-152-8067 2

3 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0002AD Electrical Service (3/21/2015 to 3/20/2016) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0002AE Water and Sewage Services (3/21/2015 to 3/20/2016) LO Reimbursable water and sewage usage

0003 Vessel Cape Taylor Option Year 2 (3/21/2016 to LO 3/20/2017) This vessel has the characteristics of a Cape T vessel

0003AA Berthage (3/21/2016 to 3/20/2017) Per diem DA charges for layberthing services as set forth in the statement of work

0003AB Connect Cycle (3/21/2016 to 3/20/2017) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0003AC Disconnect Cycle (3/21/2016 to 3/20/2017) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0003AD Electrical Service (3/21/2016 to 3/20/2017) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0003AE Water and Sewage Services (3/21/2016 to 3/20/2017) LO Reimbursable water and sewage usage

0004 Vessel Cape Taylor Option Year 3 (3/21/2017 to LO 3/20/2018) This vessel has the characteristics of a Cape T vessel

0004AA Berthage (3/21/2017 to 3/20/2018) Per diem DA charges for layberthing services as set forth in Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 3

4 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F) the statement of work

0004AB Connect Cycle (3/21/2017 to 3/20/2018) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0004AC Disconnect Cycle (3/21/2017 to 3/20/2018) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0004AD Electrical Service (3/21/2017 to 3/20/2018) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0004AE Water and Sewage Services (3/21/2017 to 3/20/2018) LO Reimbursable water and sewage usage

0005 Vessel Cape Taylor Option Year 4 (3/21/2018 to LO 3/20/2019) This vessel has the characteristics of a Cape T vessel

0005AA Berthage (3/21/2018 to 3/20/2019) Per diem DA charges for layberthing services as set forth in the statement of work

0005AB Connect Cycle (3/21/2018 to 3/20/2019) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0005AC Disconnect Cycle (3/21/2018 to 3/20/2019) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0005AD Electrical Service (3/21/2018 to 3/20/2019) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 4

5 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

0005AE Water and Sewage Services (3/21/2018 to 3/20/2019) LO Reimbursable water and sewage usage

0006 Vessel Cape Texas Base Year 5yr. Alt. (3/21/2014 LO to 3/20/2015) This vessel has the characteristics of a Cape T vessel

0006AA Berthage (3/21/2014 to 3/20/2015) Per diem DA charges for layberthing services as set forth in the statement of work

0006AB Connect Cycle (3/21/2014 to 3/20/2015) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0006AC Disconnect Cycle (3/21/2014 to 3/20/2015) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0006AD Electrical Service (3/21/2014 to 3/20/2015) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0006AE Water and Sewage Services (3/21/2014 to 3/20/2015) LO Reimbursable water and sewage usage

0007 Vessel Cape Texas Option Year 1 (3/21/2015 to LO 3/20/2016) This vessel has the characteristics of a Cape T vessel

0007AA Berthage (3/21/2015 to 3/20/2016) Per diem DA charges for layberthing services as set forth in the statement of work

0007AB Connect Cycle (3/21/2015 to 3/20/2016) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0007AC Disconnect Cycle (3/21/2015 to 3/20/2016) EA A complete disconnect cycle for ship to shore Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 5

6 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0007AD Electrical Service (3/21/2015 to 3/20/2016) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0007AE Water and Sewage Services (3/21/2015 to 3/20/2016) LO Reimbursable water and sewage usage

0008 Vessel Cape Texas Option Year 2 (3/21/2016 to LO 3/20/2017) This vessel has the characteristics of a Cape T vessel

0008AA Berthage (3/21/2016 to 3/20/2017) Per diem DA charges for layberthing services as set forth in the statement of work

0008AB Connect Cycle (3/21/2016 to 3/20/2017) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0008AC Disconnect Cycle (3/21/2016 to 3/20/2017) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0008AD Electrical Service (3/21/2016 to 3/20/2017) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0008AE Water and Sewage Services (3/21/2016 to 3/20/2017) LO Reimbursable water and sewage usage

0009 Vessel Cape Texas Option Year 3 (3/21/2017 to LO 3/20/2018) This vessel has the characteristics of a Cape T vessel

0009AA Berthage (3/21/2017 to 3/20/2018) Per diem DA charges for layberthing services as set forth in Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 6

7 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F) the statement of work

0009AB Connect Cycle (3/21/2017 to 3/20/2018) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0009AC Disconnect Cycle (3/21/2017 to 3/20/2018) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0009AD Electrical Service (3/21/2017 to 3/20/2018) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0009AE Water and Sewage Services (3/21/2017 to 3/20/2018) LO Reimbursable water and sewage usage

