Report - Pavement Cores

View the file

Other files

File Type Posted
ROBO_-_NP-OCMU_10(2).pdf PDF
Report_NEPA.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
FP14_Eng.pdf PDF
Plans_-_NP-OCMU_10(2).pdf PDF
IFB_Solicitation_-_NP-OCMU_10(2).pdf PDF
Appendix_Government_Railroad_Agreement.pdf PDF
VETS-4212_-_Form.pdf PDF
Synopsis_NP-OCMU_10(2).doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Core Results and Location Map

Core # Location AC Thickness Base Subgrade C-01 STA 111+00 4.0 Prime coat Red sandy clay C-02 STA 126+00 4.0 Prime coat Red sandy clay C-03 STA 139+00 4.0 Prime coat Red-orange sandy clay C-04 STA 153+00 3.5 Prime coat Red-orange sandy clay C-05 STA 168+00 3.5 Prime coat Red sandy clay C-06 Route 905 3.25 6.5 GAB Orange-brown sandy clay C-07 Route 904 3.75 --- Red-brown sandy clay C-08 Bus Turnaround 3.0 10 GAB Red sandy clay C-09 Route 902 2.75 6.5 GAB Red sandy clay C-10 Route 400 3.25 --- Red-orange sandy clay

Project Photos

Route 10 – Typical Existing Conditions

High Severity Transverse Cracking

Longitudinal Cracking

Block Cracking

Parking Area – Typical Existing Conditions

Route 400 – Typical Existing Conditions

1993 AASHTO Pavement Design

DARWin Pavement Design and Analysis System A Proprietary AASHTOWare Computer Software Product

Flexible Structural Design Module 6" FDR and AC overlay

Flexible Structural Design

18-kip ESALs Over Initial Performance Period 104,161 Initial Serviceability 4.2 Terminal Serviceability 2 Reliability Level 75 % Overall Standard Deviation 0.49 Roadbed Soil Resilient Modulus 15,000 psi Stage Construction 1

Calculated Design Structural Number 1.64 in

Rigorous ESAL Calculation

Performance Period (years) 25 Two-Way Traffic (ADT) 117 Number of Lanes in Design Direction 1 Percent of All Trucks in Design Lane 100 % Percent Trucks in Design Direction 100 %

Vehicle Class

Percent of

ADT

Annual

Growth

Average Initial Truck Factor

(ESALs/ Truck)

Annual % Growth in

Truck Factor

Accumulated 18-kip ESALs over Performance Period

1 89.5 2 0.0007 0 830 2 5 2 0.3 0 19,871 3 5 2 1.2 0 79,486 4 0.5 2 0.6 0 3,974

Total 100 - - - 104,161

Growth Simple

Total Calculated Cumulative ESALs 104,161

Specified Layer Design

Layer Material Description

Struct Coef.

(Ai)

Drain Coef.

(Mi)

Thickness (Di)(in)

Width (ft)

Calculated SN (in)

1 AC Pavement 0.42 1 2 10 0.84 2 FDR with cement 0.25 1 6 10 1.50

Total - - - 8.00 - 2.34

1993 AASHTO Pavement Design

DARWin Pavement Design and Analysis System A Proprietary AASHTOWare Computer Software Product

Flexible Structural Design Module

1.5 inch Mill and Overlay

Flexible Structural Design

18-kip ESALs Over Initial Performance Period 79,969 Initial Serviceability 4.2 Terminal Serviceability 2 Reliability Level 75 % Overall Standard Deviation 0.49 Roadbed Soil Resilient Modulus 15,000 psi Stage Construction 1

Calculated Design Structural Number 1.56 in

Rigorous ESAL Calculation

Performance Period (years) 20 Two-Way Traffic (ADT) 117 Number of Lanes in Design Direction 1 Percent of All Trucks in Design Lane 100 % Percent Trucks in Design Direction 100 %

Vehicle Class

Percent of

ADT

Annual

Growth

Average Initial Truck Factor

(ESALs/ Truck)

Annual % Growth in

Truck Factor

Accumulated 18-kip ESALs over Performance Period

1 89.5 2 0.0007 0 637 2 5 2 0.3 0 15,256 3 5 2 1.2 0 61,025 4 0.5 2 0.6 0 3,051

Total 100 - - - 79,969

Growth Simple

Total Calculated Cumulative ESALs 79,969

Specified Layer Design

Layer Material Description

Struct Coef.

(Ai)

Drain Coef.

(Mi)

Thickness (Di)(in)

Width (ft)

Calculated SN (in)

1 AC Pavement 0.42 1 2 10 0.84 2 Milled AC Pavement 0.3 1 2.5 10 0.75

Total - - - 4.50 - 1.59