Results_of_Bid_Opening_-_Schedule_A&B_-_NP-HOSP_10(4).pdf
PDF 28 KB Posted
- Attached to
- Hot Springs National Park 10(4)
- Solicitation number
- DTFH71-17-B-00022
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Report_Pavement_Condition_Survey.pdf | ||
| IFB_Solicitation_-_NP-HOSP_10(4).pdf | ||
| FP14_Eng.pdf | ||
| Plans_-_NP-HOSP_10(4).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| VETS-4212_-_Form.pdf | ||
| Report_NEPA.pdf | ||
| Synopsis_-_NP-HOSP_10(4).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration
Eastern Federal Lands Highway Division
Bid Opening for
Hot Springs National Park
PROJECT: NP-HOSP 10(4)
SOLICITATION NO. DTFH71-17-B-00022
May 16, 2017 at 2:00 p.m.
Sterling, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. DTFH71-17-B-00022 Project: NP-HOSP 10(4) May 16, 2017, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Aspen Construction Company SCHEDULE A
$851,855.00
OPTION 1
$166,637.00
SCHEDULE A + OPTION 1
$1,018,492.00
Construction Solutions Group
LLC
SCHEDULE A
$839,050.65
$152,600.00
$991,650.65
Randy Kinder Excavating, Inc. SCHEDULE A
$593,489.60
$94,713.90
$688,203.50
Engineers Estimate SCHEDULE A
$550,000.00
OPTION 1
$100,000.00
$650,000.00
ALL WORK MUST BE COMPLETED BY NOVEMBER 22, 2017
| Slide Number 1 |
| FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. DTFH71-17-B-00022 Project: NP-HOSP 10(4)�May 16, 2017, 2:00 p.m. local time � |
File details come from the government source that posted it. Updated .