0010 Vessel Cape Texas Option Year 4 (3/21/2018 to LO 3/20/2019) This vessel has the characteristics of a Cape T vessel

0010AA Berthage (3/21/2018 to 3/20/2019) Per diem DA charges for layberthing services as set forth in the statement of work

0010AB Connect Cycle (3/21/2018 to 3/20/2019) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0010AC Disconnect Cycle (3/21/2018 to 3/20/2019) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0010AD Electrical Service(3/21/2018 to 3/20/2019) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 7

8 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

0010AE Water and Sewage Services (3/21/2018 to 3/20/2019) LO Reimbursable water and sewage usage

0011 Vessel Cape Trinity Base Year 5yr. Alt. LO (3/21/2014 to 3/20/2015) This vessel has the characteristics of a Cape T vessel

0011AA Berthage (3/21/2014 to 3/20/2015) Per diem DA charges for layberthing services as set forth in the statement of work

0011AB Connect Cycle (3/21/2014 to 3/20/2015) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0011AC Disconnect Cycle (3/21/2014 to 3/20/2015) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0011AD Electrical Service (3/21/2014 to 3/20/2015) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0011AE Water and Sewage Services (3/21/2014 to 3/20/2015) LO Reimbursable water and sewage usage

0012 Vessel Cape Trinity Option Year 1 (3/21/2015 to LO 3/20/2016) This vessel has the characteristics of a Cape T vessel

0012AA Berthage (3/21/2015 to 3/20/2016) Per diem DA charges for layberthing services as set forth in the statement of work

0012AB Connect Cycle (3/21/2015 to 3/20/2016) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0012AC Disconnect Cycle (3/21/2015 to 3/20/2016) EA A complete disconnect cycle for ship to shore Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 8

9 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0012AD Electrical Service (3/21/2015 to 3/20/2016) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0012AE Water and Sewage Services (3/21/2015 to 3/20/2016) LO Reimbursable water and sewage usage

0013 Vessel Cape Trinity Option Year 2 (3/21/2016 to LO 3/20/2017) This vessel has the characteristics of a Cape T vessel

0013AA Berthage (3/21/2016 to 3/20/2017) Per diem DA charges for layberthing services as set forth in the statement of work

0013AB Connect Cycle (3/21/2016 to 3/20/2017) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0013AC Disconnect Cycle (3/21/2016 to 3/20/2017) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0013AD Electrical Service (3/21/2016 to 3/20/2017) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0013AE Water and Sewage Services (3/21/2016 to 3/20/2017) LO Reimbursable water and sewage usage

0014 Vessel Cape Trinity Option Year 3 (3/21/2017 to LO 3/20/2018) This vessel has the characteristics of a Cape T vessel

0014AA Berthage (3/21/2017 to 3/20/2018) Per diem DA charges for layberthing services as set forth in Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 9

10 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F) the statement of work

0014AB Connect Cycle (3/21/2017 to 3/20/2018) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0014AC Disconnect Cycle (3/21/2017 to 3/20/2018) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0014AD Electrical Service (3/21/2017 to 3/20/2018) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0014AE Water and Sewage Services (3/21/2017 to 3/20/2018) LO Reimbursable water and sewage usage

0015 Vessel Cape Trinity Option Year 4 (3/21/2018 to LO 3/20/2019) This vessel has the characteristics of a Cape T vessel

0015AA Berthage (3/21/2018 to 3/20/2019) Per diem DA charges for layberthing services as set forth in the statement of work

0015AB Connect Cycle (3/21/2018 to 3/20/2019) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0015AC Disconnect Cycle (3/21/2018 to 3/20/2019) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0015AD Electrical Service (3/21/2018 to 3/20/2019) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one) Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 10

11 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

0015AE Water and Sewage Services (3/21/2018 to 3/20/2019) LO Reimbursable water and sewage usage

0016 Vessel Cape Taylor Base Year 10yr.Alt. (3/21/2014 LO to 3/20/2015) This vessel has the characteristics of a Cape T vessel

0016AA Berthage (3/21/2014 to 3/20/2015) Per diem DA charges for layberthing services as set forth in the statement of work

0016AB Connect Cycle (3/21/2014 to 3/20/2015) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0016AC Disconnect Cycle (3/21/2014 to 3/20/2015) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0016AD Electrical Service (3/21/2014 to 3/20/2015) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0016AE Water and Sewage Services (3/21/2014 to 3/20/2015) LO Reimbursable water and sewage usage

0017 Vessel Cape Taylor Option Year 1 (3/21/2015 to LO 3/20/2016) This vessel has the characteristics of a Cape T vessel

0017AA Berthage (3/21/2015 to 3/20/2016) Per diem DA charges for layberthing services as set forth in the statement of work

0017AB Connect Cycle (3/21/2015 to 3/20/2016) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0017AC Disconnect Cycle (3/21/2015 to 3/20/2016) EA Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 11

12 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0017AD Electrical Service (3/21/2015 to 3/20/2016) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0017AE Water and Sewage Services (3/21/2015 to 3/20/2016) LO Reimbursable water and sewage usage

0018 Vessel Cape Taylor Option Year 2 (3/21/2016 to LO 3/20/2017) This vessel has the characteristics of a Cape T vessel

0018AA Berthage (3/21/2016 to 3/20/2017) Per diem DA charges for layberthing services as set forth in the statement of work

0018AB Connect Cycle (3/21/2016 to 3/20/2017) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0018AC Disconnect Cycle (3/21/2016 to 3/20/2017) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0018AD Electrical Service (3/21/2016 to 3/20/2017) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0018AE Water and Sewage Services (3/21/2016 to 3/20/2017) LO Reimbursable water and sewage usage

0019 Vessel Cape Taylor Option Year 3 (3/21/2017 to LO 3/20/2018) This vessel has the characteristics of a Cape T vessel

0019AA Berthage (3/21/2017 to 3/20/2018) Per diem DA Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 12

13 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F) charges for layberthing services as set forth in the statement of work

0019AB Connect Cycle (3/21/2017 to 3/20/2018) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0019AC Disconnect Cycle (3/21/2017 to 3/20/2018) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0019AD Electrical Service (3/21/2017 to 3/20/2018) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0019AE Water and Sewage Services (3/21/2017 to 3/20/2018) LO Reimbursable water and sewage usage

0020 Vessel Cape Taylor Option Year 4 (3/21/2018 to LO 3/20/2019) This vessel has the characteristics of a Cape T vessel

0020AA Berthage (3/21/2018 to 3/20/2019) Per diem DA charges for layberthing services as set forth in the statement of work

0020AB Connect Cycle (3/21/2018 to 3/20/2019) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0020AC Disconnect Cycle (3/21/2018 to 3/20/2019) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0020AD Electrical Service (3/21/2018 to 3/20/2019) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 13

14 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F) one)

0020AE Water and Sewage Services (3/21/2018 to 3/20/2019) LO Reimbursable water and sewage usage

0021 Vessel Cape Taylor Option Year 5 (3/21/2019 to LO 3/20/2020) This vessel has the characteristics of a Cape T vessel

0021AA Berthage (3/21/2019 to 3/20/2020) Per diem DA charges for layberthing services as set forth in the statement of work

0021AB Connect Cycle (3/21/2019 to 3/20/2020) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0021AC Disconnect Cycle (3/21/2019 to 3/20/2020) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0021AD Electrical Service (3/21/2019 to 3/20/2020) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0021AE Water and Sewage Services (3/21/2019 to 3/20/2020) LO Reimbursable water and sewage usage

0022 Vessel Cape Taylor Option Year 6 (3/21/2020 to LO 3/20/2021) This vessel has the characteristics of a Cape T vessel

0022AA Berthage (3/21/2020 to 3/20/2021) Per diem DA charges for layberthing services as set forth in the statement of work

0022AB Connect Cycle (3/21/2020 to 3/20/2021) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 14

15 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

0022AC Disconnect Cycle (3/21/2020 to 3/20/2021) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0022AD Electrical Service (3/21/2020 to 3/20/2021) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0022AE Water and Sewage Services (3/21/2020 to 3/20/2021) LO Reimbursable water and sewage usage

0023 Vessel Cape Taylor Option Year 7 (3/21/2021 to LO 3/20/2022) This vessel has the characteristics of a Cape T vessel

0023AA Berthage (3/21/2021 to 3/20/2022) Per diem DA charges for layberthing services as set forth in the statement of work

0023AB Connect Cycle (3/21/2021 to 3/20/2022) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0023AC Disconnect Cycle (3/21/2021 to 3/20/2022) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0023AD Electrical Service (3/21/2021 to 3/20/2022) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0023AE Water and Sewage Services (3/21/2021 to 3/20/2022) LO Reimbursable water and sewage usage

0024 Vessel Cape Taylor Option Year 8 (3/21/2022 to LO 3/20/2023) This vessel has the characteristics of a Cape T vessel

Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 15

16 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

0024AA Berthage (3/21/2022 to 3/20/2023) Per diem DA charges for layberthing services as set forth in the statement of work

0024AB Connect Cycle (3/21/2022 to 3/20/2023) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0024AC Disconnect Cycle (3/21/2022 to 3/20/2023) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0024AD Electrical Service (3/21/2022 to 3/20/2023) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0024AE Water and Sewage Services (3/21/2022 to 3/20/2023) LO Reimbursable water and sewage usage

0025 Vessel Cape Taylor Option Year 9 (3/21/2023 to LO 3/20/2024) This vessel has the characteristics of a Cape T vessel

0025AA Berthage (3/21/2023 to 3/20/2024) Per diem DA charges for layberthing services as set forth in the statement of work

0025AB Connect Cycle (3/21/2023 to 3/20/2024) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0025AC Disconnect Cycle (3/21/2023 to 3/20/2024) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0025AD Electrical Service (3/21/2023 to 3/20/2024) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 16

17 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F) exempt taxes from electric service charges (check one)

0025AE Water and Sewage Services (3/21/2023 to 3/20/2024) LO Reimbursable water and sewage usage

0026 Vessel Cape Texas Base Year 10yr.Alt. (3/21/2014 LO to 3/20/2015) This vessel has the characteristics of a Cape T vessel

0026AA Berthage (3/21/2014 to 3/20/2015) Per diem DA charges for layberthing services as set forth in the statement of work

0026AB Connect Cycle (3/21/2014 to 3/20/2015) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0026AC Disconnect Cycle (3/21/2014 to 3/20/2015) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0026AD Electrical Service (3/21/2014 to 3/20/2015) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0026AE Water and Sewage Services (3/21/2014 to 3/20/2015) LO Reimbursable water and sewage usage

0027 Vessel Cape Texas Option Year 1 (3/21/2015 to LO 3/20/2016) This vessel has the characteristics of a Cape T vessel

0027AA Berthage (3/21/2015 to 3/20/2016) Per diem DA charges for layberthing services as set forth in the statement of work

0027AB Connect Cycle (3/21/2015 to 3/20/2016) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 17

18 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

0027AC Disconnect Cycle (3/21/2015 to 3/20/2016) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0027AD Electrical Service (3/21/2015 to 3/20/2016) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0027AE Water and Sewage Services (3/21/2015 to 3/20/2016) LO Reimbursable water and sewage usage

0028 Vessel Cape Texas Option Year 2 (3/21/2016 to LO 3/20/2017) This vessel has the characteristics of a Cape T vessel

0028AA Berthage (3/21/2016 to 3/20/2017) Per diem DA charges for layberthing services as set forth in the statement of work

0028AB Connect Cycle (3/21/2016 to 3/20/2017) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0028AC Disconnect Cycle (3/21/2016 to 3/20/2017) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0028AD Electrical Service (3/21/2016 to 3/20/2017) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0028AE Water and Sewage Services (3/21/2016 to 3/20/2017) LO Reimbursable water and sewage usage

0029 Vessel Cape Texas Option Year 3 (3/21/2017 to LO 3/20/2018) This vessel has the characteristics of a Cape T vessel Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 18

19 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

0029AA Berthage (3/21/2017 to 3/20/2018) Per diem DA charges for layberthing services as set forth in the statement of work

0029AB Connect Cycle (3/21/2017 to 3/20/2018) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0029AC Disconnect Cycle (3/21/2017 to 3/20/2018) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0029AD Electrical Service (3/21/2017 to 3/20/2018) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0029AE Water and Sewage Services (3/21/2017 to 3/20/2018) LO Reimbursable water and sewage usage

0030 Vessel Cape Texas Option Year 4 (3/21/2018 to LO 3/20/2019) This vessel has the characteristics of a Cape T vessel

0030AA Berthage (3/21/2018 to 3/20/2019) Per diem DA charges for layberthing services as set forth in the statement of work

0030AB Connect Cycle (3/21/2018 to 3/20/2019) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0030AC Disconnect Cycle (3/21/2018 to 3/20/2019) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0030AD Electrical Service (3/21/2018 to 3/20/2019) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 19

20 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F) exempt taxes from electric service charges (check one)

0030AE Water and Sewage Services (3/21/2018 to 3/20/2019) LO Reimbursable water and sewage usage

0031 Vessel Cape Texas Option Year 5 (3/21/2019 to LO 3/20/2020) This vessel has the characteristics of a Cape T vessel

0031AA Berthage (3/21/2019 to 3/20/2020) Per diem DA charges for layberthing services as set forth in the statement of work

0031AB Connect Cycle (3/21/2019 to 3/20/2020) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0031AC Disconnect Cycle (3/21/2019 to 3/20/2020) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0031AD Electrical Service (3/21/2019 to 3/20/2020) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0031AE Water and Sewage Services (3/21/2019 to 3/20/2020) LO Reimbursable water and sewage usage

0032 Vessel Cape Texas Option Year 6 (3/21/2020 to LO 3/20/2021) This vessel has the characteristics of a Cape T vessel

0032AA Berthage (3/21/2020 to 3/20/2021) Per diem DA charges for layberthing services as set forth in the statement of work

0032AB Connect Cycle (3/21/2020 to 3/20/2021) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 20

21 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

0032AC Disconnect Cycle (3/21/2020 to 3/20/2021) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0032AD Electrical Service (3/21/2020 to 3/20/2021) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0032AE Water and Sewage Services (3/21/2020 to 3/20/2021) LO Reimbursable water and sewage usage

0033 Vessel Cape Texas Option Year 7 (3/21/2021 to LO 3/20/2022) This vessel has the characteristics of a Cape T vessel

0033AA Berthage (3/21/2021 to 3/20/2022) Per diem DA charges for layberthing services as set forth in the statement of work

0033AB Connect Cycle (3/21/2021 to 3/20/2022) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0033AC Disconnect Cycle (3/21/2021 to 3/20/2022) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0033AD Electrical Service (3/21/2021 to 3/20/2022) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0033AE Water and Sewage Services (3/21/2021 to 3/20/2022) LO Reimbursable water and sewage usage

0034 Vessel Cape Texas Option Year 8 (3/21/2022 to LO 3/20/2023) This vessel has the characteristics of a Cape T vessel Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 21

22 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

0034AA Berthage (3/21/2022 to 3/20/2023) Per diem DA charges for layberthing services as set forth in the statement of work

0034AB Connect Cycle (3/21/2022 to 3/20/2023) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0034AC Disconnect Cycle (3/21/2022 to 3/20/2023) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0034AD Electrical Service (3/21/2022 to 3/20/2023) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0034AE Water and Sewage Services (3/21/2022 to 3/20/2023) LO Reimbursable water and sewage usage

0035 Vessel Cape Texas Option Year 9 (3/21/2023 to LO 3/20/2024) This vessel has the characteristics of a Cape T vessel

0035AA Berthage (3/21/2023 to 3/20/2024) Per diem DA charges for layberthing services as set forth in the statement of work

0035AB Connect Cycle (3/21/2023 to 3/20/2024) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0035AC Disconnect Cycle (3/21/2023 to 3/20/2024) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0035AD Electrical Service (3/21/2023 to 3/20/2024) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 22

23 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F) exempt taxes from electric service charges (check one)

0035AE Water and Sewage Services (3/21/2023 to 3/20/2024) LO Reimbursable water and sewage usage

0036 Vessel Cape Trinity Base Year 10yr.Alt. LO (3/21/2014 to 3/20/2015) This vessel has the characteristics of a Cape T vessel

0036AA Berthage (3/21/2014 to 3/20/2015) Per diem DA charges for layberthing services as set forth in the statement of work

0036AB Connect Cycle (3/21/2014 to 3/20/2015) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0036AC Disconnect Cycle (3/21/2014 to 3/20/2015) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0036AD Electrical Service (3/21/2014 to 3/20/2015) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0036AE Water and Sewage Services (3/21/2014 to 3/20/2015) LO Reimbursable water and sewage usage

0037 Vessel Cape Trinity Option Year 1 (3/21/2015 to LO 3/20/2016) This vessel has the characteristics of a Cape T vessel

0037AA Berthage (3/21/2015 to 3/20/2016) Per diem DA charges for layberthing services as set forth in the statement of work

0037AB Connect Cycle (3/21/2015 to 3/20/2016) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 23

24 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

0037AC Disconnect Cycle (3/21/2015 to 3/20/2016) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0037AD Electrical Service (3/21/2015 to 3/20/2016) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0037AE Water and Sewage Services (3/21/2015 to 3/20/2016) LO Reimbursable water and sewage usage

0038 Vessel Cape Trinity Option Year 2 (3/21/2016 to LO 3/20/2017) This vessel has the characteristics of a Cape T vessel

0038AA Berthage (3/21/2016 to 3/20/2017) Per diem DA charges for layberthing services as set forth in the statement of work

0038AB Connect Cycle (3/21/2016 to 3/20/2017) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0038AC Disconnect Cycle (3/21/2016 to 3/20/2017) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0038AD Electrical Service (3/21/2016 to 3/20/2017) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0038AE Water and Sewage Services (3/21/2016 to 3/20/2017) LO Reimbursable water and sewage usage

0039 Vessel Cape Trinity Option Year 3 (3/21/2017 to LO 3/20/2018) This vessel has the characteristics of a Cape T Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 24

25 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F) vessel

0039AA Berthage (3/21/2017 to 3/20/2018) Per diem DA charges for layberthing services as set forth in the statement of work

0039AB Connect Cycle (3/21/2017 to 3/20/2018) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0039AC Disconnect Cycle (3/21/2017 to 3/20/2018) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0039AD Electrical Service (3/21/2017 to 3/20/2018) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0039AE Water and Sewage Services (3/21/2017 to 3/20/2018) LO Reimbursable water and sewage usage

0040 Vessel Cape Trinity Option Year 4 (3/21/2018 to LO 3/20/2019) This vessel has the characteristics of a Cape T vessel

0040AA Berthage (3/21/2018 to 3/20/2019) Per diem DA charges for layberthing services as set forth in the statement of work

0040AB Connect Cycle (3/21/2018 to 3/20/2019) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0040AC Disconnect Cycle (3/21/2018 to 3/20/2019) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0040AD Electrical Service (3/21/2018 to 3/20/2019) DA Reimbursable electrical power usage Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 25

26 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F)

Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0040AE Water and Sewage Services (3/21/2018 to 3/20/2019) LO Reimbursable water and sewage usage

0041 Vessel Cape Trinity Option Year 5 (3/21/2019 to LO 3/20/2020) This vessel has the characteristics of a Cape T vessel

0041AA Berthage (3/21/2019 to 3/20/2020) Per diem DA charges for layberthing services as set forth in the statement of work

0041AB Connect Cycle (3/21/2019 to 3/20/2020) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0041AC Disconnect Cycle (3/21/2019 to 3/20/2020) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0041AD Electrical Service (3/21/2019 to 3/20/2020) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0041AE Water and Sewage Services (3/21/2019 to 3/20/2020) LO Reimbursable water and sewage usage

0042 Vessel Cape Trinity Option Year 6 (3/21/2020 to LO 3/20/2021) This vessel has the characteristics of a Cape T vessel

0042AA Berthage (3/21/2020 to 3/20/2021) Per diem DA charges for layberthing services as set forth in the statement of work

0042AB Connect Cycle (3/21/2020 to 3/20/2021) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 26

27 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F) for this subline item.

0042AC Disconnect Cycle (3/21/2020 to 3/20/2021) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0042AD Electrical Service (3/21/2020 to 3/20/2021) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0042AE Water and Sewage Services (3/21/2020 to 3/20/2021) LO Reimbursable water and sewage usage

0043 Vessel Cape Trinity Option Year 7 (3/21/2021 to LO 3/20/2022) This vessel has the characteristics of a Cape T vessel

0043AA Berthage (3/21/2021 to 3/20/2022) Per diem DA charges for layberthing services as set forth in the statement of work

0043AB Connect Cycle (3/21/2021 to 3/20/2022) EA A complete connect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0043AC Disconnect Cycle (3/21/2021 to 3/20/2022) EA A complete disconnect cycle for ship to shore Electric Power, Potable Water and telephones.

Additional cycles may be ordered at price given for this subline item.

0043AD Electrical Service (3/21/2021 to 3/20/2022) DA Reimbursable electrical power usage Utility company_____ exempts _______ will not exempt taxes from electric service charges (check one)

0043AE Water and Sewage Services (3/21/2021 to 3/20/2022) LO Reimbursable water and sewage usage

0044 Vessel Cape Trinity Option Year 8 (3/21/2022 to LO 3/20/2023) This vessel has the characteristics of a Cape T Continued ...

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

NSN 7540-01-152-8067 27

28 98

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTMA-91-B-2013-0002

(A) (B) (C) (D) (E) (F) vessel

0044AA Berthage (3/21/2022 to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